Loading...
HomeMy WebLinkAboutPW Southern Heights Bridge Replacement; Amendment 4FOURTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH MARK THOMAS & COMPANY, INC. FOR PROFESSIONAL SERVICES FOR THE SOUTHERN HEIGHTS BRIDGE REPLACEMENT PROJECT THIS FOURTH AMENDMENT to the Professional Services Agreement by and between the CITY OF SAN RAFAEL (hereinafter "CITY"), and MARK THOMAS & COMPANY, INC., (hereinafter "CONSULTANT"), is made and entered into as of the ,,A— day of , 2021. RECITALS WHEREAS, pursuant to City Council Resolution #14129, the CITY and CONSULTANT entered into a Professional Services Agreement on June 7, 2016, for preliminary engineering and public outreach in connection with CITY'S Southern Heights Bridge Replacement project, for an amount not to exceed $241,568 (the "Agreement"); and WHEREAS, pursuant to City Council Resolution #14439, the CITY and CONSULTANT entered into a First Amendment to the Agreement dated December 26, 2017, to perform final design and right of way services for an amount not to exceed $343,499 and increasing the total not to exceed amount under the Agreement to $585,067; and WHEREAS, pursuant to City Council Resolution #14634, the CITY and CONSULTANT entered into a Second Amendment to the Agreement dated February 8, 2019, to perform additional final design and right of way services for an amount not to exceed $132,777 and increasing the total not to exceed amount under the Agreement to $717,844; and WHEREAS, pursuant to City Council Resolution #14826 on June 15, 2020, the CITY and CONSULTANT entered into a Third Amendment to the Agreement dated 2020, for construction support and additional right of way services for an amount not to exceed $180,198 and increasing the total not to exceed amount under the Agreement to $898,042; and WHEREAS, the City requires a slope stability analysis for the slope under the newly constructed Southern Heights Bridge; and WHERAS, staff received a proposal from Mark Thomas & Company, Inc. (Exhibit A) for said services in a total amount not to exceed $51,789 for the fourth amendment and staff has reviewed the proposal and found it complete and within industry standards; I AMENDMENT TO AGREEMENT NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows: 1. Article II of the Agreement, entitled "STATEMENT OF WORK" is hereby amended to include the additional services set forth in CONSULTANT's proposal entitled "Scope of Services" dated November 21, 2021, attached to this Fourth Amendment as "Exhibit A" and incorporated herein by reference. 2. Article V of the Agreement, entitled "ALLOWABLE COSTS AND PAYMENTS" is hereby amended to include additional compensation payable to CONSULTANT for the services described in "Exhibit A" to this Fourth Amendment, on a time and materials basis in accordance with the "Scope of Services" included in "Exhibit A", in a not to exceed amount of $51,789, and to change the total not to exceed amount under the Agreement to $949,831. 3. Except as specifically amended herein, all the other provisions, terms, and obligations of the Agreement between the parties shall remain valid and shall be in full force. 2 IN WITNESS WHEREOF, the parties have executed this Fourth Amendment on the day, month, and year first above written. CITY OF SAN RAFAEL ATTEST: of5 frr LINDSAY LARA, City Clerk APPROVED AS TO FORM LQ I ROBERT F. EPSTEIN, CityAttorney CONSULTANT: MARK THOMAS & COMPANY, INC. By: Name: Zach Siviglia Title: President and Name: R. Matt Brogan Title: Secretary \/ MARK THOMAS SCOPE OF WORK TASK 1. SLOPE STABILITY ANAYLSIS Task 1.1. Geotechnical Investigation Southern Heights Bridge Replacement - Amendment .'-.'4 City of San Rafael November 21. 2021 Par kh will drill one short boring on the slope to verify the soil / rock condition. This will require portable equipment and preparation of a level pad to setup the tripod and Minuteman drill rig. A long day of drilling work is expected. For the steep s ope, the standard jute netting may not be adequate, and Parikh will work with Mark Thomas to consider more heavy duty erosion control products. Parikh will also evaluate the slope profile and determine if a bench/break in the middle of the s ope would be helpful. The possibility of 'nstalling short landscape timber walls to terrace the slope may also be considered. Parikh assumes discuss'on and interaction with the Mark Thomas and the City will be necessary. A geotechnical memo summarizing the geotechnical recommendations will be prepared. Task 1.2. Topographic Survey Mark Thomas will perform a field survey to establish control to facilitate topographic surveys of the site. Inter - visible local project horizontal control (NAD83) and vertical control (NAVD88) will be established to facilitate a terrestrial scan of the slope. Control point coordinates, basis of bearings and coordinates, and benchmark notes will be provided to show on plans. Topographic mapping of the roughly 950 feet of slope will be sufficient to serve as the basis for design of slope stabi ity improvements. This scope of work assumes one day of field work for the control, and one extended day of field work for the topographic survey. Task 1.3. Slope Stability/Erosion Control Design Mark Thomas will prepare erosion control plans including revised planting and irrigation plans. Structure plans will be developed for the landscape timber walls if recommended for slope stability by Parikh. Up to four plan sheets will be prepared based on the post -construction survey and geotechnical recommendations. DELIVERABLES • Geotechnical Memo • Post -construction topograph'c survey • Slope Stability/Erosion Control Plans M all low—Al 5� L Q C OJ w u f0 C. Gl O7 to �L m H t CD 2 Q Gl m m C f0 Ln W CL O U N U W O cc IL CC O LL J N O a CL Ln O U 0 u C O m a r m N ui Yo1 Ln n A Fa - 0 411Jed m m m m v o Ln m m N o vin v m .mi o N vLn 0 0 N m u K o F - O N a o co n C H N N N N o F- _ J04eulpio133 v V v V r4 mw 37afOJd 'JS.~n v Pa;143jy ade3spuel � m m m w ja8euew ov m }iafoJd an l.Nn Q ma�plaid uos�ad Z � N N Nct uelolu43alAaninS m c, v v m m joAanmS }PafoJd �S to r~-1 ,N -I N N N N Jaaeueyll AaAMS N v v O to vOOi m 11 jaaul8u3 u;llsap ti v m v m ,'o N N N N n jaaul8u3 Pafoid m m rn Jaaul2u3 PafoJd o N �n m o Q Y ` J u A/ O z m m o Q G c u o N J ✓1 � yf u � p v n l7 H ¢i o 0 2 I = m o o vJi in �n J p C W u J OF O ei f -i ri ri � CONTRACT ROUTING FORM INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below. TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER: Contracting Department: Public Works Project Manager: Ashley Dohrmann for Theo Extension: 3352 Contractor Name: Mark Thomas & Company, Inc. Contractor's Contact: Marlayna Harney Contact's Email: mharney@markthomas.com ❑ FPPC: Check if Contractor/Consultant must file Form 700 Step RESPONSIBLE DESCRIPTION COMPLETED REVIEWER DEPARTMENT DATE Check/Initial 1 Project Manager a. Email PINS Introductory Notice to Contractor Click here to ❑ enter a date. b. Email contract (in Word) and attachments to City Click here to Attorney c/o Laraine.Gittens@cityofsanrafael.org enter a elate. ❑D 2 City Attorney a. Review, revise, and comment on draft agreement Click here to and return to Project Manager enter a date. ❑x b. Confirm insurance requirements, create Job on Click here to PINS, send PINS insurance notice to contractor enter a elate. ❑x 3 Department Director Approval of final agreement form to send to Click or tap ❑x contractor to enter a date. 4 Project Manager Forward three (3) originals of final agreement to Click here to ❑X contractor for their signature enter a date. 5 Project Manager When necessary, contractor -signed agreement ❑ N/A agendized for City Council approval *City Council approval required for Professional Services Agreements and purchases of goods and services that exceed Or $75,000; and for Public Works Contracts that exceed $175,000 12/6/2021 Date of City Council approval PRINT CONTINUE ROUTING PROCESS WITH HARD COPY 6 Project Manager Forward signed original agreements to City 12/15/2021 Attorney with printed copy of this routing form 7 City Attorney Review and approve hard copy of signed 12 f 101 agreement W7,( 8 City Attorney Review and approve insurance in PINS , and bonds (for Public Works Contracts) % 2-14 9 City Manager/ Mayor Agreement executed by City Council authorized 1?/ �� Ll official 10 City Clerk Attest signatures, retains original agreement and forwards /C.4 copies to Project Manager