HomeMy WebLinkAboutPW Reimbursement Agreement; Third Street Rehabilitation Project (MMWD)MMWD Misc. Agreement — 5971
REIMBURSEMENT AGREEMENT BETWEEN
THE CITY OF SAN RAFAEL AND MARIN MUNICIPAL WATER DISTRICT
FOR CONTRACT AND CONSTRUCTION MANAGEMENT OF THE
THIRD STREET REHABILITATION PROJECT
THIS REIMBURSEMENT AGREEMENT ("AGREEMENT") is made and entered into
thiV. day o1AAWA4022, by and between the CITY OF SAN RAFAEL, hereinafter referred
to as "CITY", andthe ARIN MUNICIPAL WATER DISTRICT, hereinafter referred to as
"MMWD", both located in the State of California, collectively the "PARTIES";
For good and valuable consideration, the PARTIES agree as follows:
SECTION 1: RECITALS.
A. CITY plans to conduct corridor improvements along Third Street starting at Union Street
and continuing to Second Street and along Second Street from Shaver Street to 4th Street,
hereinafter the "ROADWAY PROJECT",
B. As part of the ROADWAY PROJECT the CITY will resurface the roadway along this
identified portion of Third Street.
C. MMWD plans to replace and/or repair water supply facilities within the identified portion
of Third Street, hereinafter the "PIPELINE PROJECT", in advance of the CITY's final
roadway resurfacing associated with the ROADWAY PROJECT.
D. For their mutual benefit, the PARTIES agreed to a Memorandum of Understanding on
February 26, 2021 ("MOU"), which combined the PIPELINE PROJECT with the
ROADWAY PROJECT resulting in a "JOINT PROJECT".
E. The MOU provides that the CITY will manage the integration of design plans, Caltrans
encroachment permit, and the bidding and the award of the JOINT PROJECT contract to
the lowest responsive bidder, hereinafter referred to as "CONTRACTOR".
F. CITY and MMWD wish to enter into this AGREEMENT to clarify the allocation of costs
associated with the construction, management, and administration of the PIPELINE
PROJECT.
SECTION 2: PROJECT COORDINATION
A. All notices and other communications required or permitted to be given under this
AGREEMENT shall be in writing and given by personal delivery, or deposited with the
United States Postal Service, postage prepaid, addressed to the parties named in this
Section. Notice shall be deemed given as of the date of personal delivery, or if mailed,
upon the date of deposit with the United States Postal Service.
Reimbursement Agreement Between MMWD & City of San Rafael Page 1
To: MMWD
Ben Horenstein
To: CITY
Bill Guerin
MA -5971
General Manager Public Works Director
Marin Municipal Water District City of San Rafael
220 Nellen Avenue 111 Morphew Street
Corte Madera, CA 94925 San Rafael, CA 94901
B. MMWD. The General Manager shall be the representative of MMWD for all purposes
under this AGREEMENT. Ben Horenstein is hereby designated as the Project Director
for MMWD. MMWD's Project Director shall be responsible for all aspects of the
progress and execution of this AGREEMENT on behalf of MMWD.
C. CITY. The Public Works Director shall be the representative of CITY for all purposes
under this AGREEMENT. Bill Guerin, the Public Works Director, is hereby designated
as the Project Director for CITY. CITY's Project Director shall be responsible for all
aspects of the progress and execution of this AGREEMENT on behalf of CITY.
D. The Public Works Director is hereby declared to be the authorized CITY representative in
administering this AGREEMENT. The MMWD General Manager is hereby declared to be
the authorized MMWD representative in administering this AGREEMENT. Either Party
may change its designated representative by providing written notice of the same to the
other Party.
SECTION 3: SCOPE OF AGREEMENT
A. The PARTIES acknowledge and agree that the sole purpose of this AGREEMENT is to
set forth the PARTIES' responsibilities regarding the construction, management,
inspection, and administration of the PIPELINE PROJECT portion of the JOINT
PROJECT and to set forth the amount that MMWD will reimburse the City for its costs
associated with the construction, management, and administration of the PIPELINE
PROJECT.
B. The PARTIES agree that the services needed for the construction contracting,
management, and administration of the PIPELINE PROJECT within the JOINT
PROJECT include the tasks set forth below:
1. Public Bidding of the Joint Project
2. Construction management services of PIPELINE PROJECT;
3. Payment to CONTRACTOR for PIPELINE PROJECT;
4. Construction Inspection of PIPELINE PROJECT and Procurement of Pipeline
Materials; and
5. Material testing services for the PIPELINE PROJECT, including, but not
limited to, trench subgrade and backfill compaction and asphalt testing.
C. The PARTIES agree and understand that as part of the JOINT PROJECT there are various
best practices and mitigation measures that have associated costs, including, but not limited
to, the preparation of a construction risk management plan and traffic management plan.
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 2
SECTION 4: DUTIES OF CITY
A. The CITY shall administer a public bid to construct the JOINT PROJECT with a separate
bid item for the PIPELINE PROJECT, the plans and specifications for which are
incorporated into CITY plans and specifications. Prior to including the PIPELINE
PROJECT plans and specifications in the public bid, MMWD will review and provide any
revisions to CITY for inclusion in the CITY plans and specifications. Prior to award and
entering into a construction contract for the JOINT PROJECT, the CITY shall receive
written authorization from MMWD of acceptance of the CONTRACTOR bid item or a
portion of the CONTRACTOR'S bid item for the PIPELINE PROJECT.
B. The CITY shall provide construction management for the JOINT PROJECT. CITY shall
require CONTRACTOR to provide the CITY with Payment and Performance bonds for
the ROADWAY PROJECT, all in accordance with the terms and conditions of the CITY
contract. The CITY shall also require CONTRACTOR to provide MMWD with Payment,
Performance, and Maintenance bonds for the PIPELINE PROJECT, all in accordance with
the terms and conditions of the CITY contract, which shall be mutually agreed upon by the
PARTIES, with the CONTRACTOR.
C. CITY shall pay CONTRACTOR for the PIPELINE PROJECT in accordance with the unit
bid prices and specifications approved by MMWD. No extra work on the PIPELINE
PROJECT will be authorized by CITY or CONTRACTOR without prior written approval
of MMWD. CONTRACTOR shall receive compensation for such MMWD approved extra
work at the unit bid prices and in accordance with the specifications contained in the bid
submitted by CONTRACTOR; insofar as such prices are applicable. Where existing
contract bid items cannot be extended for payment of such MMWD approved extra work,
a change order will be executed between CITY and CONTRACTOR only if such work and
cost are authorized in advance by MMWD in writing. The request for approved extra work
shall be sent to MMWD's Project Manager, Alex Anaya at aanayaamarinwater.org.
D. CITY or its representative shall be responsible for communicating MMWD's decisions
regarding PIPELINE PROJECT to CONTRACTOR and coordinating the execution and
implementation of MMWD decisions with CONTRACTOR on the PIPELINE PROJECT.
E. CITY shall require CONTRACTOR to name MMWD as an additional insured on all
insurance required to be obtained, including but not limited to CONTRACTOR general
liability and automobile policies, and shall require that CONTRACTOR indemnify
MMWD to the same extent as CITY under the JOINT PROJECT contract.
F. CITY shall be responsible for the Project Administration and Construction Management
of the JOINT PROJECT and will contract with a construction management firm, referred
to herein as CONSULTANT, to provide these services. These services shall include:
general inspection (not including daily inspection by MMWD for PIPELINE work as set
forth in section 5G below), progress payment preparation, change order preparation,
schedule review, claims negotiation, meeting attendance, project reports, labor and wage
compliance, utility coordination, project documentation, as -built plans (excluding redline
as-builts of PIPELINE plan sheets prepared by MMWD inspectors), and overall project
administration.
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 3
MA -5971
G. CITY shall provide MMWD status updates and other Construction Management
information needed to facilitate the construction of the PIPELINE PROJECT on a weekly
or an "as needed" basis.
H. CITY shall prepare and submit to MMWD invoices for CONTRACTOR costs associated
with the PIPELINE PROJECT on a monthly basis.
I. At the completion of the PIPELINE PROJECT, CITY shall prepare and submit invoice to
MMWD for CONSULTANT costs associated with the construction management and
administration of the PIPELINE PROJECT.
SECTION 5: DUTIES OF MMWD
A. MMWD shall reimburse CITY for the PIPELINE PROJECT construction costs in
accordance with the unit bid prices and specifications authorized in writing by MMWD.
MMWD shall also reimburse CITY for any extra or changed work authorized by advanced
written notice from MMWD's Project Manager, Alex Anaya. MMWD shall review CITY
progress payment estimates and provide CITY written notice approving or disapproving
each progress payment estimate related to the PIPELINE PROJECT within 14 calendar
days of MMWD receiving each progress payment estimate from CITY. MMWD will remit
payment to CITY within 21 calendar days following its approval of a PIPELINE PROJECT
progress payment.
B. MMWD shall review CONTRACTOR change orders for extra work on the PIPELINE
PROJECT and provide CITY a written notice of approval or disapproval of extra work
within three (3) days of receiving each request. MMWD shall be responsible for
CONTRACTOR claims arising from MMWD failure to timely approve or disapprove
CONTRACTOR change orders for extra work.
MMWD shall be responsible for delays to the JOINT PROJECT which are a direct result
of unavoidable delays in the work prosecution or completion of the PIPELINE
PROJECT. Unavoidable delays in the work prosecution or completion shall mean all
delays resulting from causes beyond the CONTRACTOR'S control which they could not
reasonably have anticipated and mitigated or avoided by the exercise of care, prudence,
foresight, and diligence and which actually and necessarily cause a delay in the
completion of the whole work. Any delay which results from MMWD changes in the
amount of work to be done, the quantity of material to be furnished, or the schedule of
other forces working concurrently for MMWD, shall be the responsibility of MMWD.
Any delay caused by MMWD's or another PIPELINE PROJECT -related utility's failure
to provide for removal or relocation of existing main or trunkline utility facilities located
on the construction site which are not identified with reasonable accuracy in the contract
document, will be defined as right-of-way delays and will be paid for as outlined below.
Right-of-way delays will be considered unavoidable, and the responsibility of MMWD,
to the extent that they actually and necessarily delay the CONTRACTOR'S completion
of the whole work on the PIPELINE PROJECT. Unavoidable delays do not include
delays caused directly or indirectly by the default, delay, or other breach of the
CONTRACTOR or any subcontractor of CONTRACTOR. Delays due to adverse
weather conditions will be regarded as unavoidable only to the extent that they actually
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 4
MA -5971
and necessarily cause a delay in completion of the whole work and to the extent that such
condition could not reasonably have been anticipated and mitigated or avoided by the
exercise of care, prudence, foresight, and diligence of the CONTRACTOR.
C. In order to bear all costs associated with and arising from construction management and
administration of the PIPELINE PROJECT within the JOINT PROJECT, MMWD shall
reimburse CITY for 16.6% of all construction management CONSULTANT costs
associated with the JOINT PROJECT. CITY shall prepare and submit an invoice for
CONSULTANT costs at the completion of the PIPELINE PROJECT, which shall be paid
within 30 calendar days of receipt by MMWD.
Said reimbursement ratio of 16.6% was calculated based on the following estimate:
$3,025,275 PIPELINE PROJECT IMPROVEMENTS = 16.6%
$18,248,707.54 JOINT PROJECT IMPROVEMENTS
MMWD shall reimburse CITY for CONSULTANT construction management and
administration fees in the amount of $155,757 at the completion of the PIPELINE
PROJECT based upon the following calculation:
The CONSULTANT Construction Management fee is $938,300 (excluding
materials testing).
16.6% x $938,300 = $155,757.
D. PARTIES agree to work cooperatively to renegotiate cost sharing of CONSULTANT fees
for construction management and administration should there be a change in these fees or
scope of the PIPELINE PROJECT.
E. MMWD shall reimburse CITY for 16.6% of all costs associated with and arising from
Water Pollution Control and the Project Schedule of the PIPELINE PROJECT within the
JOINT PROJECT. CITY shall prepare and submit an invoice for these construction costs
at the completion of the PIPELINE PROJECT, which shall be paid within 30 calendar days
of receipt by MMWD.
F. MMWD shall reimburse CITY for administration and trench cost savings from restoring
the pavement using a straight trench versus the standard t -cut trench section described in
the Marin County Uniform Construction Standards 2018 for the pipeline installed within
the CITY'S ROADWAY PROJECT limit. MMWD and CITY have agreed on an amount
of $3.82 per square foot of trench within pavement restoration area, which is a total of
$159,570.95. CITY shall prepare and submit an invoice for this amount at the completion
of the PIPELINE PROJECT, which shall be paid within 30 calendar days of receipt by
MMWD. All surface restoration for other PIPELINE PROJECT work outside the
ROADWAY PROJECT boundaries shall be restored per the Marin County Uniform
Construction Standards 2018 upon installation of the pipeline and restoration of the
roadway pavement.
G. MMWD shall provide inspection services, at MMWD'S cost, for all construction of the
PIPELINE PROJECT. MMWD shall review and approve all submittals required by the
PIPELINE PROJECT specifications within 10 calendar days of receipt by MMWD.
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 5
MA -5971
H. MMWD shall provide the water distribution system pipe materials for the PIPELINE
PROJECT and materials testing services for the PIPELINE PROJECT, including, but not
limited to materials testing of the trench subgrade, backfill, and asphalt compaction used
for trench restoration, but excepting 14 -steel casing and 8 -inch fusible PVC pipe to be
furnished by CONTRACTOR. Materials testing services shall be paid for by MMWD.
MMWD shall provide all materials testing results to CONSULTANT within twenty-four
(24) hours of receiving them. Water distribution system pipe backfill material including
but not limited to, sand, class 2 aggregate base, control density fill and hot mix asphalt and
14 -inch steel casing pipe and 8 -inch fusible PVC pipe shall be furnished by the
CONTRACTOR and shall be paid per the MMWD Bid Item price for said items.
SECTION 6: PARTNERING
A. The PARTIES agree to participate in the Formal Collaborative Partnering Process
described below with the project CONTRACTOR.
B. Formal Collaborative Partnering for this project will start within 30 days of the issuance of
the Notice to Proceed to CONTRACTOR and will include the following:
a. CITY and CONTRACTOR will contract with an IPI Certified Independent
Professional Neutral Partnering Facilitator;
b. A "Partnering Charter" containing the joint development of goals will be developed
collaboratively between the CITY, MMWD, SRSD, and the CONTRACTOR;
c. A periodic, joint evaluation of the Partnering process;
d. Executive Level, Core Team, and Stakeholder Partnering;
e. A Partnering Follow-up Plan to resolve potential problems at the lowest possible
level; and
f. A Training Plan for development of partnering skills.
C. Participation in the formal partnering process will not void any portion of the contract. All
rights and remedies set forth in the final contract will be preserved.
SECTION 7: MISCELLANEOUS TERMS
A. Term of AGREEMENT: This AGREEMENT shall terminate upon MMWD acceptance
of the completed PIPELINE PROJECT, provided that MMWD reimbursement and CITY
and MMWD indemnification duties shall continue following the end of such term.
B. Termination: This AGREEMENT may be terminated, without cause, by either Party,
upon thirty (30) calendar days advance written notice to the other Party following CITY
rejection of bids as provided herein, and may be terminated, with cause, by either Party,
upon thirty (30) calendar days advance written notice to the other Party following the
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 6
MA -5971
notified Party's failure to cure or correct the cause of termination notice, within thirty (30)
calendar days receipt of that notice.
C. Amendment and Merger: This AGREEMENT contains all the terms and conditions
made between the PARTIES to this AGREEMENT and may only be modified by written
AGREEMENT signed by all the PARTIES to this AGREEMENT or their respective
successors -in -interest. This writing is intended both as a final expression of the
AGREEMENT between the parties hereto with respect to the included terms and as a
complete and exclusive statement of the terms of this AGREEMENT. No modification
of this AGREEMENT shall be effective unless and until such modification is evidenced
by a writing signed by both PARTIES.
D. Agreement Binding; The terms and provisions of this AGREEMENT shall extend to and
be binding upon and inure to the benefit of the heirs, executors, and administrators or to
any approved successor, as well as to any assignee or legal successor to any PARTIES to
this AGREEMENT. Any terms of this AGREEMENT that by their nature extend beyond
the term (or termination) of this AGREEMENT shall remain in effect until fulfilled and
shall apply to both PARTIES' respective successors and assigns.
E. Cooperation: The PARTIES pledge cooperation during the term of this AGREEMENT.
F. No Third -Party Beneficiaries: Nothing contained in this AGREEMENT shall be
construed to create, and the PARTIES do not intend to create, any rights in third parties.
G. Severability: If any term, covenant or condition of this AGREEMENT or the application
thereof to any person or circumstance is determined to be invalid or unenforceable, the
remainder of this AGREEMENT or the application of such term, covenants or conditions
to persons or circumstances other than those as to which it is held invalid or
unenforceable, shall not be affected thereby, and each term, covenant and condition of
this AGREEMENT shall be valid and be enforced to the fullest extent permitted by law.
H. No Waiver: The waiver by either of the PARTIES of any default under this
AGREEMENT shall not operate as a waiver of any subsequent breach of the same or any
other provision of this AGREEMENT.
I. Time is of the Essence: Time is of the essence with respect to the performance of every
provision of this AGREEMENT for which time or performance is a factor. PARTIES
agree to adhere to all deadlines stated in the approved project specifications.
J. Mediation: Any dispute or claim in law or equity between the County and MMWD
arising out of this AGREEMENT, if not resolved by informal negotiation between the
PARTIES, shall be mediated. The mediation process shall continue until the case is
resolved or until such time as the mediator makes a finding that there is no possibility of
resolution. If mediation is unsuccessful, the PARTIES may avail themselves of any other
remedies.
K. Applicable Law: This AGREEMENT shall be construed and enforced in accordance
with the laws of the State of California.
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 7
MA -5971
L. No Presumption Regarding Drafter: The PARTIES acknowledge and agree that the
terms and provisions of this AGREEMENT have been negotiated and discussed between
the PARTIES and their attorneys, and this AGREEMENT reflects their mutual
AGREEMENT regarding the same. Because of the nature of the negotiations, and
discussions it would be inappropriate to deem any Party to be the drafter of this
AGREEMENT. Therefore, no presumption for or against validity, or as to any
interpretation hereof, based upon the identity of the drafter, shall be applicable in
interpreting or enforcing this AGREEMENT.
M. Assistance of Counsel: Each Party to this AGREEMENT warrants as follows:
a. That each Party had the assistance of counsel in the negotiation for, and the
execution of, this AGREEMENT and all related documents; and
b. That each Party has lawfully authorized the execution of this AGREEMENT.
N. Section Headings: The section headings contained in this AGREEMENT are for
convenience and identification only and shall not be deemed to limit or define the contents
of the sections to which they relate.
O. Countervarts and Electronic Signatures: This AGREEMENT may be executed by electronic
signature and in any number of counterparts, each of which shall be deemed an original, but
all of which together shall constitute one document. Counterpart signature pages may be
delivered by telecopier, email or other means of electronic transmission.
IN WITNESS WHEREOF, the PARTIES hereto have executed this AGREEMENT by their duly
authorized officers as of the day and year first above written.
CITY OF SAN FAEL
J -J
Jim Schutz, City Manager
ATTEST:
By: X '
Lindsay Lara, City Clerk
APPROVED AS TO FORM:
By: r
Robert Epstein, City Attorney
MARI MUNICIPAL ATER DISTRICT
General Manager
ATTEST:
By:4k�A-�t
Board Secretary
APPROVED AS TO FORM:
By:
General Counsel
Reimbursement AGREEMENT Between MMWD & City of San Rafael Page 8
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Ashley Dohrmann (for April) Extension: 3352
Contractor Name: MMWD
Contractor's Contact: Alexa Anaya Contact's Email: aanaya@marinwater.org
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step RESPONSIBLE DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1 Project Manager a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
1/25/2022
Attorney c/o Laraine.Gittens@cityofsanrafael.org
©AD
2 City Attorney a. Review, revise, and comment on draft agreement
1/31/2022
❑x LG
and return to Project Manager
1/31/2022
❑X LG
b. Confirm insurance requirements, create Job on
(N/A)
PINS, send PINS insurance notice to contractor
_
3 Department Director Approval of final agreement form to send to
❑X BG
T 2/2/2022
_ contractor
�4 Project Manager Forward three (3) originals of final agreement to
2/2/2022
_ contractor for their signature
5 Project Manager When necessary, contra ctor-si ned agreement
❑ N/A
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed
$75,000; and for Public Works Contracts that exceed $175,000
Or
2/7/2022
Z
Date of City Council approval
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
Attorney with printed copy of this routing form
/
Z ! 2022
AD
7
City Attorney
City Attorney
Review and approve hard copy of signed
agreement
Review and approve insurance in PINS, and bonds
(for Public Works Contracts)
2—JI 2.Z
8
9
City Manager/ Mayor
Agreement executed by City Council authorized
official10
—City
Clerk
Attest signatures, retains original agreement andIRV
forwards copies to Project Manager
DA1MXP;;-