HomeMy WebLinkAboutPW Third Street Rehabilitation Project - Contract Change Order No. 2CITY OF SAN RAFAEL Department of Public Works
CONTRACT CHANGE ORDER NO: 2 REV. NO: SUPPL. N0: -
PROJECT 3rd Street Rehabilitation Project NO: 11315
TO Ghilotti Bros., Inc.
525 Jacoby Street, San Rafael, CA 94901 SHEET 1 OF 7
You are hereby directed to,make the herein described changes from the plans and specifications or do the following
described work not included in the plans and specifications on this contract.
ADJUSTMENT AT FORCE ACCOUNT
1. Provide labor, materials and equipment to construct approximately 1,070 square feet of sculped shotcrete retaining
wall, drill and install 600 linear feet of soil nails, cast in place concrete footings as needed, excavation as required,
clear and grub the hillside, furnish and install 1,270 square feet of Tecco Mesh and 504 linear feet of rock anchors,
and all necessary layout and clean up. The supporting documents are attached.
The price paid shall include all the labor, materials, tools, equipment, overhead, profit, and incidentals, and for doing all
the work involved in performing various miscellaneous tasks as approved in writing by the Engineer.
Drill Tech Mobilization.....................................................................
$16,500.00
Clearand Grub................................................................................
$27,500.00
Water Buffalo/drill washout................................................................
$10,450.00
Washout Rental/disposal....................................................................
$8,470.00
Debris Box Rental/disposal................................................................
$8,250.00
The following work will be paid for at an agreed to unit price.
Soil Nail Anchors 600 LF at $143.00 per linear foot ....................................
$85,800.00
Sculped Shotcrete Wall (including reinforcing) 33 CY at $2,200 per cubic yard...
$72,600.00
Rock anchors 504 LF at $220.00 per linear foot ..........................................
$110,880.00
Tecco Mesh 1,270 SF at $60.50 per square foot ..........................................
$76,835.00
The following work will be performed on a time and materials basis. The maximum value of time and materials work shall
not exceed $35,000.
GBI Support for Drill Tech (Clean up) ......................................................
$10,000.00
RockExcavation.................................................................................
$25,000.00
Offsetting Credit for Bid Item Work not performed:
Bid Item A318 87 LF of Catchment Fence not constructed ..............................
-$21,750.00
Bid Item A316.1 100 LF Soldier Piles not constructed .......................................
-$31,500.00
Bid Item A316 716 SF of Retaining Wall not constructed ...................................
-$100,240.00
The cost of this work is $298,795.00. Additional Working Days will be deferred in conjunction with this work.
Estimated Cost: Increase $ 298,795.00 Decrease $
Adjustment of Time No Adj X Deferred Add'I Days Less Days
Submitted by: 1/ad Matt Vail, Resident Engineer Date 7/21/2022
/ s -Dale 2022 08 10
Reviewed by: zs:za. oo A ril Miller, Public Works Director Date {8/10/22
Approval: Jim Schutz, City Manager Date b ��
We, the undersigned can r,ve given care con ideration to the change proposed and hereby agree, if this proposal is approved, that we will
provide all equipment, furnish all materials, except aNpay otherwise be noted above, and perform all services necessary for the work above specified,
and will accept as full paypWt there r the prices show above.
Accepted by: Date Z
Contractor: Dennis Huette, Ghilotti Bros., Inc. Title: Project Manager
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the
ordered work and filing a written protest within the time therein specified.
CITY OF SAN RAFAEL Department of Public Works
CONTRACT CHANGE ORDER NO: 2 REV. NO:
PROJECT 31d Street Rehabilitation P
TO Ghilotti Bros., Inc.
525 Jacobv Street, San Rafael, CA 94901
SUPPL. N0; -
NO: 11315
SHEET 1 OF 7
You are hereby directed to make the herein described changes from the plans and specifications or do the following
described work not included in the plans and specifications on this contract.
ADJUSTMENT AT FORCE ACCOUNT
1. Provide labor, materials and equipment to construct approximately 1,070 square feet of sculped shotcrete retaining
wall, drill and install 600 linear feet of soil nails, cast in place concrete footings as needed, excavation as required,
clear and grub the hillside, furnish and install 1,270 square feet of Tecco Mesh and 504 linear feet of rock anchors,
and all necessary layout and clean up. The supporting documents are attached.
The price paid shall include all the labor, materials, tools, equipment, overhead, profit, and incidentals, and for doing all
the work involved in performing various miscellaneous tasks as approved in writing by the Engineer.
Drill Tech Mobilization.....................................................................
$16,500.00
Clear and Grub................................................................................
$27,500.00
Water Buffalo/drill washout................................................................
$10,450.00
Washout Rental/disposal....................................................................
$8,470.00
Debris Box Rental/disposal................................................................
$8,250.00
The following work will be paid for at an agreed to unit price.
Soil Nail Anchors 600 LF at $143.00 per linear foot ....................................
$85,800.00
Sculped Shotcrete Wall (including reinforcing) 33 CY at $2,200 per cubic yard...
$72,600.00
Rock anchors 504 LF at $220.00 per linear foot ..........................................
$110,880.00
Tecco Mesh 1,270 SF at $60.50 per square foot ..........................................
$76,835.00
The following work will be performed on a time and materials basis. The maximum value of time and materials work shall
not exceed $35,000.
GBI Support for Drill Tech (Clean up) ......................................................
$10,000.00
Rock Excavation.................................................................................
$25,000.00
Offsetting Credit for Bid Item Work not performed:
Bid Item A318 87 LF of Catchment Fence not constructed ..............................
-$21,750.00
Bid Item A316.1 100 LF Soldier Piles not constructed .......................................
-$31,500.00
Bid Item A316 716 SF of Retaining Wall not constructed ...................................
-$100,240.00
The cost of this work is $298,795.00. Additional Working Days will be deferred in conjunction with this work.
Estimated Cost: Increase $ 298,795.00
Adjustment of Time No Adj X Deferred
Submitted by:
Reviewed by:
Approval
Dale: 2022.08 10
Decrease $
Add'I Days Less Days
Matt Vail. Resident Engineer Date
I Miller, Public Works Director Date
Jim Schutz, City Manager Date
7/21/2022
8/10/22
119 Z L
We, the undersigned kontracLoK have given c;eful (�onsiderafion to the change proposed and hereby agree, if this proposal is approved, that we will
provide all equipment, u ish all materials, exceAtag may otherwise be noted above, and perform all services necessary for the work above specified,
and will accept as full pant there r the prices shown above.
Accepted by:4/7,Date z
Contractor: Dennis Huette, Ghilottl Bros., Inc. Title: Project Manager
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the
ordered work and filing a written protest within the time therein specified.
S o
r� ley
rY WITH P�
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Click hereto enter text. ATly—r'.1 Nit tker Extension: 3352
Contractor Name: &4koOft� +Wee -
Contractor's Contact: Click here to enter text. Contact's Email: Click here to enter text.
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
No cor AvnJ
b. Email contract (in Word) and attachments to City
Click here to
IC)n ly C- Qj
Attorney c/o Laraine.Gittens@cityofsanrafael.org
enter a date.
❑ Q�
2
City Attorney
a. Review, revise, and comment on draft agreement
Click here to
and return to Project Manager
enter a date.
❑
b. Confirm insurance requirements, create Job on
Click here to
PINS, send PINS insurance notice to contractor
enter a date.
❑
3
Department Director
Approval of final agreement form to send to
Click or tap
❑
contractor
to enter a
date -
4
Project Manager
Forward three (3) originals of final agreement to
Click here to
❑
contractor for their signature
enter a date.
5
Project Manager
When necessary, contractor -signed agreement
❑ N/A
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed
$75,000; and for Public Works Contracts that exceed $175,000��
Or
Click here to
1 CC+ Ct+
Date of City Council approval
enter a date.
rkcx CI
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager Forward signed original agreements to City
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
/
agreement
8
City Attorney
Review and approve insurance in PINS, and bonds
J -7 -7 -
(for Public Works Contracts)
9
City Manager/ Mayor
Agreement executed by City Council authorized
official
f�
10
City Clerk
Attest signatures, retains original agreement and
�n
forwards copies to Project Manager
11
r1
Z