HomeMy WebLinkAboutPW Construction Administration and Scheduling Services - Fire Station 54 and 55; First AmendmentFIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH
LOVING CAMPOS ASSOCIATES, ARCHITECTS, INC. FOR CONSTRUCTION
ADMINISTRATION AND SCHEDULING SERVICES FOR PHASE 2 ESSENTIAL
FACILITIES PROJECTS — FIRE STATION 54 AND 55
THIS FIRST AMENDMENT to the Professional Services Agreement by and between
the CITY OF SAN RAFAEL (hereinafter "CITY"), and LOVING CAMPOS ASSOCIATES,
ARCHITECTS, INC., (hereinafter "CONSULTANT"), is made and entered into as of the
day of Feb 11, 2023 , 2022.
RECITALS
WHEREAS, pursuant to City Council Resolution No. 14989 (the "Resolution"), the
CITY and CONSULTANT entered into a Professional Services Agreement dated January 27,
2022 to perform construction administration services in connection with the CITY'S project to
reconstruct Fire Stations 54 & 55 for an amount not to exceed $280,300 (the "Agreement"); and
WHEREAS, the CITY requires additional unforeseen construction administration
services from the CONSULTANT to facilitate the construction of the fire stations, and the
CONSULTANT is willing to provide such services.
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows:
1. Article II of the Agreement, entitled "DUTIES OF CONTRACTOR" is hereby
amended to include the additional services set forth in CONSULTANT's
proposal entitled "Architect's Additional Service Request (ASR 01) — Additional
Design Services Due To Unforeseen Site and Building Conditions" dated
September 29, 2022, attached to this First Amendment as Exhibit A and
incorporated herein by reference.
2. Article IV of the Agreement, entitled "COMPENSATION" is hereby amended to
include additional compensation payable to CONSULTANT for the services
described in Exhibit A to this First Amendment, in accordance with the "Fee
Schedule" included in Exhibit A, in a not -to -exceed amount of $50,446, and to
change the total not -to -exceed amount under the Agreement to $330,746.
1
3. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be
in full force.
IN WITNESS WHEREOF, the parties have executed this First Amendment on the day,
month, and year first above written.
CITY OF SAN RAFAEL
Jim Schutz (Feb 11, 2023 14:47 PST)
JIM SCHUTZ, City Manager
ATTEST:
LLt
Brenna Nurnti (furl (Feb 13.202 07 48 PST)
LINDSAY LARA, City Clerk
APPROVED AS TO FORM:
GENEVIEVE COYLE, Assistant City Attorney
2
CONSULTANT
cz Cas
By: C,+ri Campus IFeb ' 2023 13:36 PSTI
Name: Carl Campos
Title: C E 0
[If Contractor is a corporation, add signature
of second corporate officer]
By:Davld Bripud I b9,202313:3B PSY1
Name:David Bogstad
Title: President
r1LCA
L■� ARCHITECTS
A CALIFORNIA CORPORATION
Date: September 29, 2022
Project: Fire Stations 54 & 55, San Rafael, CA
EXHIBIT A
ARCHITECT'S ADDITIONAL SERVICE REQUEST
LCA Project #19073
Owner: San Rafael Fire Department Public Works Department
Individual: April Miller, Director, Public Works, a ril.miller cit ofsanrafael.or
CC: Fabiola Guillen-Urfer, fabiola.guillenurfer@cityofsanrafael.ore
Subject: Additional Design Services Due To Unforeseen Site and Building Conditions:
Fire Station 54: 46 Castro Avenue, San Rafael, California 94901
Fire Station 55: 955 Pt San Pedro, San Rafael, California 94901
ASR 01
Under the conditions of the Architect's Contract for Professional Services with the Owner, as required, the Architect
notifies the Owner, and the Owner hereby authorizes the Architect to perform Additional Services as previously agreed.
Explanation: The following Additional Services have been incurred during the Construction Administration Phase:
FIRE STATION 54 AND FIRE STATION 55: CONSTRUCTION ADMINISTRATION: ADDITIONAL SERVICES:
Greg Barton, CA, see Exhibit A for LCA Fee Schedule):
1. Review and response to an unusual number of Requests for Information (RFIs)
2. Review and response to an unusual number of Change Order Requests (CORS)
3. Procurement issues requiring substitutions past contract deadline requirements, i.e., tile, roofing, generator, etc.
4. Unforeseen existing conditions that led to conflicts in the field:
A. Rerouting of Fire Station 55 sanitary sewer due to Contractor error and lack of cooperation.
B. Existing sanitary sewer condition/replacement —sewer too shallow & in need of replacement.
C. Leveling of Fire Station 54 App Bay slab and associated revisions requested by the General Contractor.
D. Multiple unforeseen, underground utility conflicts, i.e., water lines, sewer lines, traffic control conduits.
5. Contractor Issues:
A. Reinforcing at elevator shaft/rebar not installed correctly by the Contractor.
B. Fireline routing below the ceiling — required multiple hours by the Architect and Consultant Team to resolve.
C. 1 -hour -rated ceiling/soffit construction by the General Contractor in Dorms not per Plans. Required multiple
meetings, Site Visits, and correspondence, to resolve.
D. Conflicts with existing sanitary sewer elevation and installed storm drain.
6. Utility issues:
A. Unforeseen MMWD requirements that required changes to domestic and firewater design
590 Ygnacio Valley Road, Suite 310 • Walnut Creek, CA 94596 • 925. 944. 1626
1970 Broadway, Suite 800 •Oakland, CA 94612 • 510. 272. 1060
www.ica-architects.com
San Rafael Fire Department Public Works Department — Fire Stations 54 and 55
9/29/2022
LCA #19073 — ASR 01
Page 12
1. Multiple additional Site Visits
2. Review, comment, and sign -off on Contractor's Monthly Progress Payments —including additional Site Visits per
payment application. Execute substantial billing reductions per payment application.
3. Review and comment on multiple Change Order Requests (CORS)
4. Provide technical, construction review and comments on inordinate amounts of Requests for Information (RFIs).
5. Provide technical, construction review and comments on significant construction concerns, including, but not
limited to:
A. Exterior sewer and storm drainage installation
B. Abandoned Underground StorageTank— unforeseen condition
C. Generator enclosure footing and structure
D. Antenna Array ,
E. Attic crawl space and other locations of HVAC components
F. Elevator Rebar
G. Traffic warning signal relocation — unforeseen condition
Architectural Coordination, Fee Breakdown:
Greg Barton: 65 hours @ $195.00 = $12,675.00 Greg Barton: 103 hours @ $195.00 = $20,085.00
Ron Guelden: 45.6 hours 185.00 = $8,436.00 Ron Guelden: 50 hours @ $185.00 = $9,250.00
Fire Station 54, Subtotal: $21,111.00 Fire Station 55, Subtotal: $29,335.00
Total Add Service Request: $50,446.00
Attachments: Exhibit A — LCA Fee Schedule
Authorization of Additional Services
Date
San Rafael Fire Department Public Works Department— Fire Stations 54 and 55
9/29/2022
LCA #19073 — ASR 01
Page 13
EXHIBIT A
LCA ARCHITECTS, INC.
2022 HOURLY FEE SCHEDULE*
DESCRIPTION _
Principal
HOURLY RATE
$230.00
Associate
$190.00 to $200.00
Project Manager
$200.00
Construction Manager
$165.00 to $190.00
Project Architect
$170.00 to $190.00
Quality Control Manager
$195.00
Specifications Writer
$195.00
Job Captain
$165.00 to $185.00
Designer
$165.00 to $180.00
CAD Tech
$165.00 to $170.00
Project Coordinator
$120.00 to $135.00
Administration/Research/Presentations
$125.00 to $135.00
Clerical
$135.00
Architectural Animation — Preparation of
computer-generated views, renderings and
simulations of architectural interiors and exteriors_
Preparation of video "fly-by's," walkthroughs, and
other simulations.
$185.00/hr.
Expert Witness— Review of documents, meetings,
site visits, telephone conferences, administration of
the documents and materials, research, deposition,
testimony, court appearances, and travel time.
$500.00/hr.
Perspective Sketches and Renderings, Visual
Simulations
On a Per Drawing Basis
Mileage (outside of the Walnut Creek area)
**as adjusted by IRS guidelines
0.625/mile**
Copies, prints, CADD plots, photography, preparing and compiling .pdf sets, scanning, colored print
mounting, long distance phone calls, postage, express mail, and travel outside the Walnut Creek
area will be billed on a reimbursable basis: at cost plus 15%.
Overtime - If overtime is required by staff, to meet a customer's timing request, additional hourly
fee charges may apply. California employment law will apply.
* Effective 08/09/2022. Subject to change quarterly.
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Nataly Torres (for Fabiola G.) Extension: 3353
Contractor Name: Loving Campos Associates, Architects, Inc.
Contractor's Contact: Carl Campos Contact's Email: ccampos@Ica-architects.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED REVIEWER
DEPARTMENT
DATE Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
i ..
enter a date.
b. Email contract (in Word) and attachments to City
12/15/2022
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑X NT
2
City Attorney
a. Review, revise, and comment on draft agreement
12/16/2022
and return to Project Manager
12/16/2022
❑X GC
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
❑X GC_
3 Department Director
Approval of final agreement form to send to
1/6/2023
❑x AM
contractor
Forward three (3) originals of final agreement to
2/7/2023
4 Project Manager
contractor for their signature
5 Project Manager
When necessary, contractor -signed agreement
❑X N/A
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
8
City Attorney
Review and approve insurance in PINS, and bonds
(for Public Works Contracts)
9
City Manager/ Mayor
Agreement executed by City Council authorized
official
10
City Clerk
Attest signatures, retains original agreement and
forwards copies to Project Manager
First Amendment - Loving Campos Associates
- Fire Station 54&55 Construction Support
Services
Final Audit Report
Created: 2023-02-07
By: Nataly Torres (nataly.torres@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAF-ZEquYy70uu7MAxEjgKCckfygUSGGw_
2023-02-13
"First Amendment - Loving Campos Associates - Fire Station 54
&55 Construction Support Services" History
Document created by Nataly Torres (nataly.torres@cityofsanrafael.org)
2023-02-07 - 8:51:44 PM GMT
E-4' Document emailed to Carl Campos (ccampos@Ica-architects.com) for signature
2023-02-07 - 8:55:26 PM GMT
Email viewed by Carl Campos (ccampos@Ica-architects.com)
2023-02-07 - 8:56:00 PM GMT
a0 Document e -signed by Carl Campos (ccampos@Ica-architects.com)
Signature Date: 2023-02-07 - 9:38:07 PM GMT - Time Source: server
L--' Document emailed to David Bogstad (dbogstad@Ica-architects.com) for signature
2023-02-07 - 9:38:08 PM GMT
Email viewed by David Bogstad (dbogstad@Ica-architects.com)
2023-02-07 - 9:42:30 PM GMT
Email viewed by David Bogstad (dbogstad@Ica-architects.com)
2023-02-09 - 9:38:20 PM GMT
4 Document e -signed by David Bogstad (dbogstad@Ica-architects.com)
Signature Date: 2023-02-09 - 9:38:44 PM GMT - Time Source: server
'► Document emailed to Laraine Gittens(laraine.gittens@cityofsanrafael.org) for approval
2023-02-09 - 9:38:46 PM GMT
SAN RAFAEL I "'Y
Adobe
rHE CITY WITH A r-IISSION Acrobat Sign
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2023-02-10 - 6:36:12 PM GMT
b© Document approved by Laraine Gittens(laraine.gittens@cityofsanrafael.org)
Approval Date: 2023-02-10 - 6:39:36 PM GMT - Time Source: server
Cly Document emailed to Genevieve Coyle (genevieve.coyle@cityofsanrafael.org) for signature
2023-02-10 - 6:39:38 PM GMT
Email viewed by Genevieve Coyle (genevieve.coyle@cityofsanrafael.org)
2023-02-10 - 6:42:50 PM GMT
60 Document e -signed by Genevieve Coyle (genevieve.coyle@cityofsanrafael.org)
Signature Date: 2023-02-10 - 6:43:01 PM GMT - Time Source: server
E--'.. Document emailed to city.clerk@cityofsanrafael.org for approval
2023-02-10 - 6:43:03 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2023-02-11 - 2:00:58 AM GMT
GS0 Signer city.clerk@cityofsanrafael.org entered name at signing as Lindsay Lara
2023-02-11 - 2:01:06 AM GMT
a0 Document approved by Lindsay Lara(city.clerk@cityofsanrafael.org)
Approval Date: 2023-02-11 - 2:01:08 AM GMT - Time Source: server
L--'4 Document emailed to jim.schutz@cityofsanrafael.org for signature
2023-02-11 - 2:01:09 AM GMT
,n Email viewed by jim.schutz@cityofsanrafael.org
2023-02-11 -10:47:15 PM GMT
60 Signerjim.schutz@cityofsanrafael.org entered name at signing as Jim Schutz
2023-02-11 -10:47:37 PM GMT
60 Document e -signed by Jim Schutz(jim.schutz@cityofsanrafael.org)
Signature Date: 2023-02-11 - 10:47:39 PM GMT - Time Source: server
Document emailed to city.clerk@cityofsanrafael.org for signature
2023-02-11 -10:47:40 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2023-02-13 - 3:47:59 PM GMT
60 Signer city. clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi (for)
2023-02-13 - 3:48:23 PM GMT
Powered by
4SAN RAFAEL Adobe
"` ZlTM """' A "0SS'C" Acrobat Sign
6o Document e -signed by Brenna Nurmi (for) (city.clerk@cityofsanrafael.org)
Signature Date: 2023-02-13 - 3:48:25 PM GMT - Time Source: server
Agreement completed.