HomeMy WebLinkAboutPW Rotary Manor Improvements Project; Second AmendmentSECOND AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH
COASTLAND CIVIL ENGINEERING, INC., FOR ROTARY MANOR DRAINAGE
IMPROVEMENTS PROJECT
THIS SECOND AMENDMENT to the Professional Services Agreement by and
between the CITY OF SAN RAFAEL (hereinafter "CITY"), and COASTLAND CIVIL
ENGINEERING, INC. (hereinafter "CONSULTANT"), is made and entered into as of the
day of Feb 22, 2023 202_.
RECITALS
WHEREAS, the CITY and CONSULTANT entered into a Professional Services
Agreement dated December 19, 2019 to perform professional services in connection with
CITY'S Rotary Manor Drainage Improvements Project, for an amount not to exceed $163,526
(the "Agreement"); and
WHEREAS, the CITY and CONSULTANT entered into a First Amendment to the
Professional Services Agreement dated January 14, 2021 to perform professional services in
connection with CITY'S Rotary Manor Drainage Improvements Project, for an amount not to
exceed $10,340 and increasing the total not to exceed under the Agreement to $173,866; and
WHEREAS, CITY requires additional professional services from the CONSULTANT,
and the CONSULTANT is willing to provide such services.
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows:
1. Article II of the Agreement, entitled "DUTIES OF CONSULTANT" is hereby
amended to include the additional services set forth in CONSULTANT's
proposal dated December 22, 2022, attached to this Second Amendment as
Exhibit A and incorporated herein by reference.
2. Article IV of the Agreement, entitled "COMPENSATION" is hereby amended to
include additional compensation payable to CONSULTANT for the services
described in Exhibit A to this Second Amendment, on a time and materials rate
basis in accordance with Exhibit A, in a not -to -exceed amount of $69,722, and to
change the total not -to -exceed amount under the Agreement to $243,588.
3. Article V of the Agreement, entitled "TERM OF AGREEMENT" is hereby
amended to extend the term through December 16, 2023.
4. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be
in full force.
IN WITNESS WHEREOF, the parties have executed this Second Amendment on the
day, month, and year first above written.
CITY OF SAN RAFAEL
Jim Schutz (Feb 22, 202315:56 PST)
JIM SCHUTZ, City Manager
ATTEST:
en nn N Ymi or'
Brenna Nurmi (for) (Feb 22, 2023 15:57 PST)
LINDSAY LARA, City Clerk
APPROVED AS TO FORM:
GENEVIEVE COYLE, Assistant City Attorney
2
CONSULTANT
Name: Heidi Utterback
Title: Corp. Secretary
[If Contractor is a corporation, add signature
of second corporate officer]
IM
Name:
Title:
COASTLAND ���
December 22, 2022
Mr. Theo Sanchez
Exhibit A
Associate Civil Engineer
City of San Rafael
1400 Fifth Avenue
San Rafael, CA 94901
Via email: Theo.Sanchez@CityofSanRafael,org
Subject: Proposal Amendment #2 to Provide Additional Engineering Design Services for the
Revised Rotary Manor Culvert Replacement Project
Dear Mr. Sanchez,
At the City's request, we have prepared this amendment proposal to the contract currently in progress
for the Rotary Manor Culvert Replacement Project, located at 1821 Fifth Street in San Rafael. The original
scope of work consisted of the preparation of construction documents, environmental compliance and
permitting clearances for the replacement of a failing corrugated metal culvert and site restoration.
This amendment includes the following additional services:
Preparation of two temporary construction easements (TCEs), for properties at 1801 Fifth Street
and at Rotary Manor (1821 Fifth Street),
Preparation of a permanent easement (PE) for maintenance of the box culvert on Rotary Manor
property, and
Regulatory permitting and CDFW/Marin County Clerk CEQA filing fees not included in our contract
This amendment also includes additional efforts to finalize the
required by permitting agencies:
• Consultation with CDFW to address their comments,
• Add dewatering details to Plans as requested by CDFW,
■ Final coordination with geotechnical engineer, and
• Final cost estimation review.
design drawings and address changes
These additional efforts are necessary due to (1) multiple and extended project delays that were not
within our control, (2) project duration exceeding three years resulting in much larger than anticipated
project management and coordination efforts, and (3) changes to our hourly billing rates since the project
was awarded.
We have also in good faith conducted planning, coordination and consultation for multiple additional
scopes of work that were never awarded, including the relocation of the box culvert into Fifth Street,
Santa Rosa Auburn Pleasant Hill Fairfield
1400 Neotomas Avenue 11641 Blocker Drive, Ste. 170 3478 Buskirk Avenue, Ste. 1000 324 Campus Lane, Ste. A
Santa Rosa, CA 95405 Auburn. CA 95603 Pleasant Hill, CA 94523 Fairfield, CA 94534
Tel: 707.571.8005 Tel: 530.888.9929 Tel: 925.233.5333 Tel: 707.702 1961
www.coastiandcivii.com
December 22, 2022
Mr. Theo Sanchez, City of San Rafael
temporary and permanent relocation of cable and gas utilities in Rotary Manor, and preliminary planning
and design for the encroachment permits.
We have prepared the following scope of work and estimated fee for your consideration.
SCOPE OF SERVICES
Task 1— Project Management and Coordination
This task includes project and contract management, coordination between the City and the design
team, management of project schedules and budgets, and scheduling/administering of meetings.
Task 2 — Prepare Storm Drainage Easements
This task includes preparation of a temporary construction easement and permanent easement for the
portion of the box culvert on Rotary Manor property. Coastland will work with the City to determine the
easement boundaries for two temporary and one permanent easements. Coastland's subconsultant,
Cinquini & Passarino (C&P) will survey the interior of the culvert that is located on Rotary Manor property.
Subsequently, C&P will prepare legal descriptions and plats for the temporary and permanent easements,
and record the easements with the County.
Deliverables:
Legal Descriptions and Plats for a Temporary Construction Easement and Permanent Easement
for the Storm Drainage Culvert on Rotary Manor Property
Task 3 — Reimbursement for Regulatory Permit Filing Fees
On behalf of the City, WRA made payments for CDFW permit application fee ($5,745), RWQCB permit
application fee ($2,417), CDRW and County Clerk CEQA filing fees ($2,598). These payments were not
within the original scope of work but were conducted with the approval and as a convenience to the City.
Deliverables:
• None — reimbursement only
Task 4 — Finalize Regulatory Permitting
WRA will respond to both the CDFW and the RWQCB to work towards complete applications, including a
written response to CDFW's "30 -day letter" of incomplete application. This includes time for WRA and
Coastland to assist with the terms and conditions of the permits as well as associated bidding.
Deliverables:
• CDFW Lake and Streambed Alteration Agreement
• RWQCB Nationwide Maintenance Permit
• Corps of Engineers Nationwide Permit 3 for Maintenance of Existing Structures
COASTLANO OC .•.:
December 22, 2022
Mr. Theo Sanchez, City of San Rafael
Task 5 — Finalize Bid Documents
Coastland will make changes as required by regulatory agencies and finalize the bid documents, which
include the Project Plans, Specifications, and Cost Estimate. These tasks include final coordination with
the geotechnical engineer and landscape architect, as well as final specifications for the disposal of any
potential onsite contaminated soils.
Deliverables:
• Final Bid Documents, including Plans, Specifications, and Cost Estimate
ASSUMPTIONS / EXCLUSIONS
In the development of this project approach and design estimate, we have made the following
assumptions and exclusions:
■ Coordination with property owners is excluded.
■ Hydraulic assessment of the culvert is excluded
• Representation on behalf of the City for legal matters associated with this project is excluded.
0 Design and permitting tasks are completed by June 2023.
441061-1401a44
Based on our scope of work and our estimated time, we propose that the additional services associated
with the project be completed for a not -to -exceed amount of $69,722. The amount quoted assumes that
all of the work for these additional items will fall under the scope of services as described above.
We greatly appreciate the opportunity to assist the City of San Rafael with completion of this important
project. Please feel free to contact Jennifer Melman or me at (707) 571-8005 if you have any questions
or need any additional information.
Sincerely,
Heidi Utterback, PE Jennifer Melman, PE
Principal
COASTLANO OCCIAW.
December 22, 2022
Mr. Theo Sanchez, City of San Rafael
DESIGN WORK ESTIMATE
Rotary Manor Culvert Replacement Project Engineering Design
Amendment #2 Services
City of San Rafael
Task Information Billing Classification & Rate
Subconsultants
Hours & Cost
Principal
Engineer
$215
Senior Assistant
Engineer Engineer
Admin
C&P
Survey
WRA
Permits
TOTAL
HOURS
TOTAL
FEE
$185 $160
$100
1
Project Management
Project Management 4
Subtotal
20
24
$4,560
$4,560
24
2
Prepare Storm Drainage Easements
Prepare Legal Descriptions & Plats (2 TCE & 1 PE) 2
10 4
2
$9,804
$5,296
16
$12,724
Survey Culvert Interior (on Rotary Manor property)
2
$5,666
Record Easements with County 1
2 4
7
$1,225
Subtotal
25
$19,615
3
Reimbursement for Regulatory Permit Fling Fees
Regulatory Permitting & CDFWICountyFiling Fees
$10,760
0
$10,760
1 $101760
Subtotal
0
4
IFinalize Regulatory Permits
(Finalization of Regulatory Permitting 2
12 6
$9,253
$13,515
20
$12,863
$13,515
OEQAIS/MND
0
Subtotal
20
$26,378
5
IFinalize Bid Documents
(Make Final Changes to Plans and Specifications 2
12 12
4
30
$4,970
'Update Estimate 2
8 8
18
$3,190
$8,160
Subtotal
48
CCE Direct Costs (repro, mileage, etc.)
$250
Totat Cost
$15,100
S33,52a
117
$69,722
COASTLANO OCCIAVAff
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Nataly Torres (for Theo) Extension: 3353
Contractor Name: Coastland Civil Engineering
Contractor's Contact: Jenny Melman Contact's Email: melman@coastlandcivil.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
Click here to
❑
1
Project Manager
a. Email PINS Introductory Notice to Contractor
enter a date.
b. Email contract (in Word) and attachments to City
1/30/2023
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑X NT
2
City Attorney
a. Review, revise, and comment on draft agreement
2/17/2023
and return to Project Manager
2/17/2023
® _GC_
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
0 GC
3
Department Director
Approval of final agreement form to send to
2/21/2023
® AM
contractor
4
Project Manager
Forward three (3) originals of final agreement to
2/21/2023
contractor for their signature
5
Project Manager
When necessary, contractor -signed agreement
® N/A
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
8
City Attorney
Review and approve insurance in PINS, and bonds
(for Public Works Contracts)
9
City Manager/ Mayor
Agreement executed by City Council authorized
official
Attest signatures, retains original agreement and
10
City Clerk
forwards copies to Project Manager
2nd Amendment - Coastland Civil - Rotary
Manor
Final Audit Report
Created: 2023-02-21
By: Nataly Torres (nataly.torres@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAyAIP3kOsYyMUxFLckQQ4t3vQxlc3xnTO
2023-02-22
"2nd Amendment - Coastland Civil - Rotary Manor" History
Document created by Nataly Torres (nataly.torres@cityofsanrafael.org)
2023-02-21 - 10:09:49 PM GMT
E-41 Document emailed to Heidi Utterback (utterback@coastlandcivil.com) for signature
2023-02-21 - 10:12:31 PM GMT
Email viewed by Heidi Utterback (utterback@coastlandcivil.com)
2023-02-21 -10:41:14 PM GMT
60 Document e -signed by Heidi Utterback (utterback@coastlandcivil.com)
Signature Date: 2023-02-21 -11:12:50 PM GMT - Time Source: server
E'y Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2023-02-21 -11:12:51 PM GMT
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2023-02-22 -10:31:12 PM GMT
6© Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2023-02-22 - 11:04:36 PM GMT - Time Source: server
C'7y Document emailed to Genevieve Coyle (genevieve.coyle@cityofsanrafael.org) for signature
2023-02-22 - 11:04:38 PM GMT
Email viewed by Genevieve Coyle (genevieve.coyle@cityofsanrafael.org)
2023-02-22 - 11:19:35 PM GMT
6© Document e -signed by Genevieve Coyle (genevieve.coyle@cityofsanrafael.org)
Signature Date: 2023-02-22 - 11:19:43 PM GMT - Time Source: server
�&- SAID RAFAEL Adobe
Acrobat Sign
E-' Document emailed to city.clerk@cityofsanrafael.org for approval
2023-02-22 -11:19:45 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2023-02-22 -11:30:29 PM GMT
6© Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2023-02-22 - 11:30:41 PM GMT
6© Document approved by Brenna Nurmi (city.clerk@cityofsanrafael.org)
Approval Date: 2023-02-22 - 11:30:43 PM GMT - Time Source: server
E14 Document emailed to jim.schutz@cityofsanrafael.org for signature
2023-02-22 - 11:30:45 PM GMT
Email viewed by jim.schutz@cityofsanrafael.org
2023-02-22 - 11:55:15 PM GMT
fS© Signerjim.schutz@cityofsanrafael.org entered name at signing as Jim Schutz
2023-02-22 - 11:56:00 PM GMT
b© Document e-signed by Jim Schutz(jim.schutz@cityofsanrafael.org)
Signature Date: 2023-02-22 - 11:56:02 PM GMT - Time Source: server
Document emailed to city.clerk@cityofsanrafael.org for signature
2023-02-22 -11:56:03 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2023-02-22 - 11:57:29 PM GMT
6© Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi (for)
2023-02-22 - 11:57:50 PM GMT
b© Document e-signed by Brenna Nurmi (for) (city.clerk@cityofsanrafael.org)
Signature Date: 2023-02-22 - 11:57:52 PM GMT - Time Source: server
7 Agreement completed.
2023-02-22 - 11:57:52 PM GMT
SAN i2AFAEL I AP dob by
"" -17-11TH A MISSIC" Acrobat Sign