HomeMy WebLinkAboutPW Spinnaker Point Parking Modification Project Notice of Completion____________________________________________________________________________________
FOR CITY CLERK ONLY
Council Meeting: May 1, 2023
Disposition: Accepted completion of the Spinnaker Point Parking Modification Project and
authorized the City Clerk to file the Notice of Completion
Agenda Item No: 4.h
Meeting Date: May 1, 2023
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: Joanna Kwok, Senior Engineer
April Miller, Public Works Director
City Manager Approval: ______________
TOPIC: SPINNAKER POINT PARKING MODIFICATION PROJECT NOTICE OF COMPLETION
SUBJECT: ACCEPT COMPLETION OF THE SPINNAKER POINT PARKING MODIFICATION
PROJECT (CITY PROJECT NO. 11363), AND AUTHORIZE THE CITY CLERK TO FILE
THE NOTICE OF COMPLETION
RECOMMENDATION:
Accept completion of the Spinnaker Point Parking Modification Project and authorize the City Clerk to file
the Notice of Completion.
BACKGROUND:
The City had identified the opportunity to increase on-street parking spaces along Spinnaker Point Drive
by converting the existing parallel parking on the north side of the street, adjacent to the Albert J. Boro
Community Center, into angled parking. The project incorporated angled parking in the street by
reconfiguring the existing roadway, narrowing the median, and shifting the sidewalk to the north to align
with the future Tiscornia Marsh Habitat Restoration project led by the Marin Audubon Society. The
conversion to angled parking on the north side of Spinnaker Point Drive between Bahia Way and the
crosswalk west of Portsmouth Cove resulted in 42 parking spaces, two of which are accessible parking
spaces. This nearly doubled the number of existing parallel parking spaces that were replaced at this
location. Other completed improvements include new curb and gutter, widened sidewalk to enhance the
pedestrian experience, and streetlights to improve visibility and safety of the area.
A portion of the sidewalk was temporarily paved with asphalt and will be finished with concrete upon
adjustment of utility box by PG&E. Installation of the project bioretention area was deferred to not delay
the project construction as unforeseen utility conflicts were being resolved. As such, City staff will procure
a contractor to complete both the concrete sidewalk and install the project bioretention area at a later
time in coordination with the utility box adjustment.
The Spinnaker Point Parking Modification Project was advertised in accordance with San Rafael’s
Municipal Code on June 23, 2022, and sealed bids were publicly opened and read aloud on July 19,
2022. On August 1, 2022, the City Council adopted a resolution authorizing the City Manager to enter
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
into an agreement with the low bidder, Michael Paul Company Inc., in the amount of $844,693 and
approving a construction contingency of $125,307 for a total appropriation in an amount of $970,000.
City staff have performed the final inspection and determined that all work has been satisfactorily
completed in accordance with the project plans and specifications. City staff recommends that the City
Council accept the project.
ANALYSIS:
Pursuant to Civil Code Section 8182, the City records a Notice of Completion upon City acceptance of
the improvements. This acceptance initiates a time period during which project subcontractors may file
Stop Notices seeking payment from the City from the funds owed to the Contractor for the project work.
FISCAL IMPACT:
No fiscal impact is associated with accepting this report.
RECOMMENDED ACTION:
Accept completion of the Spinnaker Point Parking Modification Project and authorize the City Clerk to file
the Notice of Completion.
ATTACHMENTS:
1. Notice of Completion
IIIIIIlIIII Ilili IIIII uli 1il Ill III IIIIIIIII! IIIII IIIII _!1lII IIII IIII
2023-0011663
Recorded
Of dal Records
County of
Mann
Recording Requested By
SHE UY sCOTr
The City of San Rafael
Recorder
County (JeA
When Recorded Mail To
02;07PM 09-May 2023
Lindsay Lara, City Clerk
1400 Fifth Avenue, 209
San Rafael, CA 94901
EXEMPT FROM RECORDING FEES PER
GOVERNMENT CODE § 27383
NOTICE OF COMPLETION
Civil Code §§ 8182, 8184, 9204, and 9208
NOTICE IS HEREBY GIVEN THAT:
1. The undersigned is the agent of the owner of the Project described below
2 Owner's full name is City of San Rafael ("City")
3. City's address is 1400 Fifth Ave., San Rafael, CA 94901
4. The nature of City's interest in the Project is:
_ Fee Ownership _ Lessee _ Other: Public Right -of -Way Easement
REC FEE 0-00
CONFORMED CORM 0.00
Page I of I
5. Construction work on the Project performed on City's behalf is generally described as
follows:
Spinnaker Point Parking Modification Project: Scope of work includes
excavation/demolition, off -haul of materials, reconfiguring Spinnaker Point Drive to incorporate
angled parking, narrowing median, widening sidewalk, realigning curb and gutter, and installing
new streetlights.
6. The name of the original Contractor for the Project is: Michael Paul Company, Inc.
located at 1200 Casa Grande Rd., Petaluma, CA 94954.
The Project was accepted as complete on: May 1, 2023.
8. The Project is located at: Spinnaker Point Drive from Bahia Way to the crosswalk west of
Portsmouth Cove.
Verification: In signing this document, I, the undersigned, declare under penalty of perjury under
the laws of the State of California that I have read this notice, and I know and understand the
contents of this notice, and that the facts stated in this notice are true and correct.
Date and Place Signature
A',7r� 1 M I �I PX
Namb and Title
EXEMPT FROM NOTARY ACKNOWLEDGMENT REQUIREMENTS PER
GOVERNMENT CODE § 27287 AND CIVIL CODE § 9208
Spinnaker Point Parking
Modification Project
2023 Form NOTICE OF COMPLETION
Page 1