Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPW Service Level Agreement; Task Order No. 99.2 Northgate Plan ReviewCity of San Rafael
SERVICE LEVEL AGREEMENT
DATED NOVEMBER 3, 2023
WITH PARAMETRIX, INC.
TASK ORDER NO. 99.2
(Amendment to Task Order No. 99)
Northgate Plan Review
Amendment Amount: $7,650
THIS AMENDMENT TO TASK ORDER No. 99 is entered into on Sep 4, 2024
between the City of San Rafael, a municipal corporation ("City"), and Parametrix, Inc., ("Contractor").
RECITALS
A. Whereas Master Consultant Services Agreement is hereby renamed Service Level
Agreement; and
B. The City and Contractor (as may be identified as "Consultant" in the original Agreement)
have entered into a Service Level Agreement ("Agreement") dated November 3, 2023, under which
Contractor has agreed to perform certain contract services for the City; and
C. Pursuant to the Agreement, on November 27, 2023, the City and Contractor entered into
"Task Order No. 99" under which Contractor agreed to perform contract services in connection with
City's Northgate Plan Review (the "Project"), for a total not to exceed $9,940; and
D. Pursuant to the Agreement, on May 27, 2024, the City and Contractor entered into "Task
Order No. 99.1" under which Contractor agreed to perform additional services in connection with the
Project, as specified in Exhibit A attached to and included in Task Order No. 99.1, for a total not to
exceed $8,780, changing the total of Task Order No. 99 not to exceed $18,720.
E. City now requires additional services for the Project, and the Contractor is willing to
provide such services.
NOW, THEREFORE, City and Contractor agree to amend Task Order No. 99 as follows:
AGREEMENT TO AMEND TASK ORDER
1. Section 1 entitled "Scope of Services," is hereby amended to include the additional services set
forth in Exhibit A of this Task Order Amendment.
2. Section 2 entitled "Date of completion; Work hours estimate; Cost estimate and budget; Fee
schedule" is hereby amended to include the additional services, work hours estimate, cost estimate and
budget set forth in Exhibit A, for an amount not to exceed $7,650, changing the total not to exceed to
$26,370.
Rev May 2013
City of San Rafael Service Level Agreement
Amendment to Task Order
3. Except as specifically amended herein, all of the other provisions, terms and obligations of Task
Order No. 99, as amended by Task Order 99.1, shall remain valid and shall be in full force.
4. Signatures. The parties have executed this Amendment as of the date first written above.
CITY OF SAN RAFAEL CONTRACTOR
::�: a _ Daviol
By: CristMn All MZ6 (Sep4, 202420:30 PDT) BY: David Parisi (Aug 13, 202411:38 PDT)
Cristine Alilovich, City Manager David Parisi
Name:
Reviewed By
R,4 rf P. E j&gj'
By: Robert F. Epstein(All g3 f,202420:43 PDT)
Robert F. Epstein, City Attorney
Exhibits:
A — Scope of Work
2
Rev Jan 2019
Title: Principal Consultant
(if Contractor is a corporation, add
signature of second corporate officer)
By:
ct
Name: Nathan Johnson
Title: Senior Vice President
Exhibit A
From: Jimmy Jessup <JJessup@parametrix.com>
Sent: Monday, July 29, 2024 5:05 PM
To: Sarah Teplitsky <Sarah.Teplitsky@cityofsanrafael.org>
Subject: RE: Northgate - Circulation and Emergency Access Plan Review
Hi Sarah,
No problem —thanks for coordinating all the input, I know how that goes! I've incorporated input from the Fire
Chief and removed meetings with the fire department. I'll assume that I should not further follow-up with Chief
Sinnott at this time.
Please see below our proposed scope and fee:
Parametrix is excited for the opportunity to:
1) Perform first round of peer review of the Northgate Town Square Redevelopment Fire Access Plan and
Latest set of comments from the City and from the San Rafael Fire Department. As part of this task, we will:
a. Perform a plan check review against the 2022 edition of the CA Fire Code sections 503, Appendix D,
and any other standards relating to emergency access. The review will be performed on the Fire
Access Plan anticipated to be received by the City on Wednesday, Ju131, 2024.
b. Review all potential intersections for which fire apparatus turning analysis should be performed
and identify any locations not analyzed on the Fire Access Plan
c. Verify fire apparatus turning radii at all indicated locations on the applicant Fire Access Plan is
correctly applied and displayed. It is assumed that the Pierce Turning Performance Analysis
parameters and calculated turning radii reflect the San Rafael Fire Department's desired design
vehicle.
d. Identify any potential fire access shortfalls, and make recommendations for additional parking
restrictions or measures to ensure access remains sufficient.
e. Provide a draft memorandum to the City summarizing the review method, findings, and
recommendations. The memorandum will state whether the latest Fire Access Plan conforms with
the minimum requirements set forth in the CA Fire Code sections 503 and Appendix D, and will
identify any specific areas that do not meet the minimum code requirements.
f. Update the draft memorandum after incorporating comments from the outcome in Task 2) below.
Final memorandum will be issued within one week of issuing final meeting minutes from 2) below.
2) Participate in a 1.5-hour meeting to discuss the draft memorandum from Task 1) above together with City
and Fire Department staff, the project applicant, or other interested parties. As part of this task, we will:
a. Draft a meeting agenda
b. Issue draft meeting minutes within three working days of the meeting
c. Incorporate comments to the draft meeting minutes and issue final meeting minutes within one
week of receiving comments
d. Assumption: This task assumes that City staff will coordinate schedules of meeting invitees and
arrange for distribution of the meeting invite.
3) After applicant adjustments are executed to the Fire Access Plan if requested, Perform a second round of
peer review of the Northgate Town Square Redevelopment Fire Access Plan. This review will incorporate
the same steps as Task 1) above.
4) Participate in a 1.5-hour meeting to discuss the draft memorandum from 1) above together with City and
Fire Department staff, the project applicant, or other interested parties. Services will be the same as
included in 2) above.
Parametrix will complete the above items for a fee not to exceed $7,650. We will conduct the tasks on a time and
materials basis in accordance with our existing billing rates. We will complete Task 1 within three weeks of Notice
to Proceed, and we will complete Task 3 within two weeks of receipt of an updated Fire Access Plan. The timing for
Tasks 2 and 4 are dependent on eventual arrangement of meeting dates.
We are excited to serve the City of San Rafael in this important matter. Please do not hesitate to contact me if you
have any questions.
Regards,
Parametrik
Jimmy Jessup
he/him
Engineer III
510.343.6512 1 direct
We're Moving!
We're Moving! Find us at our new location starting August 1.
6001 Shellmound Avenue, Suite 500, Emeryville, CA 94608
Parametrik 1=
TRANSPORTATION (ONSULTING
HOURLY SERVICE RATES FOR PROFESSIONAL SERVICES
October 1, 2023 - September 30, 2024
Principal Consultant
$390.00
Sr Consultant
$250.00
Sr Planner
$240.00
Engineer IV
$185.00
Engineer III
$160.00
Planner III
$160.00
Sr Graphic Designer
$160.00
Sr Project Accountant
$155.00
Sr Project Controls Specialist
$155.00
Engineer 1
$135.00
Planner II
$130.00
Planner 1
$125.00
Notes:
Hourly service rates are effective through September 30, 2024
Reimbursable charges include, but are not limited to, transportation
charges, reproduction services, shipping expenses and subconsultant
fees. Mileage charges will be charged at the prevailing IRS rate per mile.
Monthly invoices are due withing 30 days from the date of the invoice.
800 Bancroft Way, Suite 203 • Berkeley, CA 94710 1 510.343.6400 1 Parametrix.com
TO Amendment 99.2 Northgate Plan Review
Final Audit Report 2024-08-29
Created: 2024-08-13
By: Shannon Mackie (shannon.mackie@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAiRNyODnFVrJjWv1dpYpgSdogRB8FM4f
"TO Amendment 99.2 Northgate Plan Review" History
Document created by Shannon Mackie (shannon.mackle@cityofsanrafael.org)
2024-08-13 - 6:22:54 PM GMT- IP address: 199.88.113.8
C'; Document emailed to David Parisi (dparisi@parametrix.com) for signature
2024-08-13 - 6:24:20 PM GMT
Email viewed by David Parisi (dparisi@parametrix.com)
2024-08-13 - 6:37:41 PM GMT- IP address: 104.47.73.126
6o Document e-signed by David Parisi (dparisi@parametrix.com)
Signature Date: 2024-08-13 - 6:38:01 PM GMT - Time Source: server- IP address: 47.209.40.127
�., Document emailed to Nathan Johnson (njohnson@parametrix.com) for signature
2024-08-13 - 6:38:03 PM GMT
Email viewed by Nathan Johnson (njohnson@parametrix.com)
2024-08-29 - 11:31:01 PM GMT- IP address: 104.47.73.126
do Document e-signed by Nathan Johnson (njohnson@parametrix.com)
Signature Date: 2024-08-29-11:31:48 PM GMT - Time Source: server- IP address: 174.193.195.224
® Agreement completed.
2024-08-29 - 11:31:48 PM GMT
( SAN RAFAEL POt9L" e
` � Adobe
Acrobat Sign
r1
WITH P'
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackle (for Sarah Teplitsky) Extension: 3353
Contractor Name: Parametrix, Inc
Contractor's Contact: Jimmy Jessup Contact's Email: Bessup@parametrix.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
7/31/2024
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑X SM
2
City Attorney
a. Review, revise, and comment on draft agreement
8/9/2024
and return to Project Manager
8/9/2024
® NT
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
❑X NT
3
Department Director
Approval of final agreement form to send to
8/12/2024
M AM
contractor
4
Project Manager
Forward three (3) originals of final agreement to
8/13/2024
—211
contractor for their signature
5
Project Manager
When necessary, contractor -signed agreement
® N/A
agendized for City Council approval *
*City Council approval required for Professional Services
1X
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
8/30/24
SM
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
8
City Attorney
Review and approve insurance in PINS, and bonds
(for Public Works Contracts)
9
City Manager / Mayor
Agreement executed by City Council authorized
official
Attest signatures, retains original agreement and
10
City Clerk
forwards copies to Project Manager
Task Order No. 99.2 - Parametrix Inc. -
Northgate Plan Review
Final Audit Report 2024-09-05
Created: 2024-08-30
By: Nataly Torres(nataly.torres@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAA33cicxgC1fLTWJ8tbmUw_eWtuMKoPE7j
"Task Order No. 99.2 - Parametrix Inc. - Northgate Plan Review"
History
Document created by Nataly Torres (nataly.torres@cityofsanrafael.org)
2024-08-30 - 5:18:01 PM GMT- IP address: 99.145.194.25
E-14 Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2024-08-30 - 5:21:39 PM GMT
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2024-08-30 - 6:38:03 PM GMT- IP address: 104.47.65.254
6o Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2024-08-30 - 6:40:19 PM GMT - Time Source: server- IP address: 199.88.113.8
E'y Document emailed to rob.epstein@cityofsanrafael.org for signature
2024-08-30 - 6:40:21 PM GMT
Email viewed by rob.epstein@cityofsanrafael.org
2024-09-01 - 3:43:00 AM GMT- IP address: 104.28.85.165
6o Signer rob.epstein@cityofsanrafael.org entered name at signing as Robert F. Epstein
2024-09-01 - 3:43:18 AM GMT- IP address: 104.28.85.164
6© Document e-signed by Robert F. Epstein (rob.epstein@cityofsanrafael.org)
Signature Date: 2024-09-01 - 3:43:20 AM GMT - Time Source: server- IP address: 104.28.85.164
E-y Document emailed to city.clerk@cityofsanrafael.org for approval
2024-09-01 - 3:43:22 AM GMT
Email viewed by city.clerk@cityofsanrafael.org
2024-09-03 - 2:38:39 PM GMT- IP address: 104.47.64.254
SAN PAFAEL Powered by � Adobe
"'` "s'` Acrobat Sign
d© Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2024-09-03 - 2:38:54 PM GMT- IP address: 199.88.113.8
b© Document approved by Brenna Nurmi(city.clerk@cityofsanrafael.org)
Approval Date: 2024-09-03 - 2:38:56 PM GMT - Time Source: server- IP address: 199.88.113.8
C'y Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2024-09-03 - 2:38:58 PM GMT
Email viewed by cristine.alilovich@cityofsanrafael.org
2024-09-05 - 3:30:32 AM GMT- IP address: 174.249.146.169
60 Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2024-09-05 - 3:30:46 AM GMT- IP address: 174.249.146.169
rS© Document e-signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)
Signature Date: 2024-09-05 - 3:30:48 AM GMT - Time Source: server- IP address: 174.249.146.169
�B Agreement completed.
2024-09-05 - 3:30:48 AM GMT
SAN RAFAEL I Adobe
by
TIE ' III G' Acrobat Sign