HomeMy WebLinkAboutPW Service Level Agreement; Task Order No. 127; Engineering & Traffic Survey AB 43 EvaluationCity of San Rafael
SERVICE LEVEL AGREEMENT
DATED NOVEMBER 3, 2023
WITH PARAMETRIX, INC.
TASK ORDER NO. 127
Subject title: Engineering & Traffic Survey AB 43 Evaluation
Task Order Amount: $65,230
THIS TASK ORDER is entered into on Sep 4, 2024
a municipal corporation ("City"), and Parametrix, Inc., ("Contractor")
RECITALS
between the City of San Rafael,
A. Whereas Master Consultant Services Agreement is hereby renamed Service Level Agreement;
and
B. The City and Contractor (as may be identified as "Consultant" in the original Agreement) have
entered into a Service Level Agreement ("Agreement") dated November 3, 2023 under which
Contractor has agreed to perform certain contract services for the City; and
C. Pursuant to the terms of the Agreement, the City wishes Contractor to perform certain tasks as set
forth in this Task Order, which constitute the Work;
NOW, THEREFORE, City and Contractor agree as follows:
AGREEMENT
1. Scope of services. Contractor shall provide any and all of the services set forth in Exhibit A of
this Task Order, for an amount not to exceed the Task Order Amount, identified above, as directed by the
City.
David Parisi shall be the Project Manager for Contractor for this Task Order. Additional contract services
may be performed by other Contractor staff with prior notice and approval by City.
a. City's duties. The City will:
(1) Determine the scope of services, as set forth in Exhibit A.
(2) Make available work plans and specifications and other City data related to the project,
including full information as to the City's requirements.
(3) Designate Eugelyn Lopez, or their designee as the person at the City responsible for
monitoring performance under this Task Order.
b. Contractor duties. The Contractor will:
(1) Provide and perform tasks identified in Exhibit A, Scope of Services.
(2) Provide miscellaneous services related to the Work and not stipulated elsewhere in this
Task Order, when requested by the City in writing. A Task Order Amendment is
Rev. March 2024
City of San Rafael Service Level Agreement
Task Order
required if these additional services cannot be performed within the Task Order budget.
2. Date of completion; Work hours estimate; Cost estimate and budget; Fee schedule: Costs are not -
to -exceed stated Task Order Amount in this Task Order. See Exhibit A for Work and fee schedule details.
Authorization to proceed.
The City will give Contractor authorization to proceed with the work specified in this Task Order only after
Contractor submits updated insurance certificates and endorsements, in accordance with the Agreement.
4. Service Level Agreement terms; Conflicts.
Except as expressly otherwise provided herein, all terms of the Agreement shall apply to Contractor in the
performance of work pursuant to this Task Order. If there is a conflict between this Task Order and the
Agreement, this Task Order shall control.
Amendment of Task Order: Conflicts.
Except as provided in Section 1(b)(2) above, this Task Order may not be modified except by an Amended
Task Order executed and approved in the same manner as the Task Order.
6. Signatures. The parties have executed this Task Order, as of the date first written above.
Rev March 2024
City of San Rafael Service Level Agreement
Task Order
CITY OF SAN RAFAEL CONTRACTOR
By: Cristine Alilovich )Sep 4, 2024 20:29 PDT)
Cristine Alilovich, City Manager
Reviewed By
Raderf- F. EarErg;%�
By: Robert F Epstein (Aug 3 , 2074 X 43 PDTi
Robert F. Epstein, City Attorney
Exhibits:
A
Rev March 2024
Scope of work
Davip( Thy tI
By: David Parisi (Aug 13, 202411:41 PDT)
Name: David Parisi
Title: Principal Consultant
(if Contractor is a corporation, add signature
of second corporate officer)
By:
Name: Nathan Johnson
Title: Senior Vice President
Exhibit A
Parametrik Scope of Work
let's create tomorrow, together
City of San Rafael
Update of Engineering & Traffic Surveys in Context of AB 43
Introduction
Parametrix is pleased to provide a workplan for performing a review and suggesting updates to the
City's recent draft Engineering & Traffic Survey (E&TS) report, accounting for recent provisions of
California Assembly Bill (AB) 43, which allow for greater local jurisdictional influence in establishment
of posted speed limits, as well as provisions of AB 321, which allow for reduced speed limits in
school zones when children are present.
The draft E&TS, performed by W-Trans, recommends speed limits based on data collected through
engineering reviews and speed surveys conducted along non -local roadways in the City. Based on
this information, the E&TS recommends speed limits based on an engineering method that utilizes
the 85th percentile speed, or the critical speed. However, recent legislation through AB 43 (2021)
and AB 321 (2011) increases local jurisdictional ability to establish speed limits that are aligned with
the intent and actual use of roadways. In particular, AB 43 directs local jurisdictions to account for
the safety of vulnerable road users, including children, seniors, persons with disabilities, and the
unhoused, when establishing speed limits.
Recognizing the strong relationship between vehicle speeds and crash outcomes for vulnerable road
users, this scope of work will study the potential to establish speed limits according to the provisions
of AB 43 and AB 321. The work would be comprised of tasks in a stepwise manner, with each task
building on the previous task, according to City roadway segments as follows:
• Downtown, focused on 4th Street, and a few other streets that may apply
Roadways near schools, senior housing facilities, and other high pedestrian -generating land
uses
• Other collector and arterial roadways, including Point San Pedro Road, Freitas Parkway, etc.
Task 1- Project Management and Implementation Strategy
Objectives
The objective of this task is to provide overall project management of the consultant contract with
City of San Rafael Public Works. This task includes general management functions that include the
following:
• Kick-off meeting - Attend virtual kick-off meeting to discuss scope of work, schedule, and
roles and responsibilities.
• Project Schedule Tracking - Establish project schedule within one week of project initiation
and track progress against schedule milestones throughout the project
�1
800 Bancroft Way, Suite 203 • Berkeley, CA 94710 1 510.343.6400 1 Parametrix.com
Parametrik
Scope of Work
• Budget Tracking - Track the project budget using Parametrix in-house tools to verify that
progress is keeping pace with spending.
• Monthly design team meetings, including additional coordination meetings as necessary.
• Monthly invoicing - Prepare a monthly invoice for services performed by Parametrix.
• Correspondence - Prepare written correspondence as needed to document and coordinate
project management issues and/or concerns throughout the project.
As part of this task, Parametrix will develop an implementation strategy for integration of
recommended established speed limits as a result of this scope of work. This work will include
developing a description of two options for implementing speed limits (typically at once or staged),
and detailing strengths and weaknesses of both alternatives.
Parametrix will assist the City in liaising with integral stakeholders, including the Police Department,
school district, and others, in presenting the methodology and justification of engineering study
results in accordance with AB 43 provisions. Parametrix will develop maps with speed limit results
that overlay timing of speed limit sign changes and other communication materials that can be used
by the City for conveying study results and plan for implementation.
Deliverables
• Project schedule with key milestones, monthly invoicing
• Miscellaneous correspondence to document project management issues.
• Implementation strategy option description and strength/weakness table
• Implementation strategy maps and timing
Assumptions
• Budget assumes 12 progress update teleconference meetings after kick-off meeting.
Task 2 - Downtown San Rafael
The objective of this task is expand on the information contained in the draft E&TS and to explore
newly available tools to local jurisdictions when establishing speed limits in contexts applicable to
the downtown San Rafael setting. In particular, this task would analyze 4th Street, as well as up to 4
other roadways, and would account for the complexities involved in assessment of stretches of
roadways that do not meet the definition of "Business Activity District" but may meet other provisions
of AB 43 allowing for reduced speed limits depending on numerous characteristics. This task
consists of the following steps:
• Alignment with City on roadways for further speed limit analysis.
• Documentation of existing signed conditions, and results of the draft E&TS, last recorded
E&TS, and prior E&TS before the last.
• Identification of discrete roadway segments for conducting additional speed surveys, further
crash history analysis, or other further evaluation, and execution of these evaluations.
• Identification of roadway characteristics according to AB 43 and the California Vehicle Code
(CVC) Sections 22358.7, 22358.8, and 22358.9, to determine if appropriate lengths and
City of San Rafael 2 June 2024
Update of Engineering & Traffic Surveys in Context of
AB 43
Parametrik Scope of Work
sections of the roadway are identified as being on the LRSP High Collision Network, adjacent
to high bicycle or pedestrian -generating land uses, have a lower previously -adopted speed
limit, or meets the definition of "Business Activity District."
• Based on these classifications, the lowest potential recommended speed limit in accordance
with AB 43 would be identified and mapped for consideration by the City.
• Discussion of roadway speed limit eligibility and results with City and enforcement personnel
• Results can be provided either as suggested edits for incorporation into the W-Trans E&TS
report, or summarized as updated results within a report for those roadway segments with
modified established speed limits.
• Presentation of results at a virtual stakeholder group meeting and at two public hearings.
• Support for and review of staff reports and associated resolution or ordinance language for
adoption of reduced speed limits.
Deliverables
• Spreadsheet of all collected data for analyzed roadway segments from the existing E&TS,
prior E&TS, AB 43-relevant information, and lowest recommended speed limits for downtown
roadways
• Draft written summary of downtown San Rafael AB 43 speed limit analysis results with maps;
final version produced after one set of non -contradictory comments received from City.
• Presentation deck of downtown San Rafael AB 43 speed limit analysis results with maps
Assumptions
• Budget assumes a total of 5 roadways reviewed for the downtown task.
• It is assumed that based on the stakeholder group meeting, there may be requests to revise
the recommended speed limits, which will be accommodated within the budget. At the public
hearings, it is assumed that there would not be requests to the report and recommendations;
if any changes are requested at public hearings, an additional fee may be required to
address them.
Task 3 - Roadways near Schools, Senior Housing Facilities, and
High Pedestrian -Generating Land Uses
Task Objectives
The objective of this task is to conduct a similar analysis as was performed in Task 1, with a focus on
land uses that generate high volumes of vulnerable road users. This task will start with identification
of relevant roadways for assessment within 1/4 mile of schools, senior housing facilities, and other
public -use facilities such as community centers and will also expand on the existing E&TS collected
information and assess AB 43 applicability to these roadways.
Bulleted discrete work steps for this task would be the same as those listed in Task 1, except that
this task does not include presentation of results at any public hearings.
City of San Rafael 3 June 2024
Update of Engineering & Traffic Surveys in Context of
AB 43
Parametrik
Deliverables
Scope of Work
• Spreadsheet of all collected data for analyzed roadway segments from the existing E&TS,
prior E&TS, AB 43-relevant information, and lowest recommended speed limits for roadways
agreed to with the City for Task 2.
• Written summary of Task 2 roadway AB 43 speed limit analysis results with maps; final
version produced after one set of non -contradictory comments received from City.
Assumptions
• Budget assumes a total of 10 roadway segments reviewed for Task 2.
• Budget does not include presentation of results at hearings, as assumptions is to combine
presentation of results from Task 2 and Task 3 within Task 3.
• It is assumed that based on the meetings there would be no request to review or revise any
of the recommendations in the report. If any changes are requested, an additional fee may
be required to address them.
Task 4 - Other Collector and Arterial Roadways
The objective of this task is to conduct a similar analysis as was performed in Tasks 1 and 2, with a
focus on collector and arterial roadways that were not identified for analysis in Tasks 1 and 2. This
task will start with identification of other relevant roadways for assessment such as Point San Pedro
Road, Manual T. Freitas Parkway, or others and will also expand on the existing E&TS collected
information and assess AB 43 applicability to these roadways.
Bulleted discrete work steps for this task would be the same as those listed in Task 1. This task
includes presentation of both Task 2 and Task 3 results at public hearings.
Deliverables
• Spreadsheet of all collected data for analyzed roadway segments from the existing E&TS,
prior E&TS, AB 43-relevant information, and lowest recommended speed limits for roadways
agreed to with the City for Task 3.
• Written summary of Task 3 roadway AB 43 speed limit analysis results with maps; final
version produced after one set of non -contradictory comments received from City.
• Presentation deck of Task 3 roadway AB 43 speed limit analysis results with maps.
Assumptions
• Budget assumes a total of 5 roadway segments reviewed for Task 3.
• It is assumed that based on the meetings there would be no request to review or revise any
of the recommendations in the report. If any changes are requested, an additional fee may
be required to address them.
City of San Rafael 4 June 2024
Update of Engineering & Traffic Surveys in Context of
AB 43
Parametrik Scope of Work
e�5e,ex,e��mar,ow �ne:A..,
Budget and Schedule
The tasks proposed in this workplan can be executed in a progressive manner Para metrixwill conduct all work on a time -and -materials basis, with a cost not to exceed the total For each of the four tasks below Para metrixwill invoice
monthly in accordance with the City's requirements. Payments are to be received within 30 days of receipt
The rates outlined in the table below are effective from October 1, 2023, through September 30, 2024 After September 30, 2024, the remaining contract balance will be subject to an annual escalation increase of either five percent
(5%), or an increase equal to actual adjusted labor rates, whichever is lower
Parametrik E
w s,.rcxm,o„rc
Z
7y
E
6
�+
E
El
3
£
'
San Rafael EUS AB 43 Evaluation
e.
Ifs
L
E
FEE PROPOSAL and SCHEDULE Iawry R.I.
smee
Ssmao
S2SSw
Smw
51550D
1
InW �,. W MI•.,•r.ulYn 4N1•ar 5 10.7Y
1S•
a
.0
0
0
•
1
Nr wwgwn.n s 1..10
rl
}
1)
/
O!
LrIY2rNWNY.n S •.1 )0
]0
1.
1
Yqp TyN•nm 14.1 .M frw•Yni[•h•nwWWr S 7.1JO
1•
I
17
O...a•w•../�Yl• f 22.270
M
u
•a
U
2v
.2
1
IY4/vrllw,YfK•Yw •n•N•1IN,u.Y•n S It�10
/•
W
•
}
0}
bM Y,wt arxpw.yleon •n/4.sr S S100
N
}
t•
•
01
H JE:wTN•M IW,r rM•., $ 5,220
21
Y
11
6
1►r..rlr..wr.►s•.rrlrYl•.HSL.2.l•/an $ 26,0io
%
•
la
u
a
2
Of
W..ry YY.nY.•Yon•M NI•IlwlY}Yen $ 11,910
IO
•
$•
•
}
02
SlMuwt r.a•.,w..en•n•...o, i U70
t.
7
>D
fia�rrw..1/a.•...1. S M
1'•
7•
Y
12
Y
2
01
•YOMI}Iis &A10
1
}•
•
1
t
Lw/Y.nl Maw�•.eon.�a+•ae.,I S 1I
r} 1
r I
Il
J
wrcw.., s -y
w
anmeu.u•i. [we,ael
Pa}amctri2 Base Faa NOPOW Total S 65,?30
■ k 900 Bancroft Way Suite 203 • 13-0ey CA 94710 1 510363 6E00 IParametrix com
Parametrik Scope of Work
let's create tomorrow, together
In Closing
We look forward to serving the City of San Rafael on this important project. If you have any
questions, please do not hesitate to contact me.
Sincerely,
David Parisi, PE, TE
Principal Consultant
800 Bancroft Way, Suite 203 • Berkeley, CA 94710 1 510.343.6400 1 Parametrix.com
Parametrik TRANSPORTATION(ONSUITING
HOURLY SERVICE RATES FOR PROFESSIONAL SERVICES
October 1, 2023 - September 30, 2024
Principal Consultant
$390.00
Sr Consultant
$250.00
Sr Planner
$240.00
Engineer IV
$185.00
Engineer III
$160.00
Planner III
$160.00
Sr Graphic Designer
$160.00
Sr Project Accountant
$155.00
Sr Project Controls Specialist
$155.00
Engineer I
$135.00
Planner II
$130.00
Planner 1
$125.00
Notes:
Hourly service rates are effective through September 30, 2024
Reimbursable charges include, but are not limited to, transportation
charges, reproduction services, shipping expenses and subconsultant
fees. Mileage charges will be charged at the prevailing IRS rate per mile.
Monthly invoices are due withing 30 days from the date of the invoice.
800 Bancroft Way, Suite 203 • Berkeley, CA 94710 1 510.343.6400 1 Parametrix.com
TO 127
Final Audit Report
- ETS AB43 Evaluation
Created: 2024-08-13
By: Shannon Mackle (shannon.mackle@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAARn8kkGgYusnT2XyKMTTo37NkORB02y_v
"TO 127 - ETS AB43 Evaluation" History
2024-08-29
Document created by Shannon Mackie (shannon.mackle@cityofsanrafael.org)
2024-08-13 - 6:30:03 PM GMT- IP address: 199.88.113.8
E'., Document emailed to David Parisi (dparisi@parametrix.com) for signature
2024-08-13 - 6:31:57 PM GMT
Email viewed by David Parisi (dparisi@parametrix.com)
2024-08-13 - 6:41:38 PM GMT- IP address: 104.47.74.126
d0 Document e-signed by David Parisi (dparisi@parametrix.com)
Signature Date: 2024-08-13 - 6:41:52 PM GMT - Time Source: server- IP address: 47.209.40.127
P--+ Document emailed to Nathan Johnson (njohnson@parametrix.com) for signature
2024-08-13 - 6:41:54 PM GMT
Email viewed by Nathan Johnson (njohnson@parametrix.com)
2024-08-29 - 11:30:10 PM GMT- IP address: 104.47.74.126
b0 Document e-signed by Nathan Johnson (njohnson@parametrix.com)
Signature Date: 2024-08-29-11:30:48 PM GMT - Time Source: server- IP address: 174.193.195.224
Agreement completed.
2024-08-29 - 11:30:48 PM GMT
a, SAN RAFAEL Adobe
Acrobat Sign
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackie (for Eugelyn Lopez) Extension: 3353
Contractor Name: Parametrix, Inc
Contractor's Contact: David Parisi Contact's Email: dparisi@parametrix.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step RESPONSIBLE DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1 Project Manager a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
7/25/2024
Attorney c/o Laraine.Gittens@cityofsanrafael.org
©SM
2
City Attorney
a. Review, revise, and comment on draft agreement
8/9/2024
and return to Project Manager
8/9/2024
© NT
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
❑X NT
3 Department Director
Approval of final agreement form to send to
8/12/2024
M AM
contractor
4
Project Manager
Forward three (3) originals of final agreement to
8/13/2024
�XI
contractor for their signature
5
Project Manager
When necessary, contractor -signed agreement
® N/A
agendized for City Council approval *
*City Council approval required for Professional Services
FZ
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6 Project Manager
Forward signed original agreements to City
8/30/24
SM
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
8 City Attorney
Review and approve insurance in PINS , and bonds
(for Public Works Contracts)
9 1
City Manager / Mayor
Agreement executed by City Council authorized
official
10
City Clerk
Attest signatures, retains original agreement and
forwards copies to Project Manager
Task Order No. 127 - Parametrix, Inc. -
Engineering & Traffic Survey AB 43 Evaluation
Final Audit Report 2024-09-05
Created: 2024-08-30
By: Nataly Torres (nataly.tor-es@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHSCAABAADzf2GQib2o2Bytxvb3l7vllQXEBVLmVn
"Task Order No. 127 - Parametrix, Inc. - Engineering & Traffic S
urvey AB 43 Evaluation" History
Document created by Nataly Torres (nataly.torres@cityofsanrafael.org)
2024-08-30 - 5:30:58 PM GMT- IP address: 99.145.194.25
`'► Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2024-08-30 - 5:34:26 PM GMT
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2024-08-30 - 6:34:31 PM GMT- IP address: 104.47.65.254
6o Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2024-08-30 - 6:36:21 PM GMT - Time Source: server- IP address: 199.88.113.8
'=► Document emailed to rob.epstein@cityofsanrafael.org for signature
2024-08-30 - 6:36:23 PM GMT
'n Email viewed by rob.epstein@cityofsanrafael.org
2024-09-01 - 3:43:29 AM GMT- IP address: 104.28.85.164
6© Signer rob.epstein@cityofsanrafael.org entered name at signing as Robert F. Epstein
2024-09-01 - 3:43:46 AM GMT- IP address: 104.28.85.164
&o Document e-signed by Robert F. Epstein (rob.epstein@cityofsanrafael.org)
Signature Date: 2024-09-01 - 3:43:48 AM GMT - Time Source: server- IP address: 104.28.85.164
17y Document emailed to city.clerk@cityofsanrafael.org for approval
2024-09-01 - 3:43:50 AM GMT
Email viewed by city.clerk@cityofsanrafael.org
2024-09-03 - 2:39:02 PM GMT- IP address: 104.47.64.254
/' SAN RAFAEL 'by
Adobe
�`� N 11 ,,` - "., 5 °" Acrobat Sign
d0 Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2024-09-03 - 2:39:17 PM GMT- IP address: 199.88.113.8
6© Document approved by Brenna Nurmi (city.clerk@cityofsanrafael.org)
Approval Date: 2024-09-03 - 2:39:19 PM GMT - Time Source: server- IP address: 199.88.113.8
Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2024-09-03 - 2:39:21 PM GMT
Email viewed by cristine.alilovich@cityofsanrafael.org
2024-09-05 - 3:29:31 AM GMT- IP address: 174.249.146.169
b© Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2024-09-05 - 3:29:52 AM GMT- IP address: 174.249.146.169
d© Document e-signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)
Signature Date: 2024-09-05 - 3:29:54 AM GMT - Time Source: server- IP address: 174.249.146.169
Agreement completed.
2024-09-05 - 3:29:54 AM GMT
Powered by
Adobe a
SAN RAFAEL Adobe
Acrobat Sign