SERVICE LEVEL AGREEMENT
DATED NOVEMBER 3, 2023
WITH PARAMETRIX, INC.
TASK ORDER NO. 131
Subject title: 2024 HSIP & RM3 Grant Application Support
Task Order Amount: $49,070
THIS TASK ORDER is entered into on Sep 23, 2024 between the City of San Rafael,
a municipal corporation ("City"), and Parametrix, Inc., ("Contractor").
RECITALS
A. Whereas Master Consultant Services Agreement is hereby renamed Service Level Agreement;
and
B. The City and Contractor (as may be identified as "Consultant" in the original Agreement) have
entered into a Service Level Agreement ("Agreement") dated November 3, 2023 under which
Contractor has agreed to perform certain contract services for the City; and
C. Pursuant to the terms of the Agreement, the City wishes Contractor to perform certain tasks as set
forth in this Task Order, which constitute the Work;
NOW, THEREFORE, City and Contractor agree as follows:
AGREEMENT
1. Scope of services. Contractor shall provide any and all of the services set forth in Exhibit A of
this Task Order, for an amount not to exceed the Task Order Amount, identified above, as directed by the
City.
Jimmy Jessup shall be the Project Manager for Contractor for this Task Order. Additional contract
services may be performed by other Contractor staff with prior notice and approval by City.
a. City's duties. The City will:
(1) Determine the scope of services, as set forth in Exhibit A.
(2) Make available work plans and specifications and other City data related to the project,
including full information as to the City's requirements.
(3) Designate Mariana Sanchez, or their designee as the person at the City responsible for
monitoring performance under this Task Order.
b.Contractor duties. The Contractor will:
(1) Provide and perform tasks identified in Exhibit A, Scope of Services.
(2) Provide miscellaneous services related to the Work and not stipulated elsewhere in this
Task Order, when requested by the City in writing. A Task Order Amendment is
Rev March 2024
City of San Rafael Service Level Agreement
Task Order
required if these additional services cannot be performed within the Task Order budget.
2. Date of completion, Work hours estimate, Cost estimate and budget; Fee schedule: Costs are not -
to -exceed stated Task Order Amount in this Task Order. See Exhibit A for Work and fee schedule details.
Authorization to proceed.
The City will give Contractor authorization to proceed with the work specified in this Task Order only after
Contractor submits updated insurance certificates and endorsements, in accordance with the Agreement.
Service Level Agreement terms; Conflicts.
Except as expressly otherwise provided herein, all terms of the Agreement shall apply to Contractor in the
performance of work pursuant to this Task Order. If there is a conflict between this Task Order and the
Agreement, this Task Order shall control.
Amendment of Task Order; Conflicts.
Except as provided in Section 1(b)(2) above, this Task Order may not be modified except by an Amended
Task Order executed and approved in the same manner as the Task Order.
6. Signatures. The parties have executed this Task Order, as of the date first written above.
Rev March 2024
City of San Rafael Service Level Agreement
Task Order
CITY OF SAN RAFAEL CONTRACTOR
C-91 TaV4 Takiri
By: Gistine ALIovich (Sep 23, 2024 17:52 EDT) By: David Parisi (Sep 12, 2024 10:32 PDT)
Cristine Alilovich, City Manager David Parisi
Name:
Reviewed By
Rvherf F. Ensfai�
By: Poca[F Exton(Sec) .102413 P4 P011
Robert F. Epstein, City Attorney
Exhibits:
A
Rev March 2024
Scope of work
Title: Principal Consultant
(if Contractor is a corporation, add signature
of second corporate officer)
%;LAK
By:
Name: Nathan Johnson
Title: SeniorVice President
Exhibit A
Parametr ik Scope of Work
let's create tomorrow, together
City of San Rafael
2024 HSIP and RM3 Grant Application Preparation
Introduction
Parametrix is pleased to provide a workplan for preparing grant applications on behalf of the City of
San Rafael ("City") for the Caltrans Local Highway Safety Improvement Program (HSIP) Cycle 12
grant, and for the MTC Regional Measure 3 (RM3) Safe Routes to Transit & Bay Trail (SR2TBT) grant
program. The applications will be prepared for the following projects:
HSIP: Lincoln Avenue from Mission Avenue to 2^d Street. The conceptual designs to be
developed will add intersection safety improvements that will include reconfiguration of the
vehicle lanes on Lincoln to incorporate dedicated left -turn pockets at all intersection
approaches, upgrades to traffic signal equipment (e.g., new mast arm poles, protected left -
turn phase with left -turn arrows, vehicle detection and full signal system upgrades), and
other signing and striping improvements. Application deadline is September 9, 2024.
• RM3 SR2TBT: The Downtown San Rafael North -South Greenway Gap Closure Project will be
proposed for this grant program. The application will reflect the same project concept for
which an Active Transportation Program grant application was prepared in June 2024.
Application deadline is September 30, 2024.
Our proposed scope of work, which will satisfy the requirements of the HSIP and RM3 applications,
will consist of the following:
Task 1.1- HSIP: Development and Assessment of Potential
Project
The objective of this subtask is to produce initial plan view concept drawings and perform traffic
operations analysis sufficient to determine feasibility of the HSIP grant application for Lincoln
Avenue. This subtask will conclude with an agreement by the City and Parametrix to either proceed
with preparing a grant application or to cease work progression due to identification of an
unanticipated fatal flaw relating to potential project impact on traffic operations, on -street parking, or
other factor.
This subtask will include the following activities:
Project management, progress reports and administration. Parametrix will attend one kick-off
conference call to summarize the project scope and receive background studies from the
City, including existing base mapping, signal as-builts, traffic counts from Miovision cameras,
and existing improvement plans, if any. Parisi will coordinate to provide biweekly (once every
two weeks) progress check -ins via email and video call with City staff and invoices on a
monthly basis.
J
800 Bancroft Way, Suite 203 • Berkeley, CA 94710 1 510.343.6400 1 Parametrix.com
Parametrik
Scope of Work
• Develop project conceptual plans. Parametrix will prepare conceptual plans for the Lincoln
Avenue downtown corridor improvements showing existing conditions and proposed
improvements on an aerial photo base. Right of way will be approximated using Marin Map
or other publicly available sources. Topographic and/or boundary surveys will not be
collected.
Feasibility evaluation. Parametrix will apply available traffic counts and signal timing
information to perform a PM peak hour intersection operations analysis using Synchro
software. The analysis will compare existing conditions and planned improvements at each
intersection alongthe Lincoln Avenue corridor. Potential impacts to PM peak hour vehicle
travel metrics such as average delay and queue length will be summarized. Parametrix will
calculate the amount of on -street parking that would be removed by the plan improvements,
and will also identify other potential negative impacts of the proposed improvements to users
of the circulation network.
• Go / No-go decision. Parametrix will present the results of the feasibility evaluation in a
meeting with the City. The purpose of this meeting is to collectively determine if the potential
impacts of the proposed improvements would negatively influence any circulation network
user to the extent that an HSIP grant application should not be prepared for the downtown
Lincoln corridor. If no 'showstoppers' are identified, the team will agree to proceed to the
next subtask.
Assumptions
• Budget and schedule forecast assumes notice to proceed is received before August 2, 2024,
and that all signal timing sheets and traffic count inputs are received by August 2, 2024.
Task 1.2 - HSIP: Development of Grant Application
The objective of this subtask is to identify the application approach and to successfully prepare and
submit all HSIP Cycle 12 grant application materials for final submittal.
This subtask will include the following activities:
• Identify HSIP application approach. Parametrix will work with the City to identify whether the
HSIP application will be prepared under either the Benefit Cost Ratio (BCR) or Funding Set -
aside (SA) categories. Based on our preliminary review, the proposed project would likely be
most competitive under the BCR category, which may apply a combination of
countermeasures within the HSIP toolkit. Maximum HSIP funds under the BCR category is
$10 million.
The City may submit multiple funding applications for the same project with modifications to
project extent and scope (e.g., expanding or reducing project extents for different BCRs and
budgets) and/or under both the BCR and SA funding categories. Parametrix' proposed scope
and cost assumes an initial baseline of one application; additional grant applications for the
same project would be subject to additional cost.
• Crash history analysis. Parametrix will identify the issues at each project location by drawing
from previously prepared reports, including the San Rafael Local Road Safety Plan (2024),
recent collision records, and recent traffic studies.
City of San Rafael 2 July 2024
2024 HSIP and RM3 Grant Application Preparation
Parametrik
Scope of Work
• Develop project cost estimate: Parametrix will identify applicable HSIP countermeasures in
the plans and develop a cost estimate with City input on planning -level costs and non -
construction (soft) costs according to HSIP guidelines.
• Prepare HSIP application. Parametrix will prepare one HSIP application for the Lincoln
Avenue downtown intersections by filling out the narrative questions and preparing
necessary application attachments that include:
a. Local Roadway Safety Plan (LRSP Certification). Parametrix will complete the LRSP
certification form indicating that the San Rafael Local Road Safety Plan is less than
five years old.
b. Engineer's Checklist. David Parisi of Parametrix will be the engineer of "responsible
charge" of the preparation of the HSIP application.
c. Vicinity map. Exhibits showing the proposed project locations in relation to the City
limits.
d. Project plans and maps. Conceptual plans will follow the HSIP Engineer's Checklist
criteria in showing the improvements at an appropriate scale to allow verification of
the project and construction limits. The plans will show
■ the full scope of the proposed project,
■ the influence area for each safety countermeasure,
• changes to existing lanes and shoulder widths,
■ limits of roadway excavation / demolition,
• City, State, railroad and other approximate agency rights of way,
■ Project cross -sections, if applicable.
e. Collision diagrams. Exhibit to demonstrate patterns of collisions and whether
proposed countermeasures would address such collisions.
f. Collision list. Table matching the collisions shown in the collision diagram and used
for the BCR calculation in the HSIP analyzer form.
g. Detailed Engineer's Estimate and Project Cost Estimate for all likely construction
costs. Main project elements broken out into separate construction items.
HSIP analyzer. Fillable form relating to site conditions and proposed
countermeasures.
i. Pictures of existing conditions. Photos showing existing safety concerns to be altered
by the proposed project.
j. Letter of support from Caltrans. Required when projects encroach on State right of
way, are subject to joint funding with Caltrans, or propose changes to intersections
on State highways (not applicable for this application).
City of San Rafael 3 July 2024
2024 HSIP and RM3 Grant Application Preparation
Parametrik Scope of Work
Task 2.1- RM3: Development of Grant Application
The objective of this task is to prepare and submit a complete RM3 SR2TBT grant application for the
Downtown San Rafael North -South Greenway Gap Closure Project.
Parametrix will apply the same project materials for the recently -submitted Active Transportation
Program grant application, including local jurisdiction grant eligibility verification, concept design
plans, cost estimate, letters of recommendation, complete streets checklist, etc.
Parametrix will prepare one RM3 SR2TBT grant application by filling out the narrative questions and
preparing necessary application attachments that include:
a. Project Map. Parametrix will prepare a scaled map showing the proposed project location in
relation to nearby active transportation facilities, transit facilities, locations of interest, and
regional connections.
b. Cover Letter. Letter on application agency letterhead signed by an authorized official
authorizing the application submittal.
c. Project Status and Schedule. An overview of the project's phasing, and identification of
potential obstacles that may affect project delivery and risk mitigation strategies.
d. Project Funding Information. The funding plan for each project phase.
e. Project Screening Criteria. Consistency with One Bay Area Grant (OBAG) 3 local land -use
linkages, complete streets checklist, and determination of qualification for transformative
project status.
f. Safety Countermeasures. Description of the project's scope for improving real and perceived
safety for active transportation users.
g. Demonstrated Project Need. Demonstration of the degree to which the project's scope has
the potential to increase active transportation travel.
h. Support of the Bay Trail and Gap Closure Implementation Plan. Description of how the project
either connects to or closes a gap in the Bay Trail alignment.
i. State -Owned Toll Bridge Corridor Congestion Relief. How the project would increase carrying
capacity of nearby state-owned toll bridges.
j. Public Transportation Accessibility. Description of the project's enhancements to improve
access to public transportation facilities.
k. Design Alternatives Analysis. Description of potential design solutions and why the proposed
project was chosen as the selected concept.
I. Consistency with Regional Planning Priorities and Efforts. How the project meets Plan Bay
Area goals and objectives.
m. Demonstrated Local Engagement and Support. Local public participation and engagement
efforts to develop the project scope.
n. Benefit to MTC Equity Priority Communities. How the project would benefit an identified EPC.
o. Leveraged Funding. Depiction of funding sources planned for the project.
City of San Rafael 4 July 2024
2024 HSIP and RM3 Grant Application Preparation
Parametrik
Scope of Work
p. Multimodal Improvements. Description of benefits to various active transportation users.
q. Completion of Approved Environmental Document. Note: CEQA exemption for the project has
already been filed with the County Clerk.
r. Multi -Jurisdictional Project Sponsorship. Description of all local agencies involved in the
inception and delivery of the project.
Assumptions
• Budget no changes to the Downtown San Rafael North -South Greenway Gap Closure Project
extents, plans, and estimate, that were applied in the Active Transportation Program grant
application submitted in June 2024.
City of San Rafael 5 July 2024
2024 HSIP and RM3 Grant Application Preparation
Parametrik
Hers emale ramp„vw, •ns�,��„
Budget and Schedule
Scope of Work
Para metrix will conduct all work on a time -and -materials basis, with a cost not to exceed the total for each of the tasks below, Parametrix will invoice monthly in accordance with the City's requirements. Payments are to be received
within 30 days of receipt.
The rates outlined in the table below are effective from October 1, 2023, through September 30, 2024. After September 30, 2024, the remaining contract balance will be subject to an annual escalation increase of eitherfive percent
(5%)• or an increase equal to actual adjusted labor rates, whichever is lower.
Parametrik ! E
San Rafael 2024 HSIP Cycle 12 Grant Application
and
M"*
IMmbualM [rnrn
ArunetrCr ltfe fee Prop wlrotal S tl,070
k800 Banriolt Way, Suite 203• Berkeley, cA 9471 1510.343.e4001 Pa—.Wx,com
Parametrik Scope of Work
let's create tomorrow, together
In Closing
We look forward to serving the City of San Rafael on this important project. If you have any
questions, please do not hesitate to contact me.
Sincerely,
David Parisi, PE, TE
Principal Consultant
800 Bancroft Way, Suite 203 • Berkeley, CA 94710 1 510.343.6400 1 Parametrix.com
TO 131 - HSIP & RM3 Grant Application (1)-
combined
Final Audit Report
Created:
2024-09-12
By:
Shannon Mackie (shannon.mackle@cityofsanrafael.org)
Status:
Signed
Transaction ID:
CBJCHBCAABAAZRD02RWIBbzJByIJhEYxwNjooGzGl3ut
2024-09-20
"TO 131 - HSIP & RM3 Grant Application (1)-combined" History
Document created by Shannon Mackie (shannon.mackle@cityofsanrafael.org)
2024-09-12 - 4:51:00 PM GMT- IP address: 199.88.113.8
C,7'-► Document emailed to David Parisi (dparisi@parametrix.com) for signature
2024-09-12 - 4:51:59 PM GMT
Email viewed by David Parisi (dparisi@parametrix.com)
2024-09-12 - 5:31:58 PM GMT- IP address: 104.47.74.126
&Q Document e-signed by David Parisi (dparisi@parametrix.com)
Signature Date: 2024-09-12 - 5:32:21 PM GMT - Time Source: server- IP address: 12.219.157.70
E'-r Document emailed to Nathan Johnson (njohnson@parametrix.com) for signature
2024-09-12 - 5:32:23 PM GMT
Email viewed by Nathan Johnson (njohnson@parametrix.com)
2024-09-20 - 8:22:46 PM GMT- IP address: 104.47.73.254
41 Document e-signed by Nathan Johnson (njohnson@parametrix.com)
Signature Date: 2024-09-20 - 11:52:59 PM GMT - Time Source: server- IP address: 99.112.28.226
Pd Agreement completed.
2024-09-20 - 11:52:59 PM GMT
�I1R SAN RAFAEL Adobe
"""` ^ I bY Acrobat Sign
apt, RAP
s 2
TyVVITH P�'
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackle (for Mariana Sanchez) Extension: 3353
Contractor Name: Parametrix Inc
Contractor's Contact: Jimmy Jessup Contact's Email: jjessup@parametrix.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
8/5/2024
City Attorney
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑X SM
2
a. Review, revise, and comment on draft agreement
9/11/2024
and return to Project Manager
9/11/2024
❑X NT
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
9/11/2024
0 NT
© AM
3 Department Director
Approval of final agreement form to send to
contractor
9/12/2024
4 Project Manager Forward three (3) originals of final agreement to
Z
contractor for their signature
❑X N/A
_
5 Project Manager
When necessary, contractor -signed agreement
agendized for City Council approval *
*City Council approval required for Professional Services
❑
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
Forward signed original agreements to City
6 Project Manager
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
Review and approve insurance in PINS, and bonds
8
City Attorney
(for Public Works Contracts)
9
City Manager / Mayor
Agreement executed by City Council authorized
official
Attest signatures, retains original agreement and
10
City Clerk
forwards copies to Project Manager
TO 131 - HSIP & RM3 Grant App (Greenway
Gap Closure)
Final Audit Report
Created: 2024-09-23
By: Shannon Mackie (shannon.mackle@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAA1wJNrwt2gerwBIKKZsuMIDmEVK5TORTJ
2024-09-23
"TO 131 - HSIP & RM3 Grant App (Greenway Gap Closure)" His
tory
Document created by Shannon Mackie (shannon.mackle@cityofsanrafael.org)
2024-09-23 - 6:04:53 PM GMT- IP address: 199.88.89.34
C'-► Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2024-09-23 - 6:06:46 PM GMT
ZZ Document shared with Jonathan Schellin Oonathans@cityofsanrafael.org) by Shannon Mackie
(shannon.mackle@cityofsanrafael.org)
2024-09-23 - 6:15:58 PM GMT- IP address: 199.88.89.34
:L Document shared with Nataly Torres(nataiy.torres@cityofsanrafael.org) by Shannon Mackie
(shannon.mackle@cityofsanrafael.org)
2024-09-23 - 6:15:59 PM GMT- IP address: 199.88.89.34
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2024-09-23 - 6:17:55 PM GMT- IP address: 104.47.65.254
do Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2024-09-23 - 6:25:14 PM GMT - Time Source: server- IP address: 199.88.113.8
C'y Document emaiied to rob.epstein@cityofsanrafael.org for signature
2024-09-23 - 6:25:17 PM GMT
Email viewed by rob.epstein@cityofsanrafael.org
2024-09-23 - 8:33:54 PM GMT- IP address: 104.28.124.178
6© Signer rob.epstein@cityofsanrafael.org entered name at signing as Robert F. Epstein
2024-09-23 - 8:34:09 PM GMT- IP address: 104.28.124.178
'' SAN RAFAEL I Adobe
"' ""` Acrobat Sign
cS© Document e-signed by Robert F. Epstein (rob.epstein@cityofsanrafael.org)
Signature Date: 2024-09-23 - 8:34:11 PM GMT - Time Source: server- IP address: 104.28.124.178
E'. Document emailed to city.clerk@cityofsanrafael.org for approval
2024-09-23 - 8:34:16 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2024-09-23 - 8:51:16 PM GMT- IP address: 104.47.64.254
630 Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2024-09-23 - 8:51:30 PM GMT- IP address: 199.88.113.8
b© Document approved by Brenna Nurmi (city.clerk@cityofsanrafael.org)
Approval Date: 2024-09-23 - 8:51:32 PM GMT - Time Source: server- IP address: 199.88.113.8
E'4 Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2024-09-23 - 8:51:34 PM GMT
Email viewed by cristine.alilovich@cityofsanrafael.org
2024-09-23 - 9:51:57 PM GMT- IP address: 174.242.35.50
6m Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2024-09-23 - 9:52:41 PM GMT- IP address: 174.242.35.50
6© Document e-signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)
Signature Date: 2024-09-23 - 9:52:43 PM GMT - Time Source: server- IP address: 174.242.35.50
® Agreement completed.
2024-09-23 - 9:52:43 PM GMT
SAN RAFAEL Adobe
Acrobat Sign