HomeMy WebLinkAboutPW Service Level Agreement; Task Order No. 136; 390 Canal Pump Station Generator ReplacementCity of San Rafael
SERVICE LEVEL AGREEMENT
DATED OCTOBER 12, 2024
WITH CONSOR NORTH AMERICA, INC.
TASK ORDER NO. 136
Subject title: 390 Canal Pump Station Generator Replacement
Task Order Amount: $60,800
THIS TASK ORDER is entered into on Oct 30, 2024
between the City of San Rafael,
a municipal corporation ("City"), and Consor North America, Inc., ("Contractor").
RECITALS
A. The City and Contractor (as may be identified as "Consultant" in the original Agreement) have
entered into a Service Level Agreement ("Agreement") dated October 12, 2024 under which
Contractor has agreed to perform certain contract services for the City; and
B. Pursuant to the terms of the Agreement, the City wishes Contractor to perform certain tasks as set
forth in this Task Order, which constitute the Work;
NOW, THEREFORE, City and Contractor agree as follows:
AGREEMENT
I . Scope of services. Contractor shall provide any and all of the services set forth in Exhibit A of
this Task Order, for an amount not to exceed the Task Order Amount, identified above, as directed by the
City.
Andrew Mitchell shall be the Project Manager for Contractor for this Task Order. Additional contract
services may be performed by other Contractor staff with prior notice and approval by City.
a. City's duties. The City will:
(1) Determine the scope of services, as set forth in Exhibit A.
(2) Make available work plans and specifications and other City data related to the project,
including full information as to the City's requirements.
(3) Designate Mariana Sanchez, or their designee as the person at the City responsible for
monitoring performance under this Task Order.
b.Contractor duties. The Contractor will:
(1) Provide and perform tasks identified in Exhibit A, Scope of Services.
(2) Provide miscellaneous services related to the Work and not stipulated elsewhere in this
Task Order, when requested by the City in writing. A Task Order Amendment is
required if these additional services cannot be performed within the Task Order budget.
2. Date of completion: Work hours estimate, Cost estimate and budget: Fee schedule: Costs are not -
Rev. March 2024
City of San Rafael Service Level Agreement
Task Order
to -exceed stated Task Order Amount in this Task Order. See Exhibit A for Work and fee schedule details.
Authorization to proceed.
The City will give Contractor authorization to proceed with the work specified in this Task Order only after
Contractor submits updated insurance certificates and endorsements, in accordance with the Agreement.
4. Service Level Agreement terrns: Conflicts.
Except as expressly otherwise provided herein, all terms of the Agreement shall apply to Contractor in the
performance of work pursuant to this Task Order. If there is a conflict between this Task Order and the
Agreement, this Task Order shall control.
5. Amendment of Task Order; Conflicts.
Except as provided in Section I(b)(2) above, this Task Order may not be modified except by an Amended
Task Order executed and approved in the same manner as the Task Order.
6. SiLM1tu1'es. The parties have executed this Task Order, as of the date first written above.
2
Rev March 2024
City of San Rafael Service Level Agreement
Task Order
CITY OF SAN RAFAEL
cr�,sEi�e-,4�Corric�
By: Cristine Ahlovich (Oct 30, 2024 21:39 PDT)
Cristine Alilovich, City Manager
Reviewed By
By: Robert F. Epstein (Oct f5,2024 09:53 PDT)
Robert F. Epstein, City Attorney
Exhibits:
A Scope of work
3
Rev. March 2024
CONTRACTOR
CGl-is '&a afanl
By: Chris Ravasarn (00A, 2024 10:22 PDT)
Name: Chris Rayasam
Title: C E 0
(if Contractor is a corporation, add signature
of second corporate officer)
/4"t, NLa dw"q,
By: Ian Machan (Oct 24, 202413:41 HST)
Name: Ian Machan
Title: EVP
Exhibit A
n consor
2950 Buskirk Avenue, Suite 120
Walnut Creek, CA 94597
August 22, 2024
Mariana Sanchez
City of San Rafael Department of Public Works
111 Morphew Street, San Rafael, CA 94901
Re: 390 Canal Pump Station Generator - Proposal
Dear Ms. Sanchez:
City of San Rafael Public Works (City) requested that Consor North American, Incorporated (Consor) provide a
scope and fee estimate for performing Engineering Services related to 390 Canal pump station generator
replacement project.
These services will be administered through our current Master Consultant Services Agreement with San Rafael
for Civil Services. Attached is a scope, cost, and schedule to provide these services. A detailed estimated cost
breakdown is included with this submittal using the agreed rates from our On -Call contract. Our team for this
task order is comprised of Consor as the overall Project and Task Order Manager, TJC and Associates, Inc.
(TJCAA) will provide structural and electrical design, and Miller Pacific Engineering Group will perform
geotechnical services.
I will be your primary point of contact on this project task order. If you have any questions or require additional
information, please contact me anytime. Your request will receive my immediate and personal attention.
Sincerely,
Consor North America, Inc.
Andrew Mitchell, PE
Senior Engineer
925-433-6815
Andrew.Mitchell@consoreng.com
390 CANAL PUMP STATION GENERATOR REPLACMENT PROJECT
PROJECT UNDERSTANDING
This scope of work is regarding the replacement of a pump station generator at 390 Canal in the City of San
Rafael. Geotechnical investigation and recommendations will be necessary and the generator replacement will
need design for the structural and electrical components.
SCOPE OF WORK
TASK 1: PROJECT MANAGEMENT
This task involves project management activities including staff and budget management and invoicing.
Task 1 Assumptions:
• Project duration assumed to be six months
Task 1 Deliverables:
• Kickoff Meeting
• Monthly Invoicing
• Progress Reports
• Monthly Status Meetings
• Meeting agenda, summary, and action items as necessary
TASK 2: GEOTECHNICAL INVESTIGATION
Miller Pacific Engineering Group will perform a Geotechnical Investigation to explore subsurface conditions
and develop geotechnical criteria for use in design and construction of the generator replacement. Our
Phase 1 services will include:
• Site reconnaissance to observe and document existing conditions within the proposed project area.
• Reviewing published geologic mapping and geotechnical background information. This will include
reviewing geotechnical reports from previous, nearby projects obtained from our in-house library
and any provided documents.
• Obtaining a soil boring permit from Marin County Environmental Health.
• Coordinating with Underground Service Alert (USA) to mark underground utilities in areas where
we plan to conduct subsurface exploration.
• Subsurface exploration consisting of one boring drilled to a depth of about 10- to 15-feet below the
ground surface. The boring will be located within the parking lot area adjacent to the pump
station. We will push drill rods to firm materials (or to 65-feet of rod length) to estimate the
thickness of the underlying bay mud materials.
• Laboratory testing to characterize subsurface soils and aid in our geotechnical evaluation.
• Engineering analyses to estimate potential future settlements, develop design -level geotechnical
recommendations and design criteria related to the generator pad foundation design, and other
geotechnical-related items.
2 1 P a g e
In completing our Phase 1 services, we will prepare a Geotechnical Investigation letter report which
summarizes the subsurface exploration and laboratory testing programs and geotechnical
recommendations and design criteria.
Task 2 Deliverables:
• Geotechnical Investigation letter report.
TASK 3: STRUCTURAL DESIGN SERVICES
TJCAA will provide the design for the pump station generator concrete pad and equipment anchorage.
Task 3 Assumptions:
• TJCAA Structural will provide a draft 100% design package to the Client for the Client to comment
on, and then a final design package incorporating Client's comments.
• Draft 100% design package includes only design drawings. Drawings will be provided in half-size
(11x17) PDF format and delivered via e-mail.
• Final design package includes calculations and drawings in full-size (22x34) PDF format,
electronically stamped and signed and delivered via e-mail.
• TJCAA Structural engineers do not anticipate attending any project meetings or teleconference calls
for project coordination.
• Design documents for civil, mechanical, and other disciplines will be completed by the Client.
• Design will comply with the requirements of the 2022 California Building Code.
• Design fees quoted assume design and construction will be completed by 2024.
• Drawings will be provided in TJCAA's standard format, developed using AutoCAD.
• The title block will be provided by the Client in AutoCAD format suitable for use as a reference file.
• Specifications will be provided in the drawings, as part of the general note sheets.
• TJCAA assumes that geotechnical information is available for the project area and will be provided
to TJCAA before commencement of the work.
Task 3 Deliverables:
• Draft 100% design package (11x17 PDF)
• Final design package including calculations (22x34 PDF)
TASK 4: ELECTRICAL DESIGN SERVICES
TJCAA provide the design for the pump station generator electrical engineering design including design of a
new automatic transfer switch (ATS) panel and wiring connections to existing equipment.
Sheet List:
• GE-1 Electrical Legend and Abbreviations
• GE-2 Electrical Standard Details
• E-1 Electrical Single Line Diagram and Grounding Schematic
• E-2 Electrical Site Plan and Annotated Photos
3 1 P a g e
Spec List:
• 26 05 00 Common Work Results for Electrical
• 26 05 05 Selective Demolition for Electrical
• 26 05 19 Low -Voltage Electrical Conductors and Cables
• 26 05 26 Grounding and Bonding for Electrical Systems
• 26 05 33 Raceway and Boxes for Electrical Systems
• 26 05 73 Overcurrent Protective Device Coordination Study
• 26 08 00 Commissioning of Electrical Systems
• 26 32 13 Diesel or NG-Engine-Driven Generator Sets (Only the Installation section will be used)
• 26 36 23 Automatic Transfer Switches
Task 4 Assumptions:
• TJCAA Electrical will provide a Draft 100% PS&E Design package, and a Final PS&E Design package
incorporating the Client's Draft comments.
• Draft 100% Design package will include Drawings, Specifications, and Engineer's Opinion of
Probable Cost. Drawings will be provided in half-size (11x17) PDF format; Specifications and EOPC
in PDF format; and delivered via e-mail.
• Final Design package Drawings will be provided in full-size (22x34) PDF format. Drawings and Specs
will be electronically stamped, signed, and delivered via e-mail.
• Drawings will be provided in TJCAA's standard format, developed using AutoCAD. Four Electrical
drawings are budgeted.
• Specifications will be provided using CSI standard 50-Division format. Nine electrical specifications
are budgeted.
• The title block will be provided by the Client in AutoCAD format suitable for use as a reference file.
• No site plan is available for use in developing project drawings. As -built drawings and
documentation is very limited and has been transmitted to TJCAA.
• The new generator is Owner -furnished equipment for installation by the Contractor.
• Existing connections to the SCADA system will be rewired to the new generator.
• One site visit for two engineers is included in the project scope.
• One virtual meeting to review the Draft 100% comments is included in the project scope.
• Items NOT included in the project scope are air permitting; engineering support of civil, mechanical,
instrumentation and controls design; surveying or mapping; arc -flash and power system studies;
cybersecurity; and P&IDs.
• Design fees quoted assume design will be completed by 2024.
Task 4 Deliverables:
• Draft 100% design package (11x17 PDF)
• Final design package (22x34 PDF)
TASK 5: SUPPLEMENTAL CONSULTATION AND PLAN REVIEW (OPTIONAL TASK)
Miller Pacific Engineering Group will be available to consult with the project team to answer questions or
provide supplemental recommendations as needed. Miller Pacific should review the project plans as they
4 1 P a g e
near completion to confirm the intent of our recommendations has been sufficiently incorporated. They
understand this phase will be authorized at a later date.
TASK 6: CONSTRUCTION OBSERVATION AND TESTING (OPTIONAL TASK)
During construction, Miller Pacific will visit the site intermittently to observe the Contractor's operations
and test geotechnical portions of the work. They anticipate that they would observe and/or test trench
backfill, generator pad preparation, foundation excavations for the generator pad, and other geotechnical
items as requested. Upon satisfactory completion of the project, they will prepare a brief letter report
documenting our observations and testing. They will also present our opinion regarding Contractor
compliance with the geotechnical portion of the approved design plans and specifications. They understand
this phase will be authorized at a later date.
TASK 7: BIDDING ASSISTANCE (OPTIONAL TASK)
Consor and TJCAA will be available to provide clarity and answer questions regarding the design during the
bidding process.
Task 7 Assumptions:
• TJCAA Structural engineers will be available to answer any questions and clarify issues associated
with aspects of the design within the scope of work. TJCAA Structural engineers do not anticipate
any involvement in pre -bid meetings and/or site walk-through, or bid evaluations. However, TJCAA
Structural engineers will be available for consultation on an as -needed basis.
• Bid Services is not included in the project scope but is listed as an optional service. One virtual pre -
bid meeting, responding to three questions, developing two addenda and conformed documents
are budgeted.
TASK 8: DESIGN SERVICE DURING CONSTRUCTION (OPTIONAL TASK)
Consor and TJCAA will be available to respond to requests for information, review submittals, and provide
design direction during the construction phase.
Task 8 Assumptions:
• TJCAA Structural engineers do not anticipate attending the pre -construction meeting and
subsequent periodic construction meetings, and/or observational field visits.
• TJCAA Structural engineers will provide written answers to Requests for Information (RFIs). For
budgeting purposes, TJCAA Structural engineers have included three RFIs associated with the
design elements within the scope of work.
• TJCAA Structural engineers will review shop drawings and other materials that the contractor is
required to submit in accordance with contract documents. For budgeting purposes, TJCAA
Structural engineers have included five submittals associated with the design elements within the
scope of work.
5 1 P a g e
• Structural observations as required by the CBC is provided by others. Construction inspections,
including but not limited to Special Inspections is provided by others.
• All work is authorized and completed at the same time (e.g., equipment information and anchor
point layout is provided one time, without revisions to provided information).
• Engineering Support During Construction is not included in the project scope but is listed as an
optional service. Reviewing five submittals, responding to three RFls, attending one site
observation, and developing as -built documentation are budgeted.
• ESDC fees quoted assume construction will begin and end in 2025.
SCHEDULE
We anticipate the kick-off meeting to occur two weeks after Task Order Approval by the City. Based on the
City's desire to proceed with design as quickly as possible, a City email will suffice as a Notice to Proceed and
Task Order Approval.
6 1 P a g e
COS1
Project Number: Project Number Project Name: 390 Canal Pump Station Generator Install
v,
o
0
0
c
f0
=
N
C
m
0
m
J
C
0
f0
O
C
C
w
Q
v1
c
H
Z
0
0
TASKS
M
L
c)
Labc
AKM
DVA
Direct Labor
Mul
No.
Initial Hourly Rate
$81 62
$41 19
$0.00
$0.00
$0.00
$0.00
Key Personnel
No
No
No
No
No
No
Prevailing Wage
No
No
No
No
No
No
2.c
0
$0
1.0
Proiect Manaaement
16
6
22
$1.553
$4
2.0
Geotechnical Investigation
0
$0
3.0
Structural Desian Services
0
$0
4.0
Electrical Design Services
0
$0
0
$0
Subtotal - Hours
16
6
0
0
01
0
22
$1.553.06
V
Anticipated Salary Increases
$38.79
Other Direct Costs
Total Cost
$1,306
$247
$0
$0
$0
$0
$1,553
$1,592
390 Canal Pump Station Generator Install - Template Cost and Budget Sheet July 2024 Project 1 Hrs 8/22/2024
COS1
Project Number: Project Number Project Name: 390 Canal Pump Station Generator Install
m
N
o
�
c
o
=
N
1O
c
m
0
m
J
C
O
[0
O
W
Q
to
C
O
~
Z
.W
O
o
`o
c
TASKS
M
Labc
AKM
DVA
Direct Labor
Mul,
No.
Initial Hourly Rate
$81.62
$41.19
$0.00
$0 00
$0 00
$0.00
Key Personnel
No
No
No
No
No
No
Prevailing Wage
No
No
No
No
No
No
2.5
0
$0
Supplemental Consultation and Plan
5.0
Review
0
$0
6.0
Construction Observation and Testing
0
$0
7.0
Bidding Assistance
4
2
6
$409
S1
8.0
Design Services Durinq Construction
6
2
8
$572
$1
0
$0
Subtotal - Hours
1 10
41
01
01
01
0
14
$980.96
S
Anticipated Salary Increases
$24.51
Other Direct Costs
Total Cost
1 $816
$165
$0
$0
$0
$0
S981
$1,005
390 Canal Pump Station Generator Install Optional Tasks - Template Cost and Budget Sheet July 2024 Project 1 Hrs 8/22/2024
h0*1 RAFq41*`
1
i 2
14, y0
WITH P
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackle (for Mariana Sanchez) Extension: 3353
Contractor Name: Consor North America, Inc
Contractor's Contact: Andrew Mitchell Contact's Email: Andrew.mitchell@consoreng.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
10/14/2024
Attorney c/o Laraine.Gittens@cityofsanrafael.org
®SM
2 City Attorney
a. Review, revise, and comment on draft agreement
10/14/2024
and return to Project Manager
10/14/2024
® NT
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
❑X NT
3
Department Director
Approval of final agreement form to send to
10/14/2024
❑X AM
contractor
4
Project Manager
Forward three (3) originals of final agreement to
10/14/2024
rX1
contractor for their signature
5
Project Manager
When necessary, contractor -signed agreement
IX N/A
agendized for City Council approval *
*City Council approval required for Professional Services
❑
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
8 City Attorney
Review and approve insurance in PINS , and bonds
(for Public Works Contracts)
9 City Manager / Mayor
Agreement executed by City Council authorized
official
10
City Clerk
Attest signatures, retains original agreement and
forwards copies to Project Manager
Task Order 136 - Consor - 390 Canal Pump
Station Generator Replacement
Final Audit Report
Created: 2024-10-24
By: Shannon Mackie (shannon.mackle@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAcCvsG2ZIOD1KCf837y0HaapbO5VeaOA2
2024-10-31
"Task Order 136 - Consor - 390 Canal Pump Station Generator
Replacement" History
Document created by Shannon Mackle (shannon.mackle@cityofsanrafael.org)
2024-10-24 - 4:29:38 PM GMT- IP address: 199.88.113.8
L77+ Document emailed to chris.rayasam@consoreng.com for signature
2024-10-24 - 4:31:20 PM GMT
X Document shared with mariana.sanchez@cityofsanrafael.org by Shannon Mackle
(shannon. mackle@cityofsanrafael.org)
2024-10-24 - 4:31:50 PM GMT- IP address: 199.88.113.8
Email viewed by chris.rayasam@consoreng.com
2024-10-24 - 5:22:19 PM GMT- IP address: 64.62.34.74
60 Signer chris.rayasam@consoreng.com entered name at signing as Chris Rayasam
2024-10-24 - 5:22:43 PM GMT- IP address: 64.62.34.74
&0 Document e-signed by Chris Rayasam (chris.rayasam@consoreng.com)
Signature Date: 2024-10-24 - 5:22:45 PM GMT - Time Source: server- IP address: 64.62.34.74
P4 Document emailed to ian.machan@consoreng.com for signature
2024-10-24 - 5:22:47 PM GMT
Email viewed by ian.machan@consoreng.com
2024-10-24 - 11:40:15 PM GMT- IP address: 174.202.13.216
c. o- Signer ian.machan@consoreng.com entered name at signing as Ian Machan
2024-10-24 - 11:41:13 PM GMT- IP address: 174.202.13.216
Powered SAN RAFAEL �
wo �> Adobe
Acrobat Sign
4o Document e-signed by Ian Machan (ian.machan@consoreng.com)
Signature Date: 2024-10-24 - 11:41:15 PM GMT - Time Source: server- IP address: 174.202.13.216
C'y Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2024-10-24 - 11:41:17 PM GMT
t Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2024-10-25 - 3:42:59 PM GMT- IP address: 199.88.113.8
60 Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2024-10-25 - 4:52:42 PM GMT - Time Source: server- IP address: 199.88.113.8
E'' Document emailed to rob.epstein@cityofsanrafael.org for signature
2024-10-25 - 4:52:44 PM GMT
Email viewed by rob.epstein@cityofsanrafael.org
2024-10-25 - 4:53:24 PM GMT- IP address: 24.5.134.43
6o Signer rob.epstein@cityofsanrafael.org entered name at signing as Robert F. Epstein
2024-10-25 - 4:53:43 PM GMT- IP address: 24.5.134.43
6o Document e-signed by Robert F. Epstein (rob.epstein@cityofsanrafael.org)
Signature Date: 2024-10-25 - 4:53:45 PM GMT - Time Source: server- IP address: 24.5.134.43
C'-► Document emailed to city.clerk@cityofsanrafael.org for approval
2024-10-25 - 4:53:47 PM GMT
Email viewed by city. clerk@cityofsanrafael.org
2024-10-25 - 5:01:04 PM GMT- IP address: 67.169.52.201
0() Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2024-10-28 - 2:50:41 PM GMT- IP address: 199.88.113.8
fS© Document approved by Brenna Nurmi (city.clerk@cityofsanrafael.org)
Approval Date: 2024-10-28 - 2:50:43 PM GMT - Time Source: server- IP address: 199.88.113.8
P-4 Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2024-10-28 - 2:50:45 PM GMT
Email viewed by cristine.alilovich@cityofsanrafael.org
2024-10-31 - 4:39:34 AM GMT- IP address: 104.47.65.254
bo Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2024-10-31 - 4:39:50 AM GMT- IP address: 71.198.110.147
6© Document e-signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)
Signature Date: 2024-10-31 - 4:39:52 AM GMT - Time Source: server- IP address: 71.198.110.147
gl� SAN RAFAEL AdobebY
Acrobat Sign
�J Agreement completed.
2024-10-31 - 4:39:52 AM GMT
SAN RAFAEL I dobe�
Acrobat Sign