HomeMy WebLinkAboutCC Resolution 2546RESOLUTION NO. 7X46
RESOLUTION AMENDING ENGINEER'S ESTIMATE
OF COST OF IMPROVEMENTS,TO BE ACQUIRED
AND ENGINEER'S REPORT IN WHITE OAKS UNIT
TWO ASSESSMENT DISTRICT, CITY OF SAN
RAFAEL, MARIN COUNTY, CALIFORNIA.
WHEREAS, on the 2nd day of October, 1961, the owners of
certain property filed a petition to form the White Oaks Unit Two
Assessment District with the City Clerk of the City of San Rafael,
Marin County, California; and
WHEREAS, said petition requested that all disbursements
of funds in connection with the proceedings of said assessment dis-
trict be made in accordance with "Exhibit A" attached thereto and
entitled "Engineer's Estimate of Cost of Acquisition of Improvements
For White Oaks Unit Two Assessment District, City of San Rafael,
California"; and
WHEREAS, the City Council of the City of San Rafael, Marin
County, California, adopted its Resolution No. 2537 on the 2nd day
of October, 1961, accepting the terms of said petition including the
Engineer's Estimate of Cost attached thereto as Exhibit "A"; and
WHEREAS, on the 2nd day of October, 1961, the Engineer's
Report and assessment was filed with the City Clerk, which report
contains an estimate of the cost of acquisition of said improvements;
and
WHEREAS, it is necessary to amend the Engineer's Estimate
of Cost and the Engineer's Report and assessment hereinabove referred
to in order that said Engineer's Estimate of Cost and the Engineer's
Report and assessment will contain the increased costs determined by
said City Council to be paid to said city for administrative overhead
and bond service fees.
NOW, THEREFORE, BE IT RESOLVED that the City Council of
the City of San Rafael, Marin County, California, does hereby resolve(
and find:
1. That the Engineer's Estimate of Cost for the acquisi-
tion and construction of improvements in White Oaks Unit Two
Assessment District, San Rafael, California, attached to the above-
mentioned petition and labeled "Exhibit A" is hereby amended to
contain the estimate of costs attached hereto and entitled "Amended
Engineer's Estimate of Cost of Acquisition of Improvements For White
Oaks Unit Two Assessment District, City of San Rafael, California"
and hereby made a part hereof.
2. That the Engineer's Report and assessment hereinabove
referred to is hereby amended to contain the revised estimate of
costs as shown on the "Amended Engineer's Estimate of Cost of Acquisi-
tion of Improvements for White Oaks Unit Two Assessment District,
City of San Rafael, California".
3. That the moneys received from the.proceeds of assessments
levied and bonds issued will be disbursed in accordance with the
said schedule of costs annexed hereto.
I HEREBY CERTIFY that the foregoing Resolution was duly
and regularly adopted by the City Council of the City of San Rafael,
California, at a regular meeting thereof, held on the 20th day of
November, 1961, by the following vote, to wit:
AYES • Councilmen Ay, Ran, JOHN, Venary and r,,: ,, Veronri
NOES: Councilmen
ABSENT: Councilmen
-2-
Wi . B.. MORGAN
W. L. MORGAN, City Clerk,
City of San Rafael, County of Marin,
California.
,l
(SEAL)
W. C. CORNU LL -- -
PEPUTY CITY_ CL.E
1.
MENDEDENGIN-EE STI TE OF COST OF ACQUISITION
0F FOR WHITE OAKS UNIT TWO
01STRI
ES TIATED COST 0r A Qi_xRTt�C TMPRQ�TWNTS
A. Clegrin -. fire, Gruadi
' ._. :.. ., ,1Ian 0 cu.yds. at $1.05
per cu. yd.
2. Site Clearing and Crubbing
SQx_ea4.�. 5id4��i�c� Gu��a r� Cutte:
G�.a�g f ,.3�t
$0 04 por sq ft.
2. Stripping & stockpiling top avil
2000 "y dao at. $0.67 per cu, yd.
3. 2`° Aspbmlt Concrete Surf:lcit'ag in-
" ding se�A coats & 6" Crushed
R,w-k F-.rxe 73 t OOO s. ft., a t $0,249
ger sq fta
" i��Dyye Se eQ {yu material 900
6', PcrtLond C..: Cry wTey pave-
ment inclu6 .. g d 1s & e Si®n
Dints s 2 v 21U sq t. at 1 per
sq., ft.
61, Curb & Gutter 7, 00 lin. ft � at
4$2.05 perVCurt
q� f . �p y.
7. Vertical �.rurt 1P 11 ine ft. at
$165 p -r xis:@ fi
So P.C.C. � 1k 21-,400 aq. ft. at
$ , r ft.
9. Srreeq� "ligoR V16 enwh ;at $40.00 ergo
10. stand S , veet Kv is 23 a&. at
$3 .00 each
11s C ,, crete Staff. 826 sq ft. &t
$3.80 per sq. ft
per lin. ft s
a Concrete Hee". Ilia 2 a&. $2.)0.00
4. Storm Manhole'.R' .3 each at 2.00 ea
5. Curb Outlet S tractuTe 1 ea. at
•90 w
6. Field inlets
2 ��{{; at $325.00 ea
rete TlIin sY tJ s 5 ea. at $2 5r.:dc
each
D. sa"itary Som.
., J U o 2 p f OO. 11n,, A t c. At $ 6 o i s
per Wk., ft. _
20 b" C.i.;p, 19100 lift ft,. at $7.50
Der lin, Etc, .
3, V.C,P., 420 xin, ft., &t $5.25
rte. lfn ft.
4. .,nit* -r' Maw- lep 21 each at $400.00
:;;..ch
5. nddj.ng i.nlet:;13 21 en@ &t $78.00 ea.
6. 1. .: ater*1 C icon guts 18 ea. at
$36,00 each
$26,500000
700.00
427 m 200.00
19351.39
189149.61
49984000
19348.10
159940.00
19833015
11,712.00
504000
782.00
10450.00
X62r014075
$o°�G2�i�50
2 9 520 0 #iii
..• 200 A0
10 36.00
966000
•�fSoC.d'.1A .
12,071.
$16--009.92
02050
.2 9 100 a 00
9:002.00
�,963a o0
v64$®00�4z90Vo42
177 (ine ides over' e�&dv engineer-
i.ng D connecti ChArges 37 .924 , 9g
..
TOTAL ESTIMATED COST OF ENROVEMENT ISITIf $1.819291.65
Contingency Allowance 6.810.35
TOTAL ESTIMATED A(;Q"ISITION COSTS INcLUDING CONTINGENCIES$1889102.00
Engineering & Plena Fees $169000.00
:voila Curntrol. 49000.00
City Of 84n r, el, ct Fees 29100000
Citi of Sao 1:. ,_:el A::_:. st ive
And Boac' Service Fee 52000.00
Cost - P,-oceedt.- _s 960.00
Subdi-l" si4 a Bond Vremium 19755.00
Legal ]fees 5.643.00
TOTAL ESTIMATED INCIDENTAL EXP SES $_;L5,14 58.__00
EST .:D TOTAL PRO CT COST - $223t560.00
Bond Discount at 92% of Par
ESTIMATED TOTAL AMOUNT OF BOND ISSUE
ANIS TOTAL AMOUNT TO BE ASSESSED $2439000.00
DATED
9 1961.
GEORGE S. NOLTE
P.,
m 2