Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPW Service Level Agreement; Task Order No. 125.1 Francisco Blvd East Mid-Block Crossing DesignCity of San Rafael
SERVICE LEVEL AGREEMENT
DATED APRIL 9, 2024
WITH KIMLEY-HORN AND ASSOCIATES, INC.
TASK ORDER NO. 125.1
(Amendment to Task Order No. 125)
Francisco Blvd East Mid -Block Crossing Design
Amendment Amount: $16,950
THIS AMENDMENT TO TASK ORDER No. 125 is entered into on Dec 13, 2024
between the City of San Rafael, a municipal corporation ("City"), and Kimley-Horn and Associates, Inc.,
("Contractor").
RECITALS
A. The City and Contractor (as may be identified as "Consultant" in the original Agreement)
have entered into a Service Level Agreement ("Agreement") dated April 9, 2024 under which Contractor
has agreed to perform certain contract services for the City; and
B. Pursuant to the Agreement, on August 8, 2024, the City and Contractor entered into
"Task Order No. 125" under which Contractor agreed to perform contract services in connection with
City's Francisco Blvd East Mid -Block Crossing Design (the "Project"), for a total not to exceed $68,693;
and
C. City now requires additional services for the Project, and the Contractor is willing to
provide such services.
NOW, THEREFORE, City and Contractor agree to amend Task Order No. 125 as follows:
AGREEMENT TO AMEND TASK ORDER
1. Section 1 entitled "Scope of Services," is hereby amended to include the additional services set
forth in Exhibit A of this Task Order Amendment.
2. Section 2 entitled "Date of completion; Work hours estimate; Cost estimate and budget; Fee
schedule" is hereby amended to include the additional services, work hours estimate, cost estimate and
budget set forth in Exhibit A, for an amount not to exceed $16,950, changing the total not to exceed to
$85,643.
3. Except as specifically amended herein, all of the other provisions, terms and obligations of Task
Order No. 125 shall remain valid and shall be in full force.
Signatures. The parties have executed this Amendment as of the date first written above.
Rev May 2013
City of San Rafael Service Level Agreement
Amendment to Task Order
CITY OF SAN RAFAEL
( v; i .A"Ilali
By: O isl ne Alilovich Mec 13.202413:45 PST)
Cristine Alilovich, City Manager
Reviewed By
Radert
By: Robert F. Epstein (Dec t . 202.1 13:15 PST)
Robert F. Epstein, City Attorney
Exhibits:
A — Scope of Work
2
Rev Jan 2019
CONTRACTOR
tg,=�k
By: KwvZ Ak ab Oct 22.2024 13:52 PDT;
Name: KWasl AkWabl
Title: Vice President
(if Contractor is a corporation, add
signature of second corporate officer)
By: Kevm Aguigui (Dc 2, 2 4 13.53 PDT)
Name. Kevin Agu i p i
Title: Vice President
Exhibit A
Kimley>>)Horn
Date: August 13, 2024
To: April Miller, Public Works Director
City of San Rafael
From. Chadi Chazbek, P.E.
Kimley-Horn and Associates, Inc.
Subject: Francisco Blvd East Mid -Block Crossing Design (Task Order No. 125) —Additional
Service Request #1
Dear April,
Kimley-Horn is currently working with the City of San Rafael to provide final design engineering
services for the Francisco Blvd East Mid -Block Crossing Design (Task Order No. 125), as noted in
the listed Task Order Scope of Services. To date, Kimley-Horn has prepared final construction bid
documents which includes final bid plans, project specifications, and engineer's opinion of probable
cost. Other support documentation includes a lighting analysis at the mid -block crossing and
environmental support documentation. Kimley-Horn is pleased to submit this Additional Service
Request #1 to the original scope of services, to include the additional services as outlined below.
Additional Scone of Services
Task 6 — Desian Services Durina Construction (DSDC
Kimley-Horn will provide design support during bidding and construction as part of construction
support services. The proposed budget is based on an assumed scope, as described below. We
assume that all work will be performed upon authorization and direction of the City. We have
assumed a total of 70 hours for design services during construction (DSDC).
Each task includes an' assumed number of hours. Effort in excess of the assumed hours is assumed
to be additional work beyond this scope, and can be performed for an additional fee, upon the City's
authorization.
Bid Support
The Kimley-Horn team will provide design support ahead of and during project advertisement by
answering contractor inquiries and preparing addenda as requested by the City.
The level of effort associated with responding to contractor inquiries, preparing addenda, and all other
requested efforts for bid support is assumed to total 30 hours for budgeting purposes; this work will
be performed on a time -and -materials basis.
Construction Support
The Kimley-Horn team will provide design support during project construction. Kimley-Horn assumes
a total effort of 40 hours for budgeting purposes; this work will be performed on a time -and -materials
basis.
Kimley>>> Horn
Page 2
As part of this task, Kimley-Horn will prepare Conformed Record Drawings using the contractor or
City resident engineer mark-ups of the project drawings. The Record Drawings incorporate the as -
built information and will be dated and signed by the Engineer(s) of Record (EOR) prior to being
submitted to the City Engineer.
Kimley-Horn may perform the following construction support activities, as directed by the City, within
the hours budgeted for the task. Our proposed fee does not assume or include enough hours for us to
perform all the activities summarized below. This list is meant to be a list of services we can provide
during construction.
• Pre -construction conference
• Visits to site and observation of construction
• Recommendations with respect to defective work
• Clarifications and interpretations
• Change orders
• Shop drawings and samples
• Substitutes and "or -equal'
• Inspections and tests
• Applications for payment
• Substantial completion
• Final notice of acceptability of the work
• Limitation of responsibilities
FEE AND EXPENSES
Kimley-Horn proposes to provide professional services outlined in this additional scope of services Task
6 — Design Services During Construction (DSDC) for an additional amount of $16,950.
Current not to exceed task order amount: $68,693
Additional requested fee: $16,950
Revised not to exceed task order amount: $85,643
CLOSURE
If you concur in all the foregoing and wish to direct us to proceed with the services, please have
authorized persons execute both copies of this Agreement in the spaces provided below, retain one
copy, and return the other to us. We will commence services only after we have received a fully -
executed agreement. Fees and times stated in this Agreement are valid for sixty (60) days after the
date of this letter.
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Sincerely,
Chadi Chazbek, P.E
4637 Chabot Drive, Suite 300, Pleasanton, CA 94588
TO Amendment 125.1 - Francisco Blvd
Crossing Design
Final Audit Report
Created: 2024-10-22
By: Shannon Mackie (shannon.mackie@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAXRihGvAog4P439B1 RsccmASCAlkdo5kl
2024-10-22
"TO Amendment 125.1 - Francisco Blvd Crossing Design" Histor
Y
Document created by Shannon Mackie (shannon.mackle@cityofsanrafael.org)
2024-10-22 - 8:15:58 PM GMT- IP address: 199.88.113.8
C'► Document emailed to Kwasi Akwabi (kwasi.akwabi@kimley-horn.com) for signature
2024-10-22 - 8:17:28 PM GMT
Email viewed by Kwasi Akwabi (kwasi.akwabi@kimley-horn.com)
2024-10-22 - 8:43:07 PM GMT- IP address: 134.238.198.140
&9 Document e -signed by Kwasi Akwabi (kwasi.akwabi@kimley-horn.com)
Signature Date: 2024-10-22 - 8:52:22 PM GMT - Time Source: server- IP address: 134.238.198.140
C'-. Document emailed to kevin.aguigui@kimley-horn.com for signature
2024-10-22 - 8:52:25 PM GMT
Email viewed by kevin.aguigui@kimley-horn.com
2024-10-22 - 8:52:55 PM GMT- IP address: 134.238.198.140
Coq Signer kevin.aguigui@kimley-horn.com entered name at signing as Kevin Aguigui
2024-10-22 - 8:53:42 PM GMT- IP address: 134.238.198.140
GHQ Document e -signed by Kevin Aguigui (kevin.aguigui@kimley-horn.com)
Signature Date: 2024-10-22 - 8:53:44 PM GMT - Time Source: server- IP address: 134.238.198.140
O Agreement completed.
2024-10-22 - 8:53:44 PM GMT
SAN RAFAELAdm b by
" "' -'' 11` "'. I Acrobat Sign
RAFq�!
I f -, Wk. t-..
i 2
y
ITH pr1y
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackie (for Mariana Sanchez) Extension: 3353
Contractor Name: Kimley-Horn
Contractor's Contact: Chadi Chazbek Contact's Email: chadi.chazbek@kimley-horn.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Click here to
Check/Initial
❑
1
Project Manager
a. Email PINS Introductory Notice to Contractor
enter a date.
b. Email contract (in Word) and attachments to City
10/9/2024
Attorney c/o Laraine.Gittens@cityofsanrafael.org
10/17/2024
NSM
2
City Attorney
a. Review, revise, and comment on draft agreement
and return to Project Manager
10/17/2024
❑X NT
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
❑X NT
3
Department Director
Approval of final agreement form to send to
10/22/2024
© AM
contractor
10/22/2024
4
Project Manager
Forward three (3) originals of final agreement to
contractor for their signature
When necessary, contractor -signed agreement
5
Project Manager
❑ N/A
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
12/2/2024
Date of City Council approval
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
Forward signed original agreements to City
12/12/24
SM
6
Project Manager
City Attorney
Attorney with printed copy of this routing form
Review and approve hard copy of signed
7
agreement
8
City Attorney
Review and approve insurance in PINS , and bonds
(for Public Works Contracts)
Agreement executed by City Council authorized
9
City Manager/ Mayor
official
Attest signatures, retains original agreement and
10
City Clerk
forwards copies to Project Manager
TO Amendment 125.1 - Francisco Blvd
Crossing Design
Final Audit Report 2024-12-13
Created: 2024-12-12
By: Shannon Mackle (shannon.mackle@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAnvQxPvv8A6ThcuiRB7f2fQwiu8KTVgTf
"TO Amendment 125.1 - Francisco Blvd Crossing Design" Histor
Y
Document created by Shannon Mackie (shannon.mackle@cityofsanrafael.org)
2024-12-12 - 7:40:22 PM GMT- IP address: 199.88.89.34
El Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2024-12-12 - 7:41:03 PM GMT
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2024-12-12 - 7:44:48 PM GMT- IP address: 104.47.64.254
&0 Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2024-12-12 - 7:45:04 PM GMT - Time Source: server- IP address: 199.88.113.8
04 Document emailed to rob.epstein@cityofsanrafael.org for signature
2024-12-12 - 7:45:07 PM GMT
Email viewed by rob.epstein@cityofsanrafael.org
2024-12-12 - 9:15:40 PM GMT- IP address: 199.88.114.102
tt Signer rob.epstein@cityofsanrafael.org entered name at signing as Robert F. Epstein
2024-12-12 - 9:15:56 PM GMT- IP address: 199.88.114.102
6© Document e -signed by Robert F. Epstein (rob.epstein@cityofsanrafael.org)
Signature Date: 2024-12-12 - 9:15:58 PM GMT - Time Source: server- IP address: 199.88.114.102
C'y Document emailed to city.clerk@cityofsanrafael.org for approval
2024-12-12 - 9:16:00 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2024-12-12 - 9:33:46 PM GMT- IP address: 199.88.113.8
( ` SAN RAFAEL Powered b1
U i�ft- Adobe
`�' Acrobat Sign
d� Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2024-12-13 - 3:38:34 PM GMT- IP address: 199.88.113.8
6© Document approved by Brenna Nurmi (city.clerk@cityofsanrafael.org)
Approval Date: 2024-12-13 - 3:38:36 PM GMT - Time Source: server- IP address: 199.88.113.8
&I Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2024-12-13 - 3:38:38 PM GMT
In Email viewed by cristine.alilovich@cityofsanrafael.org
2024-12-13 - 9:45:22 PM GMT- IP address: 104.47.65.254
d© Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2024-12-13 - 9:45:32 PM GMT- IP address: 199.88.113.8
Oe Document e -signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)
Signature Date: 2024-12-13 - 9:45:34 PM GMT -Time Source: server- IP address: 199.88.113.8
® Agreement completed.
2024-12-13 - 9:45:34 PM GMT
by
SAN RAFAEL Pdob
��A� � Adobe
"` """' - ""`' — I Acrobat Sign