HomeMy WebLinkAboutPW Service Level Agreement; Task Order No. 141 Materials Testing for Downtown Library RenovationCity of San Rafael
SERVICE LEVEL AGREEMENT
DATED SEPTEMBER 9, 2023
WITH TWINING, INC.
TASK ORDER NO. 141
Subject title: Materials Testing for Downtown Library Renovation
Task Order Amount: $16,557.30
THIS TASK ORDER is entered into on DeC 8, 2024 between the City of San Rafael,
a municipal corporation ("City"), and Twining, Inc., ("Contractor").
RECITALS
A. Whereas Master Consultant Services Agreement is hereby renamed Service Level Agreement;
and
B. The City and Contractor (as may be identified as "Consultant" in the original Agreement) have
entered into a Service Level Agreement ("Agreement") dated September 9, 2023 under which
Contractor has agreed to perform certain contract services for the City; and
C. Pursuant to the terms of the Agreement, the City wishes Contractor to perform certain tasks as set
forth in this Task Order, which constitute the Work;
NOW, THEREFORE, City and Contractor agree as follows:
AGREEMENT
1. Scope of services. Contractor shall provide any and all of the services set forth in Exhibit A of
this Task Order, for an amount not to exceed the Task Order Amount, identified above, as directed by the
City.
Martel Attento Rhorer shall be the Project Manager for Contractor for this Task Order. Additional
contract services may be performed by other Contractor staff with prior notice and approval by City.
a. City's duties. The City will:
(1) Determine the scope of services, as set forth in Exhibit A.
(2) Make available work plans and specifications and other City data related to the project,
including full information as to the City's requirements.
(3) Designate Andrew Powell, or their designee as the person at the City responsible for
monitoring performance under this Task Order.
b.Contractor duties. The Contractor will:
(1) Provide and perform tasks identified in Exhibit A, Scope of Services.
(2) Provide miscellaneous services related to the Work and not stipulated elsewhere in this
Task Order, when requested by the City in writing. A Task Order Amendment is
Rev. March 2024
City of San Rafael Service Level Agreement
Task Order
required if these additional services cannot be performed within the Task Order budget.
2. Date of completion, Work hours estimate,• Cost estimate and budget,• Fee schedule: Costs are not -
to -exceed stated Task Order Amount in this Task Order. See Exhibit A for Work and fee schedule details.
Authorization to proceed.
The City will give Contractor authorization to proceed with the work specified in this Task Order only after
Contractor submits updated insurance certificates and endorsements, in accordance with the Agreement.
4. Service Level Agreement terms,• Conflicts
Except as expressly otherwise provided herein, all terms of the Agreement shall apply to Contractor in the
performance of work pursuant to this Task Order. If there is a conflict between this Task Order and the
Agreement, this Task Order shall control.
5. Amendment of Task Order. Conflicts.
Except as provided in Section 1(b)(2) above, this Task Order may not be modified except by an Amended
Task Order executed and approved in the same manner as the Task Order.
6. Si2mltUres. The parties have executed this Task Order, as of the date first written above.
Rev. March 2024
City of San Rafael Service Level Agreement
Task Order
CITY OF SAN RAFAEL
By: CUistine Alilovich(Dec 8,202418:31 PST)
Cristine Alilovich, City Manager
Reviewed By
Ra6ere F CAE&'
By: Rvher: r. Epstein ,Dcc 0024 10:30 PSTI
Robert F. Epstein, City Attorney
Exhibits:
A
Rev March 2024
Scope of work
CONTRACTOR
Name: Marie[ Attento
Title: Chief Strategy Officer
(if Contractor is a corporation, add signature
of second corporate officer)
M
By: —
Name: Linas Vitkus
Title: President and COO
10%
5027 Commercial Tel: 925.849.8186
"TWINING Concord, CA 94520ircle, Suite G, Fax: 562 426 6424
Exhibit A
November 26th, 2024
Proposal No. 24-2388
Subject: Proposal for Materials Testing & Special Inspection Services
Project: City of San Rafael - Public Library Renovation
Dear Mr. Powell,
Twining, Inc. (Twining) is pleased to present this proposal for your consideration. We are confident that you
will find Twining to be the best suited and most qualified firm to meet the materials testing and inspection
needs of the project referenced above. Our ability to provide in-depth inspection and materials engineering
support, a broad range of sophisticated laboratory testing, and literally hundreds of qualified technicians and
inspectors is unsurpassed in the state of California.
We are proposing to service this project utilizing our Concord facility that provides critical quality assurance
data in a proactive and efficient manner. All our reports are electronically transmitted to the project team by
our Quality Management team. Twining's affiliation with the International Union of Operating Engineers means
that all covered work we do is staffed by union personnel and provides even more assurance of our stability
and the quality of our inspectors and technicians.
Budgetary Cost Analysis -Testing and Inspection
Though we have included a budgetary cost analysis detailing scope and estimated costs for our services, these
cost estimates are not intended to be lump sums or guaranteed costs. Please note these estimates are based
upon the project schedule provided and are subject to change. We are prepared to revise our proposal if the
scope presented is insufficient.
Twining will provide materials testing and inspection services on a time and materials budget, in
accordance with the attached schedule of fees and terms and conditions. The Report Distribution Form
is necessary in order for us to issue project related reports in an accurate and timely manner.
Twining, Inc. is pleased to have this opportunity to propose our services foryour important project. Should you
have any questions or comments, please contact me at (925)-771-3099 or at matt_en-to@twin_i-ngLn-c.cQm.
MarielAttento Rhorer
Chief Strategy Officer
Attachments:
(i) Table -1 Cost Estimate
(ii) Table -2 Schedule of Fees
(iii) Table 3- Report Distribution Form
Project Name: City of San Rafael - Public Library Renovation
ProposalNo:24-2388
Date: November 26 2024
Twining Inc. - Concord
Mariel Attento Rhorer
Phone: 925-771-3099
Division
Description
of Work
Assumptions Manpowe
ed Days
Quantity
Measure
Special Inspector - Reinforced Concrete
Trench Rebar
1
5
40
Hours
$135.00
$5,40000
& Concrete
Special Inspector- Drilled -In, Epoxy, Expansion Anchors
1
1
8
Hours
$135.00
$1,080.00
Assuming City
Special Inspector - Reinforced Concrete
Flat Work
will require this 0.5
5
20
Hours
$135.00
$2,700.00
QC
Project Manager
Division
2
Hours
$235.00
$470.00
Standard Sample Pick -Up: Concrete Cylinders 6" x 12" and 4" x 8"
1 Pour
5
Each
$33.00
$330.00
4" x 8" Cylinder: Compression Strength (ASTM C39)
5
Each
$43.00
$430.00
Clerical / Report Distribution
5%
$520.50
Division
SUB -TOTAL
$10.930.50
Misc.
Special Inspector - Structural Steel (Field)
Structural
Periodic Inspectioi 1
4
32
Hours
$135.00
$4,320.00
Steel (Stairs,
Guardrails)
Special Inspector- Structural Steel (Shop)
If Needed
8
Hours
$13500
$1,080.00
Clerical / Report Distribution
5%
$226.80
SUB -TOTAL
$5,626.80
Terms and Conditions
Parking if not provided by client
Provided by Owner
0
Daily
$ $
GRAND -TOTAL 1
$16,557.30
REMARKS: This proposal is based on the construction schedule provided by Unger, dated 10/16124 See attached Schedule of fees for adVonal terms and conditions.
"TWINING
Schedule Of Fees 2024-2025
NOTE: Rates will be adjusted annually each July 1st to reflect increased costs
Personnel Rates: Per Hour Unless Otherwise Noted
Task
Equipment Usage (Dally Unless otherwise Noted),
Code
Engineering And Consulting Personnel
Rate
10026
Senior Principal Advisonconsullan1
5
39000
10001
Principal Engineer/Geologist
S
280.00
10017
Metallurgical Engineer
S
390.00
70000
Registered Geotechnical Engineer
S
280,00
10010
Technical Advisor
5
260.00
10011
Material Scientist, Welding/NDT Consultant
S
275.00
70003
Registered Geologist/Ceriified Engineering Geologist
S
275.00
10003
Senior Engineer/Geologist
S
250.00
10009
Registered Civil Engineer
S
240,00
60003
Roofing/Waterproofing Consultant
S
265.00
10013
Project Engineer/Manager
S
235.00
30000
Quality Control Manager
$
235.00
10005
Senior Staff Engineer/Geologist
S
220.00
10007
Staff Engineer/Geologist
S
205.00
10015
Quality Control Administrator
S
205.00
10019
Metallurgical Technician
S
17500
90001
CADD Operator/Draftsperson
S
16000
95103
Administrative Support
$
10500
70107
Field Supervisor
S
19500
91030
Safely Supervisor
S
195.00
20000
Laboratory Manager
$
180.00
98000
Laboratory Technician
S
15500
90005
Expert Witness Testimony
S
630.00
91010
Qualified SWPPP Developer
$
220 00
91000
Qualified SWPPP Practitioner
S
205.00
30001
Vibration Engineer
S
24000
Task
Half -Cell Potential Equipment Set
S
405.00
Cede
Field lnspeclton Personnel
S
Rate
10101
Concrete/Reinforced Steel Inspector
$
135 00
10103
Prestressed/Post Tensioned Inspector
S
135.00
10105
Concrete ICC Inspector
S
135.00
10109
Drilled -In -Anchor Inspector
S
135.00
10111
Gunite/Shotcrele Inspector
S
135.00
10113
Masonry Inspector
S
135 00
10201
Structural Steel/Welding Inspector
S
135 00
10203
AWS Certified Welding Inspector
S
135.00
10207
Fireproofing Inspector
$
135 00
10501
Lead Inspector
S
14000
10115
Firestop Special Inspector- IFC Premier
S
205 00
10117
Fireslop Special Inspector- ICP
S
225.00
7 500 1
Asphalt Field and Plant Inspeclorrrechnician
$
135 00
70103
Pile Driving Inspector
S
13500
70101
Soils Technician
S
13500
10107
Concrete Quality Control (ACI/Caltrans Technician)
S
135.00
10122
Wood Framing Inspector
S
13500
60001
Roofing/Waterproofing Inspector
Quotation
10500
Public Works Inspector
Quotation
10515
Mechanical Inspector
$
19500
10519
Electrical Inspector
S
195.00
10521
Plumbing Inspector
S
195.00
10523
Building Inspector
$
19500
30002
Vibration Monitoring Technician
S
165.00
50003
Field Engineering Technician
$
14500
Task
6" x 12' Cylinder Compression Strength (ASTM C39)
S
54.00
=
Shop Iflliptil Personnel
S
Rate
10301
Structural Steel Fabrication Inspector
S
147.00
10309
Balch Plant Quality Control Technician/Inspector
$
147.00
10325
Glue -Laminated Fabrication Inspector
$
Quotation
10328
Pre -Cast Concrete/Pipe Fabrication Inspector
$
147.00
Task
Size (ASTM C76, C293 or CTM 523)
Code
Nondestructive Testing Personnel
S
Rate
10401
NDE Ultrasonic Testing Technician
S
150.00
10403
NDE Magnetic Particle Testing Technician
5
150.00
10405
NDE Dye Penetrant Testing Technician
S
150.00
10305
Combination NDE Technician/Welding Inspector
S
150.00
10409
Radiographic Testing (Crew Of 2)
Quotation
10020
NDE Engineer
5
255.00
Task
Code Equipment Usage loa.iv urvess otwn. Noce
95318 Skidmore S 51.00
95309 Torque Wrench, Small $ 21.00
95312 Torque Wrench, Large S 32.00
95315 Torque Multiplier S 48.00
Task
Equipment Usage (Dally Unless otherwise Noted),
Code
Continued
Rate
95321
Air Meter
S
37.00
95322
Unit Weight Bucket
S
28.00
95323
Field Concrete Scale
5
37.00
95324
2" x 2" x 2" Mold
S
26.00
95343
Nuclear Gauge (Per Hour)
5
13.00
95319
Sand Cone Density Test Equipment
$
60.00
95333
Pull Test Equipment
S
74.00
95348
Concrete/Asphalt Coring Equipment
S
720.00
95336
Floor Flatness (Dipstick)
$
63.00
95330
Schmidt Hammer
5
46.00
95341
Vapor Emission Test Kits
S
58.00
95342
Relative Humidity Probe
S
90.00
95339
UPV (Ultrasonic Pulse Velocity) Meter
5
420.00
95351
Fireproofing Adhesion/Cohesion (Per Test)
S
42.00
95300
A Scan Ultrasonic Equipment And Consumables
S
100.00
95303
Magnetic Particle Equipment And Consumables
S
53.00
95306
Liquid Penetrant Consumables
S
48.00
95307
Phased Array Ultrasonic Equipment (Per Hour)
S
105.00
95347
Ground Penetrating Radar
S
399.00
95345
Impact Echo
S
405,00
95362
Ultrasonic Tomography
S
525-00
95349
Inertial Profiler (Per Hour)
Quotation
95352
Borascope
S
315.00
95356
Infrared Camera
S
105.00
95357
Project Dedicated Vehicle
5
189.00
95384
Rolter Compacted Concrete Vibrating Hammerriamping Plate
S
84.00
95367
Half -Cell Potential Equipment Set
S
405.00
95368
Concrete Electrical Resistivity Meter
S
189.00
95369
Field Hardness (Sleel)
S
116.00
95370
Coaling Thickness Gauge
5
116-00
95373
Curing Box (Not Temperature Controlled, One -Torre Feel
S
786.00
Per Box)
95371
Temperature Control Curing Box (Per Month)
S
525.00
95372
Temperature Matching Curing Box (Per Month)
S
599-00
Task
Code
Specimen Pick -Up
Rate
20100
Soil/Aggregate Sample (Each)
$
5500
20102
Standard Sample: Concrete Cylinders (Each)
$
3300
20101
Standard Sample MortarlGrout Cubes And Cores,
$
3300
Fireproofing, Rebar, And Epoxy Prisms (Each)
20103
Oversize Sample: Masonry Prisms And Sholcrele Panels (Each)
S
7700
20104
Oversize Sample: Flexural Beams (Each)
20107
Technician For Specimen Pick -Up Not Listed Above
S
13200
(Per Hour, 2 -Hour Minimum)
20109
Technician For Specimen Pick -Up Before 5:00 a.m
$
14300
Or After 5:00 p m Monday Thru Friday, Or All Day Saturday
(Per Hour, 2 -Hour Minimum Plus Mileage)
Task
Code
Jobsito Trailer. Mobile Or On•sile Laboratory
Rate
95360
Portable Or Mobile Laboratory Unit
Quotation
95374
Jobsite Trailer, Conex, Or Equipment Storage Box
Quotation
Task
Code
Concrete Tests IFfeld Made Specimens)
Rate
20201
6" x 12' Cylinder Compression Strength (ASTM C39)
S
54.00
20202
4' x 5' Cylinder Compression Strength (ASTM C39)
S
43.00
20203
Density Of Structural Lightweight Concrete Equilibrium
S
107.00
Oven Dry Method (ASTM C567)
20205
Core Compression Including Trimming (ASTM C42)
$
91.00
20207
6" x 6" x 18" Flexural Beams Not Exceeding Referenced
S
118.00
Size (ASTM C76, C293 or CTM 523)
20209
Splitting Tensile Strength (ASTM C496)
S
118.00
20211
Modulus Of Elasticity Test (ASTM C469)
S
348.00
80003
Rapid Chloride Permeability Tesl: Cylinders Or Cores
S
626.00
(ASTM C1202)
80006
Density, Absorption, And Voids In Hardened Concrete
$
632.00
(ASTM C642)
40005
Flexural Toughness (ASTM C1609, Formerly ASTM Cl 018)
S
1,017.00
40006
Double Punch Strength Of Fiber Reinforced Concrete
S
642.00
40009
Coefficient Of Thermal Expansion Of Concrete
5
642.00
(CRD 39, AASHTO T336)
40012
Bulk Electrical Resistivity (One Age Of Tesling, ASTM C1876)
S
161.00
60013
Flexural Tensile Strength Of Metallic Fiber Reinforced Concrete
S
1,124.00
Beam (EN 14651)
c•.
"TWINING
Task
Code Concrete Soecimen Preparation
20151 Sawing Of Specimens(Each) $ 49.00
20157 Coring Of Specimens In Lab (Each) $ 49.00
20159 Grinding Of Concrete Below 6000 psi Strength (Each) $ 70.00
20160 Grinding Of Concrete 6000 psi Strength And Above (Each) $ 105.00
Task
Code
Laboratory Trial Batch: Concrete, Cement
And Mortar
Rate
30216
Compression Test 4" x 8" Cylinders Made And Tested In
$ 67.00
$
Laboratory (ASTM C192, C35)
80103
30217
Compression Test 6" x 12" Cylinders Made And Tested In
$ 80,00
80126
Laboratory (ASTM C192, C35)
$
30219
6" x 6" x 18" Flexural Beams Made And Tested in Laboratory
S 124.00
S
(ASTM C192, C78)
80193
30223
Splitting Tensile Strength Cylinders Made And Tested In
$ 140,00
80195
Laboratory (ASTM C192, C496)
$
50225
Modulus of Elasticity Test Cylinders Made And Tested In
$ 36400
3
Laboratory (ASTM C192, C469)
80204
30227
Density Of Structural Lightweight Concrete Made In
$ 12900
80206
Laboratory, Equilibrium or Oven Dry Method (ASTM C567)
$
30237
Bulk Electrical Resistivity (ASTM C1876)
$ 186.00
30201
Laboratory Trial Balch (ASTM C192/Lab Procedure Performance)
$ 626.00
30203
Concrete Mixture Design For Preconstmclion Evaluation Antl
$ 295AO
Code
Backup Data Development
Rale
30205
Drying Shrinkage Up To 28 Days, Three 3" x3' Or4' x4' Bars,
$ 610.00
S
Five Readings Up To 26 Dry Days (ASTM C157)
80212
30230
Additional Reading, Per Set Of Three Ban
$ 83.00
30231
Storage Over Ninety (90) Days, Per Set Of
$ 4900
80260
Three Bars, Per Month
Petrographic Examination Of Hardened Concrete, Level II
30207
Setting Time Up To 7 Hours (ASTM C403)
$ 19300
30209
Bleeding (ASTM C232)
$ 193.00
30229
Concrete Restrained Expansion (ASTM C878)
5 696.00
30211
Mix, Make and Test Mortar or Grout Specimens for Compressive
S 64200
Strength: Set of 6 (ASTM C878)
80222
20263
Non-Shdnk Grout: Height Change After Final Set (ASTM C1090)
5 626.00
20265
Non -Shrink Grout: Height Change At EartyAge (ASTM C827)
5 1,017.00
30232
Cracking Resistance, Set Of Three Rings, Laboratory Trial
$ 6,634.00
Batching, Test Until Creektng Or Up To 28 Days (ASTM 1581)
GM
30233
Evaluation Of Pro -Packaged Masonry Mortars (ASTM C270)
S 1,391.00
30234
Creep (ASTM C512) (One Age Of Loading, 12 Months
S 10,005.00
Duration Of Testing)
Electron Microscopy (ASTM C1723)
80198
Laboratory Development of Strength-Matunty Curve Without
$ 3,424,00
Paste Carbonation Analysis, Per Sample
Establishing Datum Tempereuire (Up To 5 Testing Ages,
268-00
80238
ASTM C1074)
80199
Laboratory Development Of Strength-Matudly Curve With
S 5,564.00
S
Establishing Datum Temperature (Up to 5 Testing Ages,
S 5,500.00
ASTM C1074)
Task
Code Evaluation of Mixing Water for Concrete Rate
80246 Evaluation of Mixing Water For Concrete Per The Requirements $ 1,07000
Of ASTM C1602. Table 1 (Physical Properties Of Mortar), Per
Sample
80248 Evaluation Of Mixing Water For Concrete Per The Requirements S 1,284 00
Of Caftrans, Section 90, Per Sample
Task
Code
Concrete - Chemical Analysis, Transport Properties,
Service Life Modelina. Petroaraohic Examination
$
Rabe
80123
Acid -Soluble Chloride Analysis (ASTM C1152)
$
321.00
80103
Includes Sample Prep)
$
803 00
80126
Wafer -Soluble Chloride Analysis (ASTM C121B)
$
204.00
80194
(Includes Sample Prep)
S
803 00
80193
Chloride Diffusion Coefficient Of Cemenlilious Mixtures By
$
3,10300
80195
Bulk Diffusion (ASTM C1556)
$
1,49800
80159
Bulk Resistivity (ASTM C1876) And Formation Factor
3
age 00
80204
Chloride Binding Isotherm
5
91000
80206
Analytical And Experimental (ASTM C1556) Modeling Of Service
$
8,56000
Effectiveness Of Po=olans & Slag Cement In Mitigating
Life Of Concrete Per Life -365 Model, Per Mixture Design
Expansion Due To ASR (ASTM C441)
80208
Analytical And Experimental (NordTest) Modeling Of Service
$
6,56000
Code
Life Of Concrete Per FIB Model Code 34, Per Mixture Design
Rale
80256
80210
Non -Steady State Chloride Migration Coefficient, NordTest 492
S
66900
80212
Petrographic Examination Of Hardened Concrete, Level 1
$
1,75000
(ASTM C856) (Excludes Thin Section), Per Sample
80260
80129
Petrographic Examination Of Hardened Concrete, Level II
$
2,25000
(ASTM C856) Includes Thin Section, Per Sample
Rock And Concrete Aggregates - Petrographic
80218
Petrographic Examination Of Hardened Concrete, Level III
S
3,50000
Rock Type Description, Per Sample (Rock Core Or Rock
(ASTM C856/C1723) (Thin Section And SEM/EDX), Per Sample
Chunk)
80222
W/CM Determination (NordTest Build 361)
S
1,338.00
80224
Examination Of Volumetric Proportions Of Hardened Concrete
S
535.00
Natural Aggregates - Petrographic Examination (Gravel And
(ASTM C457), Per Sample
Natural Sand Consisting Of Single Rock Type ASTM C295)
GM
Air Void Analysis Of Hardened Concrete (ASTM C457),
S
750.00
80268
Pel -Sample
S 27,520 00
80232
Electron Microscopy (ASTM C1723)
$
803.00
80234
Paste Carbonation Analysis, Per Sample
$
268-00
80238
Insoluble Residue Analysis (ASTM C1324)
Quotation
80240
Alkali -Silica - Damage Rating Index (DRI), Per Sample
S
1,338.00
Task
80100
Chemical Analysis Of Portland Cement Per Standard
$
80300
Evaluation Of Pozzolans And Stan Cement
Requirements (ASTM C150)
80140
Chemical Analysis Of Fly Ash Per Standard Requirements
80103
Physical Testing Of Portland Cement Per Standard
$
803 00
80143
Requirements (ASTM C150)
S 80300
80194
Physical Testing Of Type K Cement, Mortar Expansion
S
803 00
Quotation
(ASTM C806)
Chemical Analysis And Physical Testing Of Fly Ash Per
$ 1,49800
80195
Physical Testing And Chemical Analysis Of Portland Cement
$
1,49800
Qualification Of Silica Fume Par Standard Requirements
Per Standard Requirements (ASTM C150)
(ASTM C1240)
80106
Partial Analysis Or Specific Physical Tests
Qualification Of Slag Cement Per Standard Requirements
Quotation
80110
Sulfates Resistance Of Hydraulic Cement (ASTM C1012).
$
3,21000
Effectiveness Of Po=olans & Slag Cement In Mitigating
6 Months
Expansion Due To ASR (ASTM C441)
80111
Sulfates Resistance Of Hydraulic Cement (ASTM C1012).
S
3,531 00
Code
12 months
Rale
80256
80149
Type 1L Cement (ASTM C595; Excludes Special Properties)
$
1.49800
80151
Clinker Microscopy, Per Sample
$
91000
Task Physical Testing Of Chemical Admixtures For
Code Concrete Rate
80196 Qualification Of Admixture (ASTM C494) Quotation
Task
Code
Evaluation Of Pozzolans And Stan Cement
Rate
80140
Chemical Analysis Of Fly Ash Per Standard Requirements
$ 80300
(ASTM C618)
80143
Physical Testing Of Fly Ash Per Standard Requirements
S 80300
(ASTM 0618)
80146
Partial Analysis Or Specific Physical Tests
Quotation
80147
Chemical Analysis And Physical Testing Of Fly Ash Per
$ 1,49800
Standard Requirements (ASTM C1618)
80250
Qualification Of Silica Fume Par Standard Requirements
$ 1,49800
(ASTM C1240)
80252
Qualification Of Slag Cement Per Standard Requirements
$ 1,49800
(ASTM COBS)
80254
Effectiveness Of Po=olans & Slag Cement In Mitigating
$ 1,49800
Expansion Due To ASR (ASTM C441)
Task
Code
Mass Concrete - Enaineenna And Testing Services
Rale
80256
Thermal Control Plan (Without Cooling Pipes) Par Unique
$ 9.00000
Type Of Placement Of S"ar Group Of Placements, Each Plan
80256
Thermal Control Plan (With Coaling Pipes), Per A Unique
$ 10,500 00
Type Of Placement Of Similar Group Of Plecemeres, Each Plan
80260
Performance Based Maxim= Temperature Dllfarence
$ 6,00000
Laboratory 8 Analytical Studies, One Concrete Mixture Design
Task
Rock And Concrete Aggregates - Petrographic
Cada
Examination d Special USAGE d CRD Tests
Rate
80262
Rock Type Description, Per Sample (Rock Core Or Rock
$ 1,00000
Chunk)
80263
Rock Type Descriplion + XRD Including Clay Analysis,
S 1.50000
Per Sample
80266
Natural Aggregates - Petrographic Examination (Gravel And
S 2,750.00
Natural Sand Consisting Of Single Rock Type ASTM C295)
Each, One Sample
80268
Crushed Aggregates - Petrographic Examination (Crushed
S 27,520 00
Rock And Manufactured Sand Consisting Of Single Rock Type
ASTM C295), Each, One Sample
80270
Coarse Aggregate Certification For Deleterious Materials Per
S 6,500.00
Specifications Of USACE, Materials Coarser Than 0.75 -Inch
Each, One Sample, 200 Ib.
80272
Coarse Aggregate Certification For Deleterious Materials Per
S 5,500.00
Specifications Of USACE, 0.75 -Inch And Finer Material, Each,
One Sample, 25 Ib
80274
Fine Aggregate Certification For Deleterious Materials Per
S 2,75000
Specifications Of USACE, Each, One Sample
80276
Aggregate, Scratch Hardness (CRD -C 130), Each, One Sample,
S 50000
25 Ib
Task
Code
Soils And Aaareaate Tests
RAW
30503
Abrasion: LA Rattler (ASTM C131)
S 24800
30505
Abrasion: LA Rattler (ASTM C535)
$ 258.00
70301
Atterberg Limits/Plaslicily Index (ASTM D4318, CTM 204)
$ 20600
70303
California Bearing Ratio Excluding Maximum Density
S 670.00
(ASTM D1883) Sail
70304
California Bearing Ratio Excluding Maximum Density
5 624.00
(ASTM D1883) Cement -Treated Soil
70344
Cemenl-Trealetl Soil/Base Mix Design: Includes Three Trial
$ 4,223 00
Cement Contents With Three Unconfined Compressive
Strength Specimens Per Cement Content
70305
Chloride And Sulfate Content (CTM 417, CTM 422)
S 230.00
30403
Clay Lumps And Friable Particles (ASTM C142)
S. 260.00
30321
Cleanness Value 1"x#4 (CTM 227)
$ 220,00
30322
Cleanness Value 1.5" x,75" (CTM 227)
S 340,00
70393
Collapse Potential/Index (ASTM D5333)
S 279,00
r•.
"TWINING
Task
HMA Mixing And Preparation
$
160.00
Code
Soils And Aaareaate Tests. Continued
S
Rate
70396
Compressive Strength Of Molded Soil -Cement Cylinders
$
12900
75027
(ASTM D1633)
$ 27000
61.00
70309
Consolidation Tesl Full Cycle (ASTM 2435, CTM 219)
$
235.00
70311
Consolidation Test Time Rale Per Load Increment
$
62.00
75030
(ASTM D2435, CTM 219)
$ 30500
75.00
70313
Corrosivily Series Sulfate, Cl. pH, Resistivity (CTM 643,
$
309.00
$ 27000
417, and 422)
(ASTM D1561, D1188, CTM 304, 308)
97,00
70315
Crushed/Fractured Particles (ASTM D5821, CTM 205)
S
225.00
70317Direct
Shear Tesl Remolded AndlOr Residual (ASTM D3080)
$
300.00
70319
Direct Shear Tesl Undisturbed - Slow [CD] (ASTM D3080)
5
280.00
70321
Direct Shear TesI Undisturbed - Fast [CU] (ASTM D3080)
S
235-00
70378
Durability Index Per Method - A,B,C, or D (ASTM D3744,
5
260.00
$ 11500
CTM 229)
Briquette, SSD, 1 Briquette (ASTM D6925, D2726)
70325
Expansion Index (ASTM D4B29, UBC 18-2)
5
225.00
75004
Fine Aggregate Angularity (ASTM C1252, CTM 234,
5
205.00
$ 20000
AASHTO T304)
CTM 309)
30507
Flat And Elongated Particle (ASTM D4791)
$
28000
30508
Flat Or Elongated Particle (ASTM D4791)
S
26000
70331
Maximum Density Methods AIB/C (ASTM D1557,
$
23500
75106
D698, CTM 216)
S 29000
70333
Maximum Density Check Point (ASTM D1557, DNM
$
90.00
70335
Maximum Density AASHTO C [Modified] (AASHTO T-180)
S
235.00
70336
Maximum Index Density Vibratory Table (ASTM D4253)
S
43500
70337
Moisture Content (ASTM D2216, CTM 226)
S
40.00
70339
Moisture and Density Ring Sample (ASTM 02937)
S
45.00
70341
Moisture and Density Shelby Tube Sample (ASTM D2937)
S
5000
70340
Moisture -Density Relations Of Soil -Cement IOxdures
S
340.00
Premixed In The Field (ASTM D558)
Hveem Mbr Design Caftrans Untreated M'a gncluding
$ 6.85000
70342
Moisture -Densly Relations Of Soil -Cement Mlxboes
S
340.00
Hveem Mix Design Cabfans Lime Treated Mix (Including
Mixed In The Lab (ASTM D558)
Aggregate Quality Tests)
70328
pH Of Soils (ASTM D4972)
S
6500
70330
Organic Content Of Soils (ASTM D2974, Method A Only)
S
95.00
30401
Organic Impurities (ASTM C40, CTM 213)
S
11500
70343
Permeability (ASTM D5084)
Tests)
Quotation
80001
Potential Reactivity Chemical Method (ASTM C289-
$
68500
CTM 368)
Discontinued Method)
5
1,03500
70394
Potential Reactivity Mortar Bar Expansion Method,
5
1,092.00
14 -Day Exposure (ASTM C1260)
75114
70391
Potential Reactivity Mortar Bar Expansion Method,
$
3,345.00
28 -Day Exposure (ASTM C1260)
Superpave Mix Design With Additives (Excluding Aggregate
$ 12,690 00
70398
Potential Reactivity Concrete Bar Expansion Method
S
3,640.00
Effect Of Moisture On Asphalt Paving Mixtures, Pre -Mixed
(ASTM C1293), 12 month
(ASTM D4867, AASHTO T283)
70399
Potential Reactivity Concrete Bar Expansion Method
$
1,285,00
(ASTM C1293). 24 month
75039
70397
Potential Reactivity of Aggregate Combination, Non -Standard
$
1,285.00
$ 44000
Method; 14 -Day Exposure, Mortar Offer ASTM C1567)
Marshall StabBxy, Dry Set, 3 Replicates (AASHTO T245)
$ 37600
70392
Potential Reactivity Of Aggregate Combination, Non -Standard
$
1,24000
3 Emulsion Content (Caltrans LP -8)
Method; 28 -Day Exposure, Mortar (ARer ASTM C1567)
70345
R -Value Soil (ASTM 2844, CTM 301)
S
53600
70347
R -Value Aggregate Base (ASTM D2844, CTM 301)
$
58800
70349
Sand Equivalent (ASTM D2419, CTM 217)
$
160.00
70351
Sieve #200 Wash Only (ASTM D1140, CTM 202)
$
114.00
70353
Sieve With Hydrometer 3/4" Gravel To Clay (ASTM D422,
$
30900
D7928, CTM 203)
70355
Sieve With Hydrometer Sand To Clay (ASTM D422,
$
29400
D7928, CTM 203)
70357
Sieve Analysis Including Wash (ASTM C138. CTM 202)
$
18600
70359
Sieve Analysis Without Wash (ASTM C136. CTM 202)
$
155.00
70360
Sieve Analysis Split Sieve (ASTM C136, CTM 202)
$
295,00
70361
Sieve Analysis Without Wash With Cobbles (ASTM C136,
S
29000
CTM 202)
70363
Soundness Sodium Or Magnesium Sulfate, 5 Cycles
S
232.00
(ASTM C88)
70365
Specific Gravity And Absorption Coarse (ASTM C127,
$
12500
CTM 206)
70367
Specific Gravity and Absorption Fine (ASTM C126,
$
206 00
CTM 207)
70369
Swell/Settlement Potential One Dimensional (ASTM D4546)
S
106 00
70371
Triaxial
Quotation
70373
Unconfined Compression (ASTM D2166, CTM 221)
$
237.00
30317
Unit Weight Per Cubic Feat (ASTM C29, CTM 212)
5
16000
30319
Voids In Aggregate With Known Specific Gravity (ASTM C29,
$
160.00
CTM 212)
30411
Lightweight Particles Coarse, with Two Solutions (ASTM C123)
$
519.00
30412
Lightweight Particles Fine, with One Solution (ASTM C123)
$
258.00
20807
Method of Test for Relative Mortar Strength of Portland
S
1,400.00
Cement Concrete Sand (CT 515)
Task
Code Asphalt Concrete Test
75031
HMA Mixing And Preparation
$
160.00
75032
HMA Mixing And Preparation With Aggregate Treatment
S
232.00
75033
Bulk Specific Gravity Of Compacted Sample Or Core SSD
5
73,00
75027
(ASTM D2726, CTM 306C)
$ 27000
61.00
75036
Bulk Specific Gravity Of Compacted Sample Or Core Paraffin
$
103.00
$ 44000
Coaled (ASTM D1188 and CTM 300A)
CTM 382)
118.00
Task
Code
Asohaft Concrete Tests, Continued
Rate
75040
Emulsion Residue, Evaporation (ASTM D244)
$ 19500
75024
Extraction % Bhu men (ASTM D6307, CTM 382)
$ 19500
75027
Extraction % Bitumen And Gradation (ASTM D5444, D6307,
$ 27000
61.00
CTM 202, 382)
Absorption 5 Hour or 24 Hour
75028
Extraction % Bitumen, Correction Factor (ASTM D6307,
$ 44000
Absorption (Boil) 1, 2 Or 5 Hours
CTM 382)
118.00
75030
Chemical Extraction % Bitumen And Sieve Analysis
$ 30500
75.00
(ASTM D2172 Method A or B, ASTM D5444)
Efflorescence
75042
Lab Tested Maximum Density Hveem, 3 Briquettes
$ 27000
Cares Compression
(ASTM D1561, D1188, CTM 304, 308)
97,00
75057
Hveem Slabilometer Test, Premixed, 3 Briquettes
$ 27000
11800
(ASTM D1560, D1561, CTM 304, 366)
75048
Lab Tested Maximum Density Marshall, 3 Briquettes
$ 26000
(ASTM D6926, D2726)
75049
Lab Tested Maximum Density Marshall 6" Specimen,
$ 27000
3 Briquettes (ASTM D5581, D2726)
75050
Lab Tested Maximum Density Superpave Gyratory Compacted
$ 11500
Briquette, SSD, 1 Briquette (ASTM D6925, D2726)
75052
Lab Tested Maximum Density Superpave Gyratory Compacted
$ 11500
Briquette, Paraffin, 1 Briquette (ASTM D1180, D6925)
75051
Maximum Theoretical Specific Gravity [RICE] (ASTM D2041,
$ 20000
CTM 309)
75066
Marshall Stability And Flow, Cored Sample, Each
$ 10000
ASTM D6927)
75069
Marshall Stability And Flow, Premixed, 3 Briquettes
$ 28000
(ASTM D892E, D890)
75106
Marshall Stability And Flow, Gyratory Compacted Specimen
S 29000
Pre Mixed, 3 Briquettes (ASTM D5581, D6925)
75107
Marshall Stability And Flow 6" Specimen, Premixed,
$ 290.00
3 Briquettes (ASTM D5581)
75083
Moisture Content (CTM 370)
$ 11000
75005
Wet Track Abrasion Test (ASTM D3910)
$ 205-00
75093
Hveem Mix Design (Excluding Aggregate Quality Tests)
S 5,74000
75096
Hveem Mix Design, With RAP (Excluding Aggregate Quality
$ 6,23000
Tests, RAP Qualificalion)
75099
Hveem Mix Design, With Lime Mxcluding Aggregate Quality
$ 6,59000
Tests)
75094
Hveem Mbr Design Caftrans Untreated M'a gncluding
$ 6.85000
Aggregate Quality Tests)
75095
Hveem Mix Design Cabfans Lime Treated Mix (Including
$ 7,83000
Aggregate Quality Tests)
75084
Marshall Mur Design (Excluding Aggregate Quallty Tests)
$ 5,74000
75087
Marshall Mix Design With RAP (Excluding Aggregate Quality
$ 6,23000
Tests)
75090
Marshall Mix Design With Urrha (E duding Aggnegate Quality
$ 6,840 00
Tests)
75083
Open Grade Asphalt Concrete Mix Design (ASTM D7064,
S 3,31000
CTM 368)
75109
Superpave Mix Design (Excluding Aggregate Quality Tests)
$ 11,695.00
75113
Superpave Mix Design, With RAP (Excluding Aggregate
S 12,355 00
Quality Tests)
75114
Superpave Mix Design With Rubber (Excluding Aggregate
$ 12,355 00
Quality Tests)
75115
Superpave Mix Design With Additives (Excluding Aggregate
$ 12,690 00
Quality Tests)
75075
Effect Of Moisture On Asphalt Paving Mixtures, Pre -Mixed
$ 1,23500
(ASTM D4867, AASHTO T283)
75111
Hamburg Wheel Track Test, 20,000 Passes, 4 Briquettes
$ 1,340.00
(AASHTO T324)
75039
Raveling Test Of Cold Mixed Emulsified Asphalt (ASTM D7196)
$ 25000
75067
Marshall Stabllbq, Wet Set, 3 Replicates (AASHTO T245)
$ 44000
75088
Marshall StabBxy, Dry Set, 3 Replicates (AASHTO T245)
$ 37600
75070
Cold Recycled Asphalt Mix Design 2 Gradings Each,
S 11,590 00
3 Emulsion Content (Caltrans LP -8)
Task
Code Mortar And Slucco - Petrographic Examination Rate
80282 Stucco, One -Coal (ASTM C856), Includes Thin Section), $ 2,250.00
Per Sample
80286 Stucco, Two -Coal (ASTM C856), Includes Thin Section), $ 2,500.00
Per Sample
80290 Stucco, Three -Coal (ASTM C856), Includes Thin Section), $ 3,000.00
Per Sample
80294 Mortar (ASTM C1324, Petrographic Examination And Chemical S 3,250.00
Analysis), Per Sample
Task
_ Code
Brick Masonry Tests, ASTM C67
Rate
20301
Modulus Of Rupture Flexural
$
118.00
20303
Compression Strength
S
61.00
20305
Absorption 5 Hour or 24 Hour
S
86,00
20307
Absorption (Boil) 1, 2 Or 5 Hours
$
118.00
20309
Initial Rale Of Absorption
S
75.00
20311
Efflorescence
5
91.00
20313
Cares Compression
S
97,00
20315
Shear Test On Brick Cores 2 Faces
S
11800
"TWINING
Task
Code Concrete Block. ASTM C1
20321
Compression
S102,00
Rate
20323
Absorption/Moisture Conlenl/Oven Dry Density
s
102.00
20327
Linear Shrinkage (ASTM C426)
S
295.00
20335
Web And Face Shell Measurements
s
59,00
20329
Tension Test
s
188.00
20331
Core Compression
$
97.00
20333
Shear Test Of Masonry Cores 2 Faces
s
118.00
20339
Efflorescence Tests
S
91 00
Task
Code
Masonry Prisms. ASTM C1314
$
Rate
20341
Compression Test, Composite Masonry Prisms Up To 8" x 16"
S
241.00
20343
Compression Test, Composite Masonry Prisms > 8" x 16"
S
321.00
20346
Prism Cord Modulus of Elasticity
$
685,00
20347
Prism Cord Modulus Of Elaslicily With Transverse Strain
S
846,00
Cod.
(For Double -Wythe Specimen)
$
Rate
Task
Compression Test (ASTM C495 and C472)
s
81.00
Code
Mortar And Grout
s
Rate
20351
Compression 2" x 4" Mortar Cylinders (ASTM C780)
$
7000
20353
Compression 3" x 3" x 6" Grout Prisms, Includes Trimming
$
59.00
Code
(ASTM C1019)
S
Rate
20355
Compression 2" Cubes (ASTM C109)
$
7500
20357
Compression Cores Includes Trimming (ASTM C42)
$
8600
Task
Code Masonry SDecimen Preparation Rate
20155 Cutting Of Cubes Or Prisms $ 91.00
Task
_Code Flreoroo no Tests Rate
20401 Oven Dry Density (ASTM E605) $ 86 00
Task
Hardness Tesl (ASTM E18)
$
107.00
Code
Gunite And Shotcrete Tests
$
Rate
20361
Core Compression Including Trimming (ASTM C42)
$
8600
20365
Compression Cubes (includes Saw Cutting)
s
113.00
Task
Concrete Roof Fill: Gypsum, Vertnicultte. Perllte,
S
118,00
Cod.
Lightvciaht Insulating Collcrero. Etc.
$
Rate
20371
Compression Test (ASTM C495 and C472)
s
81.00
20373
Air Dry Density (ASTM C472)
s
59.00
20379
Oven Dry Density (ASTM 0495)
$
8600
Task
Boll Proof Load Test (Greater Than 1")
S
145.00
Code
Reinforcing Steel, ASTM A6 S. A706
S
Rate
20501
Tensile Test #11 Or Smaller
s
81.00
20503
Bend Test #11 Or Smaller
$
7500
20504
Bend Test #14 Or #18
$
42800
20505
Tensile Test#14
$
32100
20507
Tensile Test #18
$
42300
Task
Code
Reinforcing Steel - Welded Or Coupled Specitnem3
Rate
20521
Tensile Teal Welded/Coupletl #11 And Smaller
S
91 00
20523
Tensile Test Welded/Coupled #14
$
311.00
20525
Tensile Test Welded/Coupled #18
$
471.00
20529
Weld Macroelch
$
102.00
20531
Slippage Test - Caltrans (CTM 670)
$
257.00
20532
Tensile Test Welded Hoops #11 And Smaller
$
188.00
Task
Code
Metal and Steal Teslim
Rate
20601
Tensile Strength Up To 100K Pounds (Each)
S
91.00
20603
Tensile Strength Up To 200K Pounds (Each)
s
102.00
20605
Tensile Strength Up To 300K Pounds (Each)
S
129.00
20607
Tensile Strength Up To 400K Pounds (Each)
$
188.00
20609
Tensile Strength 400K To 600K Pounds (Each)
$
426,00
20611
Tensile Strength Stress-Slrain Percent Offset
S
266,00
20545
Weld Macroelch
$
102.00
20547
Weld Fracture
$
54.00
20615
Bend Test
S
81.00
20617
Flattening Test
$
91.00
General Conditions
Task
Code Metal and Steel Testino. Continued
20619
Hardness Tesl (ASTM E18)
$
107.00
20630Boit
Axial Tensile Test (Up To 7/8" Diameter)
$
70.00
20631
Bolt Wedge Tensile Test (Up To 7/8" Diameter)
S
86,00
20632
Boit Axial Tensile Test (Greater Than 7/8" Up To 1" diameter)
$
91.00
20633
Bolt Wedge Tensile Test (Greater Than 7/8" Up To 1" Diameter)
S
118,00
20634
Boll Axial Tensile Test (Greater Than 1" Diameter)
$
140.00
20635
Bolt Wedge Tensile Test (Greater Than 1" Diameter)
S
150.00
20636
Bolt Proof Load Test (Up To 7/8")
S
107,00
20637
Bolt Proof Load Test (Greater Than 7/8" Up To 1" Diameter)
5
129.00
20638
Boll Proof Load Test (Greater Than 1")
S
145.00
20639
Nul Proof Load Test (Up To 7/8")
S
75.00
20640
Nu l Proof Load Teal (Greater Than 7/8" Up To 1" Diameter)
$
102.00
20641
Nut Proof Load Test (Greater Than 1")
$
113.00
Task
Code
Chemical Testing Of Metal And Steel
$
Rate
80170
Steel Chemical Analysis
$
20900
80173
Weight Of Galvanized Coaling (ASTM A90)
$
107.00
80176
Epoxy Coating Thickness
$
107.00
80177
Coaling Thickness
$
107.00
Task Machining And Preparation Of Tensile And Bend
Code Sample: Carbon Steel
20751
Machinist Initial Preparation From Mock -Up, Etc (Per Hour)
$
15600
20753
Sawcut To Overall Width (Per 0 5" Thickness Or Fraction
$
7000
Thereof)
20755
Machine To Test Configuration Milled Specimens
$
10200
20757
Machine To Test Configuration Turned Specimens (Per 0.5"
S
182 00
Thickness Or Fraction Thereof)
20759
Prepare Subsae Specimens (Per 0.5" Thickness Or Fraction
s
124 00
Thereof)
Task
Code Ch,iIrtioact Rate
20621 Charpy Impact Ambient Temperature $ 113 00
20623 Charpy Impact Reduced Temperature $ 150 00
Task
Code Machining Of Charpy Samples: Carbon Steel Rafe
20780 Cutting And Milting (Per 0.5" Or Fraction Thereof) S 102.00
20783 Final Machining To Sample Configuration $ 124,00
Task
Code Prestresslno Wires And Tendons. (ASTM A416
20701 Stress -Strain Analysis Wire Or Strands (Including Chart And S 273.00
Percent Offset)
20703 Tensile Test Only $ 204.00
20705 Tendons Quotation
Task
Code POlvmer Matnx Composite Materials IFlberwrap) Rah
20706 Tensile Strength - Set of 5 Specimens/Balch/Direction S 1,71200
(ASTM D3039)
20707 Tensile Strength -Additional Specimens (ASTM D3039) $ 321.00
(ASTM D3039)
20708 Healing Chamber Time - Per 24 Hr. Period S 13400
Task
Code Calibration Services And Universal Machine Usaae Rah
20801 Calibration/Verification Services Quotation
20803 Universal Test Machine Usage (Per Hour) S 482.00
Specialty Testing
- Cylic And Fatigue Testing Programs On Special Products/Parts
• Engineering And Technical Supports/Design Of Prototypes And Special Test Se( -Up
• Fastener/Coupling Full Testing Program Per New Regulations: Tension, Tension/Bend,
Shear, Double Shear, 8 Compressions
• Fiberglass/Composite Materials Field Testing Program (ASTM D1143 D1242,
D2584, D4065, D4476, D4923, D7901, D7921, and D732)
• Field Tesling Of Struclu es And Structural Elements
• In -Place Shear Testing
• Materials And/Or Product Evaluation Per Specifications
• Structural Dynamic Testing And Durability Analysis
NOTE: Field inspection work condilions are established by contract with Operating Engineers, Local 3.
NOTE: A minimum of 24 hours notice is required for testing and inspection services.
NOTE: Far projects subject to a Project Labor Agreement (PLA), if terns/condilions of the PLA are more restrictive those terms/conditions will apply
NOTE: Rates will be adjusted annually each July 1 sl la reflect increased costs,
Administrative Fees
All administrative fees, except as noted below, including report distribution and Twining Construction Hive system are billed at the following percentage of the monthly invoice
total: 5
"TWINING
General Conditions, Continued
Note [hat hard copies of reports will be sent only to governing jurisdictions that mandate them. All other parties will receive reports electronically. The administrative fee above will receive
reports electronically. The administrative fee above will be increased by 1% if additional hard copies of reports are requested. Submittal of project specific fortes or resumes will be billed
hourly at the Administrative Support Rate.
Minimum Charges (Inspection and Technician Personnel Only - Other Personnel Charged on Portal to Portal Basis)
2 -Hour Minimum: Inspector arrives at jobsile, no work to perform.
4-HourMinimum: 1 to 4 hours of inspection
8 -Hour Minimum: Over 4 to 8 hours of inspection
8 -Hour Minimum: Night Work
Regular Time (All Types of Inspection and also All Non -Exempt Employees)
The first 8 hours worked Monday through Friday between 4:00 a.m. and 2:00 p.m. except as noted otherwise below.
Premium (All Types of Inspection and also All Non -Exempt Employees)
Work performed in excess of eight (8) hours in any one working day or forty (40) hours in any one week shall be paid for at one and one-half (1-1/2) limes the regular rate of pay. Premium
shall be reckoned by the hour and half-hour. Work performed in excess of twelve (12) hours in any one (1) working day shall be paid at two (2) limes the regular rate of pay.
Saturday and Sunday Work (All Types of Inspection and also All Non -Exempt Employees)
Work perforned on Saturday as defined below shall be paid for at one and one-haff (1-1/2) limes the regular rale of pay for the first eight (8) hours of work and at two (2) times the regular
rale of pay for all hours worked in excess of eight (8). Work performed on Sunday as defined below shall be paid for at two (2) times the regular rate of pay for all hours worked. A shift,
which commences on or after 1:00 am on Saturday morning and before 1:00 a.m. on Sunday morning shall be deemed Saturday work for the entire shift. A shift, which commences on or
after 1:00 a m on Sunday morning and before 1:00 a.m. on Monday morning shall be deemed Sunday work for the entire shift
Night Shifts
When work is performed on a night shift the rate will be $9.00 gresterthen the applicable rate A night shift is a shift, which commences after 2:00 p.m or before 4 00 a.m. during any
twenty-four (24) hour period commencing at 12:01 a.m.
Disruptive Shift Pay
Provides a minimum of eight (8) hours of night shift paywhen the night shift precludes the Employee from working the day following the night shift, excluding weekends and holidays.
Holidays
The following shall be considered as holidays under this Agreement and when work Is performed on these days, an Employee shall be paid at two times his or her regular straight -lime
rale of pay: New Years Day, President's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day Should any of these
holidays fall on Sunday, the following Monday shall be considered a holiday When a holiday falls on Saturday the Friday before shall be considered the holiday.
Meal Period
When personnel are required bytheirtlrdies to work more than five consecutive hours without a one-half hour uninterrupted meal period, one hallhour at double time rate will be charged
in addition to any applicable overtime by actual hours worked.
Travel Time and Mileage
For projects outside a 50 -mile radius from the nearest Twining facility. per excess mile to and from the project will be charged for inspectors and technicians Other than small tools,
whenever project related equipment Is required to be transported to and from [he project site, time and mileage for inspectors and field technicians win be billed an a portal to portal basis
For all projects, current IRS mileage rate per mile and applicable travel time will be charged portal to portal for engineers, consultants, supervisors, and laboretorytechnicians from the
laboratory to the project site and return
For work locations located 100 miles or mora from Twining, travel time will be charged at the relevant rate for inspectors and technicians in addition to a subsistence allowance as detailed
below
Weekend Sample Pick -Ups
In order to be in conformance with testing standards, it may be required that weekend pick-ups be performed (e.g concrete specimens cast on Friday must be picked up on weekend
in order to be in conformance with ASTM C31 requiring specimens to be moved to their final curing location within 48 hours of casting.) Applicable charges for weekend work will apply when
this is required. Should these charges not be authorized, Twining will not be Gable forany negative consequences.
Reimbursable Expenses
Parking, air fare, car rental, food, lodging and project specific softwarehippllcafions (e.g PlanGrld, Procore, etc.) will be charged at cost plus 20% per processed invoice, unless provided
by client.
Project Specific Documents
Costs presented assume [hal client will provide project specific documents (plans, specifications, submittals, RFIs, etc ) for all inspection personnel Should project specific documents be
provided electronically through a "for fee" service, the client will be responsible for providing access and paying any fees for the service.
Project Site Facilities
Prices quoted assume that initial curing facilities for test samples that comply with relevant test standards and project requirements are provided by others. In addition, prices quoted
assume that wofk/desk space for inspection staff are provided by others Additional costs, provided by quotation, will apply should Twining be required to provide such facilities
Subsistence
Subsistence on remote jobs will be charged per quotation.
Laboratory Testing Hours and Expedited Testing
Please note that laboratory testing will be billed on an hourly basis for non-standard tests. If testing is required to be performed on Saturdays, Sundays, holidays, or before 5 30 a,m, or after
4:00 p,m, an weekdays, an additional hourly charge, at the applicable regular, overtime or double time rale, with a minimum of one hour will be applied for the laboratory technician. For
rash testing a 50% surcharge in addition to the regular lest rate will apply.
Charges for Subcontracted Services
Material sent to outside laboratory for testing: Cost plus 20%
Material sent to outside fabricator or machine shop: Cost plus 20%
Glu -Lam beam inspection: Cost plus 20%
Other subcontractors: Cos[ plus 20%
Project exclusive equipment purchase: Cost plus 20%
Limit of Liability
Client agrees to limit Twining's aggregate liability to all entities for alleged or actual errors and omissions in the performance of its professional services under this agreement to 550,000 00
or [he fees actually paid to Twining, whichever amount is greater Higher limits may be available by quotation.
Additional Insurance Coverage
Any requirements for additional insurance policies or coverage beyond our normal policies/limits (e g. SIAL coverage) may be provided at an additional fee and will he quoted on a per
project requirements basis
"TWINING
General Conditions, Continued
Certified Payroll
Certified payroll will be provided, upon request, at an additional charge of 5150.00/month. Fee applies to every month that certified payroll must be submitted regardless of whether or not
services were provided for any given month,
Final Reports Required by Jurisdiction
If a final report or affidavit is required, we must first review all inspection and testing reports and clear up any unresolved issues on these reports. These issues will typically require approval
by the engineer or architect of record. This process can take several weeks or just a day, depending on the number and complexity of the issues. Cost for final reports will be billed hourly.
Terms of Payment
Fees charged are for professional and technical services and are due upon presentation. If not paid within 30 days from date of invoice, they are considered past due and the maximum
legal finance charge will be added to the unpaid balance.
In addition, should the client require that invoices be submitted through a web based or electronic system, the client will be responsible for all costs associated with the use of the system
A 3% fee will be applied for payments processed by credit card
All invoice errors or necessary corrections shall be brought to the allentlon of Twining within 15 days of receipt of invoice Thereafter, customer acknowledges invoices are correct and
valid Twining reserves the right to terminate its services to a customerwithout notice If all invoices are not current Upon such termination of services, the entire amount accrued for all
services performed shall immediately become due and payable. Customer wakes any and oil claims against Twining, its subsidiaries, affiliates, servants, and agents for termination of
work on account of these terms.
In the event of any litigation arising from or related to any agreement to provide services whether verbal or written, the prevailing party shall be entitled to recover from the non -prevailing
party all reasonable costs incurred, including staff time, court costs, attorney's fees and all other related expenses in such litigation. Additionally, In the event of a non -adjudicative settlement
of litigation between the parties or a resolution of dispute by arbitration, that same process shall determine the prevailing party
Hold Specimens
All "hold" specimens are charged at the applicable test rate whether tested or not
Specimen Sampling and Disposal
Twining samples materials used in construction in accordance with standard practices, methods, codes, and relevant project requirements. Representativeness of sampling and
accuracy of testing are subject to the same probabilistic and precision limitations as goveming standards, codes and project technical provisions.
Should samples be provided by others Twining cannot warrant or guarantee that material is representative of material that is or will be used in actual construction of the project
Specimens will be discarded aftertesting unless Twining has been notified prior to testing that the customer wishes to retrieve the specimens or storage arrangements are made. Cosls
For storage will be by quotation.
Oversize Specimens
An extra charge will be made when test specimens require more than one person to handle because of size or weight
Elevated Work Platforms
In the event an elevated work platform Is required to safety complete our work, the client must provide safe access For Twining personnel for as required inspection, tw0mg, sampling, etc
including a trained and certified operator or qualified Inspector as applicable Twining will not be responsible for signing waivers associated with providing such access. Should Twhdng be
required to supply an elevated work platform, we will contract with a qualified vendor and the markups shown above will apply
TWINING PROJECT MANAGER:
PROJECT NAME:
JOBSITE ADDRESS:
2024-2025 PROJECT SETUP AND REPORT DISTRIBUTION
PERMIT NO:
JOBSITE CONTACT:
PHONE:
Are daily field reports required to be signed by an authorized representative? ❑YES ❑NO If yes, please provide names or titles of who is authorized to sign
Is prior approval required if overtime or double-time charges will be incurred? ❑YES ❑NO If yes, please provide names, titles, and contact information for who can authorize overtime and/or double-time
charges
CA. PREVAILING WAGE ❑YES [-]NO I DAVIS BACON ❑YES [-]NO I PROJECT LABOR AGREEMENT (PLA) [-]YES ❑NO
INSURANCE REQUIRED ❑YES ❑N01 CERTIFIED PAYROLL ❑YES [-]NO I DIR* /ADVERTISED DATE
PRELIMINARY NOTICE INFORMATION REQUIRED" (20 -day preliminary notice information must be provided as of January 1, 1995, per Civil Code Section 8200)
Electronic copies of all reports will be distributed to the following parties automatically.
CLIENT"
INVOICE / Attention
Attention
Email
Email
Phone/Fax Number
Mailing Address
CERT PIR / Attention
City, State, Zip Code
Email
Phone/Fax Number
Phone/Fax Number
Mark if hard copies of reports are required
to party above'
Special Project or Invoicing
Instructions:
OWNER*"
LENDER"* None
Attention
Attention
Email
Email
Mailing Address
Mailing Address
City, State, Zip Code
City, State, Zip Code
Phone / Fax Number
Phone/Fax Number
Mark if hard copies of reports are regurred
to party above.'
Mark it hard copies of reports are required to party above.'
GEN CONTRACTOR"
BUILDING DEPT.
Attention
Attention
Email
Email
Mailing Address
Mailing Address
City, State, Zip Code
City, State, Zip Code
Phone/Fax Number
Phone/Fax Number
Mark if hard copies of reports are required
to party above.'
Mark it hard copies of reports are required to party above '
STRUCT. ENGINEER
ARCHITECT
Attention
Attention
Email
Email
brenna.nurmi(a_)cityotsanratael.org
Mailing Address
Mailing Address
City, State, Zip Code
ban Ratael
City, State, Zip Code
Phone/Fax Number
4154853066
1
Phone/Fax Number
Mark if hard copies of reports are required
to pa above!
Mark if hard copies of reports are required to party above!
By default, hard copies of reports are sent to the governing jurisdiction only. Requesting that hard copies be mailed to any of the parties above will incur a 1 % increase to your administrative fees.
RAFq�`
�1
s z
yo
V
WITH P
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackle (for Andrew Powell) Extension: 3353
Contractor Name: Twining, Inc
Contractor's Contact: Mariel Attento Rhorer Contact's Email: mattento@twininginc.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
C
enter a date.
b. Email contract (in Word) and attachments to City
12/3/2024
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑X SM
2
City Attorney
a. Review, revise, and comment on draft agreement
12/3/2024
and return to Project Manager
12/3/2024
❑X NT
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
❑X NT
3
Department Director
Approval of final agreement form to send to
12/4/2024
© AM
contractor
4
Project Manager
Forward three (3) originals of final agreement to
12/4/2024
contractor for their signature
5
Project Manager
When necessary, contractor -signed agreement
❑X N/A
agendized for City Council approval *
*City Council approval required for Professional Services
❑
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
agreement
8
City Attorney
Review and approve insurance in PINS , and bonds
(for Public Works Contracts)
9
City Manager/ Mayor
Agreement executed by City Council authorized
official
10
City Clerk
Attest signatures, retains original agreement and
forwards copies to Project Manager
TO 141 - Materials Testing for Downtown
Library Renovation - Twining
Final Audit Report 2024-12-09
Created: 2024-12-05
By: Shannon Mackle (Shannon.mackle@cityofsanrafael.org)
Status: Signed
Transaction ID: CBJCHBCAABAAelWzOJnzHa ORWDJSwBdJW-YhPXkVDd6
"TO 141 - Materials Testing for Downtown Library Renovation -
Twining" History
Document created by Shannon Mackle (shannon.mackle@cityofsanrafael.org)
2024-12-05 - 0:43:05 AM GMT- IP address: 69.181.69.46
E-► Document emailed to Mariel Attento (mattento@twininginc.com) for signature
2024-12-05 - 0:46:02 AM GMT
Email viewed by Mariel Attento (mattento@twininginc.com)
2024-12-05 - 0:54:41 AM GMT- IP address: 54.241.109.45
ZL Document shared with andrew.powell@cityofsanrafael.org by Shannon Mackle
(shannon.mackle@cityofsanrafael.org)
2024-12-05 - 1:03:16 AM GMT- IP address: 69.181.69.46
6© Document e-signed by Mariel Attento (mattento@twininginc.com)
Signature Date: 2024-12-05 - 8:15:13 PM GMT - Time Source: server- IP address: 12.145.98.29
C'► Document emailed to Linas Vitkus (Ivitkus@twininginc.com) for signature
2024-12-05 - 8:15:16 PM GMT
Email viewed by Linas Vitkus (Ivitkus@twininginc.com)
2024-12-05 - 9:55:05 PM GMT- IP address: 54.241.109.45
by Document e-signed by Linas Vitkus (Ivitkus@twininginc.com)
Signature Date: 2024-12-05 - 9:55:33 PM GMT - Time Source: server- IP address: 68.96.86.123
C� Document emailed to Laraine Gittens(Iaraine.gittens@cityofsanrafael.org) for approval
2024-12-05 - 9:55:36 PM GMT
SAN RAFAEL Adobe
"; Acrobat Sign
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2024-12-06 - 5:34:10 PM GMT- IP address: 104.47.64.254
6© Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2024-12-06 - 5:37:16 PM GMT - Time Source: server- IP address: 199.88.113.8
E14 Document emailed to rob.epstein@cityofsanrafael.org for signature
2024-12-06 - 5:37:20 PM GMT
Email viewed by rob.epstein@cityofsanrafael.org
2024-12-06 - 6:30:23 PM GMT- IP address: 24.5.134.43
GS© Signer rob.epstein@cityofsanrafael.org entered name at signing as Robert F. Epstein
2024-12-06 - 6:30:45 PM GMT- IP address: 24.5.134.43
d© Document e -signed by Robert F. Epstein(rob.epstein@cityofsanrafael.org)
Signature Date: 2024-12-06 - 6:30:47 PM GMT - Time Source: server- IP address: 24.5.134.43
P'., Document emailed to city.clerk@cityofsanrafael.org for approval
2024-12-06 - 6:30:50 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2024-12-06 - 6:32:14 PM GMT- IP address: 104.47.65.254
6© Signer city.clerk@cityofsanrafael.org entered name at signing as Brenna Nurmi
2024-12-06 - 6:32:53 PM GMT- IP address: 199.88.113.8
iSo Document approved by Brenna Nurmi (city. clerk@cityofsanrafael.org)
Approval Date: 2024-12-06 - 6:32:55 PM GMT - Time Source: server- IP address: 199.88.113.8
P4 Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2024-12-06 - 6:33:00 PM GMT
Email viewed by cristine.alilovich@cityofsanrafael.org
2024-12-09 - 2:30:40 AM GMT- IP address: 104.47.65.254
do Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2024-12-09 - 2:31:21 AM GMT- IP address: 71.198.110.147
do Document e -signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)