400%
200%
100%
75%
50%
25%
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution 695
M BUILDING TRADE RATE per hour Asbestos i°;orkers..........................................1.10 Bricklayers, included manholes and catchbasins.•..:•..•,•. 1.50 Bricklayers' hodcarrier......•............................ 1.00 Carpenters and Cabinetmakers...... ........................ 1.122 Cement Finishers.•••••••••.................r............. 1.10 Compressor Operators (On steel erection)......•..........• 1.25 Engineers derricks) ...................................•.. 1625 Engineers (building material hoists) ..................•... 1.25 Electric �y`orkers.........•................................ 1.25 V-1Elevator Constructors.A,.•.•.•••....•.••••.,,...•.r....... 1.25 ✓ Elevator Constructor Helpers ...............0.............. 0.872 Fixture Hangers .................•......................... 1.10 Glass Yorkers..........r•••.•.,•••.••...••.•.••r.•.••••.•• 1.10 Guard..........•.......• .................<............•... 0.60 Hardwood Floor Men.. ..........................•........... 1.12 ✓ Hoist I,Ian................................................. 1.372 Housesmith (reinforeed concrete)..• ....................... 1.25 Ironworkers (bridge, structural and rigger)...........•... 1.371j Ironworkers (derrick engineers)•.........•..,♦......•.•,.. 1.371 'Laborers ix}n�oleum and Carpetlorkers,•..♦.•....,•..•o-.•.....•..•.•• 1.10 .�Ja �-+o r er s (building)066.6. . . . ♦ . . . . . . . . . . . . . . . . . . . . . . • . . . . . . 0075 Marble Setters.............6.00......•.................... 1.10 kerble Setters' Helpers•... ....... ........................ 0.75 Nozzelmen-gunite 4^Bork...............•......•.............. 1.10 Painters (structural iron 1"lOrkS)«••..............•..•..... 1.20 Paint ers....,......,,..•...........................•...... 1.121 Ornamental Ironworkers•..•••...•••.•...•.....♦•,..•.r..••• 1.12Q Pile Drivers' Ehg3neers................................... 1.50 Plumbers......................................•,......•..0 1.122 Roofers ..................................................• 1.10 Sheet Metal 1.10 Steamfitters ..........................•................... 1.121 Sprinkler Fitters ...........................•............. 1.12 Stonecutters...... .......................................• 1.10 Stonesetter (including; granite curbs).••,.......•.•.....♦. 1.50 Stone Derrickmen..............................,...,....... 1.372 Tilesetters.........................♦...................., 1.10 Tilesetters' Helpers ...................................... 0.75 For Building Trades overtime payments shall be as follows: Overtime at time and one-half for first four hours after eight hours per day and all time thereafter at double time except in the following crafts, which are paid double time for all over- time after eight hours: Elevator constructors and helpers, all iron workers, all engineers, model makers and bricklayers and hodearriers. Whereever welding processes are involved the rate paid for such shall be as herein fixed for the crafts performing the work. "ROAD VVCF..K, EXCAVATING AND TRUCKING" CLASSIFICATION RATE PER HOUR Laborer "Oro =. Tractor Driver (30 H.P,) 0.96 Tractor Driver (50 H. P. or over) 1.25 Truck Driver (1.5,500 or less) 0.82 Truck Driver (over 15,500) 0.96 Grader Operator 0.82 Roller Operator 1.25 I2echanie (trouble shooter) Asphalt plant mechanical finisher operator Blacksmith Blade grader operator finished work Bridge laborer Concrete pavement mixer operator Compressor operator Concrete transit mixer operator Driller Flagmen Oiler (pourer shovels and cranes) oil disbributer bootman Trenching machine operator I1` at chman Dragline operator except shovel type Operator of poorer shovels or other excavating shovel type control RATE PER HOUR $0.90 1.25 1.00 .96 .69 1.25 .96 1.00 .82 .60 1.00 .75 ld37a .60 1.37J equipment 1.50 Overtime one and one-half times the above rates. Sundays and holidays except watchman, guards, flagmen double the above rates. Any Classification omitted herein not less than 0.50 Lathers wood Plasterers and Modelers Model maker rodel casters Laborers hod carriers INDUSTRY, Concrete Taborer X5.50 per day at 7 Mixer operator 6.0o it: ,it it Concrete finisher 8.00 +s tt rr Machinist8.00 ft if " 6 Time and one-half over seven hours except machinists time and one-half over 6 hours shall be paid. 1.25 1.10 2.00 1.25 1.12 .83 hours V st Pi it for wIn'c V Not less than IWA.12j- p©r hour, shall be. paid to any. skilled or semi- skilled laborer on any work financed in whole or part by federal funds where six hour per day is used regardless of the rate herein fixed as the highest generally prevailing. RESOLVED FURTHER that the schedule of wage rates herein set forth shall be specified in the call for bids in the above entitled matter for the work and improvement above referred to. RESOLVED FURTHER that if the said act above referred to st-Jall be declared unconstitutional or shall be declared inapplicable to the proceedings in the above entitled matter than this resolution shall have no force or effect whatsoevr ------•-------------- - ---• ---- �'l:•, 1: r;f l e Cif r/ of_-._. —----------- ],et'r>;!iJ cFJ''i`tl Mat A0 foveljoiwy J'r:':iOlrlllprL ir'!r.k r�P1 if mrl rr;;rrlrJ.r it/ ; r„ ? r..d: it'rl rt a_ --- -- -- ----- -- - --- -- rraPrriir;;; r± Coroldl or 'la; ---------- ••------iJre -------- rluU of r Ef, vote, fl;lev Coumk4u uen 1'•�i,�U l; ilt�; ti;l d;neJa