Loading...
HomeMy WebLinkAboutPW San Quentin Pump Station Reconstruction Project 2025; A51 FIFTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH CSW/STUBER-STROEH ENGINEERING GROUP, INC. FOR ENGINEERING DESIGN SERVICES ASSOCIATED WITH THE SAN QUENTIN PUMP STATION RECONSTRUCTION PROJECT THIS FIFTH AMENDMENT to the Professional Services Agreement by and between the CITY OF SAN RAFAEL (hereinafter “CITY”), and CSW/STUBER-STROEH ENGINEERING GROUP, INC. (hereinafter “CONSULTANT”), is made and entered into as of ______________________. RECITALS WHEREAS, the CITY and CONSULTANT entered into a Professional Services Agreement dated December 26, 2017 to perform professional services in connection with CITY’S San Quentin Pump Station Reconstruction Project, for an amount not to exceed $128,038 (the “Agreement”); and WHEREAS, the CITY and CONSULTANT entered into a First Amendment to the Professional Services Agreement dated October 1, 2018 to perform additional professional services for an amount not to exceed $245,979, and increasing the total not to exceed amount under the Agreement to $374,017; and WHEREAS, the CITY and CONSULTANT entered into a Second Amendment to the Professional Services Agreement dated November 5, 2022 to perform additional professional services for an amount not to exceed $130,550, and increasing the total not to exceed amount under the Agreement to $504,567; and WHEREAS, the CITY and CONSULTANT entered into a Third Amendment to the Professional Services Agreement dated May 2, 2024 to perform additional professional services for an amount not to exceed $19,313, and increasing the total not to exceed amount under the Agreement to $523,880; and WHEREAS, the CITY and CONSULTANT entered into a Fourth Amendment to the Professional Services Agreement dated October 24, 2024 to extend the Term of the Agreement through March 1, 2026 and to perform additional professional services for an amount not to exceed $24,273, and increasing the total not to exceed amount under the Agreement to $548,153; and 05/19/2025 2 WHEREAS, CITY requires additional professional services from the CONSULTANT, and the CONSULTANT is willing to provide such services. AMENDMENT TO AGREEMENT NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows: 1. Paragraph 2 of the Agreement, entitled “DUTIES OF CONTRACTOR” is hereby amended to include the additional services set forth in CONSULTANT’s proposal dated March 5, 2025, attached to this Fifth Amendment as Exhibit A and incorporated herein by reference. 2. Paragraph 4 of the Agreement, entitled “COMPENSATION” is hereby amended to include additional compensation payable to CONSULTANT for the services described in Exhibit A to this Fifth Amendment, on a time and materials basis in accordance with the Exhibit A, in a not-to-exceed amount of $43,950, and to change the total not-to-exceed amount under the Agreement to $592,103. 3. Except as specifically amended herein, all of the other provisions, terms and obligations of the Agreement between the parties shall remain valid and shall be in full force. 3 IN WITNESS WHEREOF, the parties have executed this Fifth Amendment on the day, month, and year first above written. CITY OF SAN RAFAEL CONSULTANT ______________________________ By:______________________________ CRISTINE ALILOVICH, City Manager Name:____________________________ Title:_____________________________ ATTEST: [If Consultant is a corporation, add signature of second corporate officer] ______________________________ LINDSAY LARA, City Clerk By:_____________________________ APPROVED AS TO FORM: Name:____________________________ Title:_____________________________ ______________________________ ANDREA VISVESHWARA, Chief Assistant City Attorney _______________________ ______________________ Robert Stevens CEO/President Linda Schmid CFO Andrea Visveshwara (May 19, 2025 10:47 PDT) Andrea Visveshwara ris/ine A'i'*vih (May 19, 2025 14:2т PDT) indsay ara (May 20, 2025 11:25 PDT) 2indsa\ 2ara ͞Ǥ…‘ "Íťôϡϙ ϙaÍŘèēϙ͔Ϡϙ͑͏͔͑ϙ >Ėīôϡϙ ϙ͓ϟ͐͐͒͒ϟ͏͑ϙ “ēôĺϙ‹ÍIJèēôƏϠϙ„ϟ(ϟϙ ‹ÍIJϙ‡ÍċÍôīϙ"„®ϙ ͐͐͐ϙaĺŘŕēôſϙ‹ťϙ ŽĖÍϙôıÍĖīϙĺIJīƅϙϙ ‹ÍIJϙ‡ÍċÍôīϠϙϙϙ͓͘͘͏͐ϙ ϙ“ēôĺϟ‹ÍIJèēôƏЬèĖťƅĺċŜÍIJŘÍċÍôīϟĺŘČϙ ‡(ϡϙ ‹bϙ†˜(b“Ibϙ„˜a„ϙ‹““Iibϙϳϙib‹“‡˜“Iibϙ"aIb‹“‡“Iibϙ "ôÍŘϙ“ēôĺϠϙ “ēÍIJħϙƅĺŪϙċĺŘϙťēôϙĺŕŕĺŘťŪIJĖťƅϙťĺϙŜŪŕŕĺŘťϙťēôϙĖťƅϙĺċϙ‹ÍIJϙ‡ÍċÍôīϙĖIJϙťēôϙŘôŕīÍèôıôIJťϙĺċϙťēôϙ‹ÍIJϙ†ŪôIJťĖIJϙ„Ūıŕϙ‹ťÍťĖĺIJϟϙϙ “ēôϙ‹®и‹“͑ϙîôŜĖČIJϙťôÍıϙċĖIJÍīĖƏôîϙťēôϙŕŘôīĖıĖIJÍŘƅϙϼIIJĖťĖÍīϙĺIJťŘÍèťϙČŘôôıôIJťϽϙÍIJîϙċĖIJÍīϙôIJČĖIJôôŘĖIJČϙϼ͐ŜťϙıôIJîıôIJťϽϙ ĖIJϙ‹ŪııôŘϱ͑͏͑͑ϟϙϙĺIJŜôŗŪôIJťīƅϠϙťēôϙ‹®и‹“͑ϙťôÍıϙŘôèôĖŽôîϙÍϙ͑IJîϙıôIJîıôIJťϙċĺŘϙæĖîϙÍIJîϙèĺIJŜťŘŪèťĖĺIJϙŜŪŕŕĺŘťϙ ŜôŘŽĖèôŜϙĖIJϙbĺŽôıæôŘϱ͑͏͑͑ϟϙϙĺIJŜťŘŪèťĖĺIJϙèĺıŕīôťĖĺIJϙſÍŜϙÍIJťĖèĖŕÍťôîϙĖIJϙ>Íīīϱ͑͏͑͒ϢϙēĺſôŽôŘϠϙîŪôϙťĺϙŪIJċĺŘôŜôôIJϙ èĺIJîĖťĖĺIJŜϙſĖťēϙťēôϙôƄĖŜťĖIJČϙŕŪıŕϙŜťÍťĖĺIJϙÍIJîϙôƄèôŜŜĖŽôϙīĺIJČϙīôÍîϙĖťôıŜϠϙťēôϙĺIJťŘÍèťĺŘЍŜϙſĺŘħϙŜīĺſīƅϙŕŘĺČŘôŜŜôîϙĖIJťĺϙ ͑͏͓͑ϟϙ‹ŪæŜôŗŪôIJťīƅϠϙťēôϙ‹®и‹“͑ϙťôÍıϙŘôèôĖŽôîϙÍϙ͒ŘîϙÍıôIJîıôIJťϙťĺϙèĺIJťĖIJŪôϙŕŘĺŽĖîĖIJČϙèĺIJŜťŘŪèťĖĺIJϙÍîıĖIJĖŜťŘÍťĖĺIJϙ ŜŪŕŕĺŘťϟϙϙiIJèôϙÍČÍĖIJϠϙťēôϙĺIJťŘÍèťĺŘϙċÍĖīôîϙťĺϙÍèŗŪĖŘôϙÍīīϙťēôϙīĺIJČϙīôÍîϙĖťôıŜϙÍIJîϙŘôŽĖŜôîϙťēôĖŘϙŜèēôîŪīôϙċĺŘϙèĺIJŜťŘŪèťĖĺIJϙ èĺıŕīôťĖĺIJϙæƅϙ‹ŪııôŘϱ͑͏͔͑ϟϙϙϙĺIJŜôŗŪôIJťīƅϠϙťēôϙĖťƅϙĖŜŜŪôîϙÍϙ͓ťēϙÍıôIJîıôIJťϙċĺŘϙèĺIJťĖIJŪôîϙťôèēIJĖèÍīϙŜťŘŪèťŪŘÍīϠϙ ôīôèťŘĖèÍīϠϙÍIJîϙèĖŽĖīϙôIJČĖIJôôŘĖIJČϙŜŪŕŕĺŘťϙîŪŘĖIJČϙèĺIJŜťŘŪèťĖĺIJϟϙ ϙ>ĺŘϙƅĺŪŘϙŪŜôϠϙīĖŜťôîϙæôīĺſϙĖŜϙÍϙŜŪııÍŘƅϙĺċϙæŪîČôťÍŘƅϙŜťÍťŪŜϠϙôƄŕôIJŜôŜϙťĺϱîÍťôϠϙÍIJîϙæŪîČôťϙŘôıÍĖIJĖIJČϟϙ "ôŜèŘĖŕťĖĺIJϙ ŪŘŘôIJťϙŪîČôťϙ (ƄŕôIJŜôŜϙťĺϙ "Íťôϙ ŪîČôťϙ ‡ôıÍĖIJĖIJČϙ IIJĖťĖÍīϙĺIJťŘÍèťϙČŘôôıôIJťϙ щ͐͑͗Ϡ͏͒͗ϟ͏͏ϙ щ͐͑͗Ϡ͏͒͗ϟ͏͏ϙ щ͏ϙ ͐ŜťϙıôIJîıôIJťϙ щ͓͔͑Ϡ͖͘͘ϟ͏͏ϙ щ͓͔͑Ϡ͖͘͘ϟ͏͏ϙ щ͏ϙ ͑IJîϙıôIJîıôIJťϙ щ͐͒͏Ϡ͔͔͏ϟ͏͏ϙ щ͖͘Ϡ͔͗͑ϟ͗͒ϙ щ͒͑Ϡ͕͖͘ϟ͖͐ϙ ͒ŘîϙıôIJîıôIJťϙ щ͐͘Ϡ͒͐͒ϟ͏͏ϙ щ͐͘Ϡ͒͐͒ϟ͏͏ϙ щ͏ϙ ͓ťēϙıôIJîıôIJťϙ щ͓͑Ϡ͖͑͒ϟ͏͏ϙ щ͔Ϡ͖͏͗ϟ͒͑ϙ щ͐͗Ϡ͔͕͓ϟ͕͗ϙ “ĺťÍīϙ щ͔͓͗Ϡ͔͐͒ϟ͏͏ϙ щ͓͕͗͐͘͘ϟ͔͐ϙ щ͔͐Ϡ͕͑͐ϟ͔͗ϙ ®ôϙŪIJîôŘŜťÍIJîϙÍîîĖťĖĺIJÍīϙæĖĺīĺČĖèÍīϙıĺIJĖťĺŘĖIJČϠϙŕŘôϱèĺIJŜťŘŪèťĖĺIJϙŜŪŘŽôƅŜϙÍIJîϙŘôŕĺŘťϙſĖīīϙæôϙIJôèôŜŜÍŘƅϙÍŜϙÍϙèĺIJîĖťĖĺIJϙ ĺċϙťēôϙŘôŜĺŪŘèôϙŕôŘıĖťϟϙϙϙîôŜèŘĖŕťĖĺIJϙĺċϙťēôŜôϙÍîîĖťĖĺIJÍīϙŜôŘŽĖèôŜϙŕôŘċĺŘıôîϙæƅϙ®‡ϙĖIJèīŪîôŜϙťēôϙċĺīīĺſĖIJČϟϙ “‹Xϙ͐ϡϙIi[i@I[ϙaibI“i‡Ib@ϙ ŜϙŕôŘϙ(†ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙĖĺϱ͐ϙÍIJîϙiϙaôÍŜŪŘôϙ͐ϠϙÍϙ˜‹>®‹ϱÍŕŕŘĺŽôîϙæĖĺīĺČĖŜťϙĖŜϙ ŘôŗŪĖŘôîϙťĺϙæôϙŕŘôŜôIJťϙċĺŘϙÍīīϙČŘĺŪIJîϙîĖŜťŪŘæĖIJČϙÍèťĖŽĖťĖôŜϙĖIJèīŪîĖIJČϙŽôČôťÍťĖĺIJϙŘôıĺŽÍīϟϙ“ēĖŜϙťÍŜħϙ ĖIJèīŪîôŜϙŪŕϙťĺϙťſôIJťƅϙϼ͑͏ϽϙîÍƅŜϙĺċϙæĖĺīĺČĖèÍīϙıĺIJĖťĺŘĖIJČϙæÍŜôîϙĺIJϙťēôϙ‹ÍIJϙ†ŪôIJťĖIJϙ„Ūıŕϙ‹ťÍťĖĺIJϙ ‹èēôîŪīôϙÍIJîϙĖIJċĺŘıÍťĖĺIJϙŕŘĺŽĖîôîϙæƅϙťēôϙĖťƅϙŘôČÍŘîĖIJČϙŕŘĺŕĺŜôîϙſĺŘħϟϙ“ēĖŜϙťÍŜħϙÍŜŜŪıôŜϙ ſĺŘħîÍƅŜϙÍŘôϙŘôČŪīÍŘϙôĖČēťϙϼ͗ϽϙēĺŪŘϙŜēĖċťŜϢϙĖċϙıĺIJĖťĺŘŜϙÍŘôϙŘôŗŪĖŘôîϙťĺϙæôϙĺIJŜĖťôϙċĺŘϙıĺŘôϙťēÍIJϙôĖČēťϙ ēĺŪŘŜϙŕôŘϙîÍƅϠϙÍϙēÍIJČôϙiŘîôŘϙıÍƅϙæôϙŘôŗŪôŜťôîϙťĺϙŕŘĺŽĖîôϙÍîîĖťĖĺIJÍīϙċŪIJîŜϙċĺŘϙťēĖŜϙťÍŜħϟϙ “‹Xϙ͑ϡϙ„‡(ϱib‹“‡˜“Iibϙ‹˜‡«(´‹ϙb"ϙ‡(„i‡“Ib@ϙ ŜϙŕôŘϙ(†ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͓ϠϙĖċϙſĺŘħϙĖŜϙŜèēôîŪīôîϙťĺϙæôϙŘôĖIJĖťĖÍťôîϙæôťſôôIJϙ>ôæŘŪÍŘƅϙ͐ϙ ÍIJîϙŪČŪŜťϙ͒͐ϠϙÍϙIJôŜťĖIJČϙæĖŘîϙŜŪŘŽôƅϙſĖīīϙæôϙèĺIJîŪèťôîϙſĖťēĖIJϙ͓͐ϙîÍƅŜϙĺċϙťēôϙŜťÍŘťϙĺċϙČŘĺŪIJîϙ ([KLELW$  $XJXVW  3DJH îĖŜťŪŘæÍIJèôϙæƅϙÍϙŗŪÍīĖċĖôîϙſĖīîīĖċôϙæĖĺīĺČĖŜťϟϙŜϙŕôŘϙ(†ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͔ϠϙĖċϙſĺŘħϙĖŜϙ ŜèēôîŪīôîϙťĺϙæôϙŘôĖIJĖťĖÍťôîϙæôťſôôIJϙŕŘĖīϙ͐ϙϳϙŪČŪŜťϙ͒͐ϙĺŘϙbĺŽôıæôŘϙ͐ϙϳϙ>ôæŘŪÍŘƅϙ͑͗ϠϙÍϙŘĺĺŜťĖIJČϙ æÍťϙŜŪŘŽôƅϙſĖīīϙæôϙèĺIJîŪèťôîϙſĖťēĖIJϙ͓͐ϙîÍƅŜϙĺċϙČŘĺŪIJîϙîĖŜťŪŘæÍIJèôϙæƅϙÍϙŗŪÍīĖċĖôîϙæĖĺīĺČĖŜťϟϙIJϙ ôıÍĖīϙŜŪııÍŘƅϙĺċϙŜŪŘŽôƅϙċĖIJîĖIJČŜϙſĖīīϙæôϙŕŘĺŽĖîôîϙťĺϙťēôϙèīĖôIJťϙŽĖÍϙôıÍĖīϙċĺŘϙťēôĖŘϙŘôèĺŘîŜϟϙ“ēĖŜϙ ĖIJèīŪîôŜϙŪŕϙťĺϙĺIJôϙϼ͐ϽϙŕŘôϱèĺIJŜťŘŪèťĖĺIJϙIJôŜťĖIJČϙæĖŘîϙŜŪŘŽôƅϙÍIJîϙĺIJôϙϼ͐ϽϙŕŘôϱϙèĺIJŜťŘŪèťĖĺIJϙ ŘĺĺŜťĖIJČϙæÍťϙŜŪŘŽôƅϟϙ®‡ϙÍŜŜŪıôŜϙťēôŘôϙſĖīīϙæôϙIJĺϙŕÍŪŜôŜϙĖIJϙČŘĺŪIJîϙîĖŜťŪŘæÍIJèôϙČŘôÍťôŘϙťēÍIJϙ ċĺŪŘťôôIJϙîÍƅŜϙťēÍťϙſĺŪīîϙIJôèôŜŜĖťÍťôϙÍIJϙÍîîĖťĖĺIJÍīϙŘĺĺŜťĖIJČϙæÍťϙŜŪŘŽôƅϙÍIJîϯĺŘϙIJôŜťĖIJČϙæĖŘîϙ ŜŪŘŽôƅϟ“ēôŜôϙŜŪŘŽôƅŜϙſĖīīϙæôϙèĺıæĖIJôîϙťĺϙťēôϙôƄťôIJťϙŕŘÍèťĖèÍæīôϟϙ‡ôŜŪīťŜϙĺċϙťēôŜôϙŕŘôϱ èĺIJŜťŘŪèťĖĺIJϙŜŪŘŽôƅŜϙſĖīīϙæôϙŕŘĺŽĖîôîϙŽĖÍϙôıÍĖīϟϙ ϙ “ēĖŜϙťÍŜħϙÍīŜĺϙĖIJèīŪîôŜϙ®‡ЍŜϙôċċĺŘťϙŕŘôŕÍŘĖIJČϙÍIJîϙŜŪæıĖťťĖIJČϙŘôŗŪĖŘôîϙŕŘôϱèĺIJŜťŘŪèťĖĺIJϙ IJĺťĖċĖèÍťĖĺIJŜϙťĺϙŘôČŪīÍťĺŘƅϙÍČôIJèĖôŜϙϼ‹ôèťĖĺIJϙ͓͏͓ϙaôÍŜŪŘôϙ͒Ϣϙ‹ôèťĖĺIJϙ͓͏͐ϙaĺIJĖťĺŘĖIJČϙÍIJîϙ ‡ôŕĺŘťĖIJČϙıôÍŜŪŘôŜϙ͐͏ϙЭϙ͐͐Ϣϙ(†ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͓ϠϙIiϱ͔ϠϙÍIJîϙiϙ‡ôŕĺŘťĖIJČϙ ‡ôŗŪĖŘôıôIJťϙ͒Ͻϟϙ“ēĖŜϙťÍŜħϙîĺôŜϙIJĺťϙĖIJèīŪîôϙÍîîĖIJČϙťēôϙ„ŘĺĤôèťϙťĺϙ(èĺťīÍŜϙÍŜϙŕôŘϙ‹ôèťĖĺIJϙ͓͏͐ϙ aĺIJĖťĺŘĖIJČϙÍIJîϙ‡ôŕĺŘťĖIJČϙaôÍŜŪŘôϙ͘ϟϙ “‹Xϙ͒ϡϙ„i‹“ϱib‹“‡˜“Iibϙ‡(„i‡“Ib@ϙ ŜϙŕôŘϙ˜‹>®‹ϙiϙ‡ôŕĺŘťĖIJČϙ‡ôŗŪĖŘôıôIJťϙ͒Ϡϙ®‡ϙſĖīīϙŕŘôŕÍŘôϙÍϙŕĺŜťϱèĺIJŜťŘŪèťĖĺIJϙèĺıŕīĖÍIJèôϙ ŘôŕĺŘťϙÍIJîϙŜŪæıĖťϙĖťϙťĺϙťēôϙèīĖôIJťϙċĺŘϙŘôŽĖôſϟϙ“ēĖŜϙŘôŕĺŘťϙſĖīīϙťēôIJϙæôϙŜŪæıĖťťôîϙťĺϙťēôϙ‹ÍIJϙ >ŘÍIJèĖŜèĺϙÍƅϱ"ôīťÍϙ>ĖŜēϙÍIJîϙ®ĖīîīĖċôϙiċċĖèôϙſĖťēĖIJϙ͕͏ϙèÍīôIJîÍŘϙîÍƅŜϙĺċϙťēôϙîÍťôϙĺċϙťēôϙèĺıŕīôťĖĺIJϙ ĺċϙèĺIJŜťŘŪèťĖĺIJϙÍèťĖŽĖťĖôŜϟϙ“ēĖŜϙťÍŜħϙÍīŜĺϙĖIJèīŪîôŜϙ®‡ЍŜϙôċċĺŘťϙŜŪæıĖťťĖIJČϙŘôŗŪĖŘôîϙIJĺťĖċĖèÍťĖĺIJŜϙťĺϙ ťēôϙ‡®†ϙÍIJîϙĺŘŕŜϙťēÍťϙ„ŘĺĤôèťϙĖıŕīôıôIJťÍťĖĺIJϙĖŜϙèĺıŕīôťôϟϙ “ēĖŜϙťÍŜħϙîĺôŜϙIJĺťϙĖIJèīŪîôϙ IJĺťĖċĖèÍťĖĺIJϙťĺϙÍīĖċĺŘIJĖÍϙbÍťŪŘÍīϙ"ĖŽôŘŜĖťƅϙ"ÍťÍæÍŜôϙϼb""ϽϙÍŜϙŕôŘϙ˜‹>®‹ϙŘôŕĺŘťĖIJČϙ ŘôŗŪĖŘôıôIJťϙIJŪıæôŘϙ͑ϠϙŜēĺŪīîϙŜŕôèĖÍīϱŜťÍťŪŜϙŜŕôèĖôŜϙæôϙĺæŜôŘŽôîϙîŪŘĖIJČϙ®‡ЍŜϙſĺŘħϠϙ®‡ϙıÍƅϙ ŘôŗŪôŜťϙÍîîĖťĖĺIJÍīϙċŪIJîŜϙťĺϙÍîîϙťēôŜôϙĺæŜôŘŽÍťĖĺIJŜϙťĺϙb""ϟϙ “‹Xϙ͓ϡϙ„‡iV(“ϙab@(a(b“ϙ “ēĖŜϙťÍŜħϙĖIJèīŪîôŜϙŜŪŕŕĺŘťϙĺIJϙ„ŘĺĤôèťϙîôīĖŽôŘÍæīôŜϙϼ(†ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͐ϠϙIiϱ͓ϠϙÍIJîϙ Iiϱ͔Ͻϟϙ“ēĖŜϙťÍŜħϙĖIJèīŪîôŜϙ®‡ЍŜϙôċċĺŘťϙČôIJôŘÍťĖIJČϙÍIJîϙŜŪæıĖťťĖIJČϙŘôŜŪıôŜϙċĺŘϙ˜‹>®‹ϙÍŕŕŘĺŽÍīϙ ϼ˜‹>®‹ϙiϙ“ôŘıŜϙÍIJîϙĺIJîĖťĖĺIJϙ͐ϽϠϙèĺıŕĖīôϙŘôŕĺŘťŜϙÍŜϙſôīīϙÍŜϙČôIJôŘÍīϙ„ŘĺĤôèťϙıÍIJÍČôıôIJťϟϙ ϙ “ēôϙċĺīīĺſĖIJČϙťÍŜħŜϙŜŪııÍŘĖƏôϙťēôϙæÍŜĖŜϙċĺŘϙĺŪŘϙŘôŗŪôŜťϙċĺŘϙÍîîĖťĖĺIJÍīϙщ͓͒Ϡ͔͘͏ϙĖIJϙèĺıŕôIJŜÍťĖĺIJϟϙ ϙ d^<K^d ϭ͘ŝŽůŽŐŝĐĂůDŽŶŝƚŽƌŝŶŐ Ϯ͘WƌĞͲŽŶƐƚƌƵĐƚŝŽŶ^ƵƌǀĞLJ;ƐͿĂŶĚZĞƉŽƌƚŝŶŐ ϯ͘WŽƐƚͲŽŶƐƚƌƵĐƚŝŽŶZĞƉŽƌƚŝŶŐ ϰ͘WƌŽũĞĐƚDĂŶĂŐĞŵĞŶƚ dKd>͗Ψϰϯ͕ϵϱϬ ϙ „īôÍŜôϙèĺIJťÍèťϙıôϙÍťϙ͓͔͐ϟ͘͘͘ϟ͕͗͗͑ϙĺŘϙŘĖèēŜЬèŜſŜť͑ϟèĺıϙĖċϙƅĺŪϙIJôôîϙÍîîĖťĖĺIJÍīϙĖIJċĺŘıÍťĖĺIJϟϙ ϙ ‹ĖIJèôŘôīƅϠϙϙ ϙ ϙ ‡ĖèēÍŘîϙ‹ĺŪƏÍϠϙ„(ϙ „ŘĺĤôèťϙaÍIJÍČôŘϙ ϙ CSWST2.com Adaptive Solutions. Resilient Designs. Engineering  Urban Planning  Land Surveying  Landscape Architecture CSWST2 BILLING RATE SCHEDULE Effective January 1, 2025 – December 31, 2025 ENGINEERING SERVICES HOURLY RATES SURVEYING SERVICES HOURLY RATES OTHER PROFESSIONAL SERVICES HOURLY RATES Principal $ 277.00 Associate Principal $ 252.00 Senior Project Manager $ 247.00 Project Manager $ 233.00 Sr. Landscape Architect $ 177.00 Landscape Architect $ 161.00 Construction Manager $ 242.00 Resident Engineer $ 233.00 Field Engineer $ 200.00 Technical Writer $ 142.00 Graphic Illustrator $ 135.00 Project Assistant $ 104.00 x All expenses for transportation (mileage, bridge fare, etc.) will be charged at the Internal Revenue Service rate plus 10%. x Filing fees, checking fees, prints, and other outside costs (such as agency submittal/permit fees etc.) will be charged at cost, plus service charges at the rate of 10%. x Billing will be monthly net 30 days. Senior Engineer $ 207.00 Engineer I, II, III $ 148.00 - $ 180.00 - $ 200.00 Engineer Technician $ 135.00 Engineer Assistant $ 104.00 Senior Surveyor $ 207.00 Surveyor I, II, III $ 148.00 - $ 180.00 - $ 200.00 Survey Technician $ 135.00 Survey Assistant $ 104.00 Two-Person Survey Party $ 350.00 Survey Party Chief $ 227.00 Survey Chainman $ 124.00 Survey Apprentice $ 115.00 Aerial Drone Surveyor $ 224.00 2169-G East Francisco Blvd, San Rafael, CA, 94901 Phone: 415.454.8868 | office@wra-ca.com | wra-ca.com 2/13/2025 SPC RATE SCHEDULE Effective: January 1, 2025 Director/Principal ......................................... $277 Senior Associate .......................................... $252 Associate ...................................................... $223 Senior Scientist............................................. $197 Scientist ........................................................ $181 Senior Technician ......................................... $148 Technician .................................................... $124 __________ Landscape Design Sr Associate Landscape Architect ............... $252 Associate Landscape Architect ................... $223 Landscape Architect .................................... $197 Landscape Designer III ................................ $181 Landscape Designer II ................................. $148 Landscape Designer I .................................. $133 Environmental Planning Environmental Planning Director. ................ $277 Senior Environmental Planner ..................... $271 Sr Associate Environmental Planner ........... $252 Associate Environmental Planner ................ $223 Environmental Planner II ............................. $197 Environmental Planner I .............................. $181 Assistant Environmental Planner II ............. $148 Assistant Environmental Planner ................ $133 Conservation Strategies Conservation Strategies Sr Project Mgr ...... $271 Conservation Strategies Sr Associate ......... $252 Conservation Strategies Associate .............. $229 Conservation Strategies Sr Scientist ........... $207 Conservation Strategies Scientist ............... $183 Conservation Strategies Sr Technician ....... $162 Conservation Strategies Technician ............ $142 Engineering Senior Engineer ........................................ $271 Sr Associate Engineer .............................. $259 Associate Engineer ................................... $229 Engineer II / Geomorphologist II ............ $207 Engineer I / Geomorphologist I ............. $183 Assistant Engineer II ................................ $162 Assistant Engineer ................................... $142 GIS Mapping & Analysis GIS Manager ............................................ $252 GIS Professional III ................................... $207 GIS Professional II .................................... $197 GIS Professional ....................................... $181 GIS Sr Technician ..................................... $148 GIS Technician.......................................... $133 Field Specialists Senior Field Technician ............................ $181 Field Technician ....................................... $133 Compliance Monitoring (OT = Rate x 1.5) Senior Project Biologist ............................ $125 Project Biologist ....................................... $104 Grant Cultivation & Administration Community Resilience Team ............. $90-202 Clerical Support ......................................... $97 Expert Witness ................................ Rate x 1.5 Rates shown are per hour and subject to an annual adjustment each January 1st. Necessary project expenses and subconsultants are billed at cost plus ten percent. CONTRACT ROUTING FORM INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below. Step RESPONSIBLE DEPARTMENT DESCRIPTION COMPLETED DATE REVIEWER Check/Initial 1 Project Manager a. Email PINS Introductory Notice to Contractor b. Email contract (in Word) and attachments to City Attorney c/o Laraine.Gittens@cityofsanrafael.org Click here to enter a date. 3/5/2025 ܆ ܈SM 2 City Attorney a. Review, revise, and comment on draft agreement and return to Project Manager b. Confirm insurance requirements, create Job on PINS, send PINS insurance notice to contractor 3/6/2025 3/6/2025 ܈ NT ܈ NT 3 Department Director Approval of final agreement form to send to contractor 3/7/2025  ܈ AM 4 Project Manager Forward three (3) originals of final agreement to contractor for their signature 3/7/2025 ܈ 5 Project Manager When necessary, contractor-signed agreement agendized for City Council approval * *City Council approval required for Professional Services Agreements and purchases of goods and services that exceed $75,000; and for Public Works Contracts that exceed $175,000 Date of City Council approval ܆ N/A Or 3/17/2025 ܈ PRINT CONTINUE ROUTING PROCESS WITH HARD COPY 6 Project Manager Forward signed original agreements to City Attorney with printed copy of this routing form  7 City Attorney Review and approve hard copy of signed agreement 8 City Attorney Review and approve insurance in PINS , and bonds (for Public Works Contracts) 9 City Manager / Mayor Agreement executed by City Council authorized official  10 City Clerk Attest signatures, retains original agreement and forwards copies to Project Manager   TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER: Contracting Department: Public Works Project Manager: Shannon Mackle (for Theo Sanchez) Extension: 3353 Contractor Name: CSW / Stuber-Stroeh Engineering Group Contractor’s Contact: Rich Souza Contact’s Email: richs@cswst2.com ܆ FPPC: Check if Contractor/Consultant must file Form 700 5th Amendment - San Quentin Pump Station - CSWST2 Final Audit Report 2025-05-20 Created:2025-05-16 By:Shannon Mackle (shannon.mackle@cityofsanrafael.org) Status:Signed Transaction ID:CBJCHBCAABAAg5hYBYLK8XKK3foPnkvXIMskHmFigl0Y "5th Amendment - San Quentin Pump Station - CSWST2" Histor y Document created by Shannon Mackle (shannon.mackle@cityofsanrafael.org) 2025-05-16 - 6:33:34 PM GMT- IP address: 199.88.113.8 Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval 2025-05-16 - 6:35:41 PM GMT Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org) 2025-05-16 - 8:11:54 PM GMT- IP address: 104.47.64.254 Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org) Approval Date: 2025-05-16 - 8:16:18 PM GMT - Time Source: server- IP address: 199.88.113.8 Document emailed to Andrea Visveshwara (andrea.visveshwara@cityofsanrafael.org) for signature 2025-05-16 - 8:16:20 PM GMT Email viewed by Andrea Visveshwara (andrea.visveshwara@cityofsanrafael.org) 2025-05-19 - 5:45:48 PM GMT- IP address: 104.47.65.254 Document e-signed by Andrea Visveshwara (andrea.visveshwara@cityofsanrafael.org) Signature Date: 2025-05-19 - 5:47:29 PM GMT - Time Source: server- IP address: 199.88.113.8 Document emailed to city.clerk@cityofsanrafael.org for approval 2025-05-19 - 5:47:31 PM GMT Email viewed by city.clerk@cityofsanrafael.org 2025-05-19 - 8:50:10 PM GMT- IP address: 199.88.113.8 Signer city.clerk@cityofsanrafael.org entered name at signing as Lindsay Lara 2025-05-19 - 8:50:19 PM GMT- IP address: 199.88.113.8 Document approved by Lindsay Lara (city.clerk@cityofsanrafael.org) Approval Date: 2025-05-19 - 8:50:21 PM GMT - Time Source: server- IP address: 199.88.113.8 Document emailed to cristine.alilovich@cityofsanrafael.org for signature 2025-05-19 - 8:50:26 PM GMT Email viewed by cristine.alilovich@cityofsanrafael.org 2025-05-19 - 9:22:19 PM GMT- IP address: 174.195.85.143 Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich 2025-05-19 - 9:22:58 PM GMT- IP address: 174.195.85.143 Document e-signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org) Signature Date: 2025-05-19 - 9:23:00 PM GMT - Time Source: server- IP address: 174.195.85.143 Document emailed to city.clerk@cityofsanrafael.org for signature 2025-05-19 - 9:23:02 PM GMT Email viewed by city.clerk@cityofsanrafael.org 2025-05-20 - 2:08:56 AM GMT- IP address: 199.88.113.8 Signer city.clerk@cityofsanrafael.org entered name at signing as Lindsay Lara 2025-05-20 - 6:25:26 PM GMT- IP address: 199.88.113.8 Document e-signed by Lindsay Lara (city.clerk@cityofsanrafael.org) Signature Date: 2025-05-20 - 6:25:28 PM GMT - Time Source: server- IP address: 199.88.113.8 Agreement completed. 2025-05-20 - 6:25:28 PM GMT