HomeMy WebLinkAboutPW San Quentin Pump Station Reconstruction Project 2025; A51
FIFTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH
CSW/STUBER-STROEH ENGINEERING GROUP, INC. FOR ENGINEERING DESIGN
SERVICES ASSOCIATED WITH THE
SAN QUENTIN PUMP STATION RECONSTRUCTION PROJECT
THIS FIFTH AMENDMENT to the Professional Services Agreement by and between
the CITY OF SAN RAFAEL (hereinafter “CITY”), and CSW/STUBER-STROEH
ENGINEERING GROUP, INC. (hereinafter “CONSULTANT”), is made and entered into as
of ______________________.
RECITALS
WHEREAS, the CITY and CONSULTANT entered into a Professional Services
Agreement dated December 26, 2017 to perform professional services in connection with
CITY’S San Quentin Pump Station Reconstruction Project, for an amount not to exceed
$128,038 (the “Agreement”); and
WHEREAS, the CITY and CONSULTANT entered into a First Amendment to
the Professional Services Agreement dated October 1, 2018 to perform additional professional
services for an amount not to exceed $245,979, and increasing the total not to exceed amount
under the Agreement to $374,017; and
WHEREAS, the CITY and CONSULTANT entered into a Second Amendment
to the Professional Services Agreement dated November 5, 2022 to perform additional
professional services for an amount not to exceed $130,550, and increasing the total not to
exceed amount under the Agreement to $504,567; and
WHEREAS, the CITY and CONSULTANT entered into a Third Amendment to
the Professional Services Agreement dated May 2, 2024 to perform additional professional
services for an amount not to exceed $19,313, and increasing the total not to exceed amount
under the Agreement to $523,880; and
WHEREAS, the CITY and CONSULTANT entered into a Fourth Amendment
to the Professional Services Agreement dated October 24, 2024 to extend the Term of the
Agreement through March 1, 2026 and to perform additional professional services for an amount
not to exceed $24,273, and increasing the total not to exceed amount under the Agreement to
$548,153; and
05/19/2025
2
WHEREAS, CITY requires additional professional services from the CONSULTANT,
and the CONSULTANT is willing to provide such services.
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows:
1. Paragraph 2 of the Agreement, entitled “DUTIES OF CONTRACTOR” is hereby
amended to include the additional services set forth in CONSULTANT’s proposal
dated March 5, 2025, attached to this Fifth Amendment as Exhibit A and
incorporated herein by reference.
2. Paragraph 4 of the Agreement, entitled “COMPENSATION” is hereby amended to
include additional compensation payable to CONSULTANT for the services
described in Exhibit A to this Fifth Amendment, on a time and materials basis in
accordance with the Exhibit A, in a not-to-exceed amount of $43,950, and to change
the total not-to-exceed amount under the Agreement to $592,103.
3. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be in
full force.
3
IN WITNESS WHEREOF, the parties have executed this Fifth Amendment on the day,
month, and year first above written.
CITY OF SAN RAFAEL CONSULTANT
______________________________ By:______________________________
CRISTINE ALILOVICH, City Manager
Name:____________________________
Title:_____________________________
ATTEST:
[If Consultant is a corporation, add signature
of second corporate officer]
______________________________
LINDSAY LARA, City Clerk
By:_____________________________
APPROVED AS TO FORM: Name:____________________________
Title:_____________________________
______________________________
ANDREA VISVESHWARA, Chief Assistant City Attorney
_______________________
______________________
Robert Stevens
CEO/President
Linda Schmid
CFO
Andrea Visveshwara (May 19, 2025 10:47 PDT)
Andrea Visveshwara
ris/ine A'i'*vih (May 19, 2025 14:2т PDT)
indsay
ara (May 20, 2025 11:25 PDT)
2indsa\ 2ara
͞Ǥ
"Íťôϡϙ ϙaÍŘèēϙ͔Ϡϙ͑͏͔͑ϙ
>Ėīôϡϙ ϙ͓ϟ͐͐͒͒ϟ͏͑ϙ
ēôĺϙÍIJèēôƏϠϙϟ(ϟϙ
ÍIJϙÍċÍôīϙ"®ϙ
͐͐͐ϙaĺŘŕēôſϙťϙ ŽĖÍϙôıÍĖīϙĺIJīƅϙϙ
ÍIJϙÍċÍôīϠϙϙϙ͓͘͘͏͐ϙ ϙēôĺϟÍIJèēôƏЬèĖťƅĺċŜÍIJŘÍċÍôīϟĺŘČϙ
(ϡϙ bϙ(bIbϙaϙIibϙϳϙibIibϙ"aIbIibϙ
"ôÍŘϙēôĺϠϙ
ēÍIJħϙƅĺŪϙċĺŘϙťēôϙĺŕŕĺŘťŪIJĖťƅϙťĺϙŜŪŕŕĺŘťϙťēôϙĖťƅϙĺċϙÍIJϙÍċÍôīϙĖIJϙťēôϙŘôŕīÍèôıôIJťϙĺċϙťēôϙÍIJϙŪôIJťĖIJϙŪıŕϙťÍťĖĺIJϟϙϙ
ēôϙ®и͑ϙîôŜĖČIJϙťôÍıϙċĖIJÍīĖƏôîϙťēôϙŕŘôīĖıĖIJÍŘƅϙϼIIJĖťĖÍīϙĺIJťŘÍèťϙČŘôôıôIJťϽϙÍIJîϙċĖIJÍīϙôIJČĖIJôôŘĖIJČϙϼ͐ŜťϙıôIJîıôIJťϽϙ
ĖIJϙŪııôŘϱ͑͏͑͑ϟϙϙĺIJŜôŗŪôIJťīƅϠϙťēôϙ®и͑ϙťôÍıϙŘôèôĖŽôîϙÍϙ͑IJîϙıôIJîıôIJťϙċĺŘϙæĖîϙÍIJîϙèĺIJŜťŘŪèťĖĺIJϙŜŪŕŕĺŘťϙ
ŜôŘŽĖèôŜϙĖIJϙbĺŽôıæôŘϱ͑͏͑͑ϟϙϙĺIJŜťŘŪèťĖĺIJϙèĺıŕīôťĖĺIJϙſÍŜϙÍIJťĖèĖŕÍťôîϙĖIJϙ>Íīīϱ͑͏͑͒ϢϙēĺſôŽôŘϠϙîŪôϙťĺϙŪIJċĺŘôŜôôIJϙ
èĺIJîĖťĖĺIJŜϙſĖťēϙťēôϙôƄĖŜťĖIJČϙŕŪıŕϙŜťÍťĖĺIJϙÍIJîϙôƄèôŜŜĖŽôϙīĺIJČϙīôÍîϙĖťôıŜϠϙťēôϙĺIJťŘÍèťĺŘЍŜϙſĺŘħϙŜīĺſīƅϙŕŘĺČŘôŜŜôîϙĖIJťĺϙ
͑͏͓͑ϟϙŪæŜôŗŪôIJťīƅϠϙťēôϙ®и͑ϙťôÍıϙŘôèôĖŽôîϙÍϙ͒ŘîϙÍıôIJîıôIJťϙťĺϙèĺIJťĖIJŪôϙŕŘĺŽĖîĖIJČϙèĺIJŜťŘŪèťĖĺIJϙÍîıĖIJĖŜťŘÍťĖĺIJϙ
ŜŪŕŕĺŘťϟϙϙiIJèôϙÍČÍĖIJϠϙťēôϙĺIJťŘÍèťĺŘϙċÍĖīôîϙťĺϙÍèŗŪĖŘôϙÍīīϙťēôϙīĺIJČϙīôÍîϙĖťôıŜϙÍIJîϙŘôŽĖŜôîϙťēôĖŘϙŜèēôîŪīôϙċĺŘϙèĺIJŜťŘŪèťĖĺIJϙ
èĺıŕīôťĖĺIJϙæƅϙŪııôŘϱ͑͏͔͑ϟϙϙϙĺIJŜôŗŪôIJťīƅϠϙťēôϙĖťƅϙĖŜŜŪôîϙÍϙ͓ťēϙÍıôIJîıôIJťϙċĺŘϙèĺIJťĖIJŪôîϙťôèēIJĖèÍīϙŜťŘŪèťŪŘÍīϠϙ
ôīôèťŘĖèÍīϠϙÍIJîϙèĖŽĖīϙôIJČĖIJôôŘĖIJČϙŜŪŕŕĺŘťϙîŪŘĖIJČϙèĺIJŜťŘŪèťĖĺIJϟϙ
ϙ>ĺŘϙƅĺŪŘϙŪŜôϠϙīĖŜťôîϙæôīĺſϙĖŜϙÍϙŜŪııÍŘƅϙĺċϙæŪîČôťÍŘƅϙŜťÍťŪŜϠϙôƄŕôIJŜôŜϙťĺϱîÍťôϠϙÍIJîϙæŪîČôťϙŘôıÍĖIJĖIJČϟϙ
"ôŜèŘĖŕťĖĺIJϙ ŪŘŘôIJťϙŪîČôťϙ
(ƄŕôIJŜôŜϙťĺϙ
"Íťôϙ
ŪîČôťϙ
ôıÍĖIJĖIJČϙ
IIJĖťĖÍīϙĺIJťŘÍèťϙČŘôôıôIJťϙ щ͐͑͗Ϡ͏͒͗ϟ͏͏ϙ щ͐͑͗Ϡ͏͒͗ϟ͏͏ϙ щ͏ϙ
͐ŜťϙıôIJîıôIJťϙ щ͓͔͑Ϡ͖͘͘ϟ͏͏ϙ щ͓͔͑Ϡ͖͘͘ϟ͏͏ϙ щ͏ϙ
͑IJîϙıôIJîıôIJťϙ щ͐͒͏Ϡ͔͔͏ϟ͏͏ϙ щ͖͘Ϡ͔͗͑ϟ͗͒ϙ щ͒͑Ϡ͕͖͘ϟ͖͐ϙ
͒ŘîϙıôIJîıôIJťϙ щ͐͘Ϡ͒͐͒ϟ͏͏ϙ щ͐͘Ϡ͒͐͒ϟ͏͏ϙ щ͏ϙ
͓ťēϙıôIJîıôIJťϙ щ͓͑Ϡ͖͑͒ϟ͏͏ϙ щ͔Ϡ͖͏͗ϟ͒͑ϙ щ͐͗Ϡ͔͕͓ϟ͕͗ϙ
ĺťÍīϙ щ͔͓͗Ϡ͔͐͒ϟ͏͏ϙ щ͓͕͗͐͘͘ϟ͔͐ϙ щ͔͐Ϡ͕͑͐ϟ͔͗ϙ
®ôϙŪIJîôŘŜťÍIJîϙÍîîĖťĖĺIJÍīϙæĖĺīĺČĖèÍīϙıĺIJĖťĺŘĖIJČϠϙŕŘôϱèĺIJŜťŘŪèťĖĺIJϙŜŪŘŽôƅŜϙÍIJîϙŘôŕĺŘťϙſĖīīϙæôϙIJôèôŜŜÍŘƅϙÍŜϙÍϙèĺIJîĖťĖĺIJϙ
ĺċϙťēôϙŘôŜĺŪŘèôϙŕôŘıĖťϟϙϙϙîôŜèŘĖŕťĖĺIJϙĺċϙťēôŜôϙÍîîĖťĖĺIJÍīϙŜôŘŽĖèôŜϙŕôŘċĺŘıôîϙæƅϙ®ϙĖIJèīŪîôŜϙťēôϙċĺīīĺſĖIJČϟϙ
Xϙ͐ϡϙIi[i@I[ϙaibIiIb@ϙ
ŜϙŕôŘϙ(ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙĖĺϱ͐ϙÍIJîϙiϙaôÍŜŪŘôϙ͐ϠϙÍϙ>®ϱÍŕŕŘĺŽôîϙæĖĺīĺČĖŜťϙĖŜϙ
ŘôŗŪĖŘôîϙťĺϙæôϙŕŘôŜôIJťϙċĺŘϙÍīīϙČŘĺŪIJîϙîĖŜťŪŘæĖIJČϙÍèťĖŽĖťĖôŜϙĖIJèīŪîĖIJČϙŽôČôťÍťĖĺIJϙŘôıĺŽÍīϟϙēĖŜϙťÍŜħϙ
ĖIJèīŪîôŜϙŪŕϙťĺϙťſôIJťƅϙϼ͑͏ϽϙîÍƅŜϙĺċϙæĖĺīĺČĖèÍīϙıĺIJĖťĺŘĖIJČϙæÍŜôîϙĺIJϙťēôϙÍIJϙŪôIJťĖIJϙŪıŕϙťÍťĖĺIJϙ
èēôîŪīôϙÍIJîϙĖIJċĺŘıÍťĖĺIJϙŕŘĺŽĖîôîϙæƅϙťēôϙĖťƅϙŘôČÍŘîĖIJČϙŕŘĺŕĺŜôîϙſĺŘħϟϙēĖŜϙťÍŜħϙÍŜŜŪıôŜϙ
ſĺŘħîÍƅŜϙÍŘôϙŘôČŪīÍŘϙôĖČēťϙϼ͗ϽϙēĺŪŘϙŜēĖċťŜϢϙĖċϙıĺIJĖťĺŘŜϙÍŘôϙŘôŗŪĖŘôîϙťĺϙæôϙĺIJŜĖťôϙċĺŘϙıĺŘôϙťēÍIJϙôĖČēťϙ
ēĺŪŘŜϙŕôŘϙîÍƅϠϙÍϙēÍIJČôϙiŘîôŘϙıÍƅϙæôϙŘôŗŪôŜťôîϙťĺϙŕŘĺŽĖîôϙÍîîĖťĖĺIJÍīϙċŪIJîŜϙċĺŘϙťēĖŜϙťÍŜħϟϙ
Xϙ͑ϡϙ(ϱibIibϙ«(´ϙb"ϙ(iIb@ϙ
ŜϙŕôŘϙ(ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͓ϠϙĖċϙſĺŘħϙĖŜϙŜèēôîŪīôîϙťĺϙæôϙŘôĖIJĖťĖÍťôîϙæôťſôôIJϙ>ôæŘŪÍŘƅϙ͐ϙ
ÍIJîϙŪČŪŜťϙ͒͐ϠϙÍϙIJôŜťĖIJČϙæĖŘîϙŜŪŘŽôƅϙſĖīīϙæôϙèĺIJîŪèťôîϙſĖťēĖIJϙ͓͐ϙîÍƅŜϙĺċϙťēôϙŜťÍŘťϙĺċϙČŘĺŪIJîϙ
([KLELW$
$XJXVW
3DJH
îĖŜťŪŘæÍIJèôϙæƅϙÍϙŗŪÍīĖċĖôîϙſĖīîīĖċôϙæĖĺīĺČĖŜťϟϙŜϙŕôŘϙ(ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͔ϠϙĖċϙſĺŘħϙĖŜϙ
ŜèēôîŪīôîϙťĺϙæôϙŘôĖIJĖťĖÍťôîϙæôťſôôIJϙŕŘĖīϙ͐ϙϳϙŪČŪŜťϙ͒͐ϙĺŘϙbĺŽôıæôŘϙ͐ϙϳϙ>ôæŘŪÍŘƅϙ͑͗ϠϙÍϙŘĺĺŜťĖIJČϙ
æÍťϙŜŪŘŽôƅϙſĖīīϙæôϙèĺIJîŪèťôîϙſĖťēĖIJϙ͓͐ϙîÍƅŜϙĺċϙČŘĺŪIJîϙîĖŜťŪŘæÍIJèôϙæƅϙÍϙŗŪÍīĖċĖôîϙæĖĺīĺČĖŜťϟϙIJϙ
ôıÍĖīϙŜŪııÍŘƅϙĺċϙŜŪŘŽôƅϙċĖIJîĖIJČŜϙſĖīīϙæôϙŕŘĺŽĖîôîϙťĺϙťēôϙèīĖôIJťϙŽĖÍϙôıÍĖīϙċĺŘϙťēôĖŘϙŘôèĺŘîŜϟϙēĖŜϙ
ĖIJèīŪîôŜϙŪŕϙťĺϙĺIJôϙϼ͐ϽϙŕŘôϱèĺIJŜťŘŪèťĖĺIJϙIJôŜťĖIJČϙæĖŘîϙŜŪŘŽôƅϙÍIJîϙĺIJôϙϼ͐ϽϙŕŘôϱϙèĺIJŜťŘŪèťĖĺIJϙ
ŘĺĺŜťĖIJČϙæÍťϙŜŪŘŽôƅϟϙ®ϙÍŜŜŪıôŜϙťēôŘôϙſĖīīϙæôϙIJĺϙŕÍŪŜôŜϙĖIJϙČŘĺŪIJîϙîĖŜťŪŘæÍIJèôϙČŘôÍťôŘϙťēÍIJϙ
ċĺŪŘťôôIJϙîÍƅŜϙťēÍťϙſĺŪīîϙIJôèôŜŜĖťÍťôϙÍIJϙÍîîĖťĖĺIJÍīϙŘĺĺŜťĖIJČϙæÍťϙŜŪŘŽôƅϙÍIJîϯĺŘϙIJôŜťĖIJČϙæĖŘîϙ
ŜŪŘŽôƅϟēôŜôϙŜŪŘŽôƅŜϙſĖīīϙæôϙèĺıæĖIJôîϙťĺϙťēôϙôƄťôIJťϙŕŘÍèťĖèÍæīôϟϙôŜŪīťŜϙĺċϙťēôŜôϙŕŘôϱ
èĺIJŜťŘŪèťĖĺIJϙŜŪŘŽôƅŜϙſĖīīϙæôϙŕŘĺŽĖîôîϙŽĖÍϙôıÍĖīϟϙ
ϙ
ēĖŜϙťÍŜħϙÍīŜĺϙĖIJèīŪîôŜϙ®ЍŜϙôċċĺŘťϙŕŘôŕÍŘĖIJČϙÍIJîϙŜŪæıĖťťĖIJČϙŘôŗŪĖŘôîϙŕŘôϱèĺIJŜťŘŪèťĖĺIJϙ
IJĺťĖċĖèÍťĖĺIJŜϙťĺϙŘôČŪīÍťĺŘƅϙÍČôIJèĖôŜϙϼôèťĖĺIJϙ͓͏͓ϙaôÍŜŪŘôϙ͒ϢϙôèťĖĺIJϙ͓͏͐ϙaĺIJĖťĺŘĖIJČϙÍIJîϙ
ôŕĺŘťĖIJČϙıôÍŜŪŘôŜϙ͐͏ϙЭϙ͐͐Ϣϙ(ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͓ϠϙIiϱ͔ϠϙÍIJîϙiϙôŕĺŘťĖIJČϙ
ôŗŪĖŘôıôIJťϙ͒ϽϟϙēĖŜϙťÍŜħϙîĺôŜϙIJĺťϙĖIJèīŪîôϙÍîîĖIJČϙťēôϙŘĺĤôèťϙťĺϙ(èĺťīÍŜϙÍŜϙŕôŘϙôèťĖĺIJϙ͓͏͐ϙ
aĺIJĖťĺŘĖIJČϙÍIJîϙôŕĺŘťĖIJČϙaôÍŜŪŘôϙ͘ϟϙ
Xϙ͒ϡϙiϱibIibϙ(iIb@ϙ
ŜϙŕôŘϙ>®ϙiϙôŕĺŘťĖIJČϙôŗŪĖŘôıôIJťϙ͒Ϡϙ®ϙſĖīīϙŕŘôŕÍŘôϙÍϙŕĺŜťϱèĺIJŜťŘŪèťĖĺIJϙèĺıŕīĖÍIJèôϙ
ŘôŕĺŘťϙÍIJîϙŜŪæıĖťϙĖťϙťĺϙťēôϙèīĖôIJťϙċĺŘϙŘôŽĖôſϟϙēĖŜϙŘôŕĺŘťϙſĖīīϙťēôIJϙæôϙŜŪæıĖťťôîϙťĺϙťēôϙÍIJϙ
>ŘÍIJèĖŜèĺϙÍƅϱ"ôīťÍϙ>ĖŜēϙÍIJîϙ®ĖīîīĖċôϙiċċĖèôϙſĖťēĖIJϙ͕͏ϙèÍīôIJîÍŘϙîÍƅŜϙĺċϙťēôϙîÍťôϙĺċϙťēôϙèĺıŕīôťĖĺIJϙ
ĺċϙèĺIJŜťŘŪèťĖĺIJϙÍèťĖŽĖťĖôŜϟϙēĖŜϙťÍŜħϙÍīŜĺϙĖIJèīŪîôŜϙ®ЍŜϙôċċĺŘťϙŜŪæıĖťťĖIJČϙŘôŗŪĖŘôîϙIJĺťĖċĖèÍťĖĺIJŜϙťĺϙ
ťēôϙ®ϙÍIJîϙĺŘŕŜϙťēÍťϙŘĺĤôèťϙĖıŕīôıôIJťÍťĖĺIJϙĖŜϙèĺıŕīôťôϟϙ ēĖŜϙťÍŜħϙîĺôŜϙIJĺťϙĖIJèīŪîôϙ
IJĺťĖċĖèÍťĖĺIJϙťĺϙÍīĖċĺŘIJĖÍϙbÍťŪŘÍīϙ"ĖŽôŘŜĖťƅϙ"ÍťÍæÍŜôϙϼb""ϽϙÍŜϙŕôŘϙ>®ϙŘôŕĺŘťĖIJČϙ
ŘôŗŪĖŘôıôIJťϙIJŪıæôŘϙ͑ϠϙŜēĺŪīîϙŜŕôèĖÍīϱŜťÍťŪŜϙŜŕôèĖôŜϙæôϙĺæŜôŘŽôîϙîŪŘĖIJČϙ®ЍŜϙſĺŘħϠϙ®ϙıÍƅϙ
ŘôŗŪôŜťϙÍîîĖťĖĺIJÍīϙċŪIJîŜϙťĺϙÍîîϙťēôŜôϙĺæŜôŘŽÍťĖĺIJŜϙťĺϙb""ϟϙ
Xϙ͓ϡϙiV(ϙab@(a(bϙ
ēĖŜϙťÍŜħϙĖIJèīŪîôŜϙŜŪŕŕĺŘťϙĺIJϙŘĺĤôèťϙîôīĖŽôŘÍæīôŜϙϼ(ϙaĖťĖČÍťĖĺIJϙaôÍŜŪŘôϙIiϱ͐ϠϙIiϱ͓ϠϙÍIJîϙ
Iiϱ͔ϽϟϙēĖŜϙťÍŜħϙĖIJèīŪîôŜϙ®ЍŜϙôċċĺŘťϙČôIJôŘÍťĖIJČϙÍIJîϙŜŪæıĖťťĖIJČϙŘôŜŪıôŜϙċĺŘϙ>®ϙÍŕŕŘĺŽÍīϙ
ϼ>®ϙiϙôŘıŜϙÍIJîϙĺIJîĖťĖĺIJϙ͐ϽϠϙèĺıŕĖīôϙŘôŕĺŘťŜϙÍŜϙſôīīϙÍŜϙČôIJôŘÍīϙŘĺĤôèťϙıÍIJÍČôıôIJťϟϙ
ϙ
ēôϙċĺīīĺſĖIJČϙťÍŜħŜϙŜŪııÍŘĖƏôϙťēôϙæÍŜĖŜϙċĺŘϙĺŪŘϙŘôŗŪôŜťϙċĺŘϙÍîîĖťĖĺIJÍīϙщ͓͒Ϡ͔͘͏ϙĖIJϙèĺıŕôIJŜÍťĖĺIJϟϙ
ϙ
d^<K^d
ϭ͘ŝŽůŽŐŝĐĂůDŽŶŝƚŽƌŝŶŐ
Ϯ͘WƌĞͲŽŶƐƚƌƵĐƚŝŽŶ^ƵƌǀĞLJ;ƐͿĂŶĚZĞƉŽƌƚŝŶŐ
ϯ͘WŽƐƚͲŽŶƐƚƌƵĐƚŝŽŶZĞƉŽƌƚŝŶŐ
ϰ͘WƌŽũĞĐƚDĂŶĂŐĞŵĞŶƚ
dKd>͗Ψϰϯ͕ϵϱϬ
ϙ
īôÍŜôϙèĺIJťÍèťϙıôϙÍťϙ͓͔͐ϟ͘͘͘ϟ͕͗͗͑ϙĺŘϙŘĖèēŜЬèŜſŜť͑ϟèĺıϙĖċϙƅĺŪϙIJôôîϙÍîîĖťĖĺIJÍīϙĖIJċĺŘıÍťĖĺIJϟϙ
ϙ
ĖIJèôŘôīƅϠϙϙ
ϙ
ϙ
ĖèēÍŘîϙĺŪƏÍϠϙ(ϙ
ŘĺĤôèťϙaÍIJÍČôŘϙ
ϙ
CSWST2.com
Adaptive Solutions. Resilient Designs. Engineering  Urban Planning  Land Surveying  Landscape Architecture
CSWST2 BILLING RATE SCHEDULE
Effective January 1, 2025 – December 31, 2025
ENGINEERING SERVICES HOURLY RATES
SURVEYING SERVICES HOURLY RATES
OTHER PROFESSIONAL SERVICES HOURLY RATES
Principal $ 277.00
Associate Principal $ 252.00
Senior Project Manager $ 247.00
Project Manager $ 233.00
Sr. Landscape Architect $ 177.00
Landscape Architect $ 161.00
Construction Manager $ 242.00
Resident Engineer $ 233.00
Field Engineer $ 200.00
Technical Writer $ 142.00
Graphic Illustrator $ 135.00
Project Assistant $ 104.00
x All expenses for transportation (mileage, bridge fare, etc.) will be
charged at the Internal Revenue Service rate plus 10%.
x Filing fees, checking fees, prints, and other outside costs (such as
agency submittal/permit fees etc.) will be charged at cost, plus
service charges at the rate of 10%.
x Billing will be monthly net 30 days.
Senior Engineer $ 207.00
Engineer I, II, III $ 148.00 - $ 180.00 - $ 200.00
Engineer Technician $ 135.00
Engineer Assistant $ 104.00
Senior Surveyor $ 207.00
Surveyor I, II, III $ 148.00 - $ 180.00 - $ 200.00
Survey Technician $ 135.00
Survey Assistant $ 104.00
Two-Person Survey Party $ 350.00
Survey Party Chief $ 227.00
Survey Chainman $ 124.00
Survey Apprentice $ 115.00
Aerial Drone Surveyor $ 224.00
2169-G East Francisco Blvd, San Rafael, CA, 94901
Phone: 415.454.8868 | office@wra-ca.com | wra-ca.com
2/13/2025 SPC
RATE SCHEDULE
Effective: January 1, 2025
Director/Principal ......................................... $277
Senior Associate .......................................... $252
Associate ...................................................... $223
Senior Scientist............................................. $197
Scientist ........................................................ $181
Senior Technician ......................................... $148
Technician .................................................... $124
__________
Landscape Design
Sr Associate Landscape Architect ............... $252
Associate Landscape Architect ................... $223
Landscape Architect .................................... $197
Landscape Designer III ................................ $181
Landscape Designer II ................................. $148
Landscape Designer I .................................. $133
Environmental Planning
Environmental Planning Director. ................ $277
Senior Environmental Planner ..................... $271
Sr Associate Environmental Planner ........... $252
Associate Environmental Planner ................ $223
Environmental Planner II ............................. $197
Environmental Planner I .............................. $181
Assistant Environmental Planner II ............. $148
Assistant Environmental Planner ................ $133
Conservation Strategies
Conservation Strategies Sr Project Mgr ...... $271
Conservation Strategies Sr Associate ......... $252
Conservation Strategies Associate .............. $229
Conservation Strategies Sr Scientist ........... $207
Conservation Strategies Scientist ............... $183
Conservation Strategies Sr Technician ....... $162
Conservation Strategies Technician ............ $142
Engineering
Senior Engineer ........................................ $271
Sr Associate Engineer .............................. $259
Associate Engineer ................................... $229
Engineer II / Geomorphologist II ............ $207
Engineer I / Geomorphologist I ............. $183
Assistant Engineer II ................................ $162
Assistant Engineer ................................... $142
GIS Mapping & Analysis
GIS Manager ............................................ $252
GIS Professional III ................................... $207
GIS Professional II .................................... $197
GIS Professional ....................................... $181
GIS Sr Technician ..................................... $148
GIS Technician.......................................... $133
Field Specialists
Senior Field Technician ............................ $181
Field Technician ....................................... $133
Compliance Monitoring (OT = Rate x 1.5)
Senior Project Biologist ............................ $125
Project Biologist ....................................... $104
Grant Cultivation & Administration
Community Resilience Team ............. $90-202
Clerical Support ......................................... $97
Expert Witness ................................ Rate x 1.5
Rates shown are per hour and subject to an
annual adjustment each January 1st.
Necessary project expenses and subconsultants
are billed at cost plus ten percent.
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
Step RESPONSIBLE
DEPARTMENT
DESCRIPTION COMPLETED
DATE
REVIEWER
Check/Initial
1 Project Manager
a. Email PINS Introductory Notice to Contractor
b. Email contract (in Word) and attachments to City
Attorney c/o Laraine.Gittens@cityofsanrafael.org
Click here to
enter a date.
3/5/2025
܆
܈SM
2 City Attorney
a. Review, revise, and comment on draft agreement
and return to Project Manager
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
3/6/2025
3/6/2025
܈ NT
܈ NT
3 Department Director Approval of final agreement form to send to
contractor
3/7/2025 ܈ AM
4 Project Manager
Forward three (3) originals of final agreement to
contractor for their signature
3/7/2025 ܈
5 Project Manager When necessary, contractor-signed agreement
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed
$75,000; and for Public Works Contracts that exceed $175,000
Date of City Council approval
܆ N/A
Or
3/17/2025
܈
PRINT CONTINUE ROUTING PROCESS WITH HARD COPY
6 Project Manager Forward signed original agreements to City
Attorney with printed copy of this routing form
7 City Attorney Review and approve hard copy of signed
agreement
8 City Attorney Review and approve insurance in PINS , and bonds
(for Public Works Contracts)
9 City Manager / Mayor Agreement executed by City Council authorized
official
10 City Clerk Attest signatures, retains original agreement and
forwards copies to Project Manager
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Shannon Mackle (for Theo Sanchez) Extension: 3353
Contractor Name: CSW / Stuber-Stroeh Engineering Group
Contractor’s Contact: Rich Souza Contact’s Email: richs@cswst2.com
܆ FPPC: Check if Contractor/Consultant must file Form 700
5th Amendment - San Quentin Pump Station -
CSWST2
Final Audit Report 2025-05-20
Created:2025-05-16
By:Shannon Mackle (shannon.mackle@cityofsanrafael.org)
Status:Signed
Transaction ID:CBJCHBCAABAAg5hYBYLK8XKK3foPnkvXIMskHmFigl0Y
"5th Amendment - San Quentin Pump Station - CSWST2" Histor
y
Document created by Shannon Mackle (shannon.mackle@cityofsanrafael.org)
2025-05-16 - 6:33:34 PM GMT- IP address: 199.88.113.8
Document emailed to Laraine Gittens (laraine.gittens@cityofsanrafael.org) for approval
2025-05-16 - 6:35:41 PM GMT
Email viewed by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
2025-05-16 - 8:11:54 PM GMT- IP address: 104.47.64.254
Document approved by Laraine Gittens (laraine.gittens@cityofsanrafael.org)
Approval Date: 2025-05-16 - 8:16:18 PM GMT - Time Source: server- IP address: 199.88.113.8
Document emailed to Andrea Visveshwara (andrea.visveshwara@cityofsanrafael.org) for signature
2025-05-16 - 8:16:20 PM GMT
Email viewed by Andrea Visveshwara (andrea.visveshwara@cityofsanrafael.org)
2025-05-19 - 5:45:48 PM GMT- IP address: 104.47.65.254
Document e-signed by Andrea Visveshwara (andrea.visveshwara@cityofsanrafael.org)
Signature Date: 2025-05-19 - 5:47:29 PM GMT - Time Source: server- IP address: 199.88.113.8
Document emailed to city.clerk@cityofsanrafael.org for approval
2025-05-19 - 5:47:31 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2025-05-19 - 8:50:10 PM GMT- IP address: 199.88.113.8
Signer city.clerk@cityofsanrafael.org entered name at signing as Lindsay Lara
2025-05-19 - 8:50:19 PM GMT- IP address: 199.88.113.8
Document approved by Lindsay Lara (city.clerk@cityofsanrafael.org)
Approval Date: 2025-05-19 - 8:50:21 PM GMT - Time Source: server- IP address: 199.88.113.8
Document emailed to cristine.alilovich@cityofsanrafael.org for signature
2025-05-19 - 8:50:26 PM GMT
Email viewed by cristine.alilovich@cityofsanrafael.org
2025-05-19 - 9:22:19 PM GMT- IP address: 174.195.85.143
Signer cristine.alilovich@cityofsanrafael.org entered name at signing as Cristine Alilovich
2025-05-19 - 9:22:58 PM GMT- IP address: 174.195.85.143
Document e-signed by Cristine Alilovich (cristine.alilovich@cityofsanrafael.org)
Signature Date: 2025-05-19 - 9:23:00 PM GMT - Time Source: server- IP address: 174.195.85.143
Document emailed to city.clerk@cityofsanrafael.org for signature
2025-05-19 - 9:23:02 PM GMT
Email viewed by city.clerk@cityofsanrafael.org
2025-05-20 - 2:08:56 AM GMT- IP address: 199.88.113.8
Signer city.clerk@cityofsanrafael.org entered name at signing as Lindsay Lara
2025-05-20 - 6:25:26 PM GMT- IP address: 199.88.113.8
Document e-signed by Lindsay Lara (city.clerk@cityofsanrafael.org)
Signature Date: 2025-05-20 - 6:25:28 PM GMT - Time Source: server- IP address: 199.88.113.8
Agreement completed.
2025-05-20 - 6:25:28 PM GMT