HomeMy WebLinkAboutFin Preliminary Citywide Proposed Budget for FY25-26 PPT CIPProposed FY2025 -26
Capital Improvement Program
City Council Meeting: May 19, 2025
Presentation Outline
1.About Capital Improvement
Program (CIP)
2.CIP Planning Process
3.Overview of CIP
•FY2024-25 Accomplishments
•FY2025-26 (“Year 1”) CIP Plan
4.Recap
5.Future of CIP / Next Steps
•Three-Year Planning Tool
•Annual Programs & Projects
•Funding Sources
•Rough Order of Magnitude (ROM)
Cost Estimates
•Approval of Year 1
•Including appropriation of funds
with City’s annual budget adoption
1. About Capital Improvement Program (CIP)
Buildings / Facilities
Parks
Storm Drain
Transportation
Active/New
Projects
Council-
Approved
FY2024-27 CIP
Planned Projects
Emerging Priorities
Future Year or
Unfunded
Projects
Established
Ranking Criteria
Funding Sources
& Availability
Staff Availability
& Capacity
Project Cost
Estimates
2. CIP Planning Process –Considerations
Ranking Criteria
•Coordinate across various City departments
•Strive to ensure a comprehensive & equitable approach
205 –Storm Water Fund
206 –Gas Tax Fund
214 –Library Revolving Fund
241 –Parks Measure A Fund
246 –Traffic Mitigation Fee Fund
401 –Capital Improvement Fund
420 –Essential Facilities Fund (Measure E)
430 –Measure P Fund
603 –Building Maintenance Fund
CIP Funding
Sources
(9 Fund Accounts)
NEW!
$4.8 M
31%
$10.7 M
69%
PROGRAMS & PROJECTS
Annual Programs Projects
$4.8 M
31%
$0.6 M
4%$1.2 M
8%
$8.8 M
57%
CATEGORIES
Buildings / Facilities Parks Storm Drain Transportation
3. Overview of Proposed FY2025-26 CIP
PROPOSED FY2025-26 CIP BUDGET = $15.4 M
Grant
funding
$3.4M
~22%
Draft
FY 25-26
CIP Work
Plan
(1 of 2)
Draft
FY 25-26
CIP Work
Plan
(2 of 2)
Annual Programs – FY2025-26 Overview
PROPOSED BUDGET
•City -owned and/or -occupied
facilities
•City Hall
•Fire stations
•Libraries
•Parking garages
•Parking lots
•Recreation centers
•Childcare
•And more
BUILDINGS / FACILITIES
Downtown Library
Pending Completion
Buildings / Facilities – FY2025-26 Overview
$0.88 M
18%
$1.50 M
31%
$2.43 M
51%
FUNDING SOURCE
420 Essential Facilities
430 Measure P
603 Building Maintenance
PROPOSED BUDGET
G Includes grant funding
A.J. Boro Community Center:
Window Replacements &
Mural Preparation
Buildings/Facilities – FY2024-25 Completed Projects
A.J. Boro Community Center:
Fire Backflow Prevention
Device Installation
A.J. Boro & Terra Linda
Community Centers: Partition
Wall Replacements
Buildings / Facilities – Rollover Projects (5)
➢A.J. Boro Community
Center: HVAC & Roof
Repair
➢Pickleweed Branch
Library Redesign
Pickleweed Preschool
Replacement Portables
Citywide Buildings and Facilities Plan (CBFP)
Downtown Library
Modernization
Buildings / Facilities – Upcoming Projects (10)
Fire Station 54, 55, 56
Public Safety Center
Downtown Community Center City Hall
A.J. Boro Community Center
•Park Infrastructure & facilities:
•Playgrounds
•Recreation Equipment
•Park Restrooms
PARKS – FY2025-26 Overview
$400 K
65%
$165 K
27%
$50 K
8%
FUNDING SOURCE
241 Park Measure A
401 Capital Improvement
603 Building Maintenance
G Includes grant funding
PROPOSED BUDGET
Pickleweed Park
Enhancement & Field
Renovation
Parks – Rollover Projects (3)
Boyd Park Interim
Playground Equipment
Peacock Gap Playground
Improvements
Parks – Upcoming Projects (3)
Los Ranchitos Park Sewer
Line Replacement
Freitas Park and Peacock
Gap Park Tennis Courts
Resurfacing
Welcome Gateways
$550 K
48%
$585 K
52%
FUNDING SOURCE
205 Storm Water
Grants
STORM DRAIN – FY2025-26 Overview
PROPOSED BUDGET
G Includes grant funding
Storm Drain – FY2024-25 Completed Projects
B Street Culvert
Replacement & Resurfacing
FY 2024-25 Corrugated
Metal Pipe Replacement
Storm Drain – Rollover Projects (9)
Citywide Storm Drain Plan
(CSDP)
San Quentin Pump Station
Reconstruction
(Francisco Blvd/Shoreline Pkwy)
Large Trash Capture Device
Installation (MCSTOPPP) at:
❖Canal (SR-002)
❖N. Francisco (SR-108)
❖Redwood Hwy (SR-129)
❖Rossi (SR-143)
❖San Quentin (SR-110)
➢390 Canal Pump Station Generator Replacement
➢Storm Drain Maintenance Environmental Compliance
and Permitting
Upcoming Project (1)
Large Trash Capture Device
Feasibility Study
•Prioritize repair/replacement of pipes based on conditions
Annual Corrugated Metal Pipe Replacement Program
TRANSPORTATION – FY2025-26 Overview
$1.6 M
38%
$2.6 M
62%
FUNDING SOURCE
206 Gas Tax
Grants
PROPOSED BUDGET
Gas Tax Fund
(206) includes:
•Construction
Impact Fee
•Highway
Users Tax
Account
(HUTA)
•Refuse Impact
Fee
•Road
Maintenance
and
Rehabilitation
Account
(RMRA)
•Transportation
Authority of
Marin (TAM)
Measure AA G Includes grant funding
Fremont Rd and Marquard Rd
Minor Concrete Repairs
Center Street Curb Ramp
Replacements
FY2023-24 & FY2024-25
Traffic Signal Backup Battery
Installation & Replacements
Transportation – Completed Projects
B St Culvert Replacement
and Resurfacing
FY 2024-25 Major
Pavement Maintenance
Canal Neighborhood
Parking Striping
Transportation – Rollover Projects (7)
Second St and Fourth St
Intersection Improvements
Canal Active
Transportation Experience
Improvements
➢Citywide Bicycle and Pedestrian Plan (CBPP) Update
➢Francisco Blvd East Mid-Block Crossing Enhancement
➢Lincoln Ave/Brookdale Ave & Lincoln Ave/Wilson Ct Safety
Improvements
San Rafael Canal Crossing
South Merrydale Rd – Civic
Center Connector Pathway
Transportation –
Upcoming Projects (4)
Second St Utility
Undergrounding (Phase 2)
Canal St Powerline
Undergrounding – Medway
Rd to Spinnaker Pt Dr
Lincoln Ave from Second to
Paloma Safety Improvements
Third St Rehabilitation Post
Construction PGE Meter Upgrades
Transportation – FY 2025-26 Annual Programs
PMP Website
City-Led Sidewalk Repair
•Concrete Shaving
•Crosswalk/Pathway Upgrades
•Curb Ramp Replacements
Pavement Management
•Establish 3- to 5-year plan
•Major Maintenance Project
•Nova Albion Bikeway and
Pathway Gap Closure
•Point San Pedro Rd Design
•Dig Out Project
Transportation – FY 2025-26 Annual Programs
Bridge Maintenance
•Conduct inventory of vehicular and
pedestrian bridges not on Caltrans
National Bridge Inventory (NBI) list
•Develop maintenance plan based
on Caltrans bridge inspection
reports and non-NBI bridge
assessments
•Seek funding through Caltrans
Highway Bridge Program
Public Hillside & Roadway Stability
•Develop management plan
•Evaluate/monitor site conditions
•Install erosion/sediment control devices
•Remove debris and minor obstructions
•Repair minor damages
•Local Road Safety Plan implementation
•Traffic Studies
•Multi-modal small projects
•AB-413 implementation (no parking near
crosswalks)
•AB-43 for speed limit reduction
•Implement signing/striping in downtown area
•Phase 2 exploration of AB43 in other
locations
•Crosswalk/Intersection priority criteria
•Traffic calming policy review and toolbox
Annual Road Safety Implementation Program
$4.8 M
31%
$10.7 M
69%
PROGRAMS & PROJECTS
Annual Programs Projects
$4.8 M
31%
$0.6 M
4%$1.2 M
8%
$8.8 M
57%
CATEGORIES
Buildings / Facilities Parks Storm Drain Transportation
4. Recap of Proposed FY2025-26 CIP
PROPOSED FY2025-26 CIP BUDGET = $15.4 M
Grant
funding
$3.4M
~22%
Continue to:
✓Adapt to City/community
needs
✓Apply for grant funding
✓Evaluate Annual Programs
✓Evaluate the CIP planning
process
•Include City planning documents
•Review through lens of DEIB
5. Future of Capital Improvement Program / Next Steps
This presentation will be uploaded to
the City’s Public Works Projects and
Capital Improvement Program (CIP)
webpage
https://www.cityofsanrafael.org/public-works-projects/