HomeMy WebLinkAboutPW Storm Water Pump Renovation 2009; NOC RecordedCITY of Agenda Item No: 9
Meeting Date: May 16, 2011
n'
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: .� City Manager Approval, Vk-p�c
Director of Public Works (KM)
File No. 08.06.60
SUBJECT: ACCEPT COMPLETION OF THE CORPORATE CENTER STORM WATER
PUMP STATION RENOVATION, PROJECT #11131, AND AUTHORIZE THE CITY CLERK
TO FILE THE NOTICE OF COMPLETION.
RECOMMENDATION:
Staff recommends that the City Council accept completion of the project and authorizes the City
Clerk to file the Notice of Completion.
BACKGROUND:
The electrical panel upgrade to the Corporate Center Stoinl Water Pump Station (formerly know
as 2°d Street Pump Station/Corp Yard Pump Station), was awarded to Bartley Pump, Inc. on
November 16, 2009. Upgrades were completed on November 1, 2010. This 50 year old station
provides flood control protection to the 2" St. and Hetherton St. area, which includes the Bettini
Transit Center. Bartley Pump's work included installation of a new control panel and concrete
housing structure, designed by DCV Consultants in cooperation with City staff. The entire
electrical system was replaced with new equipment, with the exception of pumps and motors.
Over the last several months City staff has worked with Pacific Gas and Electric representatives
to provide power to the station. PG&E indicated that utilizing the original power drop was
unacceptable because it was not located in a utility easement on the adjacent property. City staff
has worked closely with the adjacent property owner, Seagate Properties, to develop a temporary
utility easement for this pump station to receive power. Permanent power will be developed
from 2nd Street over the next 18 months. The temporary facility will be removed upon
completion of that work.
PROJECT UPDATE:
The project was fully completed (including all punch list items) on November 1, 2010. It was
frilly operational throughout the past rainy season with the use of a temporary generator. The
engineer recommends acceptance of the project and recordation of a Notice of Completion.
I' -i- CI
L II fl
e rr
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Paize: 2
PROJECT SUMMARY:
The following summarizes the project costs:
Category
Amount
Construction
Contract Amount based on Estimated Quantities
$147,078.00
Change Orders*
$-1,023.00
Construction Subtotal-*
$146,055.00
Design Related Costs (DCV Consultants)
$8,510
Advertisement Costs (Printing and PG&E Hookup **)
$1,855.44
Total Construction Cost
$156,420.44
* Includes the retention to be paid 35 days after Notice of Completion is filed.
** Final billing for temporary power hookup from PG&E has not been received.
(1) Change Order No. 1: After the start of construction it was determined that deleting
wiring in some areas could be accomplished without jeopardizing the integrity of the station.
The following summarizes project milestones and working days:
Additional days were allowed in order to coordinate PG&E hookup efforts. All work was
completed within the number of working days specified.
ANALYSIS:
Pursuant to Civil Code Section 3093 the City, owner of the improvements, is required to record a
Notice of Completion upon acceptance of the improvements by the City. This acceptance
initiates a time period during which project subcontractors may file Stop Notices seeking
payment from the City out of the funds owed to the Contractor for the project work.
ACTION REQUIRED:
Accept completion of the Corporate Center Storm Water Pump Station Renovation (project
#1113 1) and authorize the City Clerk to file a Notice of Completion.
\Srpw1projects\08 Drainage',08.06 Pump Stations')08.06.60 Corporate Ctr Stnrwtr Pump Station Renov\ Council& Agree ments.Coone iI''201 1-5-
16 Notice ol`Completion\05161 1 Notice or Completion REPORT -RAL 5.6.1 Ldoc
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 1st day of November, 2010 and accepted by the City Council
the 16th day of May, 2011; that the name, address and nature of the title of the party giving this notice is
as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California,
within the boundaries of which said work or improvement was made upon land owned by said City
and/or over which said City has an easement; that said work or improvement is described as follows:
CORPORATE CENTER STORM WATER PUMP STATION RENOVATIONS
CITY PROJECT #11131
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Bartley Pumps, Inc.
4000 S. Moorland Ave
Santa Rosa, CA 95407
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 14� l7 2V.
CITY OF SAN RAFAEL
A Municipal Corporation
By
NADER MANSOURIAN
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this 14 day of MA Y 20 1before me, ESTHER C. BEIRNE, City Clerk of. the
City of San Rafael, County of Marin, State of Califorlua, residing therein, personally appeared NADER
MANSOURIAN, (or proved to me on the basis of satisfactory evidence) to be the person whose name is
subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of
which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OJF PERJURY under the laws of the State of California that the foregoing
lura-ra h is true and coi:ze � .i�,•'•
Signature
ESTHER C. -�Ej F,k Clerl�¢
i . File: 03.06.60
RECORDING REQUESTED BY
Qg2�i
When recorded mail to:
1 1—��25759
kerorded I kEL' FEE
City of San Rafael
I fficial Itsa-ir-Is I
Esther C. Beirne, City Clerk
County. of I
Nariti I
1400 Fifth AvenueNIPIRD
N. bEwAiN I
Assessor—Necorder I
P. O. Box 151560
Lounty {:lerk I
San Rafael, CA 94915-1560
la
tI90J.'IN 18 -Mar -'011 I Paye I of I
RECORD WITHOUT
FEE PER G.C. 27383
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 1st day of November, 2010 and accepted by the City Council
the 16th day of May, 2011; that the name, address and nature of the title of the party giving this notice is
as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California,
within the boundaries of which said work or improvement was made upon land owned by said City
and/or over which said City has an easement; that said work or improvement is described as follows:
CORPORATE CENTER STORM WATER PUMP STATION RENOVATIONS
CITY PROJECT #11131
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Bartley Pumps, Inc.
4000 S. Moorland Ave
Santa Rosa, CA 95407
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 14� l7 2V.
CITY OF SAN RAFAEL
A Municipal Corporation
By
NADER MANSOURIAN
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this 14 day of MA Y 20 1before me, ESTHER C. BEIRNE, City Clerk of. the
City of San Rafael, County of Marin, State of Califorlua, residing therein, personally appeared NADER
MANSOURIAN, (or proved to me on the basis of satisfactory evidence) to be the person whose name is
subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of
which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OJF PERJURY under the laws of the State of California that the foregoing
lura-ra h is true and coi:ze � .i�,•'•
Signature
ESTHER C. -�Ej F,k Clerl�¢
i . File: 03.06.60
CITY OF SAN RAFAEL
ROUTING SLIP / APPROVAL FORM
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRRA / SRCC AGENDA ITEM NO.
FROM
DEPARTMENT
Nader Mansourian
Public Works
DATE: 05/11/11
TITLE OF DOCUMENT:
DATE OF MEETING: 05/16/11
� -�U�n
L� M„ i f�
MAY 1 12011
CIP(A NEY
ACCEPT COMPLETION OF THE CORPORATE CENTER STORM WATER PUMP STATION RENOVATION
PROJECT, PROJECT #11131, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION
Department Head (signature)
*** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ***
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL / AGENCY
AGENDA ITEM:
City Manager (s' nature)
NOT APPROVED
REMARKS:
APPROVED AS TO FORM:
J�'
City Attorney (signature)
E 1101 a INIT-0 1. 1
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 1st day of November, 2010 and accepted by the City Council
the 16th day of May, 2011; that the name, address and nature of the title of the party giving this notice
is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of
California, within the boundaries of which said work or improvement was made upon land owned by
said City and/or over which said City has an easement; that said work or improvement is described as
follows:
CORPORATE CENTER STORM WATER PUMP STATION RENOVATIONS
CITY PROJECT #11131
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Bartley Pumps, Inc.
4000 S. Moorland Ave
Santa Rosa, CA 95407
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 20_.
CITY OF SAN RAFAEL
A Municipal Corporation
By
NADER MANSOURIAN
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MAR1N
On this day of 20_ before me, ESTHER C. BEIRNE, City Clerk of the
City of San Rafael, County of Marin, State of California, residing therein, personally appeared NADER
MANSOURIAN, (or proved to me on the basis of satisfactory evidence) to be the person whose name is
subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Signature
ESTHER C. BEIRNE, City Clerk
File: 08.06.60