HomeMy WebLinkAboutPW NTPP Puerto Suello Hill Path to Transit Center Connector Proj.Agenda Item No: 3 e
Meeting Date: November 7, 2011
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by.
Director of Public Works (HY)
City Manager ApprovalPI,
File No.: 16.01.241.05
SUBJECT: RESOLUTION AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO
AMEND AN AGREEMENT FOR PROFESSIONAL SERVICES WITH LSA
ASSOCIATES FOR ADDITIONAL CULTURAL RESOURCE SERVICES ON
THE NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP)
PUERTO SUELLO HILL PATH TO TRANSIT CENTER CONNECTOR
PROJECT (FEDERAL AID PROJECT NUMBER NMTPL 5043(023); CITY
PROJECT NUMBER 11115) IN THE AMOUNT OF $8,077.
RECOMMENDATION: Adopt Resolution
BACKGROUND:
The Puerto Suello Multi -Use Path along the west side of US101, north of Mission Avenue, was recently
completed and opened to the public. This path ends at the northwest corner of the intersection of
Hetherton Street and Mission Avenue, three blocks from the San Rafael Transit Center. The only
pedestrian facility along Hetherton Street between Mission Avenue and the Transit Center is a five foot
wide sidewalk. There are no bicycle facilities along Hetherton Street.
Before securing authorization for construction, the City must obtain environmental clearance from
Caltrans Local Assistance. In late September 2010, following review of the latest environmental
documentation submittal, Caltrans notified the City that the potential for encountering buried
archaeological deposits during project construction was of critical concern. Subsurface testing of the
project area is needed to proceed with the environmental clearance process. This investigation includes
both field and laboratory work and preparation of a report to Caltrans based on the results. In addition,
arrangements for a Native American Monitor and curation plans are required.
On May 16, 2011, the City Council adopted Resolution No. 13152, which authorized the Public Works
Director to execute an agreement with LSA Associates to conduct the required field and laboratory work.
The contract value authorized was $53,010.
In September 2011, the City submitted a proposal to Caltrans outlining its methodology for the required
field and laboratory work. Caltrans commented on the methodology proposal requiring additional
excavation sites and more intensive sampling methods. These requirements were not known at the time
FOR CITY CLERK ONLY
File No.: & I -� D -> r X
Council Meeting:
Disposition: 4..$
11
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page:_2
Im
the original contract was executed and in order to meet these additional requirements, LSA Associates is
required to conduct additional field work and coordination beyond the original scope of work. It is
anticipated that all field work will be conducted in November 2011.
FISCAL IMPACT:
The expenditures to date for this project are as follows:
Category
Amount
Note(s)
Design
$206,268.00
Previously authorized Design Consultant
$53,010.00
Previously authorized Cultural Resources Consultant
$8,077.00
Cultural Resources Consultant Budget Increase
Total
$267,355.00
City staff has worked closely with Caltrans Local Assistance. We are approved for design reimbursement
up to $250,000. The figure identified for the Cultural Resources Consultant services is a maximum; we
will pay only amounts based on actual time and materials. If no buried cultural artifacts are found, the
time and materials costs for this contract will be significantly less than the originally authorized cultural
resource budget of $53,010.
Previously, the Council approved $1,200,000 for this project. Caltrans has authorized $600,000.00,
$250,000 for design and $350,000 for construction from the NTPP grant. An additional $600,000 was
authorized for construction through Regional Measure 2 Safe Routes to Transit funds, making a total of
$950,000 available for construction.
We are currently expecting an additional $100,000 in NTPP funds be granted for the construction of this
project. Once received, the total approved project cost will increase to $1,300,000.
OPTIONS:
The Council may choose to not authorize the Director of Public Works the authority to amend the
Professional Services Agreement with LSA Associates. If this option is chosen, all field and laboratory
work required by Caltrans cannot be completed. If environmental clearance is not obtained, the City
cannot move forward to construct the project.
ACTION REQUIRED:
Adopt the resolution allowing the Public Works Director to amend the Professional Services Agreement
with LSA Associates.
Enclosures
1. Resolution
2. Exhibit A
RESOLUTION NO. 13257
RESOLUTION AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO AMEND
AN AGREEMENT FOR PROFESSIONAL SERVICES WITH LSA ASSOCIATES FOR
ADDITIONAL CULTURAL RESOURCE SERVICES ON THE NON -MOTORIZED
TRANSPORTATION PILOT PROGRAM (NTPP) PUERTO SUELLO HILL PATH TO
TRANSIT CENTER CONNECTOR PROJECT (FEDERAL AID PROJECT NUMBER
NMTPL 5043(023); CITY PROJECT NUMBER 11115) IN THE AMOUNT OF $8,077
WHEREAS, the City Council adopted Resolution No. 13152 on May 16, 2011
authorizing the Director of Public Works to enter into a Professional Services Agreement with
LSA Associates to conduct specialized cultural resource services; and
WHEREAS, the City is obligated to pay $53,010 to date to LSA Associates in
connection with the cultural resource services; and
WHEREAS, an additional $8.077 is needed for LSA Associates to provide
additional specialized professional cultural resource services to meet Caltrans requirements; and
WHEREAS, staff received a proposal from LSA Associates for additional
cultural resource services for the additional scope of work in an amount not to exceed $8,077
(Exhibit "A" to the Amendment); and
WHEREAS, staff has reviewed their proposal and found it to be complete and
within industry standards.
NOW, THEREFORE, BE IT RESOLVED that the Council of the City of San
Rafael hereby approves and authorizes the Public Works Director to execute an amendment
to the Professional Services Agreement between LSA Associates and the City, in the form
attached hereto, expanding the scope of services under the agreement in the amount of $8,077,
for a total cost not to exceed $61,087.00
IT IS FURTHER ORDERED AND RESOLVED, that the Director of Public
Works is hereby authorized to take any and all such actions and make changes as may be
necessary to accomplish the purpose of this resolution.
I, ESTHER C. BEIRNE, Clerk of the City of San Rafael, hereby certify that the
foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the
Council of said City on the 7th day of November, 2011 by the following vote, to wit:
AYES: COUNCILMEMBERS: Brockbank, Connolly, Heller, Levine & Mayor Boro
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
ESTHER C. BEIRNE, City Clerk
File No.: 16.01.241.05
AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH
LSA ASSOCIATES TO EXPAND THE SCOPE OF WORK FOR THE
CULTURAL RESOURCE SERVICES OF THE NTPP PUERTO SUELLO HILL
PATH TO TRANSIT CENTER CONNECTOR PROJECT TO INCLUDE
ADDITIONAL CULTURAL RESOURCE SERVICES FOR A NOT TO EXCEED
AMOUNT OF $8,077, INCREASING THE TOTAL NOT TO EXCEED AMOUNT
UNDER THE AGREEMENT TO $61,087.
This Amendment to the Professional Services Agreement by and between the CITY OF
SAN RAFAEL (hereinafter "CITY"), and LSA ASSOCIATES, INC., a corporation
,hereinafter "CONSULTANT"), is made and entered into as of the 7th day of November. 2011,
RECITALS
WHEREAS, pursuant to City Council Resolution No. 13152 adopted on May 16, 2011,
the CITY and CONSULTANT entered into a Professional Services Agreement for cultural
resource services of the NTPP Puerto Suello Hill Path to Transit Center Connector Project
improvements for an amount not to exceed $53,010; and
WHEREAS, an additional amount not to exceed $8,077 is needed for LSA Associates to
conduct additional cultural resource services now being required by Caltrans in connection with
the NTPP Puerto Suello Hill Path to Transit Center Connector Project.
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby agree to an Amendment to the Professional
Services Agreement for the Puerto Suello Path to Transit Center Connector Project between the
parties as follows:
The Statement of Work (Scope of Work) to the Agreement is amended to include
the CONSULTANT's proposal dated October 7, 2011 attached hereto as Exhibit "A".
2. The Not -To -Exceed Budget Estimate, Exhibit "C", is amended to add a new Item
6, "Additional Field Work and Laboratory Work" for $8,077, and to change the "Total" to
$61,087.
3. All of the other provisions, terms and obligations of the Agreement between the
parties shall remain valid and shall be in force after this amendment.
IN WITNESS WHEREOF, the parties have executed this Amendment of the day,
month, and year first above written.
CITY OF SAN RAFAEL LSA ASSOCIATES, INC.
I VIV
NADER MANSOURIAN, Name: Malcol Sproul
Director of Public Works Title: Assistant Secretary
ATTEST:
ESTHER C. BEIRNE, City Clerk
APPROVED AS TO FORM:
ROBERT F. EPSTEIN, City Attorney
2
SA ASSOCIATES, INC. BERKELEY FORT COLLINS
157 P ARK PLACE 510-236.6810 TEL CARLSBAD IRVINE
T. RICHMOND, CA 94801 510.236-3480 FAX COLMA PALM SPRINGS
TRANSMITTAL
To: City of San Rafael
Atten: Diane Wachter
111 Morphew Street
PO Box 151560
D Al F , November 15, 2011
RIVERSIDE
ROCKLIN
SAN LUIS OBISPO
a,
T')A
y F ' P'j' P614 FA, E
El FOR YOUR RFVFW 0 FOR. YOUR F L. I -S
❑ AT YOUR REQUEST 0 FOR YOUR INFORMATION
FOR YOUR APPROVAL EI DISTRIBUTION
San Rafael, CA 94915-1560 SUBJECT: 3 SIGNED CONTRACTS
P R 01 E C T: Puerto Suello Hill Path
P R 0
JECT NUMBER: CSR1101
ITEMS BELOW ARE TRANSMITTED: 0 HEREWITH 0 UNDER SEPARATE COVER IM VIA: -US MAIL
D -A -TY, COPIES DESCRIPTION
GENERAL REMARKS:
Enclosed are 3 signed contracts. Please send one executed contract to LSA for our files.
Thank you
Raizan Ho
Accounting Liaison
COPIES TO:
BY: Ralzan Ho
PLANNING I ENVIRONMENTAL SCIENCES I DESIGN
h
M
—
`c
z
r
s
va
l ti G `„J•
��
O
N N
R T
I
rt
Y
r
O
M
i2
C
C
C
G
l?
C N v
O
O
�
�
M
j
s
i
� N
�
O N
N
s
O
O N
C
N O C
v N
j
O O U a
sy c° U) 2
`N
197
�, L S A2011
IN
Im
XH [ B "A"
RIVERSIDE
tSA ASS O(11 I FS, INC, RCRKI[1-YIRISNO R0 K1,1N
l 7 PARK P ACE 51 a.2 .6 fik10 'IIP CARI SRAll iRVItiH SAN LUIS OBISPO
t I RICHF
MOND, CAI IORNIA 94801 St0.23G.34R0 FAX PORI UOI.LINti } AI M SPRINGS S011l11 SAN I'RANCISCO
October 7, 2011
Leslie Blomquist, Associate Civil Engineer
City of San Rafael Department of Public Works
111 Morphew Street
San Rafael, California 94901-5508
Re: Augment Request for the NTPP — Puerto Suello Hill Path to Transit Center Connector
Project, San Rafael, Marin County, California (LSA #CSR1101)
Dear Ms. Blomquist:
Per your request, LSA Associates, Inc. (LSA), has prepared this budget augment to address out -of -
scope tasks that are not included in the original agreement between the City of San Rafael and LSA
for the above -referenced project. These tasks were the result of project review and consultation with
the California Department of Transportation (Caltrans) to determine the methods and approach for
archaeological testing in the project area. As a result of this coordination, the archaeological testing
now has two components: (1) truck -mounted coring; and (2) hand excavation. The tasks outlined
below, and the associated costs, are needed to implement both of these approaches.
• One additional day of fieldwork for a crew of two people to undertake and process hand
excavations, $2,080.00.
• One -and -a -half days of field director and Native American monitor time to implement truck-
mounted coring, $1,360.00.
• Increase in truck -mounted coring budget due to expanded scope of sampling (was $3,600.00,
now $5,237.00), $1,637.00.
• One day of screening and processing of cores at LSA laboratory for two people for one day
(plus Native American monitoring), as well as one half-day for a soils scientist to review the
samples, $2,220.00.
• Pre -field coordination and project management of the additional tasks, $780.00.
The total augment request for the out -of -scope costs described above is $8,077.00. Enclosed is a
spreadsheet containing a breakdown of the hours, staff, and billing rates for each of these tasks.
Please let us know what additional information you may need to process this augment. Thank you.
Sincerely,
LSA ASSOCIATES, INC.
P L.P, N1NG F:N IRONMINFA: S, I NGES DESIGN
LSA ASSOCIATES, INC.
Andrew Pulcheon
Associate/Cultural Resources Manager
PROFESSIONAL SERVICES AGREEMENT/CONTRACT
COMPLETION CHECKLIST AND ROUTING SLIP
Below is the process for getting your professional services agreements/contracts finalized and
executed. Please attach this "Completion Checklist and Routing Slip" to the front of your
contract as you circulate it for review and signatures. Please use this form for all professional
services agreements/contracts (not just those requiring City Council approval).
This process should occur in the order presented below.
:Responsible
t:E.
Description
Completion
Department
Date
I
City Attorney
Review, revise, and comment on draft
agreement.
2
Contracting Department
Forward final agreement to contractor for
their signature. Obtain at least two signed
originals from contractor.
3
Contracting Department
Agendize contractor -signed agreement for
Council approval, if Council approval
necessary (as defined by City Attorney/City
Ordinance*).
4
City Attorney
Review and approve form of agreement;
-ft,
bonds, and insurance certificates and
endorsements.
5
City Manager 1 Mayor or
Agreement executed by Council authorized
Department Head
6
--official.
City Clerk
City Clerk attests signatures, retains original
agreement and forwards copies to thena
4s
contracting department.
To be completed by Contracting Department:
Project Manager: Project Name 41Y
01 01
Agendized for City Council Meeting of of necessary):
If you have questions on this process, please contact the City Attorney's Office at 485-3080.
* Council approval is required if contract is over $20,000 on a cumulative basis.
CITY OF SAN RAFAEL
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRCC AGENDA ITEM NO.
DATE OF MEETING: November 7, 2011
FROM: Nader Mansourian
DEPARTMENT: Public Works
DATE: November 2, 2011
FILE NO.: 16.01.241.05
TITLE OF DOCUMENT: Resolution authorizing the Director of Public Works to amend an agreement for
professional services with LSA Associates for additional cultural resource services on the Non -Motorized
Transportation Pilot Program (NTPP) Puerto Suello Hill Path to Transit Center Connector Project (Federal
Aid Project Number NMTPL 5043(023); City Project Number 11115) in the amount of $8,077.
Department Head (signature)
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL / AGENCY
AGENDA ITEM:
City Manager (signature)
F -Al all a 0*0 0 NXTAIM 11611 a] M &
City Attorney (signature)