HomeMy WebLinkAboutPW Retrofit Loan Program; PG&EAgenda Item No: 3 d
Meeting Date: Nov 7, 2011
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: �� -- City Manager Approva
Director of Public Works (LB)
File No.: 18.01.74; 06.01.191
SUBJECT: RESOLUTION AUTHORIZING APPLICATION FOR THE ENERGY EFFICIENCY
RETROFIT LOAN PROGRAM AND AUTHORIZING THE PUBLIC WORKS
DIRECTOR TO SIGN A FINANCING SUPPLEMENT WITH PACIFIC GAS &
ELECTRIC COMPANY (PG&E).
RECOMMENDATION: Adopt resolution.
BACKGROUND:
Over the last few months the Department of Public Works, working closely with representatives from the
Pacific Gas and Electric (PG&E) Company, has identified three specific projects that can save energy for
the City over a period of time.
The City of San Rafael currently maintains and operates over 4,400 high pressure sodium street lights and
four parking garages within the downtown area which utilize varying types of safety lighting including
metal halide, high pressure sodium, etc. Conversion of the safety and street lighting to Light Emitting
Diode (LED) will greatly reduce the City's energy consumption.
In addition, the City previously received a grant for the replacement of the existing Heating, Ventilation
and Air Conditioning (HVAC) unit in City Hall which, when replaced with a new updated model, will
reduce energy usage at this facility. The HVAC equipment has been purchased and the installation cost
exceeded the project budget when recently bid.
The City projects noted above qualify for the Energy Efficiency Retrofit Loan Program funded by
California utility customers and administered by PG&E. The Program provides PG&E customers with a
means to finance energy-efficient retrofit projects. The loans issued under this Program are interest-free,
in order to reimburse PG&E customers for the costs they incur in connection with a qualified retrofit
project. Loans are generally paid back over a ten year period from energy savings, and are calculated by
dividing the loan amount by the estimated monthly energy savings resulting from the project.
Combining the garage safety lighting replacement with the City Hall HVAC project would provide the
necessary energy costs savings in order to fund the installation of the LED garage lighting and cover the
FOR CITY CLERK ONLY
File No.: Z4 —
Council Meeting: I t 11
Disposition:°" .
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
remaining construction costs for the HVAC installation. The street light retrofit project qualifies for
funding as a separate project. Each of these proposed projects are in accordance with the City's Climate
Action Change Plan of which Building Program 5 proposes to achieve energy savings in existing
buildings and facilities.
If approved, the total of both retrofit projects (street lighting, garage safety lighting & City Hall HVAC)
will save the City approximately 350,000 kWh each year for a total annual cost savings of approximately
$54,000. This will allow for a maximum loan amount of approximately $540,000 to be paid back over a
10 year period. After 10 years, the annual energy cost to the City will be reduced by the $54,000. The
attached Resolution authorizes the Public Works Director to apply for a loan from PG&E for the projects
mentioned.
ANALYSIS:
Submittal of the Loan Supplement Application will allow PG&E to proceed with the process of allowing
the City to secure an Energy Efficiency Retrofit Loan.
FISCAL IMPACT:
No money from the City is required for this loan. If approved, the City will be reimbursed for all
construction costs associated with the retrofit projects up to the maximum loan amount per project. The
City will repay the loan using energy cost savings over 10 years with no fees and zero percent interest. If
approved the City shall secure the loan amount prior to starting any construction for these projects.
ACTION REQUIRED: Adopt Resolution
Enclosures (2)
1. Resolution
2. Financing Supplement to the Energy Efficiency Retrofit Program Application
RESOLUTION NO. 13256
RESOLUTION AUTHORIZING APPLICATION FOR THE ENERGY EFFICIENCY
RETROFIT LOAN PROGRAM AND AUTHORIZING THE PUBLIC WORKS
DIRECTOR TO SIGN A FINANCING SUPPLEMENT WITH PACIFIC GAS &
ELECTRIC COMPANY (PG&E).
WHEREAS, the City of San Rafael maintains and operates over 4,400 high pressure
sodium street lights; and
WHEREAS, the City of San Rafael maintains four parking garages with safety lighting;
and
WHEREAS, the City of San Rafael City Hall Building utilizes a Heating, Ventilation
and Air Conditioning unit; and
WHEREAS, replacement of the street and safety lights with LED fixtures will reduce
energy and save on utility costs; and
WHEREAS, installing a HVAC chiller unit in City Hall will reduce energy and save on
utility costs; and
WHEREAS, Energy Efficiency Retrofit Loan Program is funded by California utility
customers and administered by Pacific Gas and Electric Company (PG&E); and
WHEREAS, the loans issued under the Program are interest-free, unsecured loans to
reimburse PG&E customers for the costs they incur in connection with a qualified retrofit
project; and
WHEREAS, in order to receive assistance, the City must sign a Financing Supplement
Application with Pacific Gas & Electric (PG&E).
NOW, THEREFORE, IT IS HEREBY ORDERED AND RESOLVED that the
Director of Public Works is authorized to apply for such loan and sign the Financing Supplement
to the Energy Efficiency Retrofit Program Application.
IT IS FURTHER RESOLVED that the Director of Public Works is hereby authorized
to take any and all such actions and make changes as may be necessary to accomplish the
purpose of this resolution.
1, ESTHER C. BEIRNE, City Clerk of the City of San Rafael, hereby certify that the
foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the
Council of said City held on the 7`h day of November, 2011, by the following vote, to wit:
AYES: COUNCIL MEMBERS: Brockbank, Connolly, Heller, Levine & Mayor Boro
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
ESTHER C. BEIRINE, City Clerk
File No.: 18.01.74; 06.01.191
The Energy Efficiency Retrofit Loan Program (the 'Frogram1isfunded
byCalifornia utility customers and administered byPacific Gas and
Electric Company WOW under the auspices ofthe California Public
Utilities Commission (CPUC|.The Program provides qualified PG&E
customers with ameans mfinance energy-efficient H)retrofit projects
implemented under select PG&E EEPrograms [the "Qualified
Pmgram^LThe loans issued under the Program are intne$-fpee.
unsecured loans tnfully orpartially reimburse qualified PG&E
customers for the costs they incur inconnection with aqualified retrofit
project (the "Retrofit Pnojeci^).which term shall mean the energy
efficiency retrofit project described inCustomer's relevant Energy
Efficiency Program Application.
`
Conditions for EUg|b|i��Participation inthe Program islimited tn
PG&E customers that meet the following conditions and satisfy
these condihonsthroughout the duration cfthe Retrofit Project opW
and including the date dFinal Verification (defined below mSection
8i(a}the PG&E customer must beabusiness ('Commerciai
Cugnmer")nrafederal, state, county orlocal government agency
('GmemmentCugomor"[`Commercial Customers and
Government Customers are collectively referred has^Customer;'
<b)Custnmercurren/lyne:c|vcssvrvicefromPS&Eat|hclocahonof
the Retrofit Project (the 'Lorationl;(c)Customer has continually
maintained anactive PG&E account for the previous 24months and
has aminimumdl2months ofhistorical metered energy usage at
Customer's current Location; W|at the time the Customer's
Program Application isApproved and Customer's Loan Agreement is
executed, and atthe time the can istobefunded following
completion ofthe Retrofit Project and satisfaction ofall other
requirements ofthe Loan Agreement, Customer must bningood
credit standing, cadetermined byPG&E through credit review which
may include acommercial credit check and abill history review,
which may bebased upon the following and other criteria:
m.No24'hourdisconnection notices inthe last l2months;
b.Nareturned payments within the last l2months;
c.Nnmore than 1 payment arrangement inthe last 12months,
d.Nobroken payment arrangements within the last l2months;
e.Nodeposit assessed within the '�astl2months; and
t The Retrofit Project qua0icsand Customer is eligible for
anincentive under the QuaUfiedProgram.
Loan Features: The loans offered under the Program are interest-
free 0%|andfmnofonyfees.labpaymentpenaWcsorother
charges. The loan terms and conditions are set toprovide simple
payback from energy savings during the maximum allowed loan
term, and are calculated bydividing the loan amount (eligible project
cost less Qualified Program Incentives) bythe estimated monthly
energy savings resulting from the Retrofit Project. The ensuing
number ofmonthly payments must not exceed the Maximum Loan
Term set forth inchart below ("LoanAmount and Term Limitahons^).
EUg|b|Uty'Prior topurchasing and installing any energy-efficient
measures nrequipment under the QuaiifirdProgram, Customer
must satisfy the eligibility requirements ofboth the Program and
Qualified Program. Because energy efficiency projects inpmgmss
are ineligible under the Program, Customer must have aninspection
ofthe Retrofit Project and Location conducted and completed by
PG&E before commencing any work orpurchasing any equipment
for the Retrofit Project.
|nmpectiun'PG&E wilt assist Customers inunderstanding the energy
efficiency measures available under the Qualified Program and will
answer their questions concerning this Program. After Customer
has decided upon the measures that comprise the Retrofit Project,
PG&E wilt request anengineering review, perform aninspection vf
the Location, calculate the Loan Terms and prepare the Loan
Documents. Thereafter, PG&E will provide Customer with acopy of
the inspection report, aLoan Agreement, thcAppUcadnn.the
applicable On'BKiFinancing (0BHGas and/or Electric Rate
Schedule �Calculation
[collectively,
' Loan Dncumentsl.
Loan Documents' If the terms nfthe loan are acceptable, Customer
shall execute the Leon Documents and return them tnPG&E prior m
the commencement of the Retrofit Project. Incomplete orincorrect
applications cannot beprocessed and may rcsu�inthe delay nf
PG&E'sapprmvaiand possible disqualification from the Program.
Customer maywithdrawthis Application for any reason without
penalty bysmdingwritten notice toPG&E
Customer's Responsibilities for Contractor andVendor'Upon
PS&E'snotification toCustomer that the Retrofit Project iseligible
for the Program, Customer may begin the Retrofit Project pursuant
bzthe contract a8nyeduponbyCustomer, itscontractor nr`endoc
PG&E does not endorse orrecommend any particular cont -actor pr
vendor nordoes PG&E review any contractor orvendor proposals.
Rather, Customer shaUbesoLelynasponsible for reviewing the
easib|Uty ofthe contractor's and vendor's pmpoyaUdand verifying
,heir respective qualifications, pricing, energy savings.wermnhes
and the terms and conditions of the mntroctor'sand/or vendor's
contractwithCustnmer
°Resiuenualcustomers are inemg.Nc.
Page 1of2
PF Disclailer: CUSTOMER'S DESIGN OF THE RETROFIT
PROJECT AND SELECTION AND USE OF ENERGY EFFICIENCY
EQUIPMENT, MEASURES AND SELECTION OF CONTRACTORS AND
VENDORS IS AT CUSTOMER'S SOLE DISCRETION AND AT
CUSTOMER'S SOLE RISK. TO THE EXTENT PERMITTED BY
APPLICABLE LAW, PG&E EXPRESSLYAND SPECIFICALLY
DISCLAIMS ANY LIABILITY IN RESPECT OF ANY ADVICE,
INFORMATION OR OTHER INSTRUCTION PROVIDED BY OR ON
BEHALF OF PG&E TO CUSTOMER IN CONNECTION WITH THE
QUALIFIED PROGRAM, PROGRAM OR RETROFIT PROJECT. PG&E
DOES NOT WARRANT OR BEAR ANY RESPONSIBILITY FOR ANY OF
THE FOLLOWING:
a, THE WORK PERFORMED BY CUSTOMER'S CONTRACTOR(S) OR
VENDOR(S), THAT THE RETROFIT PROJECT IS APPROPRIATE FOR
THE LOCATION;
b_ THE RETROFIT WILL RESULT IN OR YIELD ANY ENERGY
EFFICIENCY SAVINGS OR A SPECIFIC AMOUNT OF ENERGY
EFFICIENCY SAVINGS OR OTHER REDUCTION IN CUSTOMER'S
PG&E UTILITY BILL AFTER COMPLETION OF THE RETROFIT
PROJECT;
c.THE CONTRACTOR'S OR VENDOR'S SERVICES WILL BE TIMELY,
COMPLETE OR ERROR -FREE, OR THAT DEFECTS IN THE RETROFIT
PROJECT WILL BE CORRECTED BY SUCH INDIVIDUALS;
da ANY ERRORS, OMISSIONS, DEFECTS OR DELAYS IN THE DESIGN
OR CONSTRUCTION OF THE RETROFIT PROJECT OR THE
OPERATION OF ANY ENERGY EFFICIENCY MEASURES INSTALLED
AT THE LOCATION,
Verification: Upon completion of the Retrofit Project, Customer shall
request PG&E's post -completion inspection and final verification that
the Retrofit Project has been completed in conformity with the
requirements of the Qualified Program and that customer remains
eligible (the "Fina[ Verification").
x If there has been any change to the Retrofit Project's scope, cost
and/or incentives available under the Qualified Program or energy
savings, Customer will be required to enter into a Loan Modification
Agreement with PG&E, which may include new contract terms
reflecting the changes in the Retrofit Project. Of a Loan Modification
Agreement is required, it shall be deemed part of the "Loan
Documents."
b, If the changes to the Retrofit Project are such that it no longer
meets the Program's payback criteria or other conditions, the
Retrofit Project will be considered ineligible, the Loan Agreement wilt
be terminated and no loan proceeds wilt be disbursed.
c. IF PG&E DETERMINES, IN ITS ABSOLUTE DISCRETION, THAT
CUSTOMER'S CREDIT HAS DETERIORATED OR HAS OTHERWISE
PLACED CUSTOMER'S REPAYMENT OF THE LOAN AT RISK, THE
LOAN PROCEEDS SHALL NOT BE ISSUED, EVEN THOUGH THE
RETROFIT PROJECT MAY HAVE BEEN SATISFACTORILY
COMPLETED AT CUSTOMER'S EXPENSE.
Disbursements! Subject to and following PG&E's satisfactory Final
Verification, an incentive check and the loan proceeds wilt be issued
to Customer or, at Customer's written direction, to Customer's
contractor or vendor.
General Provisions-,
. Applications for loans under the Program wilt be accepted from
qualified Customers on a first-come, first-served basis until the
funds allocated by PG&E for the Program are no longer available.
The Program may be modified or terminated by the CPUC or PG&E
at any time and without prior notice. However, termination of the
Program following execution of a Loan Agreement by Customer wit[
not affect that Loan Agreement, or, if Customer thereafter satisfies
all Program conditions, the disbursement.
b, The loan proceeds may only be used to pay or reimburse
Customer for implementing or installing energy-efficient measures
or equipment through the Qualified Program.
co If there is any conflict between the terms of any document relating
to the Program, the Loan Documents shall control.
ds For all retrofit projects, including but not limited to streetlight,
HVAC and lighting retrofits, Customer acknowledges and
understands that Customer is able to use the installation vendor or
contractor of their choice.
have read, understand and agree to all of the Energy Efficiency Retrofit Loan Program requirements and terms and conditions set forth
in this Program description. I understand that loan calculations will be based on pre -inspection results and on the applicable program
documentation, and that my agency/company must meet all eligibility criteria and requirements in order to participate in the Program.
Any unapproved changes to project scope, costs or run hours, or to my agency's/company's creditworthiness, between the time the Loan
Documents are accepted and signed and the Retrofit Project is completed and the project's and my agency's/company's continued eligibility
are verified, could result in loan ineligibility.
Legal Name of Business ti.e., the formal name on your tax return) Authorized Representative's Printed Name
Authorized Representative's Signature Title Date
Tax identification information (select one):
❑ Federal Tax 10 Number:
Ella Social Security Number:
FOR PG&E USE ONLY:
PG&E OSP Administrator Printed Name Cate
Retrofit Program Application Number
oBF Application Number
'oG&Erefers to PaO:c Gas and Eiectre company, a subs -dSary of PG&E Corporation, C201 1 PacJe Gas and Electric Compa^y. At[ rights reserved_
These offerings are funded by C -tl ornia utility customers and administered by PG&E under the auspices of the C . °ornEa Panic t,rOizies ommiss en.
{ PG&E prints its materials who soy based #nks6lon recycled paper.10 Apnt 2011 CTM -0710-0650
Page 2 of 2
0
CITY OF SAN RAFAEL
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRRA / SRCC AGENDA ITEM NO.
DEPARTMENT
Nader Mansourian
Public Works
DATE: 11/2/2011
TITLE OF DOCUMENT:
DATE OF MEETING: 11/7/2011
RESOLUTION AUTHORIZING APPLICATION FOR THE ENERGY EFFICIENCY RETROFIT LOAN
PROGRAM AND AUTHORIZING THE PUBLIC WORKS DIRECTOR TO SIGN A FINANCING SUPPLEMENT
WITH PACIFIC GAS & ELECTRIC COMPANY (PG&E).
Department Head (signature)
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL/ AGENCY
AGENDA ITEM:
City Manager (signature)
City Attorney (signatu41