SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
F r g
Prepared by:�,�" City Manager Approval
roval•
11-��,� Director of ublic Works
File No. 06.08.12
SUBJECT: ACCEPT COMPLETION OF THE FIFTH AVENUE AND LOOTENS PLACE
PARKING LOT IMPROVEMENTS PROJECT, CITY PROJECT NO. 11181,
AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF
COMPLETION.
RECOMMENDATION:
Staff recommends that the City Council accept completion of the project and authorize the City Clerk to
file the Notice of Completion.
BACKGROUND:
The parking lot located at the intersection of Fifth Avenue and Lootens Place was originally constructed
in 1974. This parking lot is heavily used and was showing significant signs of deterioration to the point
that a complete resurfacing of the lot was needed. Under the Americans with Disability Act (ADA),
asphalt resurfacing triggers the requirement to install improvements to make the facility fully accessible
to the public including a path of travel from the sidewalk. In addition to resurfacing, this project
addressed the following issues:
Americans with Disability Act Compliant Parking Spaces
Two accessible parking spaces were installed, as required by ADA. One of the spaces is van accessible.
Safety Lighting
A light emitting diode (LED) lighting fixture was installed, replacing the existing high pressure sodium
fixture. This change is in accordance with program BU5 of San Rafael's Climate Change Action Plan
(CCAP) which states: "Develop a program to achieve energy savings in existing buildings with a goal of
decreasing energy use by 20 percent as of the year 2020." A second LED safety light was installed on the
east side of the lot to increase illumination at night.
Electric Vehicle Charging Station
An electric vehicle charging station, available at no charge to the public, was installed. This improvement
is in accordance with program LF8 of San Rafael's CCAP which states: "Encourage ownership of plug-in
electric vehicles, as they become available and in use, by providing charging stations in City garages and
FOR CITY CLERK ONLY
File No.: 4 - I ,.
Council Meeting: Lfbo/ . 9.x.
Disposition: a f P���?��t���rs� .
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
parking lots, consider requirements for charging stations in newly constructed private parking facilities,
and participate in regional efforts to encourage widespread availability of charging stations."
Landscaping
Based on the geometry of the reconstruction of the parking lot, four trees were removed and three new
trees were planted to mitigate the removals. It was not possible to install a fourth tree given the new
layout of the parking lot.
Other Improvements
Other improvements to the lot included resurfacing of the entire parking lot, reconstruction of the
driveway approach from Fifth Avenue, installation of an ADA compliant curb ramp at the southwest
corner near the parking lot entrance, drainage improvements, installation of a wood retaining wall, and
replacement of the existing pay station.
The project was advertised in accordance with San Rafael's Municipal Code on July 9, 2014, and sealed
bids were publicly opened and read aloud on August 4, 2014. On August 18, 2014, the City Council
adopted a resolution authorizing the Public Works Director to enter into an agreement with the low
bidder, Coastside Concrete. Construction commenced on September 15, 2014.
Construction was completed on December 17, 2014. The total project cost, including public outreach,
advertisement, and construction, is $272,017.10 as shown below. A total of $26,600.00 is being withheld
from the contractor for liquidated damages.
FUNDING SOURCES
Project Funding Sources
CIP Allocation Amount
Parking Services Fund
$340,000.00
Total Available
$340,000.00
EXPENSES
Design Services Costs
Amount
Document reproduction (i.e., advertisement, public outreach flyers)
$3,301.16
Topographic survey
$3,800.00
PG&E electrical connection services
$1,322.34
Design Service Subtotal
$8,423.50
Construction Costs
Amount
Actual construction contract amount based on measured quantities*
$281,410.00
Contract change orders*
$2,609.00
Material testing
$2,620.10
Contract construction inspection
$3,032.00
Legal services
$522.50
Amount withheld for liquated damages
-$26,600.00
Construction Costs Subtotal
$263,593.60
Total Project Expenses =
$272,017.10
*Includes the 5% retention to be paid 35 days after Notice of Completion is filed.
The project design was completed by Department of Public Works engineering staff at an approximate
cost of $16,500.00. Public Works staff provided additional construction management at an estimated cost
of $69,600.00. The total estimated staff cost of $86,100.00 is not shown in the tables above.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
The following summarizes the project milestones and working days:
Working Non-Workin
Item Date Da
vs Days
Date of Contract
August 18, 2014
- -
Date of Notice to Proceed
September 9, 2014
- -
Construction Work Commencement
September 15, 2014
- -
All Work Complete (Including Punch List Items)
December 17, 2014
- -
Working Days Allowed by Contract
30 -
Working Days Allowed by Change Order / Extra
Work
2 -
Non -Working Das Due to Weather
- 11
Non -Working Das Other Than Weather
- 12
Actual Working Days Allowed
32 -
Actual Working Das Used
55** -
**Liquidated Damages are being withheld.
Staff recommends acceptance of the project and recordation of the Notice of Completion.
ANALYSIS:
Pursuant to Civil Code Section 3093, the City is required to record a Notice of Completion upon
acceptance of the improvements by the City. This acceptance initiates a time period during which project
subcontractors may file Stop Notices seeking payment from the City out of the funds owed to the
Contractor for the project work.
ACTION REQUIRED:
Accept completion of the Fifth Avenue and Lootens Place Parking Lot Improvements Project, City
Project No. 11181, and authorize the City Clerk to file a Notice of Completion.
Enclosures: Notice of Completion
Record Without Fee,
Per GC 27383 and
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
2015-0019131
Recorded I REC FEE 0.00
Official Records I
County of I CONFORMED COPY 0.00
Marin I
RICHARD N. BENSON I
Assessor -Recorder I
County Clerk I
02:20PII 24 -Apr -2015 I Page 1 of 2
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 17th day of December, 2014 and accepted the 20th day of
April, 2015; that the name, address and nature of the title of the parry giving this notice is as follows:
The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement; that said work or improvement is described as follows:
FIFTH AVENUE AND LOOTENS PLACE PARKING LOT IMPROVEMENTS
CITY PROJECT NO. 11181
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
COASTSIDE CONCRETE
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on �,� , 20IS .
CITY OF SAN RAFAEL
A Municipal Corporation
By
KEVIN MCGOWAN
Acting Public Works Director
A notary public or other officer completing this certificate verifies
only the identity of the individual who signed the document to
which this certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF MARIN
Subscribed and sworn to (or affirmed) before me on this ZW9 day of 40.el L ,
20j�', by 4evw 4%14&PLaA&v , proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me.
WITNESS my hand and official seal.
Signature 'e�• gat
ESTHER C. BEIRNE
San Rafael City Clerk
File: 06.08.12
CITY OF SAN RAFAEL
ROUTING SLIP / APPROVAL FORM
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OFA CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRRA / SRCC AGENDA ITEM NO. 1.h
DATE OF MEETING: April 20, 2015
FROM: Kevin McGowan
DEPARTMENT: Public Works
DATE: April 7, 2015
TITLE OF DOCUMENT:
ACCEPT COMPLETION OF THE FIFTH AVENUE AND LOOTENS PLACE PARKING LOT
IMPROVEMENTS PROJECT, CITY PROJECT NO. 11181, AND AUTHORIZE THE CITY CLERIC.
TO FILE THE NOTICE OF COMPLETION
n
Department Head (signatu e)
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL / AGENCY
AGENDA ITEM:
City Manager (signature)
NOT APPROVED
REMARKS:
APPROVED AS TO FORM:
City Attorney (signature)
File No. 06.08.12
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 17th day of December, 2014 and accepted the 20th day of
April, 2015; that the name, address and nature of the title of the party giving this notice is as follows:
The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement; that said work or improvement is described as follows:
FIFTH AVENUE AND LOOTENS PLACE PARKING LOT IMPROVEMENTS
CITY PROJECT NO. 11181
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
COASTSIDE CONCRETE
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on , 20
CITY OF SAN RAFAEL
A Municipal Corporation
By
KEVIN MCGOWAN
Acting Public Works Director
A notary public or other officer completing this certificate verifies
only the identity of the individual who signed the document to
which this certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF MARIN
Subscribed and sworn to (or affirmed) before me on this day of ,
20, by , proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me.
WITNESS my hand and official seal.
Signature
ESTHER C. BEIRNE
San Rafael City Clerk
File: 06.08.12