HomeMy WebLinkAboutCC Resolution 11264 (Emergency Dispatch Center; Hannum Assoc.)RESOLUTION NO. 11264
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
RAFAEL AUTHORIZING THE EXECUTION OF AN AMENDMENT TO
THE AGREEMENT BETWEEN THE CITY OF SAN RAFAEL AND
HANNUM ASSOCIATES TO COVER ADDITIONAL SERVICES TO
PROVIDE BOTH ARCHITECTURAL AND ELECTRICAL CHANGES
FOR THE CONSTRUCTION OF AN EMERGENCY DISPATCH CENTER
FOR THE FIRE DEPARTMENT AND AUTHORIZING THE PUBLIC
WORKS DIRECTOR TO SIGN.
THE COUNCIL OF THE CITY OF SAN RAFAEL HEREBY RESOLVES AS
FOLLOWS:
The Public Works Director and the City Clerk are hereby authorized to execute, on behalf
of the City of San Rafael, an Amendment to the Agreement between the City of San
Rafael and Hannum Associates to provide additional services, both architectural and
electrical changes, for the construction of the Emergency Dispatch Center for the Fire
Department. A copy of the Amendment to the Agreement is attached hereto and by this
reference made a part hereof. The form of the Agreement shall be subject to the approval
of the City Attorney.
I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing
resolution was duly and regularly introduced and adopted at a regular meeting of the Council of
said City on the 18`h day of February, 2003, by the following vote, to wit:
AYES: COUNCILMEMBERS: Cohen, Heller, Miller, Phillips & Mayor Boro
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
JEAIrM. LEONCINI, City Clerk
File No.: 06.01.156
AMENDMENT TO AGREEMENT
FOR PROFESSIONAL SERVICES
TO COVER ADDITIONAL SERVICES TO PROVIDE BOTH
ARCHITECTURAL AND ELECTRICAL CHANGES FOR THE CITY OF SAN
RAFAEL EMERGENCY DISPATCH CENTER AND OFFICES FOR PARKING
MANAGEMENT SERVICES AT 1033 "C" STREET
This Amendment to the original Agreement is made and entered into this
24th day of January, 2003, by and between the CITY OF SAN RAFAEL and HANNUM
ASSOCIATES.
This Amendment covers increasing the original contract budget amount of
$47,750.00 by approximately $6,500.00 for additional services for changes to electrical
and tel/data requirements for parking and dispatch and also architectural changes.
All the additional work will be in accordance with the attached proposal
dated December 18, 2002 and attached herein as "Attachment A".
CITY OF SAN RAFAEL
z I ///Z �� -
Director of Public Works
ATTEST:
l�.
?1tjClerk
CONTRACTOR
Hannum Associates
By:
Title: +aY
File No. 06.01.156
T�tq V
- ATTACHMENT A
.
.,U Q A U T H O R I ;! A T I O N # 1
M0JECT NO.:
00204210;05
23 December 2002
DATE:
City of San Rafael clo Bob Marcucci
OWNER:
City of San Rafael Emergency Dispatch Cerner
PROJECT.
LOCATION:
1033 C Streit
San Rafael, CA 94901
OF WORK
Additional Services for work as requested by the Owner for changes to electricalSCOPE
requirements for parking and disPam changes to disp'* and dorm
and teUdata
roflul tayoum, ch=rgp` to parking enforcement layout and millwork locations.
front adsulsg IT roam, and
documentation of routing of new 4-3" conduits
with City of Sas' Rafael's IT te9data consultant Dan White.
ongoing coordination
DATE REQUESTED:
19 December 2002
REQUESTED BY:
Bob Marcucci
Hannum Associates Additional Services 3,500.00
3
�`S.
C&B Consulting Engineers;
Tod $ 6.500.00
RETAINER NIA
APPROVAL SIGNATURES: Bob Marcucci
DATE:
DATE: ' fj*
COPY
r.�sno�t�oocn9aloosuumi-oat..., I eoc
tJaAM ORATE INTERIOR DESIGN
Cn�txdal S 5 / A v CHIT9CTU RE / CORP
H N N U H A 5 5 0 C I A 7 E R A f A E L
- .0—TER STREET, SUITE 40�, SAN FRANCISCO, CA 94 108 / SELAtiI N6�6.0100 FAX 415.6ti6,011
a A >d C I 5 C O
.L' �'�• U ! �U. b UL'L I I LU-YVY-5117: AEA k41HI IIN'H WI INKiHW
w
H A
ri
y4
C:l
00,
r
C3, C3,
w! Ct
C4
rx
U
bb
qr
16
C
H I T E T U R E
CORPORATE 1r4 I
646.010() R FAX 415,646-0 1 II
A
H A N N U ti A 0 1 A T I SAN FRANCISCO- CA
TEI. 1 5
4 1 00 R A A B
A N
222 SUTTER STREET, 5 U I T E 440.C� 5 0
N
1 s
-
A
Doc Y9 02 0+4:27P
TO: Hanum
C6,0 zon5%At i ng Eng i neer
>: •41 f &7-799,3:,P.1
M E3 CE3NSUL` ING ENGINEERS
449 le Street, San Francis=, CA 94103.4303
----
DHANGE ORDER REQUEST
-DATE:
ATTN: Janine Moss
C'j"G
L1 Confirmation of Fee
17 Confirmation of Service
13 Design
December 18.2002
RE: San Rafael Dispatch
CSFB JOB NO. 1021`16
San Rafael Disoatch
D Post design
❑ Revision
® Additional Service
This is to: Secy or �nsultabon
® Confirm your verbalmMit�en request to provide you with engineering
for the above referenced project.
p Advise you of addrt nN ser vices neccoDary to cs�*'Npte the work for the above project
Service to be provided: Add performance specifications for sprinlder system to drawings
Fee: D Hourly to a maximum of
❑ Hourly ® Fixed fee of
O Hourly with a budget of % complete)
® Reimbursable expenses @ 1.1 f g11 b Y
Invoices Val be sent to YOU monthly as WO* progresses and Payment is expected within 30 days
I
from date'of invoke•
as r authorization to proceed with the v rk and as accepltanee
Please sign and return one copy you
of our fee, and/or aanowledgement of additional services to complete work for the project.
By; Kathleen Morelocl: on Agreed and approved by:
Behalf of IGOR
TARTAKOVSKY
C&B Consulting Engineers
Date: 12118102 Date:
COPY
Citi Cprrwifi rg En0la8rs prdsr�prldnla�.Doc
S.VM 20=2116 -San RaW D.VGM QMW
bc.:nT Q,",.K uPf T.T.Tn-QhA-gTV:X?A
page 1 of 1
De=Mber 18, 2002
C11 HT'1nCCH I.InAIKIHu
Dec 1s
d L:OlSsul'11.'iTt� tn6i nCors r.
449 10" Sheet, San Fraixasco, CA 94103-4303 _ ._..,- --•—_
� PF�ns: 4f 15�.�3Z7�30.�•a�G-i41�i437�r�3 ---,—. - -•- --
CHANGE ORDER REQUEST
TO: Hanum
Fa)c jL% ug&.
ATTN: Janine Mass
CXANGE': I Owner Changes
0 Confirmation of Fee
0 Confirmation of Service
0 Design
DATI=: December 18, 22002
RE: San Rafael Dispatch
C&D JOB NO. 102116
D Post design
q Revision
0 Additional Service
This is to: .
® Corrffrm your Ycrbaitwrittcn i"cqucat to prvvido you with onginooring corviooa or convuitmbon
for the above referenced project
E3 Advise you of additional services necessary to complete the work for the above project.
SeNfc3 to be onwided:
As requested, we have revised our scope so as to reduce our fee.
Provide a separate panelboard for the parldng services area receptacles and lighting and revise
circuiting and electrical single line accordingly.
Dispatch area: Revise device layouts and circuiting in the dispatch area based on new architectural
bac!Qmunds showing revised console configuration. Revise light fbdure layout, circuiting and title
24 cadulations for new,iight fbdure layout fused on new architectural reflected ceiling plan;
Add conduit for owner provided telecom/911 system cables and revise conduit routing;
't is --m fir slc
FoomfganeFater- reem and r. cement conduit routing on an architectural scaled skemstic plan
offiro ctation-baced on srchkKlurdl direction and written marls ups from the ownertarrhite-0
Incorporate other miscellaneous changes to plans including add dimming for dispatch area lights
and ry�. And provisions
(conduit„ci uit, backbox)1br keypad/auto door as directed. We -will provide backboxes fora strobe
in each sleep rooms and conduit hack to the tele/data room so that the owner may instafi and
connect a system that Winks the strobes when a 991 ca# is r+eoeived.
This proposal assumes no change in direction we have receNW. regarding the UPS equipment
spoons or design vW1 occur but sGme items may be ar,�tkWz" IF "n_t in 3GA#Re #fee
ME Consulting Engineers page 1 of 2
SA -ft 2D0=116&San Ratan Dispatch CenWA0znmsowxknca%GmdE_Ch=W Ordee(0 PY December 18, 2002
90'd bS:OT 20, 6 1JPf TTTO-9b9-STb:xp I �; H7lnccu i.in�i�wu
EngS P.
Dar, .3 .
De�6.02.12:19p
6.8 GanSUIZing neer
The owmermay choose fa direct the aontractarto eliminated
certain items from the bid such as the UPS by OirecOng the cortftc or of the (flim of M paf Mb
direction received from the UPS vendor.-
_ Note: Proposal for sprinkler system perforMMM spAc tcation `AM be cont xparatdy. No
changes to the mechanical plans are induded.
Fee:
❑ Hourly
❑ Hourly with a budget of
® Reimbursable expenses @ 1.1
fl ldcx,rly ICS 0 m2?dmum of
® Feced fee of go00
(BRI by % complete)
4..,th& mdelf ftm the W fawn•
.For OM -Eft s IML�... w� ..�.•��i�� Ld1:500 ar,
Invoices will be sent to you monthly as worts prognoses and payment Is expected within 30 days
from date of invoke.
Please sign Pari rr4yrn QnQ copy w your auth to proc%W with tM MOR Md as acceptance
of our fee, and/or adm M+iedgement of additional services to complete work for the project.
By. Kathleen Nlorelock
co Consulting Engineers
Date: 12/18/()2
Agreed and approved by:
Date:
CRB CamMkig Engfrs e,.
S:4t� 2o0ZW¢116San Rsfaml p'sPaech I�eIE tysa� Ot�7erZDoe
zn'd SS:4T 24. 6 uer TTTO-9V9-STb:xPJ
Page 2 of 2
December 18. 2002
S31HI')OSSH wnNNHH