HomeMy WebLinkAboutFin Budget Review FY2010-11 (2)Agenda Item No: 18 Meeting Date: June 21, 2010 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: FINANCE DEPARTMENT Prepared by: Cindy Mosser, Finance Director City Manager Approval: SUBJECT: REVIEW OF CITY OF SAN RAFAEL BUDGET FOR FISCAL YEAR 2010-2011 RECOMMENDATION: Review staff report, and provide any final direction needed for formal budget adoption at July 6th, 2010 City Council meeting. BACKGROUND: The City must adopt a balanced budget for all funds for this coming fiscal year. This report will provide the City Council and community with an update on our budget picture for fiscal year 2009-2010 and steps in progress for fiscal year 2010-2011. The City Council has reviewed fiscal year 2009-2010 budget information on several occasions. Since November 2009, the City has held study sessions, budget workshops, public outreach meetings, and budget meetings outlining service reductions, cost saving, and staffing losses. The budget balancing decisions from January 4, 2010 and January 26, 2010 have been implemented in the City's 2009-2010 budget. These actions taken also provided balancing direction and have been built into fiscal year 2010-2011. At the June 2, 2010 meeting, each Department provided an update of their goals and objectives for fiscal year 2009-2011. These objectives have been aligned with current staffing levels and resources. Most recently, at the June 7, 2010 meeting, staff presented the Council a review of the City's budget for fiscal year 2010-2011. This preview highlighted revenue trends and key assumptions used to build the "expense" side of the budget. We also noted items that were still under review and not included in our projects. Our report presented today will concentrate on the updated items. Below is the analysis of the proposed 2010-2011 budget and an update to fiscal 2009-2010 budget. File No.: g'S FOR CITY CLERK ONLY Council Meeting: (:�W -I I I �o env Disposition: t..�o�.O-k P0L SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 I ANALYSIS: Overall Budget.- The udget: The total projected overall fiscal year 2010-2011 budget for the City is estimated to be $75,725,198. This sum reflects all funds and operations for the City, inclusive of appropriations of new resources for one time and capital projects (shown as $983,485 in the table below). A final review of compensation costs, staffing levels, contractual commitments, and operating expenses has been finalized by Finance Department staff, with involvement and input from all City Departments. A final Personnel Authorization schedule denotes that staffing levels across all Departments. Exhibit V defines the staffing be Department, and summarizes the significant declines made over this past year in order to keep our budget in balance for both 2009-10 and 2010-11. General Fund. The City's General Fund, which accounts for most of the major services to our residents and businesses (such as police, fire suppression and prevention, planning, building, library, parks, streets, engineering, traffic enforcement and management, cultural programs) is projected to be approximately $56.2 million for fiscal year 2010-2011. Approximately seventy-three percent, or $41.8 million of the appropriation, are for personnel costs. CITY OF SAN RAFAEL FISCAL YEAR 2010-2011 BUDGET FIGURES FY 2010-2011 _PmposedBudget [Total City Budget $75,728,198 Less: Capital and Special Project (983,485) Total Operating Budget 74,744,713 Less: Restricted Funds (Gas Tax, etc.) (20,559,174) General Fund Operating Budget 54,185,539 Add: General Fund Program Support 2,027,200 Add: General Fund Projects 33,000 Total General Fund Appropriation $56,245,739 The General Fund reserve is estimated to be 2.5% at the end of fiscal year 2009-2010. We are estimating the reserves remain at $1.4 million for fiscal year 2010-2011, which is 2.6% of expenditures. This amount is still well below the 10 percent goal in our approved financial policies. New and Refined Operating Budget Items Included in fiscal year 2010-2011: As has been done the past several budget cycles, the Finance staff undertakes a full review of how to improve the City's financial structure and condition. This analysis takes into consideration tax and major revenue estimating and cost projections, plus staffing levels. As mentioned before, the cost projections include non -safety staff furloughs and deferral of non- SAN RAFAEL CITY COUNCIL AGENDA REPORT / Paze: 3 safety vehicle charges for a second year. The numbers contained in this report represent a high level view of the City's proposed expenses and financial condition. A summary of the proposed budget is attached as Exhibit L A budget is a moving target, requiring nimbleness to review small details as well as larger scale challenges. Fortunately for City staff, we have been able to catch up, review, and include a few items in the projected budget that we did not know two weeks ago. A few major items are discussed below: ➢ With the passage of Measure C, a new fund has been established with a conservative estimate of approximately $651,000 in tax revenues. This revenue will be refined when we receive the County's assessment reports showing parcels and charges. We have also included corresponding expenditures that will be refined by the Librarian. ➢ Unexpected injuries, and potential retirements of long term employees, necessitate additional one time public safety costs. In order to maintain basic staffing, and properly recruit replacement officers and firefighters, we will need to appropriate funds for Police and Fire staffing, to be spread across temporary help staffing while permanent position recruitments, including necessary training and orientation are completed. This effort will result in temporary `overhires' during the time transition. We included $200,000 in the Police Department budget and $100,000 in the Fire Department budget. ➢ A `bridge' agreement for Marinwood Community Services District is being developed to extend the current contract for one year, at cost of $300,000. This extension contract is planned to be before the District Board this month and is before the City Council today. The second related component of the new District City contract is the impact on staffing, paramedic tax levels, and service provision enhancements. Given that the paramedic tax must be renewed and adjusted in November, important preliminary decisions concerning a newly restructured City and District contract should be completed by the end of July. ➢ The City is working with our consultants on the pricing of the normal cost pension obligation bonds. The final pricing should be known next week, and can assist staff in firming up the cost of debt, net proceeds, and determining how much will remain of the Retirement System reserve to be held for future retirement costs for fiscal years 2011-12 and beyond. We did include an estimated interest expense of $126,000 related to the pension obligation bonds for fiscal year 2010-2011. We also included interest expense and interest income for the short-term Tax and Revenue Anticipation Note. Other Imnacts to Current Fiscal Year 2010-2011 Proiections: (items not accounted for in current budget estimates) We are continually updating our projections as we as receive information. As stated at the June 2"d special budget meeting, we remain woefully underfunded on infrastructure repairs, renovations and replacements. This past year, you approved a two year Capital Improvement Program (CIP). Under the capable leadership of the Public Works staff, many of the streets, ADA, safe routes to schools and other projects are either completed, or under way. Public Works has been developing a five year CIP plan, which will be previewed in a study session on Monday. You will be given a preview of what we can do with internal and external resources. More SAN RAFAEL CITY COUNCIL AGENDA REPORT / Paze: 4 importantly, the staff plans to highlight a number of unmet CIP needs, some of which are going to require real attention in the near future. We have set appropriations for some of our designated resources, such as a portion of storm water fees directed toward drainage projects. However, as of this writing, specific CIP projects have not been finalized for our fiscal year 2010-2011 budget. We expect to refine projects, costs and needed revenues to address our park, street, storm drain, public buildings and many other important investments into our City assets. FISCAL YEAR 2009-2010: Projecting the next budget requires the examination of current financing activity for both operating functions and capital projects. As part of adopting the 2010-2011 budget, and projecting ending balances, staff requests Council consideration of an amendment to the fiscal year 2009-2010. Total appropriations, as listed on Exhibit II, for fiscal year 2009-2010 are $83,697,210. Revenues need to be modified, based upon changes in projections since last formally approved in January 2010. These changes are codified in Exhibit III. Two categories are presented. Cateaory One represents the items recommended from the City Council actions since January 26, 2010. Additional General and Non -General Fund changes are presented as Cateaory Two. Some changes to appropriations for 2009-2010 are also necessary. These changes are codified in Exhibit IV. Two Categories are used in order to help classify changes since the last formally approved appropriations to fiscal year 2009-2010 in January 2010. The two categories are similar to the ones presented for the revenues. The actions listed as #1's reflect budget decisions made from January through June. The great majority of changes impact the operating budgets of primary service departments. All of these changes will be presented to Council for amendment consideration on July 6, 2010. FISCAL IMPACT: There is no fiscal impact as staff plans to return to the Council for final approval of the recommendation at the July 6 meeting. ACTION REQUIRED: The Council could accept the report for the City's revised budget for fiscal year 2009-2010 and direct staff to bring the proposed budget for fiscal year 2010-2011 back for final adoption on July 6, 2010; or the Council could recommend changes to the revised budget for fiscal year 2009- 2010 and to the proposed budget for fiscal year 2010-2011. CITY OF SAN RAFAEL CONSOLIDATED FUNDS SCHEDULE GENERALC 001 General Fund $52,376,478 $82,000 $52,458,478 $3,742,400 $56,200,878 NDS: EXHIBIT I SPECIAL REVENUE & GRANT FUNDS: 205 Storm Water Fund 206 Gas Tax 207 Development Services 208 Child Care 210 Paramedic/EMS 222 Recreation Revolving 223 Household Haz. Waste Fund 227 Sewer Maintenance 228 Hazardous Materials Fund 235 Baypoint Lagoons L & L District 236 Loch Lomond Assessment District 240 Parkland Dedication Street Mtce. & Cleaning Funds Library Fund Public Safety Fund Traffic & Housing Mitigation Funds Grant Funds SPECIAL REVENUE & GRANT TOTAL DEBT SERVICE FUNDS: 302 Financing Authority 1997 Bonds 304 Peacock Gap Assessment District 306 Mariposa Assessment District DEBT SERVICE TOTALS CAPITAL PROJECT FUNDS: 401 Capital Improvement 405 Open Space Acquisition 406 Bedroom Tax 407 Parks Capital Projects Var. Assessment District Projects CAPITAL PROJECT TOTALS 811,210 0 811,210 600,000 1,411,210 1,408,410 0 1,408,410 0 1,408,410 35,450 0 35,450 0 35,450 3,328,650 0 3,328,650 130,000 3,458,650 5,987,000 0 5,987,000 0 5,987,000 2,370,470 0 2,370,470 1,277,200 3,647,670 1,391,660 0 1,391,660 0 1,391,660 2,278,650 0 2,278,650 0 2,278,650 1,000 2,300 3,300 0 3,300 25,800 0 25,800 0 25,800 34,800 0 34,800 0 34,800 0 0 0 0 0 $602,500 $0 $602,500 $0 $602,500 $883,200 $176,000 $1,059,200 $0 $1,059,200 $66,320 $3,750 $70,070 $65,000 $135,070 $21,000 $0 $21,000 $0 $21,000 619,140 222,000 841,140 95,500 936,640 $19,865,260 $404,050 $20,269,310 $2,167,700 $22,437,010 230,620 0 230,620 0 230,620 0 0 0 0 0 1,080 0 1,080 0 1,080 $231,700 $0 $231,700 $0 $231,700 0 0 0 0 0 5,470 0 5,470 0 5,470 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $5,470 $0 $5,470 $0 $5,470 6/17/2010; 11:36 PM Page 1 of 4 EXHIBIT I CITY OF SAN RAFAEL ENTERPRISE FUNDS: 501 Parking Services ENTERPRISE FUND TOTALS INTERNAL SERVICE FUNDS: 601 P.C. Replacement 602 Fire Equipment Replacement 603 Building Improvement 604 Employee Benefits 605 Liability Insurance 606 Workers Compensation Insurance 607 Dental Insurance 610 Print Shop & Mail 611 Employee Retirement INTERNAL SERVICE TOTALS CAPITAL PROJECT FUNDS: 600 Vehicle Replacement 608 Radio Replacement 609 Telephone CAPITAL PROJECT TOTALS: TRUST AND AGENCY FUNDS: 710 Business Improvement District 712 Library Fiduciary 711 Recreation Fiduciary TRUST & AGENCY TOTALS COMBINED FUNDS TOTALS Less Interfund Transfers Less Internal Service Charges NET TOTALS FY 2010-2011 4,292,000 0 4,292,000 0 4,292,000 $4,292,000 $0 $4,292,000 $0 $4,292,000 449,170 0 449,170 0 449,170 122,890 0 122,890 0 122,890 118,360 0 118,360 100,000 218,360 3,020,470 0 3,020,470 0 3,020,470 1,719,430 0 1,719,430 0 1,719,430 1,831,110 0 1,831,110 0 1,831,110 508,460 0 508,460 0 508,460 0 0 0 0 0 4,200,000 0 4,200,000 0 4,200,000 $11,969,890 $0 $11,969,890 $100,000 $12,069,890 639,080 0 639,080 0 639,080 681,520 0 681,520 0 681,520 378,320 0 378,320 0 378,320 $1,698,920 $0 $1,698,920 $0 $1,698,920 39,590 0 39,590 0 39,590 0 0 0 0 0 0 0 0 0 0 $39,590 $0 $39,590 $0 $39,590 $90,479,308 $486,050 $90,965,358 $6,010,100 $96,975,458 (6,010,100) ($6,010,100) (11,637,389) (11,637,389) ($11,637,389) $78,841,919 $486,050 $79,327,969 $0 '•' 6/17/2010; 11:36 PM Page 2 of 4 EXHIBIT I CITY OF SAN RAFAEL 001 General Fund 54,185,539 $33,000 $54,218,539 $2,027,200 $56,245,739 SPECIAL REVENUE & GRANT FUNDS: 205 Storm Water Fund 1,111,560 324,740 1,436,300 0 $1,436,300 206 Gas Tax 28,136 0 28,136 1,404,050 $1,432,186 207 Development Services 0 0 0 0 $0 208 Child Care 3,432,850 0 3,432,850 45,500 $3,478,350 210 Paramedic/EMS 5,552,800 0 5,552,800 190,000 $5,742,800 222 Recreation Revolving 3,373,371 0 3,373,371 0 $3,373,371 223 Household Haz. Waste Fund 1,331,720 0 1,331,720 0 $1,331,720 227 Sewer Maintenance 2,069,600 0 2,069,600 207,000 $2,276,600 228 Hazardous Materials Fund 0 3,200 3,200 0 $3,200 235 Baypoint Lagoons L& L District 0 0 0 0 $0 236 Loch Lomond Assessment District 50 0 50 0 $50 240 Parkland Dedication 0 0 0 0 $0 Street Mtce. & Cleaninq Funds $0 $0 $0 $0 $0 Library Fund $157,479 $205,835 $1,012,914 $0 $1,012,914 Public Safety Fund $153,549 $1,000 $154,549 $0 $154,549 Traffic & Housing Mitigation Funds $68,970 $0 $68,970 $0 $68,970 Grant Funds $671,597 $242,210 $913,807 $41,000 $954,807 SPECIAL REVENUE & GRANT TOTAL $17,951,682 $776,985 $19,378,267 $1,887,550 $21,265,817 DEBT SERVICE FUNDS: 302 Financing Authority 1997 Bonds 147,460 0 147,460 1,750 $149,210 304 Peacock Gap Assessment District 0 0 0 0 $0 306 Mariposa Assessment District 0 0 0 0 $0 DEBT SERVICE TOTALS $147,460 $0 $147,460 $1,750 $149,210 CAPITAL PROJECT FUNDS: 401 Capital Improvement 0 73,500 73,500 0 $73,500 405 Open Space Acquisition 12,960 0 12,960 0 $12,960 406 Bedroom Tax 0 0 0 0 $0 407 Parks Capital Projects 0 0 0 0 $0 Var. Assessment District Projects 0 0 0 0 $0 CAPITAL PROJECT TOTALS $12,960 $73,500 $86,460 $0 $86,460 6/17/2010; 11:36 PM Page 3 of 4 EXHIBIT I CITY OF SAN RAFAEL 6/17/2010; 11:36 PM Page 4 of 4 ENTERPRISE FUNDS: 501 Parking Services 3,889,537 0 3,889,537 463,600 $4,353,137 ENTERPRISE FUND TOTALS $3,889,537 $0 $3,889,537 $463,600 $4,353,137 INTERNAL SERVICE FUNDS: 601 P.C. Replacement 358,880 0 358,880 0 $358,880 602 Fire Equipment Replacement 365,000 0 365,000 0 $365,000 603 Building Improvement 33,780 100,000 133,780 0 $133,780 604 Employee Benefits 3,183,830 0 3,183,830 0 $3,183,830 605 Liability Insurance 1,560,057 0 1,560,057 0 $1,560,057 606 Workers Compensation Insurance 1,984,919 0 1,984,919 0 $1,984,919 607 Dental Insurance 501,600 0 501,600 0 $501,600 610 Print Shop & Mail 0 0 0 0 $0 611 Employee Retirement 0 0 1,630,000 $1,630,000 INTERNAL SERVICE TOTALS $7,988,066 $100,000 $8,088,066 $1,630,000 $9,718,066 CAPITAL PROJECT FUNDS: 600 Vehicle Replacement 594,040 0 594,040 0 $594,040 608 Radio Replacement 568,670 0 568,670 0 $568,670 609 Telephone 354,968 0 354,968 0 $354,968 CAPITAL PROJECT TOTALS: $1,517,678 $0 $1,517,678 $0 $1,517,678 TRUST AND AGENCY FUNDS: 710 Business Improvement District 39,580 0 39,580 0 $39,580 712 711 Library Fiduciary Recreation Fiduciary 0 0 0 0 0 0 0 0 $0 $0 TRUST & AGENCY TOTALS $39,580 $0 $39,580 $0 $39,580 COMBINED FUNDS TOTALS $85,732,502 $983,485 $87,365,587 $6,010,100 $93,375,687 Less Interfund Transfers $0 ($6,010,100) ($6,010,100) Less Internal Service Charges ($11,637,389) ($11,637,389) ($11,637,389) NET TOTALS FY 2010-2011 $74,095,113 $983,485 $75,728,198 $0 ENEEPPERIF - 6/17/2010; 11:36 PM Page 4 of 4 EXHIBIT II - CITY OF SAN RAFAEL 001 General Fund $52,052,109 $81,500 $52,133,609 $3,088,448 $55,222,058 6/17/2010; 11:36 PM Page 1 of 4 SPECIAL REVENUE & GRANT FUNDS: 205 Storm Water Fund 811,210 0 811,210 625,330 1,436,540 206 Gas Tax 1,451,294 3,123,070 4,574,364 0 4,574,364 207 Development Services 34,750 0 34,750 0 34,750 208 Child Care 3,264,390 0 3,264,390 0 3,264,390 210 Paramedic/EMS 5,791,000 0 5,791,000 0 5,791,000 222 Recreation Revolving 2,182,210 20,000 2,202,210 1,338,350 3,540,560 223 Household Haz. Waste Fund 1,391,660 0 1,391,660 0 1,391,660 227 Sewer Maintenance 2,087,840 0 2,087,840 0 2,087,840 228 Hazardous Materials Fund 1,000 2,300 3,300 0 3,300 235 Baypoint Lagoons L & L District 25,800 0 25,800 0 25,800 236 Loch Lomond Assessment District 34,800 0 34,800 0 34,800 240 Parkland Dedication 0 0 0 0 0 Street Mtce. & Cleaning Fund $544,500 $0 $544,500 $68,790 $613,290 Library Fund $240,436 $176,000 $416,436 $0 $416,436 Public Safety Fund $66,320 $3,750 $70,070 $65,000 $135,070 Traffic & Housing Mitigation Funds $21,000 $0 $21,000 $0 $21,000 Grant Funds 719,415 1,426,541 2,145,956 150,450 2,296,406 SPECIAL REVENUE & GRANT TOTAL $18,667,625 $4,751,661 $23,419,286 $2,247,920 $25,667,206 DEBT SERVICE FUNDS: 302 Financing Authority 1997 Bonds 222,950 0 222,950 0 222,950 304 Peacock Gap Assessment District 0 0 0 0 0 306 Mariposa Assessment District 1,080 0 1,080 0 1,080 DEBT SERVICE TOTALS $224,030 $0 $224,030 $0 $224,030 CAPITAL PROJECT FUNDS: 401 Capital Improvement 0 575,400 575,400 20,393 595,793 405 Open Space Acquisition 5,470 0 5,470 0 5,470 406 Bedroom Tax 0 0 0 0 0 407 Parks Capital Projects 0 0 0 0 0 Var. Assessment District Projects 0 0 0 0 0 CAPITAL PROJECT TOTALS $5,470 $575,400 $580,870 $20,393 $601,263 6/17/2010; 11:36 PM Page 1 of 4 EXHIBIT II CITY OF SAN RAFAEL 6/17/2010; 11:36 PM Page 2 of 4 ENTERPRISE FUNDS: 501 Parking Services 4,036,000 0 4,036,000 0 4,036,000 ENTERPRISE FUND TOTALS $4,036,000 $0 $4,036,000 $0 $4,036,000 INTERNAL SERVICE FUNDS: 601 P.C. Replacement 390,150 0 390,150 0 390,150 602 Fire Equipment Replacement 55,950 0 55,950 0 55,950 603 Building Improvement 118,360 99,262 217,622 144,000 361,622 604 Employee Benefits 2,864,866 0 2,864,866 0 2,864,866 605 Liability Insurance 1,720,180 0 1,720,180 0 1,720,180 606 Workers Compensation Insurance 2,295,177 0 2,295,177 0 2,295,177 607 Dental Insurance 560,233 0 560,233 0 560,233 610 Print Shop & Mail 212,480 0 212,480 0 212,480 INTERNAL SERVICE TOTALS $8,217,396 $99,262 $8,316,658 $144,000 $8,460,658 CAPITAL PROJECT FUNDS: 600 Vehicle Replacement 133,840 0 133,840 0 133,840 608 Radio Replacement 681,520 0 681,520 0 681,520 609 Telephone 378,320 0 378,320 0 378,320 CAPITAL PROJECT TOTALS: $1,193,680 $0 $1,193,680 $0 $1,193,680 TRUST AND AGENCY FUNDS: 710 Business Improvement District 39,590 0 39,590 0 39,590 712 Library Fiduciary 0 0 0 0 0 711 Recreation Fiduciary 0 0 0 0 0 TRUST & AGENCY TOTALS $39,590 $0 $39,590 $0 $39,590 COMBINED FUNDS TOTALS $84,435,900 $5,507,823 $89,943,724 $5,500,761 $95,444,485 Less Interfund Transfers (5,500,761) ($5,500,761) Less Internal Service Charges (7,435,984) (7,435,984) ($7,435,984) NET TOTALS FY 2009-2010 $76,999,917 $5,507,823 $82,507,740 $0 6/17/2010; 11:36 PM Page 2 of 4 EXHIBIT II CITY OF SAN RAFAEL 001 General Fund 53,764,652 $35,991 $53,800,643 $2,266,561 $56,067,204 SPECIAL REVENUE & GRANT FUNDS: 205 Storm Water Fund 1,238,439 324,740 1,563,179 0 $1,563,179 206 Gas Tax 28,115 3,123,070 3,151,185 2,206,618 $5,357,803 207 Development Services 0 0 0 0 $0 208 Child Care 3,217,749 0 3,217,749 41,000 $3,258,749 210 Paramedic/EMS 5,401,344 0 5,401,344 190,000 $5,591,344 222 Recreation Revolving 3,327,979 20,000 3,347,979 0 $3,347,979 223 Household Haz. Waste Fund 1,329,745 0 1,329,745 0 $1,329,745 227 Sewer Maintenance 1,885,066 0 1,885,066 189,600 $2,074,666 228 Hazardous Materials Fund 0 3,200 3,200 0 $3,200 235 Baypoint Lagoons L& L District 0 0 0 0 $0 236 Loch Lomond Assessment District 0 0 0 0 $0 240 Parkland Dedication 0 110,000 110,000 0 $110,000 Street Mtce. & Cleaninq Fund $55,911 $0 $55,911 $0 $55,911 Library Fund $156,975 $219,610 $376,585 $0 $376,585 Public Safety Fund $145,902 $1,000 $146,902 $0 . $146,902 Traffic & Housing Mitigation Funds $64,895 $46,075 $110,970 $0 $110,970 . Grant Funds $779,423 $1,637,152 $2,416,575 $342,649 $2,759,223 SPECIAL REVENUE & GRANT TOTAL $17,631,543 $5,484,847 $23,116,390 $2,969,867 $26,086,257 DEBT SERVICE FUNDS: 302 Financing Authority 1997 Bonds 215,850 0 215,850 1,900 $217,750 304 Peacock Gap Assessment District 0 0 0 0 $0 306 Mariposa Assessment District 0 0 0 0 $0 DEBT SERVICE TOTALS $215,850 $0 $215,850 $1,900 $217,750 CAPITAL PROJECT FUNDS: 401 Capital Improvement 0 646,474 646,474 0 $646,474 405 Open Space Acquisition 12,960 0 12,960 0 $12,960 406 Bedroom Tax 0 0 0 0 $0 407 Parks Capital Projects 0 0 0 0 $0 Var. Assessment District Projects 0 0 0 0 $0 CAPITAL PROJECT TOTALS $12,960 $646,474 $659,434 $0 $659,434 6/17/2010; 11:36 PM Page 3 of 4 EXHIBIT II CITY OF SAN RAFAEL 6/17/2010; 11:36 PM Page 4 of 4 ENTERPRISE FUNDS: 501 Parking Services 3,845,046 0 3,845,046 458,300 $4,303,346 ENTERPRISE FUND TOTALS $3,845,046 $0 $3,845,046 $458,300 $4,303,346 INTERNAL SERVICE FUNDS: 601 P.C. Replacement 434,277 0 434,277 0 $434,277 602 Fire Equipment Replacement 65,000 0 65,000 0 $65,000 603 Building Improvement 37,974 218,262 256,236 0 $256,236 604 Employee Benefits 2,845,543 0 2,845,543 0 $2,845,543 605 Liability Insurance 1,562,210 0 1,562,210 200,000 $1,762,210 606 Workers Compensation Insurance 2,100,443 0 2,100,443 300,000 $2,400,443 607 Dental Insurance 555,000 0 555,000 0 $555,000 610 Print Shop & Mail 209,846 0 209,846 0 $209,846 INTERNAL SERVICE TOTALS $7,810,293 $218,262 $8,028,555 $500,000 $8,528,555 CAPITAL PROJECT FUNDS: 600 Vehicle Replacement 414,040 0 414,040 0 $414,040 608 Radio Replacement 661,970 0 661,970 0 $661,970 609 Telephone 351,685 0 351,685 0 $351,685 CAPITAL PROJECT TOTALS: $1,427,695 $0 $1,427,695 $0 $1,427,695 TRUST AND AGENCY FUNDS: 710 Business Improvement District 39,580 0 39,580 0 $39,580 712 Library Fiduciary 0 0 0 0 $0 711 Recreation Fiduciary 0 0 0 0 $0 TRUST & AGENCY TOTALS $39,580 $0 $39,580 $0 $39,580 COMBINED FUNDS TOTALS $84,747,619 $6,385,574 $91,133,193 $6,196,627 $97,329,821 Less Interfund Transfers $0 ($6,196,627) ($6,196,627) Less Internal Service Charges ($7,435,984) ($7,435,984) ($7,435,984) NET TOTALS FY 2009-2010 $77,311,635 $6,385,574 $83,697,210 $0 6/17/2010; 11:36 PM Page 4 of 4 CITY OF SAN RAFAEL BUDGET CHANGES FISCAL YEAR 2009-10 REVENUE CHANGES Grant & Project Changes (MTC SMART Station Planning, Street Design, ARRA- HVAC, Falkirk painting) 1 Aquatic Program at Hamilton Pool 1 Charges for services (San Quentin, Fire Prevention, 401 H, Stormwater) 2 Grant & Project Changes (Street Resurfacing, CDBG, Vest Grant, Latchkey, Peacock Gap Contributions, Marin Literacy) 2 Business License renewal fees reduction 2 MI D -YEAR; REVISED FOR FY 09-10 @ 1-26-2010 ". TWELVE-MONTH REVISED FOR FY 09-10 @ 6-21-2010 EXHIBIT III ALL General All FUNDS Fund Other TOTAL 001 Funds $ 1,325,662 $ 1,325,662 $ 38,830 $ 38,830 $ 47,680 $ (45,350) $ 93,030 $ 1,150,979 $ 1,150,979 $ (88,252) $ (88,252) $ - $ 2,474,899 $ (133,602) $ 2,608,501 $ 80,032,841 $ 52,343,211 $ 27,689,630 $ 82,507,740 $ 52,209,609 $ 30,298,131 W:\Management Services- WorkFile\Finance- WorkFile\Nccounting and Budgeting\Budgets\09-11\09-11 Twelve Month\Fund Sums\Adjust Schedules\adjust scheds CITY summ 09- 6/18/2010 3:10 AM 10 6-17-10.x1s CITY OF SAN RAFAEL BUDGET CHANGES FISCAL YEAR 2009-10 ]' NAII Grant & Project Changes (MTC SMART Station Planning, Street Design, ARRA-HVAC, Falkirk painting) 1 $ Aquatic Program at Hamilton Pool 1 $ Grant & Project Changes (Street Resurfacing, CDBG, Vest Grant, Latchkey, Peacock Gap -matches revenues) 2 $ Contractual Services (3rd party billing, San Quentin, Fire Prevention, Dental Claims, Stormwater) 2 $ MID -YEAR REVISED FOR FY 09-10 @ 1-26-2010 TWELVE MONTH REVISED FOR FY 09-10 @ 7-21-2010 $ EXHIBIT IV General All TOTAL Fund Other ALL FUNDS 001 Funds 1,357,162 $ 1,357,162 36,588 $ 36,588 903,020 $ (1,981) $ 905,001 354,715 $ (81,385) $ 436,100 2,651,485 (83,366) 2,734,851 81,045,725 $ 47,574,024 $ 33,471,701 83,697,210 $ 47,490,658 $ 36,2061552 W:\Management Services- WorkFile\Finance- WorkFile\Accounting and Budgeting\Budgets\09-1 1 \09-1 1 Twelve Month\Fund Sums\Adjust Schedules\adjust scheds CITY 6/18/2010 3:10 AM summ 09-10 6-17-10.xls Authorized Positions EXHIBIT V Revised Change In acted Change In % of Total Departments 2009-2010 2009-2010 2010-2011 2010-2011 2010-2011 Community Development 21.75 (5.75) 21.75 - 5.6% Community Services 61.40 (2.80) 61.40 - 15.7% City Attorney 3.50 - 3.50 - 0.9% City Clerk 2.00 - 2.00 - 0.5% City Manager/Council 7.70 (1.00) 7.70 - 2.0% Economic Development 5.00 - 5.00 - 1.3% Finance 10.00 (1.00) 10.00 - 2.6% Fire 75.00 (2.00) 75.00 - 19.2% Library 22.09 (2.11) 22.09 - 5.7% Management Services 31.68 (2.00) 31.68 - 8.1% Police 90.00 (14.00) 90.00 - 23.0% Public Works 60.80 (15.00) 60.80 - 15.6% Grand Total 390.92 (45.66) 390.92 - 100.0% General Notes: The above -authorized positions are presented as full-time equivalent employees (FTE's) based on various workweek hours as negotiated in employee agreements. The totals by department reflect a combination of full-time or permanent part-time positions that are entitled to all or pro -rated benefits in accordance with the negotiated agreements for employees or individuals who are under contract. The totals reflected above, or in the detail department program sections, do not include temporary or seasonal employees that are utilized for short-term or specific reasons during the year. CHANGES in FY 2009-2010 (Positions eliminated or suspended for FY2009-101 or added due to reorganization City Manager: Assistant to City Manager (1.00) Community Development: Assistant Planner; Fire Prevention Source of Funding of Positions: Inspector; Administrative Assistant (.75 FTE); Transfer 2 Fire 2010-2011 Inspector and a Deputy Fire Marshal to fire (5.75) Community Services: Cultural Affairs Supervisor, Administrative Redevelopment Agency Assistant ll, Youth Services Coordinator (.80 FTE) (2.80) Finance: Accounting Assistant transferred to Fire for Ambulance (1.00) Administrative Assistant to the Fire Chief eliminated; EMS coordinator & Training officer added; Suspended Training Officer 390.92 (1/2010) & Firefighters -4; Fire Inspector (2) & Deputy Fire Marshal; add Accounting Assistant for Ambulance Billing (2.00) Library: Librarian 1/II -.58; Library Aide - .53; Senior Library Assistant (2.11) Management Services: Employee Benefits Manager; Network Suppor (2.00) Police: Suspending Police Officer -3; Police Dispatcher; Police Officers -3; Ranger Marine; Personnel Manager; Dispatcher; Property Clerk; Police Officers -2; Evidence & Property Tech (14.00) Public Works: Operations and Maintenance Manager, Street Maintenance Supervisor, Supervising Street Maintenance Worker, Street Maintenance Worker III, Park Maintenance Worker III, Park and Graffiti Worker, Public Works Inspector, Senior Associate (15.00) I otal Changes over Revised I -Y 2UU8-2UU9 I (45.66)I Projected Projected Source of Funding of Positions: 2009-2010 2010-2011 City 369.54 369.54 Redevelopment Agency 7.38 7.38 San Rafael Sanitation District 14.00 14.00 390.92 390.92