Loading...
HomeMy WebLinkAboutFIN FY 2018-19 Preliminary CIP and Measure A____________________________________________________________________________________ FOR CITY CLERK ONLY Council Meeting: 5/21/2018 Disposition: Accepted Report and Resolution No. 14509 Agenda Item No: 7.a Meeting Date: May 21, 2018 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Finance Prepared by: Mark Moses, Finance Director Bill Guerin, Public Works Director Susan Andrade-Wax, Community Services Director City Manager Approval: ______________ TOPIC: CAPITAL IMPROVEMENT PROGRAM AND MEASURE A–OPEN SPACE SPENDING PLAN SUBJECT: THREE-YEAR CAPITAL IMPROVEMENT PROGRAM; RESOLUTION APPROVING THE MEASURE A – OPEN SPACE WORK PLAN FOR FISCAL YEAR 2018-2019; AND CITY- WIDE FISCAL YEAR 2018-2019 BUDGET DEVELOPMENT TIMELINE RECOMMENDATION 1. Accept report regarding the Three-Year Capital Improvement Program. 2. Adopt a resolution approving the Measure A – Open Space Work Plan for Fiscal Year 2018- 2019. BACKGROUND The purpose of this report is to provide the City Council and community with an opportunity to receive information and provide feedback on the Three-Year Capital Improvement Program (CIP). This information will be incorporated into a final, proposed City-wide Budget that will be presented to the City Council in June 2018 for the fiscal year that begins on July 1, 2018. This report also recommends a City Council action to approve the FY2018-19 Work Plan for a small piece of the CIP for which funding is provided by a County-wide transactions and use tax. In November 2012, an ordinance (“Measure A”) of the County of Marin was approved by a two -thirds majority of the electors voting on the Measure. Measure A imposes a nine year one-quarter of one percent retail transactions and use tax that is administered by the County of Marin. The purpose of Measure A is to support the preservation of Marin County parks, open space preserves, and farmland. The tax generated is estimated, at current collection levels, to generate approximately $10 million per year. Currently, the City receives approximately $477,000 annually. The content of this report was discussed at the City Council Finance Committee public meeting held on May 8, 2018, at which time staff was directed to bring these items to the full City Council. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 ANALYSIS Capital Improvement Program The Capital Improvement Program (CIP) is a planning document developed by the Department of Public Works (DPW) to identify and prioritize new construction projects and improvements to the City’s infrastructure. The priorities identified herein have been coordinated with the other departments in San Rafael to ensure that all department needs are represented. Pending Council’s recommendations, this CIP will be included in the City budget, which will be presented at a future Council meeting. The general categories within the CIP have been modified this fiscal year to reflect the following: • City-Owned Properties (COP) • Parks (P) • Drainage (D) • Right-of-Way (R/W) CIP FUNDING SOURCES CIP projects are funded from several different sources, as summarized by the following table: Category Funding Source(s) City-Owned Properties Building Fund #603 Parking Services Fund #501 Grants & Contributions Parks Measure A Fund #241 Parkland Dedication Fund # 240 Building Fund #603 Grants Contributions Drainage Storm Water Fund #205 Additional allocations are needed Right-of-Way Gas Tax Fund #206 * Grants Traffic Mitigation Fees –Fund 246 ** * In addition to traditional Gas Tax revenues, several other sources contribute to the Gas Tax Fund: Construction Vehicle Impact Fees, Refuse Vehicle Registration Fees, and federal Community Development Block Grants. All are assigned to the Gas Tax Fund because their use is restricted to right-of-way projects. ** Traffic Mitigation Fees may only be used for projects identified in Exhibit 21 of Policy 6A of General Plan 2020, or for newly added projects in the CIP, as long as the fees are used for the purpose for which they were originally collected. The Department of Public Works also seeks federal and state grants to support our infrastructure and to meet the City’s goals and objectives. This year DPW has requested grant funding from a myriad of different sources including but not limited to the Federal Emergency Management Agency (FEMA), Transportation Authority of Marin (TAM), Metropolitan Transportation Commission (MTC), and many others. While we have not been successful in securing all grants, staff will continue to monitor and apply for applicable grant sources to support our infrastructure. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3 CIP PROJECTS COMPLETED IN FY2017/18 Over the last fiscal year, Department of Public Works has faced many challenges which have impacted our ability to complete projects originally listed in last year’s CIP. Staffing changes, large scale projects such as the Sonoma-Marin Area Rail Transit (SMART) and the Essential Facilities program have required significant staff resources to administer. Filling vacant Engineering Division positions has also been challenging with a vibrant economy as finding qualified engineers has been difficult. Nevertheless, DPW completed 19 projects last year. Of particular interest are the following: Large Projects • City Hall & TLCC Roof Repair • Freitas/Las Gallinas Intersection • G Street Roadway Improvements • 2nd and Grand Intersection Improvements Smaller Projects • 3rd and Irwin Intersection Improvements • 7 Beechwood Storm Drain Repair • Menzies Parking Lot Resurfacing • Station 55 & 54 – Plumbing and Abatement • Biscayne Subdrain ACTIVE CIP PROJECTS Currently, staff is managing 58 capital projects with a wide range of complexity. This includes 21 projects that were not anticipated when last year’s Capital Improvement Program was developed. Unanticipated projects are a common occurrence and the 2018/19 CIP has an unallocated balance in each of the four funding categories to anticipate these needs. FY 2017/18 CIP DEVELOPMENT The City of San Rafael follows a standard process for developing the Capital Improvement Program. A flow chart detailing the steps followed by city staff is included in the CIP document. This year the Department of Public Works met with the other Department Directors and their staff to develop and prioritize the proposed project listing for FY18/19 related to City Owned Property and parks projects. Project List Development The FY2018/19 list of potential projects was developed by identifying projects from last year that were not addressed, listing new projects from other City Departments and then re-rating all the projects to develop a prioritized list. The projects are listed with their respective rating by their project number in the CIP. While some projects have a high rating, several projects are recommended to be reprioritized to the following fiscal year based on a limited budget, complexity, as well as staff availability. Project Estimating and Budget Analysis The Department of Public Works reviewed and estimated the cost of all high priority projects. Since these projects have not been designed, the estimates developed at this preliminary phase SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 4 are approximations. The CIP document includes an individual description of each project, the project cost, and the current funding source. These costs are then summarized into each respective category to develop a proposed budget all for a three-year period. In FY18/19 staff has noted that several city buildings are in need of significant repair due to their age. The roof systems at Falkirk Mansion as well as 519 Fourth Street are in need of repair. Due to the size of these facilities and the current condition of the roofing systems the repair may be significantly expensive. Project Staffing Allocation In previous years, the Department of Public Works analyzed the projects listed to determine if current staffing levels can accommodate the workload stated in the CIP. Staff preformed a similar analysis with the same result indicating a staffing shortfall to manage all projects. Large scale projects such as interaction with SMART and their Larkspur extension project require a significant amount of staff time to manage due to their complexity and importance to the community. Based on staff analysis of current and proposed projects staff anticipates a similar staffing shortfall in 2018/19. To address this concern DPW anticipates utilizing staff for high priority, grant, and emergency projects and fixed term and contract resources to execute the remainder of the CIP program. There are several factors that influence the Capital Improvement Program. The following topics impact decisions as to which projects are selected and how the Public Works Department addresses the City’s infrastructure needs. • Infrastructure Life Expectancy and Planning • Project Funding • Project Selection Infrastructure Life Expectancy and Planning The City of San Rafael maintains over 30 facilities, including parking lots, as well as an extensive park, road and storm water drainage system. Many of these facilities were built in the 1950’s and 1960’s. The public facilities such as our community centers are heavily utilized and show significant wear and tear. Playing fields and parks see similar use. In addition to our buildings and other public amenities, the City’s drainage systems and roadways are all showing significant wear and tear. Coupled with the maintenance and infrastructure upgrades, codes and standards have changed since our facilities were constructed, and many require modifications based on access requirements, technology needs and safety. This year’s program is focused on making repairs to facilities including drainage, roads, parks and city owned properties to minimize degradation. Staff is currently working to perform a full facilities evaluation to ensure a full understanding of our infrastructure needs and to determine the life expectancy of key elements such as HVAC systems and roofing lifespans. The results of this evaluation are due in late June 2018. Project Funding Building Maintenance Fund: The Building Maintenance Fund (#603) is supported by a General Fund allocation exclusively for the maintenance and improvement projects on City Owned Property. For SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 5 the last several years, the General Fund has contributed approximately $500,000 towards the Building Fund. On occasion, as additional funding is identified e.g. in the form of unspent General Fund allocations for other Public Works projects, one-time monies may be transferred into the Building Fund, which has allowed the Fund to accumulate a modest fund balance for larger capital improvement projects. Nearly all active and new City Owned Property projects listed in the FY 2018/19 CIP are funded by the Building Fund. In addition, several Parks and Drainage project budgets have been supplemented by the Building Fund since no other funding source is available to support these amenities. Over the last few years construction costs have risen significantly. Increased material and labor costs due to the economic expansion has resulted in consistently high bids for capital projects. In addition, regional disasters such as the North Bay fires in 2017 have put considerable pressure on the construction market, further resulting in fewer bidders and higher bids. The $500,000 per year set aside to fund maintenance and repairs at the City’s 24 parks and building facilities funds a limited number of projects. Therefore, until other funding can be identified via grants or the implementation of assessment districts or public private partnerships, several projects are deferred to future years and/or identified as “Unfunded”. Storm Drain Fund: As in past years, the Storm Drain Fund (#205) receives annual revenues of approximately $880,000. This funding is utilized exclusively for annual operation and maintenance of our 12 stormwater pump stations. These pump stations vary in age but all need constant maintenance due to frequent damage from continuous use during the rainy season. This maintenance includes but is not limited to pulling each pump, dismantling the system to dislodge debris, examine impellers and other vulnerable components in order to make sure these systems remain fully operational during major storm events in San Rafael. Properly maintained pump systems are essential to keep areas from flooding during winter storms. The City’s dedication to making sure our pump stations are functioning correctly was evident during the 2017 storm disaster in which low-lying areas of the city received minimal flooding just based on the fact that these facilities were maintained and functioned to their ability. Staff is recommending to continue utilizing the storm water fund exclusively to maintain the pump stations. The replacement of the San Quentin Pump Station is an active Drainage project and is a high priority. The design of a new pump station is under way; however, the funding has not been identified for the construction. The Public Works Department will continue to seek grant funding for this important project. Over the last year, staff has initiated, but not completed, the evaluation of the current Storm Water Activity Fee assessment in order to determine if an increase in the tax assessment is necessary to more fully offset the cost of San Rafael’s storm water management requirements. The County of Marin sought a similar parcel tax increase to fund flood control measures in Novato in November 2017. Requiring 2/3 majority to pass, Measure E only received 34% of the vote. If the City pursues a similar rate increase, it is evident that successful passage will require a considerable campaign. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 6 Based on the current insufficient funding for City Owned Property, Parks, and Drainage projects, staff is recommending the following: • More aggressive pursuance of grant funding for non-Right of Way capital projects • Pursuance of ballot measure to raise current per-parcel stormwater assessment in FY 2018-19 • Exploring alternative funding mechanisms such as assessment districts or public private partnerships Gas Tax: Roadway projects are primarily supported by the Gas Tax Fund as well as State and Federal grants. Gas tax is a percentage tax on each gallon of gas purchased in San Rafael. There are many factors that cause a shortfall in gas tax revenues (and subsequently inadequate funding for road maintenance) statewide such as more fuel efficient vehicles are purchasing less gas, but continue to drive on our roads, which adds to roadway deterioration. This year the Road Maintenance and Rehabilitation Act (RMRD, also known as Senate Bill 1) (signed by Governor Brown on April 2017), raised statewide taxes on gasoline and diesel and established new vehicle registration fees. New RMRA tax rates became effective November 1, 2017, and provide additional funding for Right of Way projects for San Rafael. San Rafael anticipates received an additional $418,000 in gas tax revenues from the State starting FY 2017-18, and an additional $1 million ongoing starting FY 2018-19. Per the State requirements, City staff must annually update the list of projects supported by Senate Bill 1 in the form of a resolution approved by City Council. The resolution for FY 2018-19 RMRA projects was approved by City Council on April 16, 2018. There was an effort to put a proposition on the statewide ballot for June 2018 that would repeal Senate Bill 1 and therefore discontinue the additional gas tax allocations the City is receiving under the new law. However, the effort did not make the ballot as it failed to collect enough valid signatures. There may be a renewed effort for the November election, updates of that effort will be forthcoming. The Department has planned the CIP assuming revenues generated from Senate Bill 1 will remain, but if a repeal effort is successful then we will reprioritize Right of Way projects as necessary. Project Selection Project selection is based on recommendations by the Department Directors to accommodate high priority needs, which focused on life/safety, maintenance and repair, public and Council input, and other factors. Department Directors rated each project within the categories to develop a prioritized list of projects. The Capital Improvement Program document which is attached the new projects proposed to be included in FY17/18 CIP. Staff is not recommending moving forward with several projects that have been noted as significant to the City Council in the past based on reprioritization and funding shortfalls. During the evaluation of projects submitted this fiscal year, several roof maintenance projects are listed as the highest priority projects. The roof system at the Falkirk Mansion as well as 519 4th Street, which temporarily houses Station 52’s engine, are both in need of repair. Falkirk Mansion is a historical building and will be a difficult and costly roof system to repair just based on the many angles and amount of labor required for the repair. In reviewing these facilities Public Works Facilities maintenance noted that some of the shingles are not present at the Falkirk Mansion such that a rain event has the potential to cause additional damage to the inside of the building. Based on this, staff is recommending proceeding with the repair of the roof system at Falkirk Mansion and if additional funding becomes available that the roof system SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 7 to 519 4th Street or the B Street Community ‘Center roof be addressed as the next highest priority projects. Staff is also recommending that replacing current play structures, which received a high rating by department directors, be deferred to future CIP’s. Staff welcomes feedback from the City Council regarding the draft Capital Improvement Program for Fiscal Year 2018/19. FUNDING The following table summarizes the funding sources by CIP Project Type. The annual revenue allocation for funds is assigned to the priority projects (see Selection Criteria section) and remaining projects are listed as “Unfunded”. CIP Project Type Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total City Owned Property 208 Childcare Fund $170,000 $1,580,000 $1,750,000 420 Measure E $250,000 $3,000,000 $3,250,000 501 Parking Services $310,000 $1,295,000 $1,605,000 603 Building Maintenance $339,000 $559,600 $898,600 Grants $1,178,000 $1,178,000 Unfunded $530,000 $2,415,600 $251,000 $3,196,600 City Owned Property Total $1,997,000 $2,669,600 $3,960,600 $3,251,000 $11,878,200 Drainage 205 Stormwater Fund $1,153,000 $1,220,000 $1,732,000 $1,596,800 $5,701,800 235 Baypoint Lagoon Assessment District $120,000 $120,000 236 Loch Lomond Assessment District $20,000 $80,000 $100,000 603 Building Maintenance $50,000 $60,000 $110,000 Unfunded $0 $1,320,000 $550,000 $4,050,000 $5,920,000 Drainage Total $1,223,000 $2,800,000 $2,282,000 $5,646,800 $11,951,800 Parks 240 Parkland Dedication $100,215 $205,920 $306,135 241 Measure A $100,000 $560,000 $660,000 603 Building Maintenance $652,453 $221,000 $226,800 $996,800 Donations $10,000 $40,000 $50,000 Grants: CDBG (Federal) $127,750 $130,000 $257,750 Unfunded $0 $90,000 $292,200 $3,723,000 $4,105,200 Parks Total $990,418 $1,246,920 $519,000 $3,723,000 $6,375,885 Right-of-Way 1 General Fund $120,000 $120,000 206 Gas Tax $457,335 $4,418,860 $7,660,617 $5,281,747 $17,818,559 206 Gas Tax - RMRA $262,000 $455,000 $717,000 206 Gas Tax (Bungalow Set-aside) $800,000 $800,000 246 Traffic Mitigation Fund $4,759,746 $2,120,000 $6,879,746 401 RDA Bonds $1,584,749 $1,584,749 501 Parking Services $20,000 $20,000 Grants $7,678,366 $17,119,163 $6,909,216 $1,022,586 $32,729,331 Unfunded $1,350,000 $1,040,000 $2,390,000 Right-of-Way Total $16,212,196 $24,133,023 $16,409,833 $6,304,333 $63,059,385 Grand Total $20,422,614 $30,849,543 $23,171,433 $18,925,133 $93,265,270 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 8 Measure A – Open Space Measure A’s expenditure plan outlines three (3) programs for spending the sales tax proceeds. Each program is described by its funding allocation, and types of projects and activities that the funding supports. • County Parks and Open Space Program (65%) o 80% is to protect or restore natural resources, and maintain existing county parks and open space preserves. o 20% is dedicated to the permanent preservation of land for public open space, community separators, wildlife corridors, greenbelts, and habitat. • Farmland Preservation Program (20%) o To protect Marin County farmland at risk of subdivision and development and preserve Marin's working farms and ranches. • City, Town, and Applicable Special District Program (15%) o Funding is allocated to cities, towns, and special districts to manage parks, open space preserves, nature preserves, recreation programs, and vegetation to promote biodiversity and reduce wildfire risk. Of the 15% that is allocated to town, cities and special districts (approximately $2.08 million), the City of San Rafael receives 22.91% based on its population. In Fiscal Year 2018-2019 the projected Measure A tax revenue is $476,662. The City of San Rafael uses this funding to support park maintenance, removal and vegetation management, protection of open space, and park related capital improvement projects. The proposed project expenditures for Fiscal Year 2018-2019 were presented as part of the Operating and Capital Improvement Budgets to the Finance Committee on May 8, 2018. Historically the City has used Measure A funding to support four general activities: park maintenance, defensible space/vegetation management, protection of open space, and park improvements. Past expenditures include the renovation of basketball and tennis courts; repair and replacement of playground equipment, stairways, railing, restrooms, gates and pathways; and accessibility improvements; restroom and safety gates. Current projects in process include the replacement of the restroom facility at Bret Harte Park; Playground enhancements at Victor Jones Park and the replacement and expansion of the Albert Park Playground. In FY 2018-2019 the City will continue to support these activities with $763,399 in planned program expenditures. Community Wildfire Protection: the focus of the Fire Department’s vegetation management program is to reduce the risk of highly flammable vegetation, like juniper and bamboo, from causing large fires in residential areas. $122,555, or 16%, will support wildfire protection through vegetation management. The Measure A funding the department receives funds a fixed term Vegetation Management Specialist that works with property owners throughout the community to reduce the amount of highly flammable vegetation surrounding homes. Vegetation Management and Parks Maintenance: Public Works utilizes $155,000, or 21% in Measure A funding for a vegetation management and parks maintenance program that focuses on City parks and open space. The program relies on goats and vegetation “chipper days” to reduce invasive species and to control erosion. Preservation of Public Safety in Community Open Space: the police department has two (2) open space rangers dedicated to patrolling open space within the City of San Rafael. The purpose of these SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 9 rangers is to minimize the occurrence of illicit and illegal behavior in City parks and open space. A total of $75,509, or 10% of Measure A funding supports this function. Park Capital Improvements and Maintenance The City’s FY 18-19 Capital Improvement program will rely on $410,335, or 54% of Measure A funding to support the following park improvement projects in FY2018-19. Albert Park Improvement Project the City proposes utilizing $310,335 of Measure A funding in support of a redesign of the Albert Park playground area. The City has contracted with Abey/Arnold Associates, Landscape Architects, to conduct public meetings and develop design concepts for the park redesign which is also included in the City’s Capital Improvement Plan. Victor Jones Park Improvement Project this project includes accessibility and infrastructure improvements to Victor Jones Park, a 6-acre park located in the Glenwood neighborhood and will utilize $100,000 in Measure A funding in FY2018-19. These planned expenditures are summarized in the Measure A Work Plan for July 1, 2018 – June 30, 2019, which included as Exhibit I to the Resolution. FISCAL IMPACT Three-Year Capital Improvement Program There is no direct fiscal impact associated with the preliminary Capital Improvement Program because the information being provided is for the purpose of discussion, public input and direction to staff. Measure A - Open Space Work Plan The impact of approving the Measure A – Open Space Work Plan is the authorization of $763,399 in spending from restricted, Measure A tax proceeds. Projected available Measure A funds as of June 30, 2018 of $284,937, combined with projected FY2018-19 revenues of $476,662 are sufficient to support the proposed Work Plan. This Work Plan has no fiscal impact on the City’s General Fund. BUDGET DEVELOPMENT TIMELINE / NEXT STEPS Based on the feedback provided to staff pertaining to the preliminary Capital Improvement Program, coupled with the internal review of the city-wide operating budget (currently in development), staff will return to the Finance Committee at its public meeting of June 5, 2018. During this meeting staff will present for the Committee’s consideration the assumptions and results it has incorporated into a final, proposed FY2018-19 City-wide Operating and Capital Budget, planned for the City Council meeting of June 18, 2018. OPTIONS The City Council has the following options to consider relating to action proposed this item: 1. Adopt the Resolution as presented, approving the FY 2018-19 Measure A – Open Space Work Plan. 2. Adopt the Resolution with modifications, approving the Fiscal Year 2018-19 Operating Budget and Capital Improvement Program. 3. Do not adopt the Resolution; request City staff to return to the City Council at the June 4, 2018 meeting with a revised Measure A – Open Space Work Plan for consideration. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 10 RECOMMENDATION 1. Accept report regarding the Three-Year Capital Improvement Program. 2. Adopt a resolution approving the Fiscal Year 2018-19 Operating Budget and Fiscal Year 2018- 19 through Fiscal Year 2020-21 Capital Improvement Program. ATTACHMENTS 1. Preliminary Three-Year Capital Improvement Program (CIP) 2. Resolution i. Exhibit I to Resolution: Measure A Work Plan for July 1, 2018 – June 30, 2019 This page intentionally left blank. Section I. CIP Process .........................................................................................................................8 Section II. FY 2017-18 Completed Projects ..........................................................................................9 Section III: New Projects ................................................................................................................... 12 Major CIP Funding Sources ..................................................................................................................... 12 New Projects: CIP Funding Sources by Category .................................................................................... 14 New Projects: Funding Detail by Project ................................................................................................ 15 City-Owned Property .......................................................................................................................... 15 Drainage .............................................................................................................................................. 17 Parks .................................................................................................................................................... 17 Right of Way ........................................................................................................................................ 18 New Projects: Project Descriptions and Budget Detail ........................................................................... 19 City-Owned Property .......................................................................................................................... 19 C.01  Fire Station 54 Remodel ..................................................................................................... 19 C.02  Fire Station 55 Remodel ..................................................................................................... 19 C.03  519 Fourth Street Roof and Structural Upgrade ................................................................ 20 C.04  TL Community Center Floor Replacement – all rooms ...................................................... 20 C.05  Microwave Network for PSC .............................................................................................. 21 C.06  Falkirk Reroof ..................................................................................................................... 21 C.07  Library Restroom Addition ................................................................................................. 22 C.08  B Street Community Center Reroof ................................................................................... 22 C.09  Fifth and Garden Parking Lot Resurfacing ......................................................................... 23 C.10  Fire Station Generator ....................................................................................................... 23 C.11  Albert Park Ball Field Restrooms ........................................................................................ 24 C.12  Albert J. Boro Center Additional Parking ........................................................................... 24 C.13  B Street Community Center Parking Lot Resurfacing ........................................................ 25 C.14  Terra Linda Recreation Center Hardscape Repair .............................................................. 25 C.15  Court Street Fountain Repair ............................................................................................. 26 C.16  City Hall & Library Lighting and Landscaping Improvements ............................................ 26 C.17  Boyd Park Sidewalk ............................................................................................................ 27 C.18  Downtown Fiber Connection ............................................................................................. 27 C.19  Terra Linda Pool House Electrical Upgrades ...................................................................... 28 C.20  City Hall Fire Upgrades ....................................................................................................... 28 C.21  Third and A Street Parking Structure Repairs .................................................................... 29 C.22  Third and C Street Parking Structure Repairs .................................................................... 29 C.23  Third and Lootens Parking Structure Repairs .................................................................... 30 C.24  Resurface City Hall Parking Lots, Lower and Upper ........................................................... 30 C.25  Fire Station 55 & 56 Parking Lot Resurfacing ..................................................................... 31 C.26  Fourth Street Twinkle Lights Replacement ........................................................................ 31 C.27  B Street Concrete Entrance Reconstruction ...................................................................... 32 C.28  Library Book Shelving Replacement ................................................................................... 32 C.29  Internet Upgrade at Corp Yard........................................................................................... 33 C.H  Library Children’s Patio Enclosure ....................................................................................... 33 C.H  Library Painting .................................................................................................................... 34 Drainage .............................................................................................................................................. 35 D.1  Corrillo Drive Culvert Replacement ..................................................................................... 35 D.2  MCSTOPP – Catch Basin Trash Capture ............................................................................... 35 D.3  Canal Street Turn Structure and Filtration System .............................................................. 36 D.4  Spinnaker Point Salt Marsh Remediation ............................................................................ 36 D.5  San Mateo Court Headway Improvements ......................................................................... 37 D.6  Happy Lane Storm Drain Abandonment .............................................................................. 37 D.7  East Jessup Storm Water Improvements ............................................................................. 38 D.8  Second Street Drainage Improvements – Between C and E Streets ................................... 38 Parks .................................................................................................................................................... 39 P.1  Gerstle Park Playground Structure ....................................................................................... 39 P.2  Peacock Gap Playground Structure ...................................................................................... 39 P.3  Sun Valley Park Playground Structure.................................................................................. 40 P.4  Bernard Hoffman Playground Upgrade ............................................................................... 40 P.5  Santa Margarita Court Replacement ................................................................................... 41 P.6  Open Space Tree Assessment and Removal ........................................................................ 41 P.7  Starkweather Park Improvements ....................................................................................... 42 P.8  Terra Linda Community Center Play Area and Access Improvements ................................ 42 P.9  Bret Hart Landscape Walls ................................................................................................... 43 P.10  Waterline replacement – Falkirk Mansion ......................................................................... 43 P.11  Bernard Hoffman Drainage and Irrigation Improvements ................................................. 44 P.12  Albert J Boro Community Center Synthetic Field ............................................................... 44 Right-of-Way ....................................................................................................................................... 45 R.01  Francisco Blvd East Road Resurfacing ................................................................................ 45 R.02  Lincoln Avenue Bridge........................................................................................................ 45 R.03  Safe Routes to School – Davidson Phase 2 ........................................................................ 46 R.04  San Rafael High School Crosswalk ...................................................................................... 46 R.05  Central San Rafael Adaptive Traffic System Control .......................................................... 47 R.06  West End/Marquad Bulb Out and Bicycle Improvements ................................................. 47 R.07  Fourth Street Seat Wall Removal ....................................................................................... 48 R.08  201 D Street Driveway and Sidewalk Improvements ........................................................ 48 R.09  Fourth Street Curb Ramp Replacement ............................................................................. 49 R.10  Innovative Deployment of Enhanced Arterials (IDEA) ....................................................... 49 R.11  Tamalpais West Bike Lane ................................................................................................. 50 R.12  Grand Avenue Vehicle Bridge - Methacrylate ................................................................... 50 R.13  Restriping Andersen Bike Lanes ......................................................................................... 51 R.14  G Street Resurfacing Phase 2 ............................................................................................. 51 R.15  Third Street and Grand Intersection Improvements ......................................................... 52 R.16  Bellam/Andersen Intersection Improvements .................................................................. 52 R.17  76 D Street Hillside Revetment .......................................................................................... 53 R.18  Bungalow Ave. Reconstruction .......................................................................................... 53 R.19  Aerial Undergrounding of Utilities ..................................................................................... 54 R.20  Belvedere/Alto/Tiburon Intersection Improvements ........................................................ 54 R.21  Fairhills Drive Slide Repair .................................................................................................. 55 Rating for New Projects .......................................................................................................................... 56 City Owned Property ........................................................................................................................... 56 Drainage .............................................................................................................................................. 57 Parks .................................................................................................................................................... 57 Right of Way ........................................................................................................................................ 58 Section IV: Active Projects ................................................................................................................ 59 Active Projects: CIP Funding Sources by Category .................................................................................. 59 Active Projects: Funding Detail by Project .............................................................................................. 61 City-Owned Property .......................................................................................................................... 61 Drainage .............................................................................................................................................. 62 Parks .................................................................................................................................................... 62 Right of Way ........................................................................................................................................ 63 Active Projects: Project Descriptions and Budget Detail ........................................................................ 65 City Owned Property ........................................................................................................................... 65 C.A  B Street Community Center Restroom Remodel ................................................................. 65 C.A  B Street Community Center Safety System Upgrade - Stage Area ...................................... 65 C.A  City Hall Accessibility and Security Improvements .............................................................. 66 C.A  City Hall Second Floor Study ................................................................................................ 66 C.A  City Hall Switchgear Replacement ....................................................................................... 67 C.A  Downtown Library Assessment Study ................................................................................. 67 C.A  Essential Facilities: Fire Station 52 ....................................................................................... 68 C.A  Essential Facilities: Fire Station 57 ....................................................................................... 68 C.A  Essential Facilities: Public Safety Center .............................................................................. 69 C.A  Fifth Street and C Street Parking Garage Improvements .................................................... 69 C.A  PG&E Energy Updates .......................................................................................................... 70 C.A  Portable Building Replacement (Silveria & Dixie) ................................................................ 70 Drainage .............................................................................................................................................. 71 D.A  Cayes Pump Station Control System ................................................................................... 71 D.A  Las Casas Drainage Basin Repair ......................................................................................... 71 D.A  Los Gamos & Oleander Drainage (Study) ............................................................................ 72 D.A  Pump Station Communication System Upgrades ............................................................... 72 D.A  San Quentin Pump Station Reconstruction ......................................................................... 73 D.A  Sea Level Vulnerability Assessment .................................................................................... 73 D.AN  Stormwater Operations and Maintenance ....................................................................... 74 Parks .................................................................................................................................................... 75 P.A  Albert Park Improvements ................................................................................................... 75 P.A  Boyd Park Restroom ............................................................................................................ 75 P.A  Bret Hart Restroom .............................................................................................................. 76 P.A  Pickleweed Park and Schoen Park Improvements ............................................................... 76 P.A  Shoreline Park Restroom ..................................................................................................... 77 P.A  Victor Jones Park Improvements ......................................................................................... 77 Right of Way ........................................................................................................................................ 78 R.A  Andersen Drive At-Grade Crossing Improvements ............................................................. 78 R.A  Bicycle and Pedestrian Master Plan (BPMP) 2018 .............................................................. 78 R.A  East San Rafael Parking Signage and Stall Markings ............................................................ 79 R.A  First Street at Mahon Creek Wall Repair ............................................................................. 79 R.A  Francisco Blvd East Sidewalk Widening ............................................................................... 80 R.A  Francisco Blvd West Multi-Use Path .................................................................................... 80 R.A  Grand Avenue Pedestrian Bridge......................................................................................... 81 R.A  Lincoln Avenue Curb Ramps ................................................................................................ 81 R.A  Maintenance of Engineering & Traffic Studies .................................................................... 82 R.A  Merrydale Pathway – North Connector .............................................................................. 82 R.A  Program for Arterial Systems Synchronization (PASS) ........................................................ 83 R.A  PTAP Program ...................................................................................................................... 83 R.A  Second Street and Third Street Queue Cutters ................................................................... 84 R.A  Sidewalk Repair Program ..................................................................................................... 84 R.A  Slide Repair – 21 San Pablo .................................................................................................. 85 R.A  Slide Repair – 70 Irwin ......................................................................................................... 85 R.A  Slide Repair – 80 Upper Toyon ............................................................................................ 86 R.A  Smith Ranch Road Resurfacing ............................................................................................ 86 R.A  Southern Heights Bridge Replacement ................................................................................ 87 R.A  Third Street and Hetherton Improvements ......................................................................... 87 R.A  Third Street Improvements – Grand to Miracle Mile .......................................................... 88 R.A  Uncontrolled Pedestrian Crosswalk Rankings ..................................................................... 88 R.AN  Radar Feedback and Mid-block Crossing Flashing Signs ................................................... 89 R.AN  Street Resurfacing ............................................................................................................. 89 R.AN  Traffic Signal Controller Upgrades .................................................................................... 90 R.M  North San Pedro Median Improvement Project ................................................................. 90 •Develop a list of potential projects for next FY CIP. List includes: past years CIP projects, projects not completed last Fiscal Year, and new projects list provided by City department directors. Develop CIP List •Department directors meet with DPW to review the CIP list and prioritize projects for the next Fiscal Year. DPW develops a prioritized list of projects, rated by five categories: safety, required by law, will cause safety issues if not addressed, meets city goals and aesthetics. Prioritize CIP List •DPW examines the list of projects and provides a rough estimate of the project costs. Project Estimates •DPW works with Department of Finance to examine the available budget for each category and determine if enough funding is available for requested projects. Budget Analysis •DPW examines existing work load to determine if proposed projects can be accomplished with current staffing. Staffing Allocation •DPW develops the Draft CIP Document reviewed by Department Directors and the City Manager. Draft CIP Document •The Recommended CIP Document is brought to City Council for review to be included into next Fiscal Year's Budget. Recommended CIP Document The largest of the City Owned Property projects to be completed last year, the re-roofing of City Hall and the TL Community Center presented unique challenges as the structural supports and some of the underlying plywood had significantly deteriorated. City Hall is also a flat roof, and replacement entailed the removal of the existing roof and the installation of additional material under the roof membrane to provide better drainage and prevent ponding. Both roof replacements were successfully completed January 2018. The City Hall lobby has a noticeably new and modern look. The old "Sister City" shelf was removed and two new display monitors were installed in its place. All items from the Sister City display were documented and carefully packed away until a new home is found. These new monitor displays announce facts about the City, employee recognition, and alternate through photographs from places within San Rafael. Content is updated regularly by the City Manager’s office. The exterior painting of the Boyd House was completed in January 2018. A historical building with intricate details, Boyd House required significant repair to the wooden exterior prior to painting, this included the replacement of the second story balcony and window frames due to wood rot. The San Rafael Heritage group helped with final color selections to ensure the color stayed true to the historical character of downtown San Rafael. The Mission and E Parking lot (located across Mission from the Library and adjacent to Falkirk) had fallen into a significant state of disrepair over time: cracked asphalt had eroded causing large potholes and the second half of the lot was still gravel. The project included resurfacing the entire parking lot with asphalt, restriping, adding new ADA signage, and building a new driveway apron. It was completed in October 2017. The Freitas Ditch is a V-channel that conveys stormwater down the center of Manuel T. Freitas Parkway, a critical component of the stormwater drainage system in Terra Linda. In several parts, the concrete had deteriorated and broken to the point where the drainage flow was compromised. The project was designed in-house and completed by the contractor with a few weeks of a notice to proceed. Inspections during the rains in spring 2018 revealed that the new concrete is functioning well. A failed major storm drain culvert was replaced behind 7 Beechwood Court last fall. Since the area is ecologically sensitive, it was important to also ensure that the new system was compatible with existing wildlife. Recent inspections reveal that much of the upper banks have been populated by native grasses that were planted post-construction and native horse tail has naturally established itself, and has proliferated at the lower bank and within the channel. The Freitas Las Gallinas intersection was completed early April 2018. The largest traffic circulation improvement in years, the project greatly increased overall capacity for the busy intersection which serves schools, a hospital, and San Rafael largest shopping complex. The bridge across the drainage channel was replaced and widened allowing left turn lanes to operate simultaneously. Bike-ped improvements included bike lanes, new sidewalks and wheelchair ramps, landscaping, and installing an irrigation system for future use. The roadway was restriped with new paving markings. The project notice of completion went to Council in May 2018. Improvements on Second and Grand Avenue intersections included underground electrical work, wheelchair ramp replacements on the northwest corner adjacent to United Market, new electrical pipes under the roadway, foundations for the traffic signal cabinets, and new traffic poles. Striping, signage, and the installation of a new improved traffic signal at the Second and Grand intersection was completed early February 2018. As one of the busiest intersections in the City, 3rd and Irwin receives considerable wear, resulting over time in uneven surfaces and cracked asphalt. The repaving of the intersection had to be coordinated closely with Caltrans, and construction was completed at night so as to minimize the impact of traffic. The grinding out of old asphalt and repaving was completed in summer 2017. This study evaluated the existing parking conditions within East San Rafael and provided plausible parking strategies that could be implemented to relieve the area of negative impacts caused by high parking demands. The subareas of study included the Canal Neighborhood subarea, Bahia subarea, Spinnaker and Baypoint Neighborhood subarea, Kerner Boulevard subarea, and the Commercial subarea. Modifications at 3rd Street and Cijos Street were made as a part of the new Golden Gate Transit Center route changes and were needed to accommodate for buses to safely negotiate the turn from 3rd onto Cijos. Improvements included widening the turn radius from 3rd Street to Cijos Street, installing new accessible curb ramps, a bulb-out on the turn from Cijos to 3rd, and accessibility improvements in the adjacent parking lot. The project replaced an outdated storm drain system, installed new curb ramps, and resurfaced the street following detailed coordination with several utility companies, residents, and Marin Academy. After weeks of coordination with property owners, all residents on G Street who desired to perform last minute sewer lateral repairs were able to do so prior to the street being resurfaced. The project was completed in fall 2018 after the contractor installed the new roadway striping. • • • • • Fund Fund Name Fund Description 205 Stormwater Established to fund Stormwater maintenance, programs, and improvements throughout the City—including maintenance and repair of the City’s 12 storm water pump stations. Receives annual revenues of approximately $850,000 from the City’s Stormwater Activity fee (Municipal Code Chapter 9.40). Standard operations and maintenance for pump stations and drainage systems amounts to $850,000/year, therefore large capital improvements on pump stations and drainage projects remain unfunded. 206 Gas Tax Gas Tax is a percentage tax on each gallon of gas purchased in San Rafael. Gasoline tax is collected and distributed to jurisdictions by the State on an annual basis, and may be used for capital projects and maintenance to local streets, roads, and Right-of-Ways. This fund also collects local dollars for Right-of-Way improvements including, for example, local Measure A funds (distributed by Transportation Authority of Marin). In April 2017, Governor Jerry Brown signed Senate Bill 1: The Road Repair and Accountability Act to address the need for additional funding for transportation and infrastructure in California. Senate Bill 1 increased per gallon fuel excise taxes, diesel fuel sales taxes and vehicle registration fees. The gas tax funds provided under Senate Bill 1, Road Maintenance and Rehabilitation Account (RMRA) must be tracked and reported on separately than other gas tax funds. In the CIP they are noted as “Gas Tax - RMRA”. 208 Childcare Fund Projects identified in the CIP as utilizing the Childcare Fund are strictly for the facility improvements as related to the City’s childcare centers. 235 Baypoint Lagoon Assessment District The Baypoint Lagoons Lighting and Landscape District was formed to protect and enhance wildlife habitat and water quality in Baypoint (Spinnaker) Lagoon and the adjacent diked salt marsh. 236 Loch Lomond Assessment District The Loch Lomond (Melo-Roos) Assessment District was established in 1992 to pay for the repair and maintenance of Storm Water system infrastructure in the district’s defined area. 240 Parkland Dedication This fund was established to account for long-term developer deposits used to enhance and maintain City park infrastructure. 241 Measure A Measure A is a nine year 0.25 percent transactions and use tax that was passed in 2012 and is managed by the County of Marin. The purpose of the tax is to care for existing parks and open spaces, support regional community parks, projects, and programs and to further farmland restoration. Funding allocations for Measure A dollars within the City of San Rafael are coordinated by Finance on an annual basis. 246 Traffic Mitigation San Rafael uses the Traffic Mitigation Fund to collect developer contributions to be used to defray the cost of public projects necessitated by the development project. Projects funded through the Traffic Mitigation Fund are identified in Exhibit 21 of Policy 6A of General Plan 2020. Some of the balance in the fund is being held in anticipation of major public right-of-way projects identified in the General Plan 2020. 420 Measure E Measure E was passed by the voters of San Rafael in November 2013 extending an existing 0.5% sales tax for 20 years and adding 0.25% (25 cents on a $100 purchase). On February 3, 2014, the San Rafael City Council directed staff to set aside the revenues from the added quarter percent to begin to address our aging essential facilities, including making critical improvements to our public safety facilities in San Rafael. In July 2015 the City Council approved a strategic plan for essential public safety facilities in San Rafael. The plan recommends seven projects including a new public safety center across from City Hall that will house both the police and fire departments. In addition, the plan recommends upgrades to the other fire stations for seismic safety and operational improvements. 501 Parking Services Projects identified in the CIP as utilizing the Parking Services Fund are strictly for the facility improvements as related to the City’s parking facilities. 603 Building Maintenance The Building Maintenance Fund supports capital and maintenance project associated with the City’s buildings, parks and other facilities. The Building Fund is an internal revenue fund, which means General Fund monies are the sole source of revenue for the fund. For the last several years, the General Fund has contributed $500,000 towards the Building Fund. On occasion, as additional funding is identified e.g. in the form of unspent General Fund allocations for other Public Works projects, one-time monies may be transferred into the Building Fund, allowing the Fund to accumulate a modest fund balance for larger capital improvement projects. City- Owned Property, Parks, and Drainage projects are all funded by the Building Fund. Since $500,000 does not fully provide for the capital needs of these facilities, many projects in these categories are also listed as Unfunded. Grants (various) The Department has and will continue to aggressively seek grant funding for major capital projects. Grant funding is most available from local, State, and Federal agencies for transportation projects, especially after the recent passage of Senate Bill 1. Emergency grants (such as Hazard Mitigation funds) is also made available after large natural disasters such as the North Bay Fires. There are grants that exist for City facilities and parks, but San Rafael is often less competitive for these grants compared to other similar sized cities in the Bay Area due to the demographic and socioeconomic make-up of the City. It is important to note that often with small projects (>~$75,000), seeking grants is not always cost beneficial. There can be significant paperwork, administrative time, and environmental review required with grant funding (especially federal). For small projects, the cost of administration and additional review processes required for grant applications may not be worth the funding received. Unfunded Projects listed as Unfunded in the CIP are ones where City funding sources (e.g. Building Fund, Stormwater Fund) cannot cover them, and grant funding has not been identified or secured. These projects will be the City’s priority in secur ing funding in the coming year. The following table summarizes the funding sources identified for all proposed new projects. The total required to execute all proposed projects for that fiscal year are totaled in the table below at the CIP Category level. In cases where proposed projects exceed the available funding, the funding source for the project will be listed as “Unfunded”. See the following section “Funding Detail by Project” for a detailed breakdown of the funding source for each individual proposed new project. Note that the totals below are for New Projects only. Active Projects already in design or construction also utilize the same funding sources, and therefore some of the current funds available in funds such as the Building Maintenance Fund are set aside for completion of these Active projects, and therefore not made available to allocate towards new projects. The funding summary and detail for Active Projects can be found in Section IV. CIP Project Type Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total City Owned Property 420 Measure E $1,934,956 $5,561,160 $7,496,116 501 Parking Services $1,295,000 $1,295,000 603 Building Maintenance $288,000 $288,000 Unfunded $330,000 $2,635,600 $251,000 $3,216,600 City Owned Property Total $618,000 $5,865,556 $5,812,160 $12,295,716 Drainage 205 Stormwater Fund $70,000 $732,000 $596,800 $1,398,800 Unfunded $120,000 $300,000 $300,000 $720,000 Grants: Unsecured $250,000 $3,750,000 $4,000,000 Drainage Total $190,000 $1,282,000 $4,646,800 $6,118,800 Parks 603 Building Maintenance $226,800 $226,800 Unfunded $90,000 $292,200 $153,000 $535,200 Grants: Unsecured $3,570,000 $3,570,000 Parks Total $90,000 $519,000 $3,723,000 $4,332,000 Right-of-Way 206 Gas Tax $684,833 $5,636,000 $3,728,000 $10,048,833 206 Gas Tax (Bungalow Set-aside) $800,000 $800,000 246 Traffic Mitigation Fund $500,000 $500,000 Grants: Unsecured $37,500 $262,000 $299,500 IDEA Grant (MTC) $832,030 $119,333 $119,333 $1,070,696 Right-of-Way Total $2,016,863 $6,592,833 $4,109,333 $12,719,029 Grand Total $2,914,863 $14,259,389 $18,291,293 $35,465,545 Project Numbering Key: C City Owned Property .01 A number indicates a new project. 01= highest priority D Drainage .A Indicates an active project P Parks .H Project on hold R Right of Way .AN Indicates an annual project. E.g. operations and maintenance costs The following tables identify the funding source for each proposed new project. For projects where funding needed exceeds available funding for respective funding sources (e.g. the Building Maintenance Fund), the project funding source is tentatively listed as “Unfunded”. Number Project Name Fund Funding Source Prior Year Funding FY 2018- 19 Total FY 2019-20 Total FY 2020-21 Total Total C.01 Essential Facilities: Fire Station 54 Remodel 420 Measure E $990,042 $2,896,740 $3,886,782 C.02 Essential Facilities: Fire Station 55 Remodel 420 Measure E $944,914 $2,664,420 $3,609,334 C.03 519 Fourth Street Roof and Structural Upgrade Unfunded $470,000 $470,000 C.04 TL Community Center Floor Replacement - all rooms 603 Building Maintenance $88,000 $88,000 C.05 Microwave Network for PSC Unfunded $80,000 $80,000 C.06 Falkirk Reroof 603 Building Maintenance $200,000 $200,000 Unfunded $330,000 $330,000 C.07 Library Restroom Addition Unfunded $200,000 $200,000 C.08 B Street Community Center Re- Roof Unfunded $200,000 $200,000 C.09 Fifth and Garden Parking Lot Resurfacing 501 Parking Services $75,000 $75,000 C.10 Fire Station Generator Unfunded $60,000 $60,000 C.11 Albert J. Boro Center Additional Parking Unfunded $220,000 $220,000 C.12 Albert Park Ball Field Restrooms Unfunded $50,000 $50,000 C.13 B Street Community Center Parking Lot Resurfacing Unfunded $263,000 $263,000 C.14 Terra Linda Recreation Center Hardscape Repair Unfunded $60,000 $60,000 C.15 Court Street Fountain Repair Unfunded $150,000 $150,000 C.16 City Hall & Library Lighting and Landscaping Improvements Unfunded $50,000 $50,000 C.17 Boyd Park Sidewalk Unfunded $80,000 $80,000 C.18 Downtown Fiber Connection Unfunded $150,000 $150,000 C.19 Terra Linda Pool House Electrical Upgrades Unfunded $110,600 $110,600 C.20 City Hall Fire Upgrades Unfunded $90,000 $90,000 C.21 Third and A Street Parking Structure Repairs 501 Parking Services $500,000 $500,000 C.22 Third and C Street Parking 501 Parking Services $145,000 $145,000 Number Project Name Fund Funding Source Prior Year Funding FY 2018- 19 Total FY 2019-20 Total FY 2020-21 Total Total Structure Repairs C.23 Third and Lootens Parking Structure 501 Parking Services $575,000 $575,000 C.24 Resurface City Hall Parking Lots, Lower and Upper Unfunded $130,000 $130,000 C.25 Fire Stations 54 & 55 Parking Lot Resurfacings Unfunded $101,000 $101,000 C.26 Fourth Street Twinkle Lights Replacement Unfunded $150,000 $150,000 C.27 B Street Community Center Concrete Entrance Reconstruction Unfunded $60,000 $60,000 C.28 Library Book Shelving Replacement Unfunded $30,000 $30,000 C.29 Internet Upgrade at Corp Yard Unfunded $50,000 $50,000 C.H Library Children's Patio Enclosure Unfunded $72,000 $72,000 C.H Library Painting Unfunded $60,000 $60,000 Grand Total $618,000 $5,865,556 $5,812,160 $12,295,716 Number New Project Name Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total D.01 Corrillo Drive Culvert Replacement 205 Stormwater Fund $70,000 $70,000 D.02 MCSTOPP - Catch Basin Trash Capture Unfunded $120,000 $300,000 $300,000 $720,000 D.03 Canal Street Turn Structure and Filtration System 205 Stormwater Fund $500,000 $500,000 D.04 Spinnaker Point Salt Marsh Remediation Grants: Unsecured $250,000 $3,750,000 $4,000,000 D.05 San Mateo Court Headway Improvements 205 Stormwater Fund $80,000 $80,000 D.06 Happy Lane Storm Drain Abandonment 205 Stormwater Fund $45,000 $45,000 D.07 East and Jessup Storm Improvements 205 Stormwater Fund $218,400 $218,400 D.08 Second Street Drainage Improvements - Between C and E Streets 205 Stormwater Fund $107,000 $378,400 $485,400 Grand Total $190,000 $1,282,000 $4,646,800 $6,118,800 Number New Project Name Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total P.01 Gerstle Park Playground Structure 603 Building Maintenance $75,600 $75,600 P.02 Peacock Gap Park Playground Structure 603 Building Maintenance $75,600 $75,600 P.03 Sun Valley Park Playground Structure 603 Building Maintenance $75,600 $75,600 P.04 Bernard Hoffman Playground Upgrade Unfunded $75,000 $75,000 P.05 Santa Margarita Court Replacement Unfunded $77,200 $77,200 P.06 Open Space Tree Assessment and Removal Unfunded $45,000 $45,000 $45,000 $135,000 P.07 Starkweather Park Improvements Unfunded $50,000 $50,000 P.08 Terra Linda Community Center Play Area and Access Improvements Unfunded $58,000 $58,000 P.09 Bret Hart Landscape Walls Unfunded $45,000 $45,000 P.10 Waterline replacement - Falkirk Mansion Unfunded $45,000 $45,000 P.11 Bernard Hoffman Drainage and Irrigation Improvements Unfunded $50,000 $50,000 P.12 Albert J Boro Community Center Synthetic Field Grants: Unsecured $3,570,000 $3,570,000 Grand Total $90,000 $519,000 $3,723,000 $4,332,000 Number New Project Name Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total R.01 Francisco Blvd East Resurfacing 206 Gas Tax $980,000 $980,000 R.02 Lincoln Avenue Bridge Repair 206 Gas Tax $60,000 $60,000 R.03 Safe Routes to School – Davidson Phase 2 206 Gas Tax $100,000 $100,000 R.04 San Rafael Highschool Crosswalk 206 Gas Tax $37,500 $313,000 $350,500 R.05 Central San Rafael Adaptive Traffic System Control 206 Gas Tax $500,000 $1,500,000 $2,000,000 R.06 West End/Marquad Bulb Out and Bicycle Improvements 206 Gas Tax $75,000 $250,000 $325,000 R.07 Fourth Street Seat Wall Removal 206 Gas Tax $150,000 $150,000 R.08 201 D Street Driveway and Sidewalk Improvements 206 Gas Tax $75,000 $75,000 R.09 Fourth Street Curb Ramp Replacement 206 Gas Tax $48,000 $48,000 $48,000 $144,000 R.10 Innovative Deployment of Enhanced Arterials (IDEA) 206 Gas Tax $119,333 $119,333 IDEA Grant (MTC) $832,030 $119,333 $119,333 $1,070,696 R.11 Tamalpais West Class IV Buffered Bike Lane 246 Traffic Mitigation Fund $500,000 $500,000 R.12 Grand Avenue Vehicle Bridge - Methacrylate 206 Gas Tax $50,000 $50,000 R.13 Restriping Andersen Bike Lanes 206 Gas Tax $45,000 $45,000 R.14 G Street Resurfacing Phase 2 206 Gas Tax $375,000 $375,000 R.15 Third Street and Grand Intersection Improvements Grants: Unsecured $37,500 $262,000 $299,500 R.16 Bellam/Andersen Intersection Improvements 206 Gas Tax $50,000 $350,000 $400,000 R.17 76 D Street Hillside Revetment 206 Gas Tax $75,000 $75,000 R.18 Bungalow Avenue Reconstruction 206 Gas Tax (Bungalow Set- aside) $800,000 $800,000 R.19 Aerial Undergrounding of Utilities 206 Gas Tax $4,000,000 $4,000,000 R.20 Belvedere/Alto/Tiburon Intersection Improvements 206 Gas Tax $100,000 $400,000 $500,000 R.21 Fairhills Drive Slide Repair 206 Gas Tax $200,000 $200,000 R.M North San Pedro Median Improvement Project 206 Gas Tax $100,000 $100,000 Grand Total $2,016,863 $6,592,833 $4,109,333 $12,719,029  Remodel the existing fire station – built in 1964 – to meet current state and local codes for the safety of the fire fighters and the residents they serve. This is part of Phase II of the strategic plan approved in July 2015 for essential public safety facilities in San Rafael, funded by Measure E. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $990,042 Construction $2,896,740 Other + Contingency  This includes a seismic retrofit, remodel and minor expansion. This is part of Phase II of the strategic plan approved in July 2015 for essential public safety facilities in San Rafael, funded by Measure E. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $944,914 Construction $2,664,420 Other + Contingency Front of Fire Station 54 Fire Station 55  The City of San Rafael obtained this building from Marin County. It is currently being used as a temporary facility for Fire Station 52 housing fire trucks while the new Fire Station 52 is built. This project entails repairing old and damaged roof sections, and anchoring the roof to the building to bring the roof up to code. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $60,000 Construction $330,000 Other + Contingency $80,000  Replace the buckled flooring in the Terra Linda Community Center. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $8,000 Construction $68,000 Other + Contingency $12,000 Example of 519 Roof Condition TL Community Center  Install microwave equipment at the PSC that can transmit to the tower on Dollar Hill or China Camp. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $7,000 Construction $64,000 Other + Contingency $9,000  The roof at Falkirk currently leaks and has been repaired and patched a number of times in recent winters. Leaks in the historic structure can cause long term damage to the building structure and its interior finishes. Re-roofing would include a new roof and flashing as well as an inspection of the structure below the roofing membrane. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $50,000 Construction $380,000 Other + Contingency $100,000 Example of microwave system Falkirk current roof conditions  Refurbish or install a new restroom facility in the current building which is compliant with current standards. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $18,000 Construction $160,000 Other + Contingency $22,000  This project includes re-roofing the work areas and meeting rooms at the B Street Community Center. The Auditorium has recently been re-roofed. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $35,000 Construction $150,000 Other + Contingency $15,000 B Street Community Center Roof  This project includes resurfacing the small parking area located behind Mike's Bikes at Fifth and Garden. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $15,000 Construction $50,000 Other + Contingency $10,000  Install generator systems at Fire Station 56 to provide backup power during emergency events. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $48,000 Other + Contingency $7,000 5th and Garden parking lot from 5th Street  The restrooms that serve the Albert Park Ball Field are not currently accessible to persons with disabilities. This has resulted in the seasonal rental of disability-accessible portable restrooms. This project would be to retrofit the current restrooms so as to accommodate full access. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $40,000 Other + Contingency $5,000  The East San Rafael Parking Study (completed in summer 2017) identified several proposed solutions to the parking crunch experienced in the Canal, Spinnaker Point, and Baypoint neighborhoods. Among the proposed solutions was the installation of additional parking on City property around the Boro Center, which is currently undeveloped space. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $14,000 Construction $181,000 Other + Contingency $25,000 Current conditions of Albert Park Ball Field Restrooms Parking installation options presented in the W Trans July 2017 report  This project includes resurfacing the parking area at the B Street Community Center. The project will include full 2” grind and overlay with signs and striping. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $16,000 Construction $200,000 Other + Contingency $47,000  This project includes replacing the hardscape area behind the Community Center utilized by the basketball court. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $48,000 Other + Contingency $7,000 Pavement in the B Street Parking lot Pavement in the B Street Parking lot  The front concrete on the existing fountain structure in the Court Street Plaza is separating from the support structure. This project includes the repair of the concrete or the installation of another type of system in the Plaza. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $13,000 Construction $120,000 Other + Contingency $17,000  This project includes design and improvements to the landscaping and lighting around the City all and the downtown library facility. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $10,000 Construction $35,000 Other + Contingency $5,000 Pipe system and concrete at Court Street Fountain Landscaping outside of City Hall entrance  Install a compliant sidewalk in front of Boyd Park to Menzies. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $7,000 Construction $64,000 Other + Contingency $9,000  Install a connection from the SMART rail system where we have a conduit to the Public Safety Center. A fiber optic internet connection transfers data fully or partially via fiber optic cables. Fiber optics cables are a significantly faster and more reliable connection than utilizing existing telephone lines for internet speeds and connection. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $13,000 Construction $120,000 Other + Contingency $17,000 Landscaping outside of City Hall entrance Fiber optic cables are made of thin glass wires  This project includes the review, design and replacement of the electrical panel systems within the Terra Linda Pool House. These systems are corroded and deteriorated due to other chemicals being stored within the same area along with a moist environment. The project will evaluate whether the existing panel can be placed in the same area and upgraded or relocated to another area that is less corrosive. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $25,000 Construction $65,600 Other + Contingency $20,000  This project includes improvements to fire safety features at City Hall. The building was built over 40 years ago and requires upgrades to the existing fire suppression to meet current standards. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $8,000 Construction $72,000 Other + Contingency $10,000 Terra Linda Pool House electrical panel systems Fire extinguisher in the City Hall Council Chambers  The project includes the removal and replacement of joint seal material and epoxy injection of existing cracked section as well as resealing slabs on all levels. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $30,000 Construction $400,000 Other + Contingency $70,000  This project includes epoxy injection of existing cracked concrete as well improvements to the exterior Insulation Finishing System. Accessibility improvements will be made to provide better entry to the facility. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $10,000 Construction $115,000 Other + Contingency $20,000 3rd and C parking structure 3rd and A parking structure  This project is recommended based on a report prepared in 2014 which recommended structural improvements to this garage. Improvements include but are not limited to installing expansion joints, repair of spalled deck areas, repair of the wearing surface and other improvements. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $50,000 Construction $450,000 Other + Contingency $75,000  This project includes resurfacing the parking lot at City Hall. Construction of the project will likely not take place until the Public Safety Center construction is complete, and the temporary Fire Station 1 is moved out of the upper City Hall parking lot. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $8,000 Construction $107,000 Other + Contingency $15,000 3rd and Lootens parking structure Upper City Hall parking lot  This project includes resurfacing applying treatments to the existing parking areas at Fire Station 55 and 56. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $48,000 Other + Contingency $7,000  This project includes replacing the twinkle lights on the trees in downtown. Economic Development is working with the downtown business community to decide whether the twinkle lights should be replaced as is (strung in the trees) or whether there should be a lower cost and easier to maintain option e.g. stringing utility poles. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $13,000 Construction $120,000 Other + Contingency $17,000 Driveway and parking lot at Fire Station 55 Driveway at Fire Station 56 Fourth Street Twinkle Lights  This project includes design and reconstruction of the entrance area to the B Street Community Center. Project will include the design and replacement of concrete to the entrance and possibly the incorporation of a drop off area. It would be good to couple this work with the completion of the Albert Park Improvements. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $48,000 Other + Contingency $7,000  Replace existing deteriorating shelving in the downtown library. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $3,000 Construction $24,000 Other + Contingency $3,000 Concrete patio, facing front entrance  The Public Works Corp yard and offices (located in East San Rafael) are currently served by a standard telephone line internet connection. This project would be to install and provide a fiber optic connection to Public Works, which would greatly increase both internet speeds and reliability. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $4,000 Construction $40,000 Other + Contingency $6,000  This project includes improvements to the Children’s Patio area at the downtown library. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $35,556 Construction $32,000 Other + Contingency $4,444 Public Works offices Children’s patio area (currently outdoors)  This project includes repainting the interior of the downtown library. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $60,000 Other + Contingency  This project includes replacing a culvert between two houses at the end of Corrillo Dr. (Flood zone 6 adding 150k). Could be temporarily lined. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $6,000 Construction $56,000 Other + Contingency $8,000  This project includes implementation of an unfunded mandate from the state requiring local jurisdictions to install trash capture devices. The City will be required to install devices over a 10 year period without funding from the state. The amount noted is an estimate of an annual amount needed to implement these systems. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $120,000 $300,000 $300,000 Other + Contingency GIS map of Corrillo Dr where pipe runs Pipe at Corrillo Drive to be replaced Example of a trash capture device  This project is located on Canal where we had a CMP Failure in the past. The project includes installing a turn structure at this location which incorporates a filtration device. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $44,000 Construction $400,000 Other + Contingency $56,000  This project includes providing additional water circulation to the Spinnaker Point Salt Marsh which develops algae decay during hot weather which smells. Three options were developed in the preliminary study prepared in 2014. At this point the City does not have funding for this project, but continues to seek grant opportunities to cover the costs. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $250,000 Construction $3,750,000 Other + Contingency Canal Street filtration system Spinnaker Point Salt Marsh from the Shoreline pathway  This project includes improvements to minimize siltation that occurs behind a headwall on San Mateo Court. A gabion wall may be needed to control siltation. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $7,111 Construction $64,000 Other + Contingency $8,889  This project includes filling an abandoned pipe with grout which runs under some homes. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $4,000 Construction $36,000 Other + Contingency $5,000 San Mateo Court Headway Example of grout work  This project includes the installation of a storm water drain on East and Jessup Streets. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $188,400 Other + Contingency $30,000  This project includes removing and replacing Storm Water systems between C and E to minimize flooding on the roadway. The work will include the installation of culverts and drainage inlets. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $107,000 Construction $318,400 Other + Contingency $60,000 Curb and gutter at East and Jessup Curb and drainage on 2nd Street  This project includes the replacement of the existing playground structure at Gerstle Park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $10,000 Construction $55,600 Other + Contingency $10,000  This project includes the replacement of the existing playground structure at Peacock Gap Park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $10,000 Construction $55,600 Other + Contingency $10,000 Play structure at Gerstle Park Current Playground Structure at Peacock Park  This project includes the replacement of the existing playground structure at Sun Valley Park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $10,000 Construction $55,600 Other + Contingency $10,000  Replace the playground equipment at this park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $7,000 Construction $60,000 Other + Contingency $8,000 Current playground structure at Sun Valley Park Current playground structure at Bernard Hoffman  This project includes repairing the court surface and miscellaneous equipment in the court area at Santa Margarita Park. Access improvements may be necessary for this project. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $77,200 Other + Contingency  This project is to create an annual allocation for assessing trees in open space that present fire hazards. This fuel reduction is an important piece of San Rafael’s Vegetation Management Plan in light of recent large scale and highly destructive wildfires in the North Bay. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $45,000 $45,000 $45,000 Other + Contingency Santa Margarita Tennis Court Fallen tree during winter storm  This project includes improvements to the shoreline pathway with informational signage and updated exercise equipment. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $43,000 Other + Contingency $7,000  This project includes improvements to the Terra Linda Community Center Play area and providing a compliant path of travel to that play area. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $50,000 Other + Contingency $8,000 Shoreline trail from Starkweather Park Pathway to side of TL Community Center  Add walls and planting to the slope area opposite the basketball court. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $4,000 Construction $36,000 Other + Contingency $5,000  Replace waterline to the entire facility. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $4,000 Construction $36,000 Other + Contingency $5,000 The current waterline at Falkirk  Improve the field area, install new irrigation, update the current softball area including the dugout and seating area. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $4,444 Construction $40,000 Other + Contingency $5,556  This project includes replacing the existing turf area at Albert J Boro Community Center (Pickleweed Park) with a synthetic field. Allocation of $25k annually is needed to further identify funding and harbor support for this project. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $3,120,000 Other + Contingency $450,000 Current field at ALJB Community Center  This project includes resurfacing Francisco Blvd. East from Vivian to Grand Ave. Bridge. This work to occur after sidewalk is in place. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $60,000 Construction $808,000 Other + Contingency $112,000  Patch spalls in bent cap and columns - This project is recommended by CalTrans. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $48,000 Other + Contingency $7,000 Francisco Blvd East from Medway Rd. Intersection Lincoln Avenue Bridge  This project includes improvements on the backside of Davidson School to improve access and safety for students and parents dropping off. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $100,000 Other + Contingency  Install a midblock crossing signal for pedestrian at San Rafael High School. The project is scheduled ahead of the other crosswalk safety improvements planned due to the current and ongoing construction at San Rafael High School. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $37,500 Design $28,000 Construction $250,000 Other + Contingency $35,000 Lovell Avenue San Rafael High School and Third St.  This project takes much of the infrastructure and hardware in the Innovative Deployment of Enhanced Arterials (IDEA) project (Project R.10) and adds software and design that would allow traffic signals in Central San Rafael to adapt on their own to real time traffic conditions. As part of this project, signals would need to be interconnected via conduit. The installation of this conduit would be a large portion of the cost of the project. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $250,000 Design $111,111 Construction $1,250,000 Other + Contingency $138,889  This is a project to improve sight distance in pedestrian safety at this intersection. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $75,000 Design $22,222 Construction $200,000 Other + Contingency $27,778 Adaptive Traffic System Miracle Mile intersection of 2nd and 4th streets from above  This project is to remove the seat walls at 4th and A Street, and replace them with additional seating, planting and irrigation. The plan includes curb cuts and additional road paving upgrades. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $150,000 Other + Contingency  This project includes improvements to an existing crosswalk below Wolfe Grade. Addition drainage improvements may be needed too. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $7,000 Construction $60,000 Other + Contingency $8,000 Seat wall benches at 4th and A Street 201 D Street Crosswalk  This multi-year project includes installation of American’s With Disabilities Act (ADA) compliant curb ramps along 4th Street. This ensures that persons with disabilities have access to pedestrian routes in the public right-of-way. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $48,000 $48,000 $48,000 Other + Contingency  This project, will deploy Automated Traffic Signal Performance Measures (ATSPM) to 54 signals in Central San Rafael. This system will allow the City to gather real-time traffic data for analysis. The City will be able to re-time traffic signals in Central San Rafael based on observed patterns from collected data to improve travel time, congestion, safety, and air quality. This project may take up to 3 years to implement and is necessary prior to the implementation of the Central San Rafael Adaptive Traffic Signal Control System project (Project R.05). Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $119,333 Design Construction $832,030 $119,333 $119,333 Other + Contingency Fourth Street curb ramp needing ADA curb ramp installation IDEA Grant  This project would create a bicycle lane on Tamalpais West, and repave the existing roadway. The project would connect the Lincoln Hill Bike Path to the Downtown SMART Station, as well as the future Francisco Blvd. West Multi-Use Pathway. The project would provide a safe and accessible route through the area and close a critical gap in the countywide north south pathway. The project is outlined in the Downtown San Rafael Station Area Plan (2012) and the Bicycle Pedestrian Master Plan (2011). In Spring 2018 the department initiated a pilot testing of a class IV buffered bike lane along Tamalpais West and will evaluate the project based on data collected and community feedback. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $500,000 Other + Contingency  This project is recommended by Caltrans to treat cracks in the concrete deck. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $4,000 Construction $40,000 Other + Contingency $6,000 Tamalpais West Bike Lane Grand Avenue Bridge  This project includes installing additional striping and signage on Andersen for the current North South Bike lane. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $2,137 Construction $38,855 Other + Contingency $4,008  This project includes resurfacing and drainage improvements from 4th to Mission. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $23,000 Construction $309,000 Other + Contingency $43,000 G Street  This project includes improving the signal systems by adding mast arms at key locations. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $37,500 Design $23,000 Construction $210,000 Other + Contingency $29,000  This project includes sidewalk improvements under the 101 overpass as well as improvements to the signal system at this intersection. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $50,000 Design $31,111 Construction $280,000 Other + Contingency $38,889 3rd and Grand Intersection Bellam Blvd under the Highway 101 overpass  Excavate vertical slopes and create a flat bench for material to collect in future storm events. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $7,000 Construction $60,000 Other + Contingency $8,000  This project includes the removing obsolete curb and gutter, lowering the roadway surface, installing a new roadway surface as well as replacing an existing drainage pipe. Sidewalk and curb ramps as well as driveway approaches are included in this project. Previous CIP's have set aside 100,000 annually for this project with construction occurring in FY2019/20 at an estimated cost of 800,000. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $700,000 Other + Contingency $100,000 76 D Street hillside damage Bungalow Ave.  This project is known as a rule 20A project to underground utilities on City streets based on funding collected by PG&E. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $355,000 Construction $3,200,000 Other + Contingency $445,000  This is a project to improve sight distance in pedestrian safety at this intersection Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $100,000 Design $35,000 Construction $320,000 Other + Contingency $45,000 Example of overhead utilities  This project includes monitoring an existing slide area on Fairhills Drive. Over the last few years the slide has not progressed. Nevertheless, DPW has elected to keep this on the CIP list in case repairs are necessary. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $25,000 Construction $150,000 Other + Contingency $25,000 Fairhills Drive The following tables outline how new projects identified are ranked and assigned a priority in the CIP. The five categories that projects are rated in are listed below, and each category is given a maximum number of points based on its weight. Note that the final project number (and hence project priority in the CIP) does not always correspond directly with the total points assigned to it in the rating exercise. Factors such as total budget, timing of other projects, and staffing availability all contribute to the final Project Number a project is assigned in the CIP. Project Number New Project Immediate Threat Required by Law Will Cause a Safety Issue City Goals Aesthetics Total Points 1 to 10 1 to 8 1 to 7 1 to 6 1 to 5 36 C.01 Essential Facilities: Fire Station 54 Remodel 8 8 7 4 5 32 C.05 Falkirk ReRoof 8 6 7 5 5 31 C.02 519 Fourth Street Roof and Structural Upgrade 8 7 7 6 1 29 C.03 TL Community Center Floor Replacement - all rooms 8 7 6 3 5 29 C.04 Microwave Network for PSC 7 6 7 6 1 27 C.06 Library Restroom Addition 5 6 4 6 3 24 C.07 B Street Community Center Re-Roof 4 4 7 4 5 24 C.08 Fifth and Garden Parking Lot Resurfacing 3 5 4 5 5 22 C.09 Fire Station Generator 6 4 5 5 1 21 C.12 Terra Linda Recreation Center Hardscape Repair 4 4 6 2 4 20 C.11 B Street Community Center Parking Lot Resurfacing 4 4 3 4 5 20 C.14 City Hall & Library Lighting and Landscaping Improvements 1 3 6 5 5 20 C.13 Court Street Fountain Repair 4 1 5 5 5 20 C.15 Boyd Park Sidewalk 6 4 4 4 2 20 C.16 Downtown Fiber Connection 7 3 5 4 1 20 C.10 Albert Park Ball Field Restrooms 2 4 3 6 5 20 C.18 City Hall Fire Upgrades 7 2 5 4 1 19 C.17 Terra Linda Pool House Electrical Upgrades 5 4 7 2 1 19 C.21 Third and Lootens Parking Structure 3 5 4 5 1 18 C.19 Third and A Street Parking Structure Repairs 3 5 4 5 1 18 C.20 Third and C Street Parking Structure Repairs 3 5 4 5 1 18 C.22 Resurface City Hall Parking Lots, Lower and Upper 3 2 7 4 1 17 C.23 Fire Stations 54 & 55 Parking Lot Resurfacings 3 1 3 5 2 14 C.24 Fourth Street Twinkle Lights Replacement 1 1 1 6 5 14 C.25 B Street Community Center Concrete Entrance Reconstruction 2 1 4 1 5 13 C.26 Library Book Shelving Replacement 1 1 1 4 5 12 C.H Library Children's Patio Enclosure 1 1 1 4 3 10 C.27 Internet Upgrade at Corp Yard 1 1 5 2 1 10 Project Number New Project Immediate Threat Required by Law Will Cause a Safety Issue City Goals Aesthetics Total Points 1 to 10 1 to 8 1 to 7 1 to 6 1 to 5 36 D.01 Corrillo Drive Culvert Replacement 6 6 7 3 1 23 D.02 MCSTOPP - Catch Basin Trash Capture 3 8 3 5 1 20 D.03 Canal Street Turn Structure and Filtration System 4 8 6 1 1 20 D.04 Spinnaker Point Salt Marsh Remediation 5 3 6 2 3 19 D.05 San Mateo Court Headway Improvements 5 4 6 1 1 17 D.08 Second Street Drainage Improvements - Between C and E Streets 3 2 6 1 3 15 D.07 East and Jessup Storm Improvements 3 2 6 1 3 15 D.06 Happy Lane Storm Drain Abandonment 2 1 2 3 1 9 Project Number New Project Immediate Threat Required by Law Will Cause a Safety Issue City Goals Aesthetics Total Points 1 to 10 1 to 8 1 to 7 1 to 6 1 to 5 36 P.03 Sun Valley Park Playground Structure 8 8 7 6 2 31 P.01 Gerstle Park Playground Structure 8 8 7 6 2 31 P.02 Peacock Gap Park Playground Structure 8 8 7 6 2 31 P.04 Bernard Hoffman Playground Upgrade 5 5 7 3 5 25 P.05 Santa Margarita Court Replacement 8 2 2 6 5 23 P.06 Open Space Tree Assessment and Removal 7 6 7 2 1 23 P.07 Starkweather Park Improvements 3 3 4 6 5 21 P.08 Terra Linda Community Center Play Area and Access Improvements 1 1 6 5 5 18 P.09 Bret Hart Landscape Walls 4 2 5 3 3 17 P.10 Waterline replacement - Falkirk Mansion 3 2 7 4 1 17 P.11 Bernard Hoffman Drainage and Irrigation Improvements 1 1 4 4 5 15 P.12 Albert J Boro Community Center Synthetic Field 1 1 2 6 5 15 Project Number New Project Immediate Threat Required by Law Will Cause a Safety Issue City Goals Aesthetics Total Points 1 to 10 1 to 8 1 to 7 1 to 6 1 to 5 36 R.11 Tamalpais West Class IV Buffered Bike Lane 7 1 7 6 5 26 R.01 Francisco Blvd East Resurfacing 7 3 7 3 5 25 R.03 Safe Routes to School – Davidson Phase 2 4 4 6 5 4 23 R.02 Lincoln Avenue Bridge Repair 5 8 7 2 1 23 R.05 Central san Rafael Adaptive Traffic System Control 3 7 7 5 1 23 R.04 San Rafael Highschool Crosswalk 8 2 8 4 1 23 R.06 West End/Marquad Bulb Out and Bicycle Improvements 4 6 5 4 3 22 R.08 201 D Street Driveway and Sidewalk Improvements 5 6 6 2 2 21 R.09 Fourth Street Curb Ramp Replacement 3 5 6 3 4 21 R.07 Fourth Street Seat Wall Removal 2 3 6 5 5 21 R.13 Restriping Andersen Bike Lanes 3 3 3 5 5 19 R.12 Grand Avenue Vehicle Bridge - Methacrylate 2 8 4 2 3 19 R.15 Third Street and Grand Intersection Improvements 3 4 5 4 1 17 R.14 G Street Resurfacing Phase 2 2 2 3 5 5 17 R.16 Bellam/Andersen Intersection Improvements 5 4 3 3 1 16 R.05 Central San Rafael Adaptive Traffic System Control 2 8 3 2 1 16 R.10 Innovative Deployment of Enhanced Arterials (IDEA) 2 8 3 2 1 16 R.17 76 D Street Hillside Revetment 4 2 5 1 3 15 R.18 Bungalow Avenue Reconstruction 3 2 4 2 4 15 R.19 Aerial Undergrounding of Utilities 2 2 2 3 5 14 R.20 Belvedere/Alto/Tiburon Intersection Improvements 4 4 3 1 1 13 R.21 Fairhills Drive Slide Repair 3 2 5 The following table summarizes the funding sources identified for all proposed active projects. The total required to execute all proposed projects for that fiscal year are totaled in the table below at the CIP Category level. Since these projects have been identified in prior year CIP’s and have already been initiated and funding allocated towards them, the only instances where the funding source is identified as “Unfunded” is where a portion of the project (e.g. design) is fully funded and the City is actively pursuing grants or other sources to fund the remaining portion of the project. See the following section “Funding Detail by Project” for a detailed breakdown of the funding source for each individual active project. Note that the totals below are for Active Projects only. Active Projects already in design or construction often utilize the same funding sources as New Projects, and therefore some of the current funds available in funds such as the Building Maintenance Fund are set aside for completion of these Active projects, and therefore not made available to allocate towards new projects. The funding summary and detail for New Projects can be found in Section III. CIP Project Type Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total City Owned Property 208 Childcare Fund $170,000 $1,580,000 $1,750,000 420 Measure E $72,335,211 $72,335,211 501 Parking Services $310,000 $310,000 603 Building Maintenance $339,000 $551,600 $890,600 CEC Loan: Energy Efficiency Upgrades $1,178,000 $1,178,000 City Owned Property Total $74,332,211 $2,131,600 $76,463,811 Drainage 205 Stormwater Fund $1,153,000 $1,150,000 $1,000,000 $1,000,000 $4,303,000 235 Baypoint Lagoon Assessment District $120,000 $120,000 236 Loch Lomond Assessment District $20,000 $80,000 $100,000 603 Building Maintenance $50,000 $60,000 $110,000 Unfunded $1,200,000 $1,200,000 Drainage Total $1,223,000 $2,610,000 $1,000,000 $1,000,000 $5,833,000 Parks 240 Parkland Dedication $100,215 $205,920 $306,135 241 Measure A $100,000 $560,000 $660,000 603 Building Maintenance $652,453 $221,000 $770,000 Donations $10,000 $40,000 $50,000 Grant: CDBG (Federal) $127,750 $130,000 $257,750 Parks Total $990,418 $1,156,920 $2,043,885 Right-of-Way 1 General Fund $120,000 $120,000 206 Gas Tax $457,335 $3,734,027 $2,274,617 $1,553,747 $8,019,726 CIP Project Type Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total 206 Gas Tax - RMRA $262,000 $455,000 $717,000 246 Traffic Mitigation Fund $4,759,746 $1,620,000 $6,379,746 501 Parking Services $20,000 $20,000 Unfunded $1,350,000 $1,040,000 $2,390,000 Measure A Transportation Sales Tax $678,233 $627,383 $641,253 $1,946,869 Caltrans Highway Bridge Program $588,748 $1,372,000 $1,960,748 FEMA Disaster Grant $1,353,000 $1,353,000 Grant: Measure A Transportation Sales Tax $0 Grant: State-Local Partnership Program $1,500,000 $1,500,000 Grant: Highway Safety Improvement Program $583,900 $583,900 Grant: ABAG $377,628 $377,628 Grant: OBAG 2 (Federal) $1,000,000 $1,000,000 Grant: Measure A Local Roads 2015/16 $245,725 $245,725 Grant: Measure A Major Road Improvements $300,000 $10,800,000 $11,100,000 Grant: OBAG 2 (Local) $250,000 $250,000 Grant: Measure A Housing Incentive Program $484,000 $484,000 County of Marin funding swap $712,000 $712,000 Grant: ATP (LPP 17/18) $502,000 $502,000 Grant: Regional Measure 2 (Local) $2,950,000 $2,950,000 Grant: Measure A Safe Pathway Fund 2015/16 $107,000 $107,000 PASS Grant (MTC) $161,265 $161,265 Grant: OBAG (Federal) $2,100,000 $2,100,000 Grant: ATP (State) $4,025,000 $4,025,000 Historical bonds: Successor Agency to Redevelopment $1,584,749 $1,584,749 Right-of-Way Total $16,212,196 $22,116,160 $10,067,000 $2,195,000 $50,590,356 Grand Total $92,757,825 $28,014,680 $11,067,000 $3,195,000 $134,931,052 Project Numbering Key: C City Owned Property .01 A number indicates a new project. 01= highest priority D Drainage .A Indicates an active project P Parks .H Project on hold R Right of Way .AN Indicates an annual project. E.g. operations and maintenance costs The following tables identify the funding source for each proposed Active project. Nearly all Active Projects are fully funded. In several limited instances, the a later portion of the project may be listed as “Unfunded” indicating that the City is actively pursuing alternative funding sources such as grants. Number Project Name Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total C.A B Street Community Center Restroom Remodel 603 Building Maintenance $75,000 $75,000 C.A B Street Community Center Safety System Update - Stage Area 603 Building Maintenance $42,000 $63,600 $105,600 C.A City Hall Accessibility and Security Improvements 603 Building Maintenance $12,000 $118,000 $130,000 C.A City Hall Second Floor Study 603 Building Maintenance $60,000 $60,000 C.A City Hall Switchgear Replacement 603 Building Maintenance $90,000 $370,000 $460,000 C.A Downtown Library Assessment Study 603 Building Maintenance $60,000 $60,000 C.A Essential Facilities: Fire Station 52 420 Measure E $13,536,345 $13,536,345 C.A Essential Facilities: Fire Station 57 420 Measure E $12,181,600 $12,181,600 C.A Essential Facilities: Public Safety Center 420 Measure E $46,617,266 $46,617,266 C.A Fifth Street and C Street Parking Garage Improvements 501 Parking Services $310,000 $310,000 C.A PG&E Energy Upgrades CEC Loan: Energy Efficiency Upgrades $1,178,000 $1,178,000 C.A Portable Building Replacement (Silveria & Dixie) 208 Childcare Fund $170,000 $1,580,000 $1,750,000 Grand Total $74,332,211 $2,131,600 $76,463,811 Number Project Name Fund Funding Source Prior Year Funding FY 2018- 19 Total FY 2019- 20 Total FY 2020- 21 Total Total D.A Cayes Pump Station Control System 235 Baypoint Lagoon Assessment District $120,000 $120,000 D.A Las Casas Drainage Basin Repair 236 Loch Lomond Assessment District $20,000 $80,000 $100,000 D.A Los Gamos and Oleander (Study) 205 Stormwater Fund $100,000 $100,000 603 Building Maintenance $50,000 $50,000 D.A Pump Station Communication System Upgrades 205 Stormwater Fund $25,000 $50,000 $75,000 D.A San Quentin Pump Station Reconstruction 205 Stormwater Fund $128,000 $128,000 Unfunded $1,200,000 $1,200,000 D.A Sea Level Rise Vulnerability Study 603 Building Maintenance $60,000 $60,000 D.AN Stormwater Operations and Maintenance 205 Stormwater Fund $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,000,000 Grand Total $1,223,000 $2,610,000 $1,000,000 $1,000,000 $5,833,000 Number Project Name Fund Funding Source Prior Year Funding FY 2018- 19 Total FY 2019- 20 Total FY 2020- 21 Total Total P.A Albert Park Improvements 240 Parkland Dedication $100,215 $205,920 $306,135 241 Measure A $310,000 $310,000 Donations $40,000 $40,000 P.A Boyd Park Restroom 603 Building Maintenance $29,000 $221,000 $250,000 P.A Bret Hart Restroom 241 Measure A $250,000 $250,000 P.A Pickleweed Park and Schoen Park Improvements Grant: CDBG (Federal) $127,750 $130,000 $257,750 P.A Shoreline Park Restroom 603 Building Maintenance $70,000 $70,000 P.A Victor Jones Park Improvements 241 Measure A $100,000 $100,000 603 Building Maintenance $553,453 $450,000 Donations $10,000 $10,000 Grand Total $990,418 $1,156,920 $2,043,885 Number Project Name Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total R.A Andersen Drive At-Grade Crossing Improvements 246 Traffic Mitigation Fund $3,652,061 $3,652,061 Historical bonds: Successor Agency to Redevelopment $1,584,749 $1,584,749 R.A Bicycle and Pedestrian Master Plan 2018 1 General Fund $60,000 $60,000 R.A East San Rafael Parking Signage and Stall Markings 206 Gas Tax $20,000 $20,000 501 Parking Services $20,000 $20,000 R.A First Street at Mahon Creek Wall Repair 206 Gas Tax $80,000 $80,000 R.A Francisco Blvd East Sidewalk Widening 206 Gas Tax $707,000 $707,000 Grant: OBAG (Federal) $2,100,000 $2,100,000 Grant: ATP (State) $4,025,000 $4,025,000 R.A Francisco Blvd West Multi-Use Path Unfunded $1,350,000 $1,350,000 Grant: OBAG 2 (Local) $250,000 $250,000 Grant: Measure A Housing Incentive Program $288,000 $288,000 County of Marin funding swap $712,000 $712,000 Grant: ATP (LPP 17/18) $502,000 $502,000 Grant: Regional Measure 2 (Local) $2,950,000 $2,950,000 R.A Grand Avenue Pedestrian Bridge 246 Traffic Mitigation Fund $823,650 $823,650 Grant: ABAG $377,628 $377,628 Grant: OBAG 2 (Federal) $1,000,000 $1,000,000 Grant: Measure A Local Roads 2015/16 $245,725 $245,725 Grant: Measure A Housing Incentive Program $196,000 $196,000 Grant: Measure A Safe Pathway Fund 2015/16 $107,000 $107,000 R.A Lincoln Avenue Curb Ramps 206 Gas Tax - RMRA $455,000 $455,000 R.A Maintenance of Engineering & Traffic Studies 1 General Fund $60,000 $60,000 R.A Merrydale Pathway - North Connector 206 Gas Tax $300,000 $300,000 206 Gas Tax - RMRA $136,000 $136,000 Unfunded $1,040,000 $1,040,000 Number Project Name Fund Funding Source Prior Year Funding FY 2018-19 Total FY 2019-20 Total FY 2020-21 Total Total R.A Program for Arterial Systems Synchronization (PASS) 206 Gas Tax $107,335 $107,335 PASS Grant (MTC) $161,265 $161,265 R.A PTAP Program 206 Gas Tax $20,000 $20,000 R.A Second and Third Street Queue Cutters 246 Traffic Mitigation Fund $190,000 $1,620,000 $1,810,000 R.A Sidewalk Repair Program 206 Gas Tax $350,000 $350,000 $350,000 $350,000 $1,400,000 R.A Slide Repair - 21 San Pablo 206 Gas Tax $12,000 $12,000 FEMA Disaster Grant $238,000 $238,000 R.A Slide Repair - 70 Irwin 206 Gas Tax $25,000 $25,000 FEMA Disaster Grant $875,000 $875,000 R.A Slide Repair - 80 Upper Toyon 206 Gas Tax $20,000 $20,000 FEMA Disaster Grant $240,000 $240,000 R.A Smith Ranch Road Resurfacing 206 Gas Tax $1,651,000 $1,651,000 206 Gas Tax - RMRA $126,000 $126,000 R.A Southern Heights Bridge Replacement Caltrans Highway Bridge Program $588,748 $1,372,000 $1,960,748 R.A Third Street and Hetherton Intersection Improvements 246 Traffic Mitigation Fund $94,035 $94,035 Grant: Highway Safety Improvement Program $583,900 $583,900 R.A Third Street Improvements - Grand to Miracle Mile Grant: Measure A Transportation Sales Tax $0 Grant: State-Local Partnership Program $1,500,000 $1,500,000 Grant: Measure A Major Road Improvements $300,000 $10,800,000 $11,100,000 R.A Uncontrolled Pedestrian Crosswalk Ranking 206 Gas Tax $114,260 $25,000 $25,000 $164,260 R.AN Radar Feedback Signs and Mid- block Crossing Flashing signs 206 Gas Tax $60,000 $60,000 $60,000 $180,000 R.AN Street Resurfacing 206 Gas Tax $981,767 $1,032,617 $1,018,747 $3,033,131 Measure A Transportation Sales Tax $678,233 $627,383 $641,253 $1,946,869 R.AN Traffic Signal Controller Upgrades 206 Gas Tax $100,000 $100,000 $100,000 $300,000 Grand Total $16,212,196 $22,116,160 $10,067,000 $2,195,000 $50,590,356  This project includes replacement of the interior restroom at B Street which has significant wall deterioration. The B Street Community Center is the City’s oldest community Center, and therefore has a number of facility improvement needs due to the aging infrastructure. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $55,000 Other + Contingency $20,000  This project includes reviewing, designing and constructing electrical upgrades to the electrical system at the B Street Community Center. Improvements including outfitting will make the entire stage area more fire safe Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $20,000 Design $22,000 Construction $48,600 Other + Contingency $15,000 B Street Community Center stage area B street Restroom Plan  This project includes improvements to the entrances to City Hall to provide more lighting, accessibility, and improve ADA compliance. The project also includes security upgrades to the Council Chambers such as the installation of additional exit doors and adding bullet proof material to the dais. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $12,000 Design Construction $118,000 Other + Contingency  This project includes the review of the existing and the development of a new space plan for the 2nd floor offices at the City Hall. The plan would include a central lobby entrance desk area with a more efficient work space area for departments. The project also includes examination of existing life safety systems such as sprinklers and as well as access improvements. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $60,000 Design Construction Other + Contingency Front entrance of City Hall Second Floor of City Hall  This project includes replacing the electrical service to the building which is antiquated, is located in the building and has been prone to fire in the past. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $90,000 Construction $310,000 Other + Contingency $60,000  This assessment study includes a full review of the downtown library to determine what improvements are necessary to sustain the facility in its present operating routine. The assessment study will include the examination of the roof, electrical, plumbing, accessibility and internal systems to determine what improvements are required. A summary of these improvements should include an estimate of the cost as well as their priority for implementation. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $52,000 Design Construction Other + Contingency $8,000 City Hall electrical diagram Downtown San Rafael Library from E Street  Fire Station 52 is an active 10,973 square foot, two-story fire station construction project. The building will house five on-duty fire fighters and accommodated six on-duty personnel should additional staffing be needed. The core elements of the new station include three drive-through apparatus bays, apparatus support spaces, public lobby, accessible restroom, office, kitchen, dining, dayroom, laundry room, private sleeping quarters, unisex restrooms, mechanical, electrical, communications rooms and staff parking. Other site/adjacent improvements include a four-story training tower and a 1,297 square foot, 24-person, training classroom. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $2,852,973 Construction $10,683,372 Other + Contingency  This is an active construction project. The new 9,855 square foot, two-story fire station will house five on-duty fire fighters/paramedics and accommodate six on-duty personnel should needed in the future. The core elements of the new station include three drive-through apparatus bays, apparatus support spaces, public lobby, accessible restrooms, office, kitchen, dining, dayroom, laundry room, private sleeping headquarters, unisex restrooms, mechanical, electrical, communications rooms, and staff parking. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $2,462,135 Construction $9,719,465 Other + Contingency Rendering of Fire Station 52 Rendering of Fire Station 57  The new 44,000-square-foot Public Safety Center is currently and active construction project across the street from City Hall. The center will be replacing the existing Fire Station 51 (Downtown Fire Station) and make room for fire, police, and emergency services. The project includes a subterranean garage, public plaza and associated site and landscaping improvements. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $842,000 Design $9,987,266 Construction $34,039,000 Other + Contingency $1,749,000  This project includes seismic upgrades and repairs to the parking facility at 5th and C based on the original study. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $40,000 Construction $220,000 Other + Contingency $50,000 5th and Garden parking lot from 5th Street Rendering of Public Safety Center  This project includes updating all lighting inside City building to be energy efficient as well as updating a majority of street lights in the City to LED. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $1,178,000 Other + Contingency  This project includes replacing portable buildings at the Dixie School Campus and the Mary Silvera Campus which are utilized for after school care programs. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $140,000 $80,000 Construction $1,300,000 Other + Contingency $30,000 $200,000 Installation of a new LED street light Portable building to be replaced at Dixie  The Cayes Pump Station was originally constructed in the 1960’s. The existing pump station is operated manually and has no telemetry or automation. This project includes updating the existing pump controls to be able to operate the systems remotely. Pump station improvements are expected to include radio equipment for connection to the City’s existing SCADA system, remote monitoring and control equipment, and a new control system to house the equipment. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $120,000 Other + Contingency  This project includes cleaning the existing Las Casas Drainage Basin, installation of a gabion system to catch debris and modification to the existing stand pipe system to minimize sedimentation from clogging the system. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $20,000 Design Construction $80,000 Other + Contingency Cayes pump station control system to be updated Las Casas drainage basin  This project includes a preliminary feasibility study to determine what drainage improvements are needed to prevent flooding from occurring on the east side of Oleander. This study will examine the cost of different alternatives including a pump station or drainage system improvements. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $50,000 Design Construction $100,000 Other + Contingency  This project includes improving the 12 pump station communication systems in order to operate the stations remotely. The work includes installation of electronic float systems and electronic systems that can adjust the pump output from Public Works without dedicating personnel to each specific pump station. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $25,000 $50,000 Other + Contingency Los Gamos and Oleander Dr. intersection North Francisco Pump Station  This project includes a preliminary study of relocating the existing San Quentin Pump Station to a location that is closer to the Bay in order to avoid pumping pressure issues that currently exist at the station. This study will examine the cost of relocation versus replacement of the existing station and provide estimates for both. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $128,000 Construction $1,200,000 Other + Contingency  This project includes identifying low lying areas along the canal and waterfront to anticipate where improvements are needed for sea level rise. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $60,000 Design Construction Other + Contingency San Quentin pump station East San Rafael Aerial  This annual project includes maintenance of our 12 pump stations. This includes replacement of motors and equipment in order to control flooding in low area of the City. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $1,000,000 $1,000,000 $1,000,000 $1,000,000 Other + Contingency Drainage pipe blocked by debris  This project includes the replacement of the play area and play structures near the B Street Community Center. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $100,215 Construction $505,380 Other + Contingency $50,540  This project includes installing a new restroom facility in the park which provides accessible access for patrons of the Boy House as well as the park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $29,000 Construction $180,000 Other + Contingency $41,000 Albert Park Construction Portable Restroom at Boyd Park  This project includes installing a new prefabricated restroom facility in the park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $17,000 Construction $197,000 Other + Contingency $36,000  In spring 2018 the City evaluated the two playgounds and proposed improvements. In light of increasing parking needs in the Canal, it was determined that improvements should be focused solely on the Albert J. Boro Community Center playground. Since Schoen is such a small park, and has some safety concerns with its proximity to the street and levee, the City determined the adjacent Albert J. Boro playground would benefit more from a playground expansion. Meetings will be scheduled with the Parks and Community Services staff to determine the needs and goals of expansion of the Albert J. Boro playground. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $127,750 $130,000 Other + Contingency Portable Restroom at Bret Hart Park Pickleweed Park  The restroom has been non-operational and closed for a number of years. Repairs are necessary to restore proper functioning of the restroom, and the new restroom installed will be built to meet the latest ADA standards. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $5,000 Construction $53,000 Other + Contingency $12,000  This project includes replacing the play structures and park amenities for a portion of the park. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $103,453 Construction $560,000 Other + Contingency Current construction at Victor Jones Park Current closed bathroom at Shoreline Park  This project includes installation of signal systems and improvement with an at grade rail crossing. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $1,502,061 Design $500,000 Construction $3,234,749 Other + Contingency  The City of San Rafael has recently made progress toward a bold new transportation vision for the city, centered around an interconnected network of proposed bicycle and pedestrian routes for travelers of all ages and abilities. The Bicycle Pedestrian Master Plan (BPMP) is currently being updated to reflect completed projects, new projects, and changing priorities in the City since the previous 2011 update. This BPMP 2018 update will provide a clear framework to guide the City's bicycle and pedestrian investments over the next five to ten years. This approach will help position San Rafael to successfully leverage funding from multiple sources, including county, state, and federal-level grant programs. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $60,000 Design Construction Other + Contingency Multi-use path along Hetherton  This project proposes improvements to alleviate parking issues in the East San Rafael area. Time-limited parking will increase turnover and make storing vehicles on public streets more difficult. Parallel parking stall markings will help drivers use curb space more efficiently. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $40,000 Other + Contingency  This project includes the repair of the creek bank on First Street. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $80,000 Other + Contingency Proposed boundaries for new parking signage  The existing sidewalk along Francisco Boulevard East is utilized daily by pedestrians and bicyclists that must navigate the congestion of fire hydrants and power poles. This project will install an 8 ft wide sidewalk/bike path on Francisco Boulevard East between Vivian Street and the Grand Avenue Bridge providing more room for pedestrians and bicyclists. Project also includes new roadway safety lighting (LED), landscaping, and drainage improvement. The design is complete and the project went out to bid in May 2018. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $695,024 Construction $5,356,976 Other + Contingency  The MUP will be constructed adjacent to the SMART tracks. The pathway would connect to the existing SMART pathway to Larkspur and existing bike lanes on Andersen Drive. On the northern end, the proposed MUP would connect to the existing Mahon Creek Pathway to the west and to an existing pedestrian bridge/walkway to the north that extends to 2nd Street in downtown San Rafael. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $223,650 Design $377,628 Construction $1,848,725 Other + Contingency $300,000 Proposed site of the MUP  The Grand Avenue Pedestrian Bridge project consists of installing a bicycle/pedestrian bridge just east of the existing Grand Avenue vehicular bridge which crosses the San Rafael Canal. This structure will improve access to Francisco Blvd. East and provide a vital connection between the downtown and east San Rafael. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $28,000 Construction $350,000 Other + Contingency $77,000  This project includes the installation of Curb Ramps on Lincoln Avenue in preparation of a Microseal operation that needs to be performed by SRSD. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $28,000 Construction $350,000 Other + Contingency $77,000 Current Grand Avenue Vehicle Bridge Lincoln Avenue from Highway 101 southbound off-ramp  Maintenance of E&TS is required every 5 to 7 years in order for posted vehicle speeds to enforceable based on the California Vehicle Code. This project will collect data and make recommendation on 58 speed zones within the City. City staff, with Council approval has entered into an agreement and anticipates the work to be completed this fiscal year. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $60,000 Design Construction Other + Contingency  Pathway would provide safe pedestrian and bicycle access to the SMART Civic Center station from Las Gallinas Avenue and the Northgate Shopping Center area via north Merrydale Road. The pathway would be an extension of the existing North San Rafael “Promenade” multi-use pathway and would be constructed along one side or the other of existing Merrydale Road. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $136,000 $300,000 Construction $840,000 Other + Contingency $200,000 Design plans for Merrydale Pathway  This project, funded primarily by a Metropolitan Transportation Commission Grant will re-time 54 signals in the Central San Rafael area. Since this was last completed in 2012, traffic patterns and signal timing requirements in the California MUTCD have since changed. The re-timing will improve travel time, congestion, safety, and air quality. This project will be completed within this fiscal year. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $268,600 Design Construction Other + Contingency  This project includes applying for PTAP funds which are used to rate the condition of the City's roadways. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $20,000 Other + Contingency  This project includes studying and possibly the installation of additional signals on Second and Third Street to keep vehicles off the rail tracks when the Larkspur extension is active. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $190,000 Design $120,000 Construction $1,500,000 Other + Contingency  The Sidewalk Repair Program was established to share the financial burden associated with sidewalk maintenance between the City and property owners, and streamlines and consolidates sidewalk repairs throughout the City. More information is at www.cityofsanrafael.org/sidewalks Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $350,000 $350,000 $350,000 $350,000 Other + Contingency Queue Cutters recently installed at a SMART rail crossing on 4th Street San Rafael sidewalk  There are three major slides which occurred in January 2017. The City has submitted for FEMA assistance for these slides located on Irwin, Upper Toyon, and D Street. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $12,000 Construction $238,000 Other + Contingency  There are three major slides which occurred in January 2017. The City has submitted for FEMA assistance for these slides located on Irwin, Upper Toyon, and D Street. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $25,000 Construction $875,000 Other + Contingency 70 Irwin slide damage Needs Captions  There are three major slides which occurred in January 2017. The City has submitted for FEMA assistance for these slides located on Irwin, Upper Toyon, and D Street. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $20,000 Construction $240,000 Other + Contingency  This project includes grinding and resurfacing Smith Ranch Road under the freeway and a portion of the road to the east and west. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $126,000 $1,631,000 Other + Contingency $20,000 80 Upper Toyon slide damage Smith Ranch Road under Highway 101  The Southern Heights Bridge is a one lane multi-span stringer structure with a timber deck supported on timber bents with concrete pedestal footings and reinforced concrete wall abutments that was constructed in 1981. The Southern Heights Bridge was inspected in 2011 by Caltrans Structure Maintenance and Investigations Based on the Caltrans recommendations, the bridge is eligible for replacement at Caltrans’ expense. The City has nearly completed the design and plans to do construction next year. In December 2017, a Caltrans inspector ordered the immediate closure of the existing bridge due to safety concerns. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $588,748 Construction $1,372,000 Other + Contingency  This project includes the installation of traffic signal improvements at the intersection of Third and Hetherton. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning $94,035 Design $100,000 Construction $483,900 Other + Contingency Southern Heights Bridge 3rd Street and Hetherton intersection, from 3rd Street westbound  The City received a major allocation from the Transportation Authority of Marin through the Measure A program to rehabilitate Third Street from Grand to Miracle Mile. Currently ides for improvements are being discussed with stakeholders. The intent of the improvements are to provide congestion relief and safety improvements along Third street. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $300,000 Construction $12,300,000 Other + Contingency  This project will evaluate and prioritize the uncontrolled crosswalks throughout the City. Once identified, these crosswalks will be ranked based on predetermined criteria. Recommendations and cost estimates for improving safety at these crosswalks will be provided and ranked by priority. City staff, with Council approval has entered into an agreement and anticipates the work to be completed this fiscal year. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design $114,260 $25,000 $25,000 Construction Other + Contingency K-rail installed temporarily at a slide on Los Ranchitos  This annual project addresses improvements to mid-block crossings and provides for additional traffic devices such as radar feedback signs to improve public safety. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $60,000 $60,000 $60,000 Other + Contingency  This project includes resurfacing a portion of the City's 175 miles of roadways. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $1,660,000 $1,660,000 $1,660,000 Other + Contingency Street resurfacing work Mid-block crossing with flashing signs  This annual project includes upgrades to the City's signal controllers. Many of the controllers are obsolete such that replacement is necessary when specific parts of the controllers fail over time. In these cases full replacement is necessary. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $100,000 $100,000 $100,000 Other + Contingency  This project includes extending the median near the rail crossing at North San Pedro to allow for safety improvement around the rail. Prior Year Funding FY 2018-19 FY 2019-20 FY 2020-21 Planning Design Construction $100,000 Other + Contingency Traffic Signal controller box at an intersection RESOLUTION NO. 14509 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL APPROVING THE MEASURE A WORK PLAN FOR PROPOSED EXPENDITURE OF MEASURE A FUNDS FOR JULY 1, 2018 – JUNE 30, 2019 WHEREAS, on November 6, 2012 Marin County voters passed Measure A, a one-quarter of one percent transactions and use tax, dedicated to parks and open space for the duration of nine years; and WHEREAS, fifteen percent of the Measure A revenues is earmarked for Marin municipalities for the purpose of managing parks, open space preserves, recreation programs and vegetation; and WHEREAS, the County of Marin is responsible for the administration of the Measure A funds, and has developed a form of agreement and program materials for use by Marin municipalities; and WHEREAS, the City of San Rafael is eligible to receive Measure A funds, and entered into an agreement with the County of Marin in October of 2013, submitting a Work Plan of Expenditures for the first year of fund disbursement; and WHEREAS, the City of San Rafael is projected to receive a total of $476,662 for FY 2018-2019, to support the Work Plan; and WHERAS, the City of San Rafael is projected to roll over $284,937 from Measure A Funds accumulated in FY 2017-18; and WHEREAS, the County of Marin requires a Work Plan for the proposed Expenditure of Measure A funds in the amount of $763,399 for July 1, 2018 – June 30, 2019; NOW, THEREFORE, BE IT RESOLVED that the San Rafael City Council approves the Measure A Work Plan for Proposed Expenditure of Measure A funds for July 1, 2018 - June 30, 2019, a copy of which is hereby attached and by this reference made a part hereof; and BE IT FURTHER RESOLVED that the Finance Director is authorized to execute, on behalf of the City of San Rafael, the Work Plan for Proposed Expenditure of Measure A funds for July 1, 2018 to June 30, 2019. I, LINDSAY LARA, Clerk of the City of San Rafael, hereby certify that the foregoing Resolution was duly and regularly introduced and adopted at a regular meeting of the City Council of said City held on Monday, the 21st day of May 2018, by the following vote, to wit: AYES: COUNCILMEMBERS: Bushey, Colin, Gamblin, McCullough & Mayor Phillips NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ______________________________ LINDSAY LARA, City Clerk Page 1 of 4 Work Plan Measure A City, Town, and Applicable Special District Program Proposed Expenditure of Measure A Funds for July 1, 2018 to June 30, 2019 Timely and accurate completion of this report is a condition of receiving Measure A funds. Instructions: • This work plan must be completed by an authorized representative of the recipient. • Please complete this work plan, then scan and e-mail it to Kevin Wright, Marin County Parks External Affairs Coordinator (kwright@marincounty.org), by June 1, 2018. • Contact Mr. Wright by e-mail (kwright@marincounty.org) or phone (415) 473-2129 if you have any questions, or if you have suggestions to improve this form. • Marin County Parks will review this plan within one month of its receipt to ensure that proposed expenditures are consistent with Marin County Ordinance 3586 (Measure A). • Recipients must provide Marin County Parks with 30-days prior notice of any project additions or substitutions that are proposed while a work plan is in effect. • Total actual project expenditures may not exceed recipient’s actual Measure A funding for any given fiscal year, plus any balance remaining from previous years. _______________________________________________________________ This portion of page is intentionally blank. Proceed to next page. Page 2 of 4 A. Name of Recipient (city, town, or special district): City of San Rafael B. Recipient’s representative and contact information: (Please print all information) Name: Mark Moses Title: Finance Director Address: PO Box 151560 City, Zip: San Rafael, CA 94901-1560 Phone: 415.485.5018 E-mail: mark.moses@cityofsanrafael.org C. Total estimated funds for Fiscal Year 2017-18: i. Estimated carry-over balance of recipient’s Measure A funds from previous fiscal years ii. Estimate of recipient’s Measure A funds for FY 2017-18. (This information will be provided by Marin County Parks) iii. Total estimated available funds for FY 17-18 (i + ii). $ 284,937.00 $ 476,662.00 $ 763,399.00 Page 3 of 4 D. Recipient’s Measure A Work Plan for Fiscal Year 2018-19: Name of work or project: Primary purpose of work or project. Select only one from list below. ** Description. Be as specific as possible. Include numbers related to square footage of facilities, acreage, etc. If Measure A funds were used for maintenance, use numbers to indicate change from pre-Measure A conditions. Amount of Measure A funds estimated to be used: Source(s) and amount(s) of matching funds projected for use. If none, enter “0” Total expenditures projected for work or project in current reporting year Wild Land Urban Interface Vegetation Program e .5FTE Wildland Urban Interface Inspector $ 82,555 -0- $82,555 Vegetation Removal on City Park/Open Space e Contractual removal of vegetation on City Park/Open Space to support Wildland Urban Interface Program $ 40,000 -0- $40,000 Contractual Vegetation Removal for Parks and Open Space; Invasive Species Removal g Contractual removal of vegetation within City Parks/Open Space $100,000 -0- $100,000 Contractual Parkette Maintenance a Contractual maintenance services for 9 City owned Parkettes $ 55,000 -0- $55,000 Park Improvements b Albert Park Playground Improvements Victor Jones Park Improvements $310,335 $100,000 -0- $410,335 Park/Open Space Security e P/T Open Space Ranger services to secure against activity posing high risk for fire damage $ 75,509 -0- $75,509 Estimated Total $ 763,399 Page 4 of 4 **Select work or project purpose only from the following menu: a) Routine maintenance b) Renovation of existing recreational facility, including infrastructure (includes planning, environmental review, permitting, design development, etc.) c) Construction of new park or recreation facility (includes planning, environmental review, permitting, de sign development, etc.) d) Parkland acquisition e) Fuel reduction - all types of fuel breaks, including primary, ridgeline, etc. f) Flashy fuel reduction (ROW, street ends, trail heads, etc.) g) Natural resource protection and restoration, and invasive plant control h) Maintaining vehicle access i) Sudden Oak Death j) Hazard tree removal k) Inventory and monitoring l) Wildlife management monitoring m) Vegetation and wildlife management - Other- E. Certification I certify that the information contained herein is true and accurate, to the best of my knowledge. __________________________________________ _____________________________________________________ Signature Title __________________________________________ _________________________________ Print Name Date