HomeMy WebLinkAboutFIN Measure A Workplan and Preliminary CIP____________________________________________________________________________________ FOR CITY CLERK ONLY Council Meeting: 6/17/2019 Disposition: Resolution 14689 Agenda Item No: 6.b Meeting Date: June 17, 2019 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Finance Prepared by: Bill Guerin, Director of Public Works Susan Andrade-Wax, Community Services Director Nadine Atieh Hade, Finance Director City Manager Approval: ______________ TOPIC: MEASURE A WORKPLAN AND PRELIMINARY CAPITAL IMPROVEMENT PROGRAM SUBJECT: RESOLUTION APPROVING THE MEASURE A WORK PLAN FOR PROPOSED EXPENDITURE OF MEASURE A FUNDS FOR JULY 1, 2019 – JUNE 30, 2020; AND REPORT ON PRELIMINARY THREE-YEAR CAPITAL IMPROVEMENT PROGRAM RECOMMENDATION: 1. Adopt a resolution approving the Measure A – Open Space Work Plan for Fiscal Year 2019- 2020. 2. Accept informational report regarding the preliminary three-year Capital Improvement Program for FY 2019-20 through FY 2021-22 and provide direction to staff. INTRODUCTION: The purpose of this report is to present the preliminary three-year Capital Improvement Program (CIP) for Fiscal Year (FY) 2019-20 through FY 2021-22 for review, as well as to present the Measure A – Open Space Work Plan for approval. This presentation will provide the City Council and community members an opportunity to participate in reviewing and sharing feedback relating to the CIP and the Measure A – Open Space Work Plan. While the CIP will be formalized in a full, detailed report and incorporated into a final, proposed citywide budget for FY 2019-20 to be presented to the City Council for approval on July 15, 2019, staff seeks City Council feedback of the preliminary CIP project list at this time. The Measure A – Open Space Work Plan will also be approved as part of the recommended action of this report. The content of this report was discussed at the City Council Finance Subcommittee meeting on June 11, 2019, at which time staff was directed to bring forth these items to the City Council. BACKGROUND: Measure A In November 2012, an ordinance of the County of Marin (“Measure A”) was approved by a two-thirds majority of the electors voting on the Measure. Measure A imposes a nine-year one-quarter of one SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 (0.025) percent retail transactions and use tax (TUT) that is administered by the County of Marin. The purpose of Measure A is to support the preservation of Marin County parks, open space preserves and farmland. The tax is estimated, at current collection levels, to generate approximately $10 million per year. This level of revenue changes during the life of the Measure due to the variability in annual receipts. Measure A’s expenditure plan outlines three (3) programs for spending the sales tax proceeds. Each program is described by its funding allocation, and types of projects and activities that the funding supports. • County Parks and Open Space Program (65%) o 80% is to protect or restore natural resources and maintain existing county parks and open space preserves. o 20% is dedicated to the permanent preservation of land for public open space, community separators, wildlife corridors, greenbelts, and habitat. • Farmland Preservation Program (20%) o To protect Marin County farmland at risk of subdivision and development and preserve Marin's working farms and ranches. • City, Town, and Applicable Special District Program (15%) o Funding is allocated to cities, towns, and special districts to manage parks, open space preserves, nature preserves, recreation programs, and vegetation to promote biodiversity and reduce wildfire risk. Of the 15% that is allocated to town, cities and special districts (approximately $2.12 million), the City of San Rafael receives 22.91% based on its population. The City uses this funding to support park maintenance, vegetation removal and management, protection of open space, and park -related capital improvement projects. Though they go under the same name, Measure A Parks is not to be confused with Measure A Transportation Sales Tax, administered by the Transportation Authority of Marin (TAM). Capital Improvement Program (CIP) The CIP is a multi-year planning tool used to identify and implement the City’s capital needs over the upcoming 3-year period: FY 2019-20 through FY 2021-22. The CIP document summarizes the City’s planned capital and infrastructure improvement projects, including their funding sources, and prioritizes projects after analysis and coordination with other City departments in order to ensure that all department needs are represented. Project selection and priority is based on recommendations by the Department Directors to accommodate high priority needs, which focused on life/safety, maintenance and repair, public and Council input, and other factors. The CIP is intended to provide a comprehensive three-year project list for the City’s known capital and infrastructure needs. The five general categories within the CIP are as follows: • City-Owned Property (C): City facilities including buildings, parking garages and lots • Drainage (D): Stormwater systems including roadway drainage and the City’s 12 stormwater pump stations • Parks (P): Park infrastructure and facilities including playgrounds, recreation equipment, and restrooms • Right-of-Way (R): Roadway improvements including construction, resurfacing, and maintenance of existing bicycle and pedestrian facilities including sidewalk and bike lanes. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3 • Transportation (T): New this year, Transportation projects are separated out from Right of Way projects. Transportation projects include traffic and signal improvements that increase traffic flow and capacity, as well as any circulation improvements that expand bicycle/pedestrian thoroughfare beyond the existing facilities in place. For example, new multi-use pathways and the expansion of existing sidewalk. ANALYSIS: Measure A Since 2013, the City has received $2,889,762 in Measure A funding, $840,574 of which has been used for park-related capital improvement projects. Table A shows a year-by-year breakdown of the park improvement projects and the Measure A funding allocations. Measure A Funding of Park Capital Improvement Projects: Historically the City has used Measure A funding to support four general activities: park maintenance, vegetation management, protection of open space and park improvements. In FY 2019-2020 the City will continue to support these activities with $486,671 in planned program expenditures. • Community Wildfire Protection: The focus of the Fire Department’s vegetation management program is to reduce the risk of highly flammable vegetation, like juniper and bamboo, from causing large fires in residential areas. $115,000, or 24%, will support wildfire protection through vegetation management. The Measure A funding the department receives funds a fixed-term Vegetation Management Specialist that works with property owners throughout the community to reduce the amount of highly flammable vegetation surrounding homes. • Vegetation Management and Parks Maintenance: Public Works utilizes $155,000, or 32%, of Measure A funding for a vegetation management and parks maintenance program that focuses on City parks and open space. The program relies on goats and vegetation “chipper days” to reduce invasive species and to control erosion. • Preservation of Public Safety in Community Open Space: The Police Department has two (2) open space rangers dedicated to patrolling open space within the City of San Rafael. The purpose of these rangers is to minimize the occurrence of illicit and illegal behavior in City parks and open space. A total of $75,509, or 16%, of Measure A funding supports this function. Park Capital Improvement Projects 2014 Expenses 2015 Expenses 2016 Expenses 2017 Expenses 2018 Expenses 2019 Projected Expenses Total Miscellaneous Park Repairs (pathways, sidewalks, etc.) $131,155 $6,220 $137,376 Miscellaneous Equipment (slides, tables, etc.) $5,246 $58,598 $10,621 $74,464 Sun Valley Park Basketball Court $46,873 $46,873 Albert Park Playground $37,761 $50,618 $221,621 $310,000 Victor Jones Park Playground $80,275 $19,725 $100,000 Bret Harte Park Restroom $2,183 $169,678 $171,861 $136,401 $64,818 $57,493 $118,035 $72,526 $391,299 $840,574 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 4 • Park Capital Improvements and Maintenance: The City’s FY 2019-20 Capital Improvement program will rely on $141,162, or 29% of Measure A funding, to support the following projects: o $121,162 will be used for the replacement of the Sun Valley Park playground. This project was selected as a high priority during the Park and Recreation Commission’s 2015 outreach process (see attachment 2 for further information on the Measure A Priority list). The current equipment in the Sun Valley playground, located in the Sun Valley neighborhood on the western side of central San Rafael, is more than 20 years old. o $20,000 will be used for community outreach and updating the design of the Pickleweed Park Field Conversion project. This was identified as a top priority by the Park and Recreation Commission in 2015 but, due to its scale, the City must seek substantial funding beyond Measure A to implement the project. In FY 2019-2020, the City plans to use Measure A funds to develop a grant proposal for Proposition 68 funding, which is being disbursed by the State over the coming years. These planned expenditures are summarized in the Measure A Work Plan for July 1, 2019 through June 30, 2020 (Attachment 2). Capital Improvement Program (CIP) Project List Development: Projects identified for the CIP are recommended by either Department Directors, studies and reports, such as the Bicycle Pedestrian Master Plan (BPMP) or the recently completed Facility Assessment Study, or may arise from direct community or Council input. Additionally, projects with specific discreet funding sources are included in the CIP. While most Right of Way and Transportation projects are informed by General-Plan related circulation and traffic improvements and the BPMP; Parks and City Owned Property projects have historically been heavily informed by Director, the publicly appointed Parks Commission, and the Facilities Maintenance division. In FY 2018-19, to help better prioritize City Owned Property projects in particular, Public Works contracted a specialized consultant to complete a comprehensive Facilities Assessment Study. The study reviewed eighteen City facilities including parks, recreation facilities and structure such as City Hall. This study identified deficiencies at each facility and prioritized repairs. Several of these projects are included in the upcoming 3-year CIP. All City Owned Property and Parks projects are ranked in a process annually with the Directors that weighs life/safety, maintenance and repair costs, public and Council input, and other factors. Public Works staff internally ranks the Drainage, Right-of-Way, and Transportation projects. All available funding over the 3-year period is allocated to the respective categories, and projects that are unable to be funded at this time are still listed in the CIP project list, however as “Unfunded”. Major new projects identified in the FY 2019-20 to FY 2021-22 CIP include: • Francisco Blvd. East Sidewalk Widening (Active) • Third Street Rehabilitation Project – Grand to Miracle Mile. (Active) • Third & Hetherton Intersection Improvements (Active) • Albert Park ADA Restroom (Identified by the Facility Assessment Study) • B Street Community Center Repairs (Identified by the Facility Assessment Study) • Sun Valley Park, Peacock Gap Park, Bernard Hoffman Park Play Structure Replacement • Lincoln Avenue Curb Ramps SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 5 • Smith Ranch Road Resurfacing • Crosswalk Improvements • Street Resurfacing In recent years one of the issues in executing all the projects in the CIP has been a general lack of interest from the construction industry in bidding on smaller projects. Going forward, staff intends to bundle smaller, similar projects for a better economy of scale. Additionally, some changes have been made in the approach Public Works has taken in replacement of playground equipment. Public Works has found it significantly more cost effective, but just as impactful for the community, to pursue replacing old equipment and installing new ground surface -- without undergoing a full redesign of the Park. This has allowed the Department to stretch limited financial resources further and freshen up more playgrounds in the City. Project Funding: There are currently five major annual funding sources for the CIP (Measure A Parks is included below): Fund # Fund Name (CIP Category) Average Annual Revenues Description 603 Building Maintenance (City Owned Property, Parks) $500,000 The Building Maintenance Fund supports capital projects associated with the City’s buildings, parks and other facilities. The Building Fund is an internal revenue fund, which means General Fund monies are the sole source of revenue for the fund. Historically, $500,000 in General Fund monies has been contributed annually to the Building Fund. 241 Measure A (Parks) $140,000 Measure A is a nine-year ¼ percent transactions and use tax that was passed in 2012 and is managed by the County of Marin. The purpose of the tax is to care for existing parks and open spaces, support regional community parks, projects, and programs and to further farmland restoration. Community Services and the Parks Commission provides input each year as to which Parks projects should be prioritized to receive Measure A funding. 205 Stormwater Fund (Drainage) $850,000 Established to fund Stormwater maintenance, programs, and improvements throughout the City—including maintenance and repair of the City’s 12 storm water pump stations. This fund receives annual revenues of approximately $850,000 from the City’s Stormwater Activity fee (Municipal Code Chapter 9.40). 206 Gas Tax + Measure A (Right of Way, Transportation) $3,315,000 The Gas Tax is a revenue distributed from the state based on a percentage tax on each gallon of gas purchased in San Rafael. Gasoline tax is collected and distributed to jurisdictions by the State on an annual basis and may be used for capital projects and maintenance to local streets, roads, traffic, and bicycle pedestrian facilities. In April 2017, Governor Jerry Brown signed Senate Bill 1: The Road Repair and Accountability Act to address the need for additional funding for transportation and infrastructure in California. Senate Bill 1 increased per gallon fuel excise taxes, diesel fuel sales taxes and vehicle registration fees. The effect was a doubling of Gas Tax revenues received for San Rafael, from roughly $1.1m to $2.2m. Fund #206 also collects annual Measure A Transportation Sales Tax dollars (distributed by Transportation Authority of Marin). A ½-cent SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 6 sales tax approved initially by voters in 2004 and reapproved in November 2018, Measure A provides roughly $700,000 annually to San Rafael towards local streets and road improvements. 246 Traffic Mitigation Fee (Transportation) ~$500,000 (depends on development) Traffic Mitigation Fees are charged by to a developer in connection with the approval of a development project – in order to generate revenues for increasing street capacity to accommodate additional traffic generated by the new development. The City utilizes its Traffic Mitigation Fees for circulation identified in Exhibit 21 of Policy 6A of General Plan 2020 and similar projects that further the General Plan. As has been noted in prior year CIPs, the long-term capital and infrastructure improvement needs for City-owned property, parks, and drainage far exceed the available revenues each year. Therefore, a considerable number of projects are identified as real capital and infrastructure needs (and maintained on the CIP project list), but are categorized as “Unfunded”. On occasion, staff has recommended a one-time transfer of funds, where allowable, to assist in funding high-priority and high-need projects. For example, after the 2017 storms, several stormwater pump stations were in need of serious repair, and the annual $850,000 revenues could not support the infrastructure and pump repair projects needed. Therefore, in the FY 2017-18 CIP, staff recommended that the $500,000 annual General Fund contribution to the Building Fund instead be allocated towards the Stormwater Fund on a one-time basis. In preparing the current year CIP, staff is once again recommending a one-time transfer of funds to support high-priority and high-need projects. City-owned property and parks’ immediate project needs have continued to exceed the $500,000 in funding available each year from the annual transfer from General Fund to the Building Maintenance Fund (#603). Unfunded projects listed in the 3-year CIP in the City-Owned Property and Parks categories total nearly $7.9 million. Therefore, in the short term, staff is recommending an additional $800,000 over two years transferred from the General Fund to the Building Maintenance Fund to support City-Owned Property and Parks projects. This $800,000 will come in the form of an increase in the annual transfer from Gas Tax to the General Fund to support a fraction of the Public Works salaries and benefits related to streets and roads maintenance (estimated at $2million/year). The historical annual amount transferred from the Gas Tax to the General Fund to support salaries is $400,000. Staff is recommending increasing this transfer to $800,000 per year for the current FY 2018-19 and the upcoming FY 2019-20 (a net increase of $400,000 each year, or $800,000 total). Subsequently, the General Fund transfer to the Building Maintenance Fund (to support City-owned property and Parks projects) will then be increased by $800,000 total over the two years. The effect will be net neutral to the General Fund over the two-year period: 1) An additional $800,000 transferred from Gas Tax to General Fund and 2) An additional $800,000 transferred from the General Fund to the Building Maintenance Fund. The result will be an additional infusion of $800,000 to support City-owned property and parks projects in the upcoming 3- year CIP. The department is actively seeking better long-term funding strategies for these projects, including: • Pursuing bond financing for major capital projects, such as San Quentin Pump Station • More aggressive pursuance of grant funding for non-right of way capital projects • Pursuance of ballot measure to raise current per-parcel stormwater assessment • Exploring alternative funding mechanisms, such as assessment districts or public private partnerships (Community Services has taken a lead on this for some of the rental facilities). SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 7 CIP Prior-Year Completed Projects: As a part of the annual CIP, the Department also recaps major projects completed in the prior fiscal year. While staffing challenges and large-scale projects, such as the Sonoma-Marin Area Rail Transit (SMART) and the Essential Facilities program, have impacted the Department’s project management capacity, the department completed several major projects during this last year, including the following: • Essential Facilities: Fire Station 52 • Albert Park play area improvements • Grand Avenue Pedestrian Bridge • 2017 storm landslide repairs (80 Upper Toyon, 70 Irwin, and 21 San Pablo) • City Hall switchgear • D Street and Via Sessi storm drain improvements • Bret Hart restroom • Bicycle and Pedestrian Master Plan 2018 • East San Rafael parking signage and stall markings • Uncontrolled crosswalk ranking study CIP Active Projects: Active projects are separated from the rest of the CIP project list since they are fully funded with prior year funds, and construction or design may be fully underway. A total of 15 projects are listed as Active in the CIP, including: • Essential Facilities: Fire Station 57 • Essential Facilities: Public Safety Center • Sea level rise vulnerability study • San Quentin pump station reconstruction (design) • Pickleweed Park and Schoen Park improvements • Shoreline Park restroom • Street resurfacing FY 2018-19 • NB 101 offramp-second right turn lane (design) • Second and Third Street queue cutters FISCAL IMPACT: Measure A The impact of approving the Measure A – Open Space Work Plan is the authorization of $486,671 in spending from restricted, Measure A tax proceeds. Projected FY 2019-20 Measure A revenues of $486,671 are sufficient to support the proposed Work Plan. This Work Plan has no fiscal impact on the City’s General Fund. Capital Improvement Program (CIP) There is no direct fiscal impact associated with the preliminary Capital Improvement Program because the information being provided is for the purpose of discussion, public input, and direction to staff. However, for planning purposes, the funding source by project phase and year is identified for each project in the CIP. The figures in the CIP are engineer’s estimates and are not based on actual bids received. It is important to note that while the City Council is accepting an informational report relating to a preliminary list and prioritization of projects within the CIP, including which projects are funded vs. those that remain unfunded, all CIP projects are subject to the City’s Purchasing Policy, including the City Council and City Manager contract thresholds at the time a contract is awarded. For example, when a construction contract is awarded for a project and the contract amount is above City Manager’s SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 8 award authority ($175,000 for Public Works projects), the contract and project would be brought forth to the City Council for approval. OPTIONS: The City Council has the following options to consider relating to this item: 1. Accept informational report regarding the preliminary Capital Improvement Program and provide direction to staff. Adopt a resolution approving the FY 2019-20 Measure A – Open Space Work Plan. 2. Accept informational report regarding the preliminary Capital Improvement Program and provide direction to staff. Adopt a resolution as amended, approving the FY 2019-20 Measure A – Open Space Work Plan. 3. Accept informational report regarding the preliminary Capital Improvement Program and provide direction to staff. Do not adopt a resolution approving the FY 2019-20 Measure A – Open Space Work Plan and provide direction to staff. RECOMMENDATION: 1. Adopt a resolution approving the Measure A – Open Space Work Plan for Fiscal Year 2019- 2020. 2. Accept informational report regarding the preliminary three-year Capital Improvement Program for FY 2019-20 through FY 2021-22 and provide direction to staff. ATTACHMENTS: 1. Resolution – Measure A 2. Exhibit I to resolution: Measure A Open Space Work Plan 3. Preliminary FY 2019-20 CIP Project Listing RESOLUTION NO. 14689 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL APPROVING THE MEASURE A WORK PLAN FOR PROPOSED EXPENDITURE OF MEASURE A FUNDS FOR JULY 1, 2019 – JUNE 30, 2020 WHEREAS, on November 6, 2012 Marin County voters passed Measure A, a one-quarter of one percent transactions and use tax, dedicated to parks and open space for the duration of nine years; and WHEREAS, fifteen percent of the Measure A revenues is earmarked for Marin municipalities for the purpose of managing parks, open space preserves, recreation programs and vegetation; and WHEREAS, the County of Marin is responsible for the administration of the Measure A funds, and has developed a form of agreement and program materials for use by Marin municipalities; and WHEREAS, the City of San Rafael is eligible to receive Measure A funds, and entered into an agreement with the County of Marin in October of 2013, submitting a Work Plan of Expenditures for the first year of fund disbursement; and WHEREAS, the City of San Rafael is projected to receive a total of $486,671.23 for FY 2019-2020, to support the Work Plan; and WHEREAS, the County of Marin requires a Work Plan for the proposed Expenditure of Measure A funds in the amount of $486,671.23 for July 1, 2019 – June 30, 2020; NOW, THEREFORE, BE IT RESOLVED that the San Rafael City Council approves the Measure A Work Plan for Proposed Expenditure of Measure A funds for July 1, 2019 - June 30, 2020, a copy of which is hereby attached and by this reference made a part hereof; and BE IT FURTHER RESOLVED that the Finance Director is authorized to execute, on behalf of the City of San Rafael, the Work Plan for Proposed Expenditure of Measure A funds for July 1, 2019 to June 30, 2020. I, LINDSAY LARA, Clerk of the City of San Rafael, hereby certify that the foregoing Resolution was duly and regularly introduced and adopted at a regular meeting of the City Council of said City held on Monday, the 17th day of June 2019, by the following vote, to wit: AYES: COUNCILMEMBERS: Bushey, Colin, McCullough & Mayor Phillips NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: Gamblin LINDSAY LARA, City Clerk Page 1 of 4 Work Plan Measure A City, Town, and Applicable Special District Program Proposed Expenditure of Measure A Funds for July 1, 2019 to June 30, 2020 Timely and accurate completion of this report is a condition of receiving Measure A funds. Instructions: • This work plan must be completed by an authorized representative of the recipient. • Please complete this work plan, then scan and e-mail it to Kevin Wright, Marin County Parks External Affairs Coordinator (kwright@marincounty.org), by June 1, 2019. • Contact Mr. Wright by e-mail (kwright@marincounty.org) or phone (415) 497-3553 if you have any questions, or if you have suggestions to improve this form. • Marin County Parks will review this plan within one month of its receipt to ensure that proposed expenditures are consistent with Marin County Ordinance 3586 (Measure A). • Recipients must provide Marin County Parks with 30-days prior notice of any project additions or substitutions that are proposed while a work plan is in effect. • Total actual project expenditures may not exceed recipient’s actual Measure A funding for any given fiscal year, plus any balance remaining from previous years. _______________________________________________________________ This portion of page is intentionally blank. Proceed to next page. Page 2 of 4 A. Name of Recipient (city, town, or special district): City of San Rafael B. Recipient’s representative and contact information: (Please print all information) Name: Nadine Atieh Hade Title: Finance Director Address: 1400 Fifth Avenue City, Zip: San Rafael, CA 94901 Phone: (415) 485-3062 E-mail: nadine.hade@cityofsanrafael.org C. Total estimated funds for Fiscal Year 2019-20: i. Estimated carry-over balance of recipient’s Measure A funds from previous fiscal years ii. Estimate of recipient’s Measure A funds for FY 2019-20. (This information will be provided by Marin County Parks) iii. Total estimated available funds for FY 19-20 (i + ii). $ 0.00 $486,671.23 $486,671.23 Page 3 of 4 D. Recipient’s Measure A Work Plan for Fiscal Year 2019-20: Name of work or project: Primary purpose of work or project. Select only one from list below. ** Description. Be as specific as possible. Include numbers related to square footage of facilities, acreage, etc. If Measure A funds were used for maintenance, use numbers to indicate change from pre-Measure A conditions. Amount of Measure A funds estimated to be used: Source(s) and amount(s) of matching funds projected for use. If none, enter “0” Total expenditures projected for work or project in current reporting year Wild Land Urban Interface Vegetation Program e .5 FTE Wildland Urban Interface Inspector $75,000 0 $75,000 Vegetation Removal on City Parks/Open space e Contract removal of vegetation to support Wildland Urban Interface Program $40,000 0 $40,000 Vegetation Removal on City Parks/Open space/Invasive Species Removal g Contract removal of vegetation within City Parks/Open Space $100,000 0 $100,000 Contractual Parkette Maintenance a Contract Maintenance Services $55,000 0 $55,000 Park/Open Space Security g P/T Open Space Ranger $75,509 0 $75,509 Park Improvements b Sun Valley Playground Replacement Pickleweed Park Field Conversion Design and Community Engagement $121,162 $20,000 0 $121,162 $20,000 Estimated Total $486,671 Page 4 of 4 **Select work or project purpose only from the following menu: a) Routine maintenance b) Renovation of existing recreational facility, including infrastructure (includes planning, environmental review, permitting, design development, etc.) c) Construction of new park or recreation facility (includes planning, environmental review, permitting, design development, etc.) d) Parkland acquisition e) Fuel reduction - all types of fuelbreaks, including primary, ridgeline, etc. f) Flashy fuel reduction (ROW, street ends, trail heads, etc.) g) Natural resource protection and restoration, and invasive plant control h) Maintaining vehicle access i) Sudden Oak Death j) Hazard tree removal k) Inventory and monitoring l) Wildlife management monitoring m) Vegetation and wildlife management - Other- E. Certification I certify that the information contained herein is true and accurate, to the best of my knowledge. __________________________________________ _____________________________________________________ Signature Title __________________________________________ _________________________________ Print Name Date Preliminary FY 2019-20 CIP Project Listing Updated 6/12/2019 Active Projects All project funding is in "Prior Year Funding" Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction City Owned Property C.A B Street Community Center Safety System Update - Stage Area 603 Building Maintenance $2,755 $41,223 $60,000 $2,755 $41,223 $60,000 C.A Essential Facilities: Fire Station 57 420 Measure E $2,462,135 $9,719,465 $2,462,135 $9,719,465 C.A Essential Facilities: Public Safety Center 420 Measure E $842,000 $9,987,266 $35,788,000 $842,000 $9,987,266 $35,788,000 City Owned Property Total $844,755 $12,490,624 $45,567,465 $844,755 $12,490,624 $45,567,465 Drainage D.A Cayes Pump Station Control System 235 Baypoint Lagoon Assessment District $10,415 $120,000 $10,415 $120,000 D.A Los Gamos and Oleander Drainage Improvements (Design)205 Stormwater Fund $12,800 $25,580 $12,800 $25,580 D.A San Quentin Pump Station Reconstruction (Design)205 Stormwater Fund $374,017 $374,017 D.A Sea Level Rise Vulnerability Study 603 Building Maintenance $9,318 $72,800 $9,318 $72,800 Drainage Total $32,533 $472,397 $120,000 $32,533 $472,397 $120,000 Parks P.A Pickleweed Park and Schoen Park Improvements 603 Building Maintenance $5,655 $5,655 Grant: CDBG (Federal)$257,750 $127,750 $130,000 P.A Shoreline Park Restroom 603 Building Maintenance $14,417 $9,501 $70,000 $14,417 $9,501 $70,000 Parks Total $20,072 $9,501 $327,750 $20,072 $9,501 $197,750 $130,000 Right-of-Way R.A Lincoln Avenue Bridge Repair (Design)206 Gas Tax $110,000 $110,000 R.A Lincoln Avenue Curb Ramps (Design)206 Gas Tax - RMRA $120,550 $120,550 R.A Street Resurfacing FY 2018-19 206 Gas Tax $1,953,326 $1,953,326 Gas Tax - Measure A Local Transportation Sales Tax $646,674 $646,674 Right-of-Way Total $0 $230,550 $2,600,000 $0 $230,550 $2,600,000 Transportation T.A Merrydale Pathway - North Connector (Design)206 Gas Tax - RMRA $181,244 $181,244 T.A NB 101 Offramp-Second Right Turn Lane (Design)206 Gas Tax $121,500 $121,500 T.A Second and Third Street Queue Cutters 246 Traffic Mitigation Fund $148,315 $380,000 $148,315 $380,000 Transportation Total $0 $451,059 $380,000 $0 $451,059 $380,000 Total Prior Year Funding FY 2019-20 Total FY 2020-21 FY 2021-22 Page 1 of 6 Preliminary FY 2019-20 CIP Project Listing Updated 6/12/2019 City Owned Property Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Funded C.01 Essential Facilities: Fire Station 54 & 55 Remodel 420 Measure E $681,342 $6,717,774 $26,116 $655,226 $6,717,774 C.02 Childcare Portable Building Replacement (Silveria, Dixie and Pickleweed)208 Childcare Fund $123,425 $1,130,000 $3,425 $120,000 $880,000 $250,000 C.03 B Street Community Center Restroom Remodel 603 Building Maintenance $10,385 $85,000 $10,385 $85,000 C.04 Albert Park Ball Field ADA Restrooms 603 Building Maintenance $75,000 $75,000 Donations $5,000 $5,000 C.05 Albert Park Baseball Stadium - ADA Lift 603 Building Maintenance $50,000 $50,000 C.06 City Hall Server Room Upgrade 603 Building Maintenance $30,000 $30,000 C.07 City Hall Accessibility and Security Improvements 603 Building Maintenance $6,650 $2,500 $60,000 $6,650 $2,500 $60,000 C.08 B Street Community Center - Misc Repair 603 Building Maintenance $70,000 $70,000 C.09 Terra Linda Community Center HVAC Replacement 603 Building Maintenance $150,000 $150,000 C.10 Microwave Network for PSC 603 Building Maintenance $7,000 $73,000 $7,000 $73,000 C.11 Albert J. Boro Community Center - Misc Repair 603 Building Maintenance $140,000 $140,000 C.12 Public Works Corp Yard - Misc Repair 603 Building Maintenance $30,000 $30,000 C.13 Fifth Street and C Street Parking Garage Improvements 501 Parking Services $8,730 $65,000 $245,000 $8,730 $65,000 $245,000 C.14 Conversion of City Hall Police Station after PSC 603 Building Maintenance $400,000 $400,000 C.15 Fifth and Garden Parking Lot Resurfacing 501 Parking Services $15,000 $70,000 $15,000 $70,000 C.16 Third and Lootens Parking Structure 501 Parking Services $50,000 $525,000 $50,000 $525,000 C.17 Third and A Street Parking Structure Repairs 501 Parking Services $30,000 $470,000 $30,000 $470,000 C.18 Third and C Street Parking Structure Repairs 501 Parking Services $10,000 $135,000 $10,000 $135,000 Funded Total $15,380 $994,652 $10,460,774 $15,380 $107,426 $0 $790,226 $845,000 $90,000 $9,122,774 $7,000 $493,000 Unfunded 519 4th Street Roof and Structural Upgrade Unfunded $470,000 Albert J Boro Library Electrical Upgrades Unfunded $15,000 Albert J. Boro Center Additional Parking Unfunded $14,000 $206,000 Albert J. Boro Community Center HVAC Repair Unfunded $263,000 Albert J. Boro Community Center Replace Room Partician Unfunded $30,000 Albert Park Baseball Stadium - Misc Repair Unfunded $75,000 B Street Community Center Concrete Entrance Reconstruction Unfunded $5,000 $55,000 B Street Community Center Parking Lot Resurfacing Unfunded $16,000 $247,000 B Street Community Center Re-Roof Unfunded $35,000 $165,000 Childcare Portable Building Replacement (Vallecito)Unfunded $50,000 $250,000 City Hall & Library Lighting and Landscaping Improvements Unfunded $10,000 $40,000 City Hall Fire Upgrades Unfunded $8,000 $82,000 Coleman Childcare Center Unfunded $40,000 Court Street Fountain Repair Unfunded $13,000 $137,000 Downtown Fiber Connection Unfunded $13,000 $137,000 Downtown Library Interior Painting Unfunded $60,000 Downtown Library Re-roof Unfunded $25,000 Falkirk Cultural Center - Misc Repair Unfunded $90,000 Fourth Street Twinkle Lights Replacement Unfunded $13,000 $137,000 Glenwood Childcare Center Unfunded $35,000 Internet Upgrade at Corp Yard Unfunded $4,000 $46,000 Library Book Shelving Replacement Unfunded $3,000 $27,000 Library Children's Patio Enclosure Unfunded $72,000 Library Restroom Addition Unfunded $18,000 $182,000 Mail Room Relocation Unfunded $60,000 Parkside Children's Center Unfunded $40,000 Parkside Preschool Playground Renovation Unfunded $120,000 Resurface City Hall Parking Lots, Lower and Upper Unfunded $8,000 $122,000 Terra Linda Community Center Misc.Unfunded $16,500 Terra Linda Pool House Electrical Upgrades Unfunded $25,000 $85,600 Terra Linda Recreation Center Hardscape Repair Unfunded $150,000 Unfunded Total $0 $235,000 $3,480,100 $0 $0 $0 Total Prior Year Funding FY 2019-20 Total FY 2020-21 FY 2021-22 Page 2 of 6 Preliminary FY 2019-20 CIP Project Listing Updated 6/12/2019 Drainage Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Funded D.01 Stormwater System Pump and CMP Replacement, System Upgrades FY 2019-20205 Stormwater Fund $705,300 $705,300 D.02 Stormwater System Pump and CMP Replacement, System Upgrades FY 2020-21205 Stormwater Fund $705,300 $705,300 D.03 Stormwater System Pump and CMP Replacement, System Upgrades FY 2021-22205 Stormwater Fund $705,300 $705,300 D.04 First and D Street Drainage Improvements 205 Stormwater Fund $300,000 $300,000 Funded Total $0 $0 $2,415,900 $0 $0 $0 $705,300 $1,005,300 $705,300 Unfunded Canal Street Turn Structure and Filtration System Unfunded $500,000 East and Jessup Storm Improvements Unfunded $1,000,000 Happy Lane Storm Drain Abandonment Unfunded $4,000 $41,000 Las Casas Drainage Basin Repair Unfunded $100,000 Levee Analysis Inventory Program Unfunded $100,000 Los Gamos and Oleander Drainage Improvements (Construction)Unfunded $550,000 MCSTOPP - Catch Basin Trash Capture Unfunded $720,000 Rotary Manor Culvert Replacement Unfunded $50,000 $250,000 San Mateo Court Headway Improvements Unfunded $80,000 San Quentin Pump Station Reconstruction (Construction)Unfunded $6,000,000 Second Street Drainage Improvements - Between C and E Streets Unfunded $170,000 Spinnaker Point Salt Marsh Remediation Grants: Unsecured $250,000 $3,750,000 Woodland Ave Drainage Improvements Unfunded $19,200 $54,080 $554,320 Unfunded Total $19,200 $358,080 $13,815,320 $0 $0 $0 FY 2020-21 FY 2021-22 Total Prior Year Funding FY 2019-20 Total Page 3 of 6 Preliminary FY 2019-20 CIP Project Listing Updated 6/12/2019 Parks Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Funded P.01 Gerstle Park Restroom Repair 603 Building Maintenance $30,000 $30,000 P.02 Gerstle Park Playground Structure 241 Measure A: Parks $100,000 $100,000 603 Building Maintenance $125,000 $125,000 P.03 Sun Valley Park Playground Structure 241 Measure A: Parks $121,162 $121,162 603 Building Maintenance $103,838 $103,838 P.04 Peacock Gap Park Playground Structure Grant: Prop 68 Per Capita $250,000 $250,000 P.05 Bernard Hoffman Playground Structure Grant: Prop 68 Per Capita $250,000 $250,000 P.06 Pickleweed Park Field Synthetic Field Conversion (Design)241 Measure A: Parks $20,000 $20,000 P.07 Gerstle Park, Peacock Gap and Santa Margarita Tennis Court Resurfacings 241 Measure A: Parks $110,000 $110,000 Donations $10,000 $10,000 P.08 Santa Margarita Court Replacement 603 Building Maintenance $77,200 $77,200 P.09 Terra Linda Community Center Basketball Court Repaving and Shade Structure241 Measure A: Parks $150,000 $150,000 Funded Total $0 $20,000 $1,327,200 $0 $0 $0 $20,000 $755,000 $225,000 $347,200 Unfunded Bernard Hoffman Drainage and Irrigation Improvements Unfunded $50,000 Bret Hart Landscape Walls Unfunded $4,000 $41,000 Open Space Tree Assessment and Removal Unfunded $135,000 Pickleweed Park Basketball Court Unfunded $150,000 Pickleweed Park Field Synthetic Field Conversion (Construction)Grants: Unsecured $3,570,000 Starkweather Park Improvements Unfunded $50,000 Terra Linda Community Center Play Area and Access Improvements Unfunded $58,000 Victor Jones Park Restroom Upgrades Unfunded $150,000 Unfunded Total $0 $4,000 $4,204,000 $0 $0 $0 FY 2020-21 FY 2021-22 Total Prior Year Funding FY 2019-20 Total Page 4 of 6 Preliminary FY 2019-20 CIP Project Listing Updated 6/12/2019 Right of Way Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Funded R.01 Street Resurfacing FY 2019-20 206 Gas Tax $1,384,104 $1,384,104 Gas Tax - Measure A Local Transportation Sales Tax $1,215,896 $1,215,896 R.02 Street Resurfacing FY 2020-21 206 Gas Tax $1,628,435 $1,628,435 Gas Tax - Measure A Local Transportation Sales Tax $971,565 $971,565 R.03 Street Resurfacing FY 2021-22 206 Gas Tax $1,601,106 $1,601,106 Gas Tax - Measure A Local Transportation Sales Tax $998,894 $998,894 R.04 Smith Ranch Road Resurfacing 206 Gas Tax - RMRA $1,633,769 $133,769 $1,500,000 R.05 Andersen Drive Microseal 206 Gas Tax $200,000 $200,000 R.06 Southern Heights Bridge Replacement Caltrans Highway Bridge Program $561,724 $4,000,523 $561,724 $523 $4,000,000 R.07 Sidewalk Repair Program FY 2019-20 206 Gas Tax $350,000 $350,000 R.08 Sidewalk Repair Program FY 2020-21 206 Gas Tax $350,000 $350,000 R.09 Sidewalk Repair Program FY 2021-22 206 Gas Tax $350,000 $350,000 R.10 Southern Heights-Courtright Road Repair 206 Gas Tax $400,000 $400,000 R.11 Francisco Blvd East Resurfacing 206 Gas Tax $60,000 $920,000 $60,000 $920,000 R.12 Lincoln Avenue Curb Ramps (Construction)206 Gas Tax - RMRA $1,500,000 $1,500,000 R.13 76 D Street Hillside Revetment Grant: CalOES $7,000 $68,000 $7,000 $68,000 R.14 201 D Street Driveway and Sidewalk Improvements 206 Gas Tax $7,000 $68,000 $7,000 $68,000 R.15 Fifth and D Resurfacing - Public Safety Center 206 Gas Tax $200,000 $200,000 R.16 First Street at Mahon Creek Wall Repair 206 Gas Tax $15,443 $200,000 $15,443 $200,000 R.17 Schoen Park Conversion to Parking Lot 206 Gas Tax $500,000 $500,000 R.18 Bungalow Avenue Reconstruction 206 Gas Tax $840,000 $640,000 $100,000 $100,000 Funded Total $0 $651,167 $19,380,292 $0 $577,167 $774,292 $7,000 $11,618,000 $60,000 $3,970,000 $7,000 $3,018,000 Unfunded Aerial Undergrounding of Utilities Unfunded $355,000 $3,645,000 Fairhills Drive Slide Repair Unfunded $600,000 Fourth Street Curb Ramp Replacement Unfunded $150,000 Lincoln Avenue Bridge Repair (Construction)Grants: Unsecured $4,000,000 Mission Ave (Boyd Park) Sidewalk Unfunded $110,600 Second Street Resurfacing (Phase 1)Unfunded $1,000,000 Unfunded Total $0 $355,000 $9,505,600 $0 $0 $0 FY 2020-21 FY 2021-22 Total Prior Year Funding FY 2019-20 Total Page 5 of 6 Preliminary FY 2019-20 CIP Project Listing Updated 6/12/2019 Transportation Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Planning Design Construction Funded T.01 Crosswalk Improvements Citywide FY 2019-20 206 Gas Tax $100,000 $100,000 T.02 Crosswalk Improvements Citywide FY 2020-21 206 Gas Tax $100,000 $100,000 T.03 Crosswalk Improvements Citywide FY 2021-22 206 Gas Tax $100,000 $100,000 T.04 Innovative Deployment of Enhanced Arterials (IDEA)IDEA Grant (MTC)$255,499 $743,655 $255,499 $743,655 T.05 Third Street and Hetherton Intersection Improvements 206 Gas Tax $400,000 $400,000 246 Traffic Mitigation Fund $94,035 $72,059 $94,035 $72,059 Grant: Highway Safety Improvement Program $270,000 $270,000 T.06 Francisco Blvd East Sidewalk Widening 206 Gas Tax $460,820 $707,000 $460,820 $707,000 Grant: OBAG (Federal)$2,100,000 $2,100,000 Grant: ATP (State)$4,025,000 $4,025,000 T.07 Third Street Improvements - Lindaro to Miracle Mile Grant: State-Local Partnership Program $1,500,000 $1,500,000 Grant: Measure A Major Road Improvements $552,230 $9,700,000 $552,230 $9,700,000 T.08 Freitas and Highway 101 Offramp Improvements 206 Gas Tax $35,000 $50,000 $1,200,000 $35,000 $50,000 $1,200,000 T.09 Third Street Intersection Improvements: Grand to Lindaro 206 Gas Tax $1,000,000 $1,000,000 246 Traffic Mitigation Funds $300,000 $300,000 Grant: Measure A Major Road Improvements $1,100,000 $100,000 $1,000,000 Grant: HSIP $1,500,000 $1,500,000 T.10 Bellam and Francisco Blvd East Improvements 206 Gas Tax $40,000 $40,000 T.11 Second Street Intersection Improvements 206 Gas Tax $100,000 $1,000,000 $100,000 $1,000,000 246 Traffic Mitigation Funds $1,000,000 $1,000,000 T.12 Fifth Street Signal System Improvements: Court to E Streets 246 Traffic Mitigation Fund $200,000 $200,000 T.13 Fourth Street Signal System Improvements: B Street to Cijos 246 Traffic Mitigation Fund $1,000,000 $1,000,000 T.14 North San Rafael Traffic Signal Connections 246 Traffic Mitigation Fund $300,000 $300,000 T.15 Bicycle & Pedestrian Master Plan Implementation FY 2019-20 206 Gas Tax $100,000 $100,000 T.16 Bicycle & Pedestrian Master Plan Implementation FY 2020-21 206 Gas Tax $100,000 $100,000 T.17 Bicycle & Pedestrian Master Plan Implementation FY 2021-22 206 Gas Tax $100,000 $100,000 Funded Total $129,035 $1,490,608 $28,685,655 $94,035 $1,340,608 $0 $35,000 $50,000 $19,785,655 $100,000 $6,700,000 $2,200,000 Unfunded Bellam/Andersen Intersection Improvements Unfunded $50,000 $31,111 $318,889 Francisco Blvd. West MUP Phase II Grants: Unsecured $1,800,000 Grants: Urban Greening (CA Natural Resources Agency)$1,200,000 Freitas and Las Gallinas: Left turn signal head Unfunded $100,000 Merrydale Pathway - North Connector (Construction)Unfunded $1,040,000 Safe Routes to School – Davidson Phase 2 Unfunded $100,000 San Rafael Highschool Crosswalk Grants: Unsecured $30,000 $150,000 $30,000 $150,000 South Merrydale Connector Unfunded $150,000 West End/Marquad Bulb Out and Bicycle Improvements Unfunded $25,000 $225,000 Unfunded Total $50,000 $86,111 $5,083,889 $0 $0 $0 $30,000 $150,000 FY 2020-21 FY 2021-22 FY 2019-20 Total Total Prior Year Funding Page 6 of 6