SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: Bill Guerin,
Director of Public Works
City Manager Approval: _______
File No.: 16.11.46
TOPIC: 2017 STORM DAMAGE REPAIRS
SUBJECT: RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A
SECOND AMENDMENT TO THE AGREEMENT WITH PARK ENGINEERING,
INC. FOR ENGINEERING SUPPORT ASSOCIATED WITH THE 2017 STORM
DAMAGE REPAIRS PROJECT IN THE AMOUNT OF $21,402.46, FOR A
TOTAL NOT-TO-EXCEED AMOUNT OF $158,092.44.
RECOMMENDATION: Adopt a resolution authorizing the City Manager to execute a second
amendment to the professional services agreement with Park Engineering, Inc. for engineering
support services in conjunction with the 2017 Storm Damage repairs in an amount of
$21,402.46, for a total not-to-exceed amount of $158,092.44.
BACKGROUND: In January 2017, the City of San Rafael experienced a significant storm event.
On February 14, 2017, the President declared a major disaster, making federal disaster aid
available to 34 counties, including Marin County. This disaster caused significant damage to
City roadways, including three slip-outs (landslides), requiring the assistance of an on-site field
engineer to coordinate construction activities and provide field inspection. The three disaster
locations include 21 San Pablo, 80 Upper Toyon, and 70 Irwin.
On August 13, 2018, the City Manager approved a professional services agreement with Park
Engineering, Inc. in an amount of $74,055.50 to provide these services. On January 22, 2019,
the City Council approved a first amendment to the professional services agreement in an
additional amount of $62,634.48 for on-going construction support.
To date, repairs to 21 San Pablo and 80 Upper Toyon are complete and the City Council has
accepted those projects.
ANALYSIS: While the three-tiered retaining wall system is complete at 70 Irwin, roadway
rehabilitation and drainage ditch repairs remain. The construction timeline at 70 Irwin has taken
longer than anticipated due to encountering unforeseen conditions, such as hillside springs
requiring drainage systems, and an extended, intense rainy season which resulted in the
contractor stopping construction activity multiple times. While the contractor was not able to
actively pursue construction during portions of the winter months, Park Engineering staff
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
continued to make occasional site visits to ensure the job site was properly maintained to meet
local and County requirements.
Consequently, additional field engineering and inspection services are required until the work at
70 Irwin is complete. The attached resolution (Attachment 1) would authorize the City Manager
to execute a second amendment to the professional services agreement to extend the term of
the agreement through December 31, 2019 and to increase the compensation for on-site field
engineering and inspection services.
FISCAL IMPACT: The consultant’s proposal of $21,402.46 will be paid for through Gas Tax
Fund (fund no. 206). The expenses associated with this agreement and subsequent
amendments are partially reimbursable by Federal Emergency Management Agency (FEMA)
and the California Office of Emergency Services (CalOES).
OPTIONS:
1. Adopt the resolution as presented.
2. Do not adopt the resolution. If this option is chosen, City staff will provide the required
field engineering and inspection services through project completion.
RECOMMENDED ACTION: Adopt a resolution authorizing the City Manager to execute a
second amendment to the professional services agreement with Park Engineering, Inc. for
engineering support services in conjunction with the 2017 Storm Damage repairs in an amount
of $21,402.46, for a total not-to-exceed amount of $158,092.44.
ATTACHMENT:
1. Resolution
2. Second Amendment to Agreement with Park Engineering, Inc., with attached Exhibit A
RESOLUTION NO. 14702
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
AUTHORIZING THE CITY MANAGER TO EXECUTE A SECOND
AMENDMENT TO THE AGREEMENT WITH PARK ENGINEERING, INC.
FOR ENGINEERING SUPPORT ASSOCIAT ED WITH THE 2017 STORM
DAMAGE REPAIRS PROJECT IN THE AMOUNT OF $21,402.46, FOR
A TOTAL NOT-TO-EXCEED AMOUNT OF $158,092.44
WHEREAS, the City of San Rafael entered into a Professional Services
Agreement dated August 13, 2018 with Park Engineering, Inc. for engineering support
services in association with the 2017 Storm Damage Repair Projects (“Projects”) in an
amount not to exceed $74,055.50 (the “Agreement”); and
WHEREAS, the City subsequently entered into a First Amendment to the
Agreement, dated January 22, 2019, increasing the compensation amount by
$62,634.48 to perform additional engineering support services for the Projects,
increasing the total not to exceed amount under the Agreement to $136,689.98; and
WHEREAS, due to weather and unforeseen conditions, City staff has
determined that additional field engineering and construction support services from
Park Engineering, Inc. are needed through Project completion; and
WHEREAS, the costs for engineering support services of the Projects will be
fully funded through the Gas Tax Fund (Fund No. 206), and a portion of such is
reimbursable by the Federal Emergency Management Agency (FEMA) and the
California Office of Emergency Services (CalOES);
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
RESOLVES as follows:
1. The City Council hereby approves and authorizes the City Manager to
execute a Second Amendment to the Professional Services
Agreement with Park Engineering for engineering support services, in
a form to be approved by the City Attorney, to extend the term
through December 31, 2019 and to provide for additional
compensation for services in the amount of $21,402.46, for a revised
total contract amount not to exceed $158,092.44.
2. The Director of Public Works is hereby authorized to take any and all
such actions and make changes as may be necessary to accomplish
the purpose of this resolution.
I, LINDSAY LARA, Clerk of the City of San Rafael, hereby certify that the
foregoing resolution was duly and regularly introduced and adopted at a regular
meeting of the Council of said City on the 15th day of July 2019, by the following vote,
to wit:
AYES: COUNCILMEMBERS: Bushey, Colin, Gamblin, McCullough & Mayor Phillips
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
__
LINDSAY LARA, City Clerk
1
SECOND AMENDMENT TO THE AGREEMENT WITH PARK
ENGINEERING, INC. FOR ENGINEERING SUPPORT ASSOCIATED
WITH THE 2017 STORM DAMAGE REPAIRS PROJECT
THIS SECOND AMENDMENT to the Professional Services Agreement by and
between the CITY OF SAN RAFAEL (hereinafter “CITY”), and PARK ENGINEERING,
INC. (hereinafter “CONSULTANT”), is made and entered into as of the ______ day of
____________, 2019.
RECITALS
WHEREAS, CITY and CONSULTANT entered into a Professional Services
Agreement dated August 13, 2018 for engineering support services associated with the 2017
Storm Damage Repairs Projects (the “Projects”) in an amount not to exceed $74,055.50 (the
“Agreement”); and
WHEREAS, CITY and CONSULTANT subsequently entered into a First Amendment
to Professional Services Agreement, dated January 22, 2019, to include an additional
compensation amount not to exceed $62,634.48 for additional engineering support services
associated with the Projects, increasing the total not-to-exceed amount under the Agreement to
$136,689.98; and
WHEREAS, CITY continues to need consulting services from CONSULTANT in
connection with the Projects, and CONSULTANT is willing to provide such services;
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows:
1. Paragraph 4 of the Agreement, entitled “COMPENSATION,” is hereby amended
to include additional compensation payable to CONSULTANT for the services
described in Exhibit “A” to the Agreement, on a time and materials basis in a not-
to-exceed amount of $21,402.46 as set forth in the “ADDITIONAL Cost Proposal
for Construction Inspection Services” dated June 12, 2019, attached to this
Second Amendment as Exhibit “A” and incorporated herein by reference, and to
change the total not-to-exceed amount under the Agreement to $158,092.44.
2. Paragraph 5 of the Agreement, entitled “TERM OF AGREEMENT,” is hereby
amended to extend the term to end on December 31, 2019.
2
3. Except as specifically amended herein, all other provisions, terms and obligations
of the Agreement between the parties, as amended on January 22, 2019, shall
remain valid and shall be in full force.
IN WITNESS WHEREOF, the parties have executed this Second Amendment on the
day, month, and year first above written.
CITY OF SAN RAFAEL PARK ENGINEERING, INC.
______________________________ By:______________________________
JIM SCHUTZ, City Manager
Name:
Title of Corporate Officer:
ATTEST:
and
______________________________
LINDSAY LARA, City Clerk By:______________________________
Name:
Title of Corporate Officer:
APPROVED AS TO FORM:
_________________________________
ROBERT F. EPSTEIN, City Attorney
Base Rate Regular
Loaded Rate
Overtime
Rate
REGULAR OVERTIME REGULAR OVERTIME
70 Irwin Slide Repair, City Project No. 11308
Andy Bodo
Assistant Resident Engineer 58.00$ 125.52$ 188.28$ 720 50 200 0 25,104.00$ 99,788.40$ 3,701.54$ 21,402.46$ 124,892.40$
1. Rate includes vehicle, mobile phone, laptop and all equipment required to perform required duties.
2. Based on part-time inspection effort for for June & July
Additional
Budget
Requested
Revised Total
Project BudgetCurrent Allotment Additional Allotment
City of San Rafael
2017 Storm Damage Repair Projects - 70 Irwin Street
ADDITIONAL Cost Proposal for Construction Inspection Services
Name/Classification
Rates Construction Hours
Total Funds
for Additional
Hours
Current
Project Budget
Remaining
Availble
Budget
■
t------1 ----+----+-1------+--1 -----+-------------1----------1 I I I I I