HomeMy WebLinkAboutPW-LR-Fin Measure A Workplan and Preliminary Capital Improvement Program____________________________________________________________________________________ FOR CITY CLERK ONLY Council Meeting: May 18, 2020 Disposition: Resolution 14797 x accepted report Agenda Item No: 6.c Meeting Date: May 18, 2020 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Finance Prepared by: Bill Guerin, Director of Public Works Susan Andrade-Wax, Library & Recreation Director Nadine Atieh Hade, Finance Director City Manager Approval: ______________ TOPIC: MEASURE A WORK PLAN AND PRELIMINARY CAPITAL IMPROVEMENT PROGRAM SUBJECT: RESOLUTION APPROVING THE MEASURE A WORK PLAN FOR PROPOSED EXPENDITURE OF MEASURE A FUNDS FOR JULY 1, 2020 – JUNE 30, 2021; AND REPORT ON PRELIMINARY THREE-YEAR CAPITAL IMPROVEMENT PROGRAM RECOMMENDATION: 1.Adopt a resolution approving the Measure A – Open Space Work Plan for Fiscal Year 2020-2021. 2.Accept informational report regarding the preliminary three-year Capital Improvement Program for FY 2020-21 through FY 2022-23 and provide direction to staff. INTRODUCTION: The purpose of this report is to present the preliminary three-year Capital Improvement Program for Fiscal Year (FY) 2020-21 through FY 2022-23 for review, as well as to present the Measure A – Open Space Work Plan for approval. This presentation will provide the City Council and community members an opportunity to participate in reviewing and sharing feedback relating to the CIP and the Measure A – Open Space Work Plan. While the CIP will be formalized in a full, detailed report and incorporated into a final, proposed citywide budget for FY 2020-21 to be presented to the City Council for approval in June 2020, staff seeks City Council feedback of the preliminary CIP project list at this time. The Measure A – Open Space Work Plan will also be approved as part of the recommended action of this report. The preliminary capital improvement program work plan was discussed at the City Council Finance Subcommittee meeting on April 14, 2020, and the Measure A – open space work plan was discussed at the City Council Finance Subcommittee meeting on May 12, 2020 at which time staff was directed to bring forth these items to the City Council. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 BACKGROUND: Measure A In November 2012, an ordinance of the County of Marin (“Measure A”) was approved by a two-thirds majority of the electors voting on the Measure. Measure A imposes a nine-year, one-quarter of one (0.025) percent retail transactions and use tax (TUT) that is administered by the County of Marin. The purpose of Measure A is to support the preservation of Marin County parks, open space preserves and farmland. The tax is estimated, at current collection levels, to generate approximately $10 million per year. This level of revenue changes during the life of the Measure due to the variability in annual receipts. Measure A’s expenditure plan outlines three (3) programs for spending the sales tax proceeds. Each program is described by its funding allocation, and types of projects and activities that the funding supports. •County Parks and Open Space Program (65%) o 80% is to protect or restore natural resources and maintain existing county parks and open space preserves. o 20% is dedicated to the permanent preservation of land for public open space, community separators, wildlife corridors, greenbelts, and habitat. •Farmland Preservation Program (20%) o To protect Marin County farmland at risk of subdivision and development and preserve Marin's working farms and ranches. •City, Town, and Applicable Special District Program (15%) o Funding is allocated to cities, towns, and special districts to manage parks, open space preserves, nature preserves, recreation programs, and vegetation to promote biodiversity and reduce wildfire risk. Of the 15% that is allocated to towns, cities and special districts (approximately $2.12 million), the City of San Rafael receives 22.91% based on its population. The City uses this funding to support park maintenance, vegetation removal and management, protection of open space, and park-related capital improvement projects. Though they go under the same name, Measure A Parks is not to be confused with Measure A Transportation Sales Tax, administered by the Transportation Authority of Marin (TAM). Capital Improvement Program (CIP) The CIP is a multi-year planning tool used to identify and implement the City’s capital needs over the upcoming 3-year period: FY 2020-21 through FY 2022-23. The CIP document summarizes the City’s planned capital and infrastructure improvement projects, including their funding sources, and prioritizes projects after analysis and coordination with other City departments in order to ensure that all department needs are represented. Project selection and priority is based on recommendations by a Working Group representing various City departments to accommodate high priority needs, which focused on life/safety, maintenance and repair, public and Council input, and other factors. The CIP is intended to provide a comprehensive three-year project list for the City’s known capital and infrastructure needs. ANALYSIS: Measure A Since 2013, the City has received $2,974,635 in Measure A funding, $890,146 of which has been used for park-related capital improvement projects. Table A shows a year-by-year breakdown of the park improvement projects. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3 Table A: Measure A Funding of Park Capital Improvement Projects Historically the City has used Measure A funding to support four general activities: park maintenance, vegetation management, protection of open space and park improvements. In April, the City of San Rafael received notification that its allocation for FY 2020-21 was estimated at $365,003. Due to the financial impacts COVID-19 has had and will continue to have on local sales tax, Marin County predicted a 25% reduction below last year’s Measure A allocation. As a result of the reduced allocation, Measure A will be unable to absorb the same amount of activities and services as in years prior. Therefore, the funding to open space rangers and additional vegetation management will be removed. As the services are valuable to the City, Staff is looking for other eligible funding sources such as Measure C (Marin Wildfire Prevention). • Vegetation Management and Parks Maintenance: Public Works utilizes $155,000, or 42% of Measure A funding for a vegetation management and parks maintenance program that focuses on City parks and open space. The program relies on goats and vegetation “chipper days” to reduce invasive species and to control erosion. • Park Capital Improvements and Maintenance: The City’s FY 2020-21 Capital Improvement program will rely on $210,003, or 58% of Measure A funding, to support the following projects: o $150,000 will be used to fund the development of a comprehensive, City-wide Parks and Recreation Master Plan that is intended to be integrated with the City’s General Plan. The Master Plan will provide a framework for directing City resources toward parks, facilities and programs, and for addressing current and future community recreational needs over the next ten (10) years. o $60,003 will be allocated towards the highest priority parks projects at the outcome of the City-wide Parks and Recreation Plan. Park Capital Improvement Projects FY 2014 Expenses FY 2015 Expenses FY 2016 Expenses FY 2017 Expenses FY 2018 Expenses FY 2019 Expenses FY 2020 Projected Expenses Total Miscellaneous Park Repairs (pathways, sidewalks, etc.) $131,155 $6,220 $137,375 Miscellaneous Equipment (slides, tables, etc.) $5,246 $58,598 $10,621 $74,465 Sun Valley Park Basketball Court $46,873 $46,873 Albert Park Playground $37,761 $50,618 $221,957 $310,336 Victor Jones Park Playground $80,275 $19,725 $100,000 Bret Harte Park Restroom $2,183 $170,798 $172,981 Pickleweed Park Field Conversion $6,523 $6,523 Albert Park Stadium Field Fencing $41,593 $41,593 $136,401 $64,818 $57,494 $118,036 $72,526 $392,755 $48,116 $890,146 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 4 These planned expenditures are summarized in the Measure A Work Plan for July 1, 2020 through June 30, 2021 (Attachment 2). Capital Improvement Program (CIP) Project List Development: Projects identified for the CIP are recommended by Public Works staff in the course of their work, studies and reports, including, but not limited to, the 2018 Bicycle and Pedestrian Master Plan (BPMP) or the Facility Assessment Study, other Department Directors or, may arise from direct community or Council input. Additionally, projects with specific discrete funding sources are included in the CIP. While most street and transportation projects are informed by the General Plan, BPMP, or traffic studies and observations, improvement projects to City parks and buildings/facilities have historically been informed by Department Directors, the publicly appointed Parks and Recreation Commission, and the Facilities Maintenance division of Public Works. New to the CIP development process this year was the creation of a working group consisting of staff from various City departments. The working group met to discuss proposed projects and rank them based on the following criteria: 1) health/safety/liability; 2) priority initiatives/City goals; 3) time sensitive funds; and 4) maintain/enhance functionality. Furthermore, these four criteria were all weighted, with the category of health/safety/liability worth 35% of the overall points available. Having a weighted system allows for the most important projects to rise to the surface and ensure they are a priority. Another change to the CIP this year involves the use of a 15% contingency in which not all available funding is allocated to deliver CIP projects. Prior experience suggests that unanticipated needs arise mid-year and having a contingency fund to cover these ensures staff are not unnecessarily performing adjustments to the current CIP priority list. In some fund types, the number of projects exceeds available funding. In this case, these future projects are identified in the CIP as “unfunded.” Major new projects identified in the FY 2020-21 to FY 2022-23 CIP include: •Third Street Safety Improvements Project •Francisco Blvd West Multi-use Pathway Phase II Project •Schoen Park Modifications •Canal Neighborhood Pedestrian Improvements •Woodland Avenue Retaining Wall •San Rafael High School Crosswalk Improvements •Southern Heights Blvd at Courtright Rd Retaining Wall •Park and Recreation Master Plan •Fifth Avenue and Garden Parking Lot Resurfacing •City Hall Council Chambers Accessibility and Security Improvements Project Funding: The five major annual funding sources for the CIP, including Measure A Parks, are: Fund # Fund Name (CIP Category) Average Annual Revenues Description 603 Building Maintenance $500,000 The Building Maintenance Fund supports both routine maintenance and capital improvement projects associated with the City’s buildings, parks and other facilities. The Building Fund is an internal revenue fund, which means General Fund monies are the sole SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 5 (City Owned Property, Parks) source of revenue for the fund. Historically, $500,000 in General Fund monies has been contributed annually to the Building Fund. 241 Measure A (Parks) $210,003 Measure A is a nine-year ¼ percent transactions and use tax that was passed in 2012 and is managed by the County of Marin. The purpose of the tax is to care for existing parks and open spaces, support regional community parks, projects, and programs and to further farmland restoration. Library and Recreation, in concert with the Parks and Recreation Commission, provides input each year as to which Parks projects should be prioritized to receive Measure A funding. 205 Stormwater Fund (Drainage) $840,000 Established to fund Stormwater maintenance, programs, and improvements throughout the City—including maintenance and repair of the City’s 12 storm water pump stations. This fund receives annual revenues of approximately $840,000 from the City’s Stormwater Activity fee (Municipal Code Chapter 9.40). 206 Gas Tax (Streets/ Transportation) $3,300,000 The Gas Tax is a revenue distributed from the state based on a percentage tax on each gallon of gas purchased in San Rafael. Gasoline tax is collected and distributed to jurisdictions by the State on an annual basis and may be used for capital projects and maintenance to local streets, roads, traffic, and bicycle pedestrian facilities. Fund #206 also collects annual Measure A Transportation Sales Tax dollars (distributed by Transportation Authority of Marin). A ½- cent sales tax approved initially by voters in 2004 and reapproved in November 2018. Note: As a result of COVID-19 and the decrease in economic and fueling activity, the City has followed a generally accepted estimate in assuming a 30% decrease in gas tax revenue assumptions for FY 2020-21 in the CIP. 246 Traffic Mitigation Fee (Transportation) ~$600,000 (depends on development) Traffic Mitigation Fees are charged to a developer in connection with the approval of a development project. The funds are used to support improvements to the traffic/transportation network. The City utilizes Traffic Mitigation Fees for circulation projects identified in Exhibit 21 of Policy 6A of General Plan 2020 and similar qualifying projects. As has been noted in prior year CIPs, the long-term capital and infrastructure improvement needs for City-owned property, parks, and drainage far exceed the available revenues each year. Therefore, a considerable number of projects are identified as real capital and infrastructure needs (and maintained on the CIP project list) but are categorized as “Unfunded”. Historically, staff transfers $400,000 each year from the Gas Tax to the General Fund to support personnel costs of Streets Maintenance staff, which we propose to do again this year. Personnel costs of employees preforming street and road maintenance and repairs total over $2M annually in the General Fund and are an allowable use of State gas tax monies. Due to the economic uncertainty caused by the COVID-19 virus and need for additional General Fund support, staff propose an additional one-time transfer of $1,246,000 to the General Fund to more fully support personnel costs for SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 6 street maintenance crews supporting Gas Tax projects above and beyond the annual $400,000 contribution. CIP Prior-Year Completed Projects: As a part of the annual CIP, the Department also recaps major projects completed in the prior fiscal year, including the following: • Essential Facilities: Fire Station 57 • Essential Facilities: Public Safety Center (near completion) • Francisco Blvd West Multi-use Pathway Phase I Project • Quiet Zone Implementation for Larkspur Extension • City Hall Solar Panel Installation • Pickleweed Park Playground Improvements • Street Restriping 2018/19 • Second and Third Street queue cutters • Street Resurfacing FY 2018/19 FISCAL IMPACT: Measure A The impact of approving the Measure A – Work Plan is the authorization of $365,003 in spending from restricted, Measure A tax proceeds. Projected FY 2020-21 Measure A revenues of $365,003 are sufficient to support the proposed Work Plan. This Work Plan has no fiscal impact on the City’s General Fund. Capital Improvement Program (CIP) There is no direct fiscal impact associated with the preliminary Capital Improvement Program because the information being provided is for the purpose of discussion, public input, and direction to staff. However, for planning purposes, the funding source by project phase and year is identified for each project in the CIP. The figures in the CIP are engineer’s estimates and are not based on actual bids received. It is important to note that while the City Council is accepting an informational report relating to a preliminary list and prioritization of projects within the CIP, including which projects are funded vs. those that remain unfunded, all CIP projects are subject to the City’s Purchasing Policy, including the City Council and City Manager contract thresholds at the time a contract is awarded. For example, when a construction contract is awarded for a project and the contract amount is above City Manager’s award authority ($175,000 for Public Works projects), the contract and project would be brought forth to the City Council for approval. OPTIONS: The City Council has the following options to consider relating to this item: 1. Accept informational report regarding the preliminary Capital Improvement Program and provide direction to staff. Adopt a resolution approving the FY 2020-21 Measure A – Open Space Work Plan. 2. Accept informational report regarding the preliminary Capital Improvement Program and provide direction to staff. Adopt a resolution as amended, approving the FY 2020-21 Measure A – Open Space Work Plan. 3. Accept informational report regarding the preliminary Capital Improvement Program and provide direction to staff. Do not adopt a resolution approving the FY 2020-21 Measure A – Open Space Work Plan and provide direction to staff. RECOMMENDATION: 1. Adopt a resolution approving the Measure A – Open Space Work Plan for Fiscal Year 2020- 2021. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 7 2.Accept informational report regarding the preliminary three-year Capital Improvement Program for FY 2020-21 through FY 2022-23 and provide direction to staff. ATTACHMENTS: 1.Resolution – Measure A 2.Exhibit I to Resolution: Measure A Work Plan 3.Preliminary FY 2020-21 CIP Project Listing RESOLUTION NO. 14797 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL APPROVING THE MEASURE A WORK PLAN FOR PROPOSED EXPENDITURE OF MEASURE A FUNDS FOR JULY 1, 2020 – JUNE 30, 2021 WHEREAS, on November 6, 2012 Marin County voters passed Measure A, a one-quarter of one percent transactions and use tax, dedicated to parks and open space for the duration of nine years; and WHEREAS, fifteen percent of the Measure A revenues is earmarked for Marin municipalities for the purpose of managing parks, open space preserves, recreation programs and vegetation; and WHEREAS, the County of Marin is responsible for the administration of the Measure A funds, and has developed a form of agreement and program materials for use by Marin municipalities; and WHEREAS, the City of San Rafael is eligible to receive Measure A funds, and entered into an agreement with the County of Marin in October of 2013, submitting a Work Plan of Expenditures for the first year of fund disbursement; and WHEREAS, the City of San Rafael is projected to receive a total of $365,003 for FY 2020-2021, to support the Work Plan; and WHEREAS, the County of Marin requires a Work Plan for the proposed Expenditure of Measure A funds in the amount of $365,003 for July 1, 2020 – June 30, 2021; NOW, THEREFORE, BE IT RESOLVED that the San Rafael City Council approves the Measure A Work Plan for Proposed Expenditure of Measure A funds for July 1, 2020 - June 30, 2021, a copy of which is hereby attached and by this reference made a part hereof; and BE IT FURTHER RESOLVED that the Finance Director is authorized to execute, on behalf of the City of San Rafael, the Work Plan for Proposed Expenditure of Measure A funds for July 1, 2020 to June 30, 2021. I, LINDSAY LARA, Clerk of the City of San Rafael, hereby certify that the foregoing Resolution was duly and regularly introduced and adopted at a regular meeting of the City Council of said City held on Monday, the 18th day of May 2020, by the following vote, to wit: AYES: NOES: ABSENT: COUNCILMEMBERS: Bushey, Colin, Gamblin, McCullough & Mayor Phillips COUNCILMEMBERS: None COUNCILMEMBERS: None _______________ LINDSAY LARA, City Clerk Page 1 of 4 Work Plan Measure A City, Town, and Applicable Special District Program Proposed Expenditure of Measure A Funds for July 1, 2020 to June 30, 2021 Timely and accurate completion of this report is a condition of receiving Measure A funds. Instructions: • This work plan must be completed by an authorized representative of the recipient. • Please complete this work plan, then scan and e-mail it to Kevin Wright, Marin County Parks External Affairs Manager (kwright@marincounty.org), by June 1, 2020. • Contact Mr. Wright by e-mail (kwright@marincounty.org) or phone (415) 497-3553 if you have any questions, or if you have suggestions to improve this form. • Marin County Parks will review this plan within one month of its receipt to ensure that proposed expenditures are consistent with Marin County Ordinance 3586 (Measure A). • Recipients must provide Marin County Parks with 30-days prior notice of any project additions or substitutions that are proposed while a work plan is in effect. • Total actual project expenditures may not exceed recipient’s actual Measure A funding for any given fiscal year, plus any balance remaining from previous years. _______________________________________________________________ This portion of page is intentionally blank. Proceed to next page. Page 2 of 4 A. Name of Recipient (city, town, or special district): City of San Rafael B. Recipient’s representative and contact information: (Please print all information) Name: Nadine Atieh Hade Title: Finance Director Address: 1400 Fifth Avenue City, Zip: San Rafael, CA 94901 Phone: (415) 485-3062 E-mail: Nadine.hade@cityofsanrafael.org C. Total estimated funds for Fiscal Year 2020-21: i. Estimated carry-over balance of recipient’s Measure A funds from previous fiscal years ii. Estimate of recipient’s Measure A funds for FY 2020-21. (This information will be provided by Marin County Parks) iii. Total estimated available funds for FY 20-21 (i + ii). $ 80,000 $ 365,003 $ 445,003 Page 3 of 4 D. Recipient’s Measure A Work Plan for Fiscal Year 2020-21: Name of work or project: Primary purpose of work or project. Select only one from list below. ** Description. Be as specific as possible. Include numbers related to square footage of facilities, acreage, etc. If Measure A funds were used for maintenance, use numbers to indicate change from pre-Measure A conditions. Amount of Measure A funds estimated to be used: Source(s) and amount(s) of matching funds projected for use. If none, enter “0” Total expenditures projected for work or project in current reporting year Contractual Vegetation Removal for Parks & Open Space; Invasive Species Removal g Contractual Services – Removal of Vegetation & Invasive Species in City Parks & Open Space $100,000 $100,000 Contractual Parkette Maintenance a Contractual Services – Park Maintenance $55,000 $55,000 Park Improvements b Park & Recreation Master Plan $210,003 $210,003 Estimated Total $365,003 **Select work or project purpose only from the following menu: a) Routine maintenance b) Renovation of existing recreational facility, including infrastructure (includes planning, environmental review, permitting, design development, etc.) c) Construction of new park or recreation facility (includes planning, environmental review, permitting, de sign development, etc.) d) Parkland acquisition e) Fuel reduction - all types of fuelbreaks, including primary, ridgeline, etc. f) Flashy fuel reduction (ROW, street ends, trail heads, etc.) g) Natural resource protection and restoration, and invasive plant control Page 4 of 4 h) Maintaining vehicle access i) Sudden Oak Death j) Hazard tree removal k) Inventory and monitoring l) Wildlife management monitoring m) Vegetation and wildlife management - Other- E. Certification I certify that the information contained herein is true and accurate, to the best of my knowledge. __________________________________________ _____________________________________________________ Signature Title __________________________________________ _________________________________ Print Name Date CAPITAL IMPROVEMENT PROGRAM FY20/21 - 22/23   2 | Page                 Capital Improvement Program FY 20/21‐22/23        This page intentionally left blank.      Capital Improvement Program FY 20/21 ‐ 22/23       3 | Page    Capital Improvement Program   FY 20/21 ‐ 22/23              City Council  Gary O. Phillips, Mayor  Kate Colin, Vice Mayor  Maribeth Bushey, Councilmember  Andrew Cuyugan McCullough, Councilmember  John Gamblin, Councilmember             4 | Page                 Capital Improvement Program FY 20/21‐22/23     Table of Contents    Section I. Overview ........................................................................................................................... 5  Background ......................................................................................................................................... 5  CIP Process and Project Selection ....................................................................................................... 5  Section II. Project Funding ................................................................................................................. 8  Fund Types .......................................................................................................................................... 8  Fiscal Year 20/21 Funding ................................................................................................................... 9  Section III. FY 19/20 Completed Projects ......................................................................................... 15  Section IV: Project Description and Budget Details ......................................................................... 18  Section V: Rating Categories and Project Ratings ............................................................................ 45  Section VI: Project Funding Tables .................................................................................................. 50                 Capital Improvement Program FY 20/21 ‐ 22/23       5 | Page  Section I. Overview  Background  Marin County’s oldest City, San Rafael lies midway between San Francisco and California’s famous wine  country. The City is in central Marin County, and while serving as the County seat, is the economic,  financial, cultural, and service center of the region. With a history dating back almost 150 years, the  public infrastructure includes miles of streets and sidewalks, numerous public buildings, acres of  medians and open space, and many other assets.   The City has a tradition of prudent financial management, including maintaining public assets in good  condition to minimize lifecycle costs. Residents and business owners greatly value the beauty of the  community’s built and natural environment and have high expectations regarding the upkeep of public  facilities. These factors have led the City to engage in active planning of capital improvements.     The City of San Rafael’s Capital Improvement Program (CIP) is a comprehensive, multi‐year planning  tool used to guide the City’s decision‐making process for construction, repair, and replacement of City  assets such as roadways, storm drain systems, parks, City buildings, and public safety facilities.  The CIP  document summarizes projects, including their funding sources, and prioritizes projects after analysis  and coordination with other City departments to ensure a comprehensive and equitable approach is  achieved. In the City of San Rafael, a new CIP budget is developed every year outlining proposed  improvements for the next three years. When the City’s annual budget is adopted, the CIP for that year  is also adopted.   The CIP seeks to balance the need to repair and replace existing assets and to deliver new assets where  they are most needed taking into account available resources. Beginning this fiscal year, the CIP reflects  a new process to identify and prioritize community values and core principles of Together San Rafael.  The City’s previous CIP prioritization process established several years ago focused on infrastructural  conditions, regulatory mandates, and project readiness. In contrast, the updated CIP development  process utilized this year incorporated other factors such as equity, whether or not projects already  have community support, and public health.   Incorporated in 1874, San Rafael has an aging infrastructure and backlog of deferred maintenance of  City‐owned  facilities  and  assets.  With  the  development  of  the  CIP  each  year,  more  projects  are  identified and requested than available resources can accomplish. To this end, staff developed a model  to prioritize and select projects to move forward for consideration.  CIP Process and Project Selection   Projects identified in the CIP are primarily driven by staff evaluation or engineering studies and/or  reports such as the 2018 Bicycle and Pedestrian Master Plan (BPMP). City staff also receive input from  community members, the City Council, Department Directors, and commissions such as the Parks and  Recreation Commission.  Project selection and priority is based on recommendations by a Rating Committee consisting of key  staff from various City departments. When rating projects, the Committee considers    6 | Page                 Capital Improvement Program FY 20/21‐22/23     health/safety/liability, priority initiatives, time sensitivity of funds involved, and the ability of a  project to maintain or enhance functionality. These four criteria, which are weighted factors shown as  percentages, are further defined as follows:   1. Health/Safety/Liability (35%) – Projects that are critical to public health and safety or  significantly reduce the City’s risk of liability will receive a higher rating.     2. Priority Initiatives (20%) – This category assigns priority to projects based on City’s goals,  including the guiding principles of Together San Rafael, the General Plan, City  Council/community supported projects, and that advance equity in the community.     3. Time Sensitive Funds (25%) – CIP projects funded by state or federal grantes often have  funding deadlines or project milestones. As such, grant funded projects will be rated higher to  accommodate timely‐use‐of‐fund requirements from the granting agency.     4. Maintain/Enhance Functionality (20%) – This category rates projects according to the  importance and urgency of the proposed repair, rehabilitation, or replacement. Proposed  maintenance than can be deferred will be rated lower than a pressing maintenance item  associated with a critical City asset.     Once the Rating Committee has prioritized projects, staff reviews available funding and allocates an  order‐of‐magnitude budget for the highest ranked projects from each category. New this year, staff  recommends retaining a contingency budget in each category as opposed to allocating all available  funding to projects. This will ensure that should an unanticipated project surface mid‐year, staff have  available funds to address this without impacting planned projects. Should contingency funds remain  at the end of the fiscal year, they will be allocated to a project during the next fiscal year.   Section V of this document provides a table of the rating criteria above as well as a summary of the  final ratings based on the Rating Committee’s ranking. The following flowchart outlines the process  staff follow during the development of the CIP.    Capital Improvement Program FY 20/21 ‐ 22/23       7 | Page     •List includes rollover projects from  the prior year CIP and new projects  as proposed by City department  directors and community members. Develop CIP  List •A Rating Committee consisting of  key staff from various City  departments ranks projects. Prioritize CIP  List •Staff examines the projects and  provides an order‐of‐magnitude  estimate of project costs. Project  Estimates •Staff from various City  departments examine the available  budget for each fund type. Budget  Analysis •Staff review existing workload to  determine the best approach to  delivering high priority projects. Staffing  Allocation •Staff develop the Draft CIP  Document for review by the  Rating Committee, department  directors, and the City Manager. Draft CIP  Document •The recommended CIP Document is  brought to City Council for review  and subsequent inclusion into next  fiscal year's budget. Recommended  CIP Document   8 | Page                 Capital Improvement Program FY 20/21‐22/23     Section II. Project Funding  Fund Types  Capital Improvement Program projects are paid for through a variety of different funds. Each fund  type has its own source of revenue as well as restrictions governing its use. The table below  summarizes the primary funding sources.     Fund # Fund Name Description  205  Stormwater  Fund    Established to fund storm water maintenance, programs, and  improvements throughout the City. Fund #205 receives annual  revenues from the City’s Stormwater Activity fee (Municipal Code  Chapter 9.40).  206  Gas Tax;  Measure AA;  Senate Bill 1  Funds  The Gas Tax is revenue collected, and subsequently distributed, by  the State of California based on a percentage tax on each gallon of  gas purchased in San Rafael. Gas Tax may be used for capital  projects or maintenance on local streets, roads, traffic, and  bicycle/pedestrian facilities. Additionally, local sales tax, passed by  voters in 2018 as Measure AA, contributes to a portion of this fund  for roadway improvement projects.   208  Childcare Fund Projects identified in the CIP as utilizing Childcare Funds are  restricted to facility improvements at the City’s childcare centers.  235  Baypoint  Lagoon  Assessment  District  The Baypoint Lagoons Lighting and Landscape District was formed to  protect and enhance wildlife habitat and water quality in Baypoint  (Spinnaker) Lagoon and the adjacent diked salt marsh.  236  Loch Lomond  Assessment  District  The Loch Lomond (Melo‐Roos) Assessment District was established  in 1992 to pay for the repair and maintenance of the Stormwater  system infrastructure in the District.  240  Parkland  Dedication  This fund was established to account for long‐term developer  deposits used to acquire and increase capacity of the City’s park  infrastructure.  241  Measure A  Measure A is a nine‐year ¼ percent transactions and use tax  managed by the County of Marin. The tax is restricted to care for  parks and open spaces. The Department of Library and Recreation,  in consultation with the Parks and Recreation Commission, provides  input each year as to which parks projects should be prioritized to  receive Measure A funding.  246  Traffic  Mitigation Fee    Traffic Mitigation Fees are an impact fee charged to a developer in  connection with the approval of a private land development project  with the purpose of offsetting or subsidizing public improvements  made necessary by the private development. The City utilizes Traffic    Capital Improvement Program FY 20/21 ‐ 22/23       9 | Page  Mitigation Fees for circulation‐related projects identified in the  General Plan.  420  Measure E Measure E was passed by the voters of San Rafael in November  2013 extending an existing 0.5% sales tax for 20 years and adding  0.25% (25 cents on a $100 purchase). In February 2014, the City  Council directed staff to set aside the revenues from the added  quarter percent to fund public safety facilities improvements.   501  Parking  Services  Projects identified in the CIP as utilizing Parking Services Funds are  restricted to parking‐related projects, including maintenance and  upgrades at City parking garages and parking lots.  603  Building  Maintenance    The Building Maintenance Fund supports routine maintenance and  capital projects associated with the City’s buildings, parks and other  facilities. The Building Maintenance Fund is an internal revenue  fund, which means General Fund monies are the sole source of  revenue.    Grants  (various)  The City actively seeks grant funding for capital projects and  programs. Grant funding is available from regional, State, and  Federal agencies for safety, transportation, emergency response,  and other types of projects.     Fiscal Year 20/21 Funding and Revenue Reductions  While  several  CIP  projects  are  grant  funded,  most  are  not  and  are  paid  for  through  Funds  205  (Stormwater), 206 (Gas Tax), 246 (Traffic Mitigation), and 603 (Building Maintenance). Within each  fund type is an Operating Budget, which consists of expenses related to maintenance of infrastructure,  equipment purchasing, miscellaneous contractual services, Annual Programs, and other non‐project  related work. Additionally, after deducting the Operating Budget from the total available funding in  each fund type, staff allocated a 15‐percent contingency of the remaining funds to provide a buffer for  unanticipated expenses which may arise mid‐year.  The public health state of emergency due to the COVID‐19 pandemic has created severe financial  burdens for the City, its residents and businesses. Inevitably, this economic downturn is resulting in a  dramatic reduction of the City’s revenues impacting CIP funding revenues in Funds 206 (Gas Tax), 208  (Childcare), 241 (Measure A‐Parks), and 501 (Parking Services). The proposed projects in this year’s CIP  represent those projects staff can deliver based on revenue assumptions at this time, including known  projected reductions. Staff plan to track revenues throughout the fiscal year to determine if additional  reductions in project budgets are necessary.        10 | Page                 Capital Improvement Program FY 20/21‐22/23     Assumptions or comments for each of these funds includes:  Fund # and Type Assumptions Comments  206 (Gas Tax)  FY 20/21 – 30% Reduction  FY 21/22 – 15% Reduction  FY 22/23 – 0% Reduction  Reduced  revenues  have  already  been  considered when determining which projects  to pursue in the CIP.  208 (Childcare)    Unclear  at  this  time  how  much  funding  decrease there may be. Previously started  design  contracts  are  being  suspended  until  further notice.  241 (Measure A‐Parks)  FY 20/21 – 25% Reduction   501 (Parking Services)    Unclear  at  this  time  how  much  funding  decrease there may be. Previously planned  design contracts for FY 20/21 have been  postponed. No planned projects to pursue in FY  20/21.     The following is a breakdown of these specific fund types for Fiscal Year 20/21 to illustrate how these  funds are typically utilized.        Capital Improvement Program FY 20/21 ‐ 22/23       11 | Page  Fund 205: Stormwater Fund  Fund 205 Total Available  $840,000  Operating Budget  $623,000  CIP Projects  $185,000  CIP 15% Contingency  $32,000                Total Available Funds  The 205 Stormwater Fund receives approximately $840,000 in annual revenues from the City’s  Stormwater Activity Fee.    Operating Budget  The Operating Budget for Fund 205 covers expenses incurred for the maintenance of the City’s  drainage system, and primarily its stormwater pump stations. Expenses include pump and motor  replacement at various stations, generator rentals, utilities, etc.     CIP Projects and Contingency  The 205 Stormwater Fund pays for CIP projects that involve the improvement of the City’s drainage  infrastructure including storm drain pipes, drainage basins, levees, and pump stations. Fifteen  percent of the non‐operating budget funding is reserved to account for any small, unanticipated  expenses not identified in the CIP document.        12 | Page                 Capital Improvement Program FY 20/21‐22/23     Fund 206: Gas Tax    Fund 206 Total Available  $8,040,000 Operating Budget  $3,510,000 CIP Projects  $2,810,000 CIP 15% Contingency  $490,000 RMRA  $1,230,000         Total Available Funds  The 206 Gas Tax Fund receives annual revenues from a variety of sources, including the State Gas Tax,  the City’s Refuse Regulatory Fee, Construction Impact Fee, Senate Bill 1: Road Maintenance and  Rehabilitation Account (RMRA), and local gas tax funds through voter approved initiatives such as  Measures A and AA.     As a result of the anticipated loss of revenue stemming from the COVID‐19 pandemic, staff estimate a  30% reduction in available Gas Tax Measure A, AA, and RMRA revenues for Fiscal Year 20/21. The  $8,040,000 shown in the table above reflects this 30% reduction and includes a $2.3 million fund  balance carried over from Fiscal Year 19/20.     Operating Budget  The Operating Budget for Fund 206 covers the costs of the City’s CIP Annual Programs including  Bridge Maintenance, MCSTOPP Implementation, Replacement of CMP Storm Drains, and Sidewalk  Repair Program. Additionally, funds are also earmarked for the maintenance of local streets, traffic  signals, miscellaneous contractual services, and partially cover the salaries of street maintenance  staff.     CIP Projects and 15% Contingency  Eligible CIP projects for the 206 Gas Tax Fund include a variety of projects within the public right‐of‐ way such as street resurfacing/restriping, curb ramp installation, pedestrian and bicycle  improvements, bridge repair, storm drain improvements, etc. Fifteen percent of the non‐operating  budget funding is reserved to account for any small, unanticipated expenses not identified in the CIP  document.    Senate Bill 1: Road Maintenance and Rehabilitation Account (RMRA)  Senate Bill 1 generates additional revenues that become part of the 206 Gas Tax Fund. These restricted  funds are reserved for specific projects, and their use is audited at the end of every fiscal year. Project  eligibility is the same as other 206‐funded projects.       Capital Improvement Program FY 20/21 ‐ 22/23       13 | Page  Fund 246: Traffic Mitigation    Fund 246 Total Available  $1,800,000 Operating Budget  $400,000 CIP Projects  $1,200,000 CIP 15% Contingency  $200,000               Total Available Funds  The Traffic Mitigation Fund (#246) receives revenues from the Traffic Mitigation Fee charged to  developers in connection with the approval of a private land development project. Designed as an  impact fee, revenues aim to offset additional vehicular trips associated with a development by  providing funding high priority circulation improvements throughout the City identified in the General  Plan. Since the fee is dependent on approved development, annual revenues vary widely from year to  year, and future revenues are largely unpredictable during the development of the CIP each spring.  Staff has estimated that $600,000 in annual revenues are anticipated in the upcoming three‐year  period.    Operating Budget  The Operating Budget for Fund 246 covers the cost of implementing the Bicycle Pedestrian Master  Plan, Citywide Crosswalk Improvements, and miscellaneous contractual costs association with  citywide signalization improvements.    CIP Projects and 15% Contingency  Eligible projects for 246 funds are those specifically identified as circulation improvements in Exhibit  21A of the 2020 General Plan. etc. Fifteen percent of the non‐operating budget funding is reserved to  account for any small, unanticipated expenses not identified in the CIP document.         14 | Page                 Capital Improvement Program FY 20/21‐22/23     Fund 603: Building Maintenance                  Total Available Funds  The 603 Building Maintenance Fund is an internal revenue fund supported by the City’s General Fund.  The budget for this fund is set at $500,000 annually.     Operating Budget  The Operating Budget for Fund 603 covers the costs of various upkeep projects completed by the  Building Maintenance staff. Smaller scale maintenance such as replacement of failed lighting fixtures,  repairs to HVAC systems, and replacement of worn carpet are examples of operating budget  expenses.     CIP Projects and 15% Contingency  The 603 Buildling Maintenance Fund pays for improvement projects to City‐owned property,  including the community centers, library, City Hall, City park infrastructure, etc. Fifteen percent of the  non‐operating budget funding is reserved to account for any small, unanticipated expenses not  identified in the CIP document.             Fund 603 Total Available  $500,000 Operating Budget  $190,000 CIP Projects  $264,000 CIP 15% Contingency  $46,000   Capital Improvement Program FY 20/21 ‐ 22/23       15 | Page  Section III. FY 19/20 Completed Projects                                                        Essential Facilities – Fire Station 57  The new 9,855 square foot, two‐story fire  station  now  houses  five  on‐duty  fire  fighters/paramedics and accommodates six  on‐duty personnel. The core elements of the  new  station  include:  three  drive‐through  apparatus bays, apparatus support spaces,  public  lobby,  accessible  restrooms,  office,  kitchen,  dining,  dayroom,  laundry  room,  private sleeping quarters, unisex restrooms,  mechanical,  electrical,  communications  rooms, and staff parking.  Pickleweed  Park  Playground  Improvements  The  Pickleweed  Park  Playground  Improvements  replaced  the  outdated  playground  with  new  play  structures,  slides, swings, and other assorted play  features.    This  project  was  funded  through  a  federal  Community  Development Block Grant (CDBG).   Street Restriping 2018‐2019   The Restriping Project consisted of  upgrading  existing  traffic  striping,  pavement markings, and markers along 12  miles  of  City  streets  to  conform  to  new  striping standards for roadways. The new  thermoplastic striping will last many years  longer than previously installed paint and  be more visible to motorists.    16 | Page                 Capital Improvement Program FY 20/21‐22/23                                                  City Hall Solar Panel Installation  During Spring 2020, new solar panel arrays  were installed on the roof of City Hall as  well  as  in  the  lower  parking  lot.  This  project assists the City in fulfilling its goal  of being ‘green’ and sustainable.     Francisco Blvd West Multi‐Use Pathway  (Andersen Dr to Rice Dr) – Phase I  As a highly desired capital improvement, the City  partnered with SMART to construct a 10‐foot  wide, ½‐mile long multi‐use path parallel to the  railroad tracks between Andersen Drive and Rice  Drive.  Breaking ground in June 2018, the Pathway  was opened for service in July 2019.  Funding was  a combination of local City funds as well as grants  from the Transportation Authority of Marin,  Measure A (HIP), Metropolitan Transportation  Commission, State Local Partnership Program  (LPP), BAAQMD, and County of Marin.  Quiet Zone Implementation for  SMART’s Larkspur Extension  In partnership with SMART, the City  diligently  worked  to  create  a  Quiet  Zone from Downtown San Rafael to  Larkspur such that the train horn is not  sounded when a train crosses a street.     Capital Improvement Program FY 20/21 ‐ 22/23       17 | Page  Other Completed Projects   Essential Facilities – Public Safety Center  o Construction of a new 44,000‐square‐foot Public Safety Center to co‐locate fire, police, and  emergency services. The project includes a subterranean garage, public plaza, and landscaping  improvements.     Sea Level Rise Vulnerability Study  o This study focused on the ‘low hanging fruit’ in which recommendations are provided for  small‐scale improvements to reduce the impact of sea level rise. This study coinsides with sea  level rise work underway by the Community Development Department and the General Plan  2040.     B Street Community Center Restroom Remodel  o Project included full demolision of the existing restrooms and installation of new ADA‐ compliant restrooms for women and men.      Street Resurfacing 2018‐2019 (annual project)  o Work included street resurfacing or rehabilitation on various street throughout the City. The  project requires coordination with residents, businesses, utility companies, and transit  operators to minimize disruption to the community.      Stormwater Operations and Maintenance (annual project)  o Maintenance of the City’s 12 pump stations     2 nd and 3rd Street Signalization Improvements at the Railroad Tracks  o Installation of new traffic signal indications at the railroad tracks to increase public safety, keep  motorists away from the tracks, and satisfy federal requirements for a Quiet Zone.      Andersen Drive Microseal  o Installation of a microseal street resurfacing product on Andersen Dr from Jacoby St south to  the Central Marin Sanitation Agency wastewater treatment plant.     Merrydale North Promenade Study (i.e. Merrydale Pathway – North Connector)  o Preparation of various design alternatives working in concert with residents and members of  the Bicycle and Pedestrian Advisory Committee.      Tivoli Lighting on 4th Street (Shaver Street to Tamalpais Avenue)  o Installation of decorative street lighting across 4th Street in the heart of Downtown San Rafael.      Sidewalk Repair Program 19‐20  o Working hand in hand with community members, buckling sidewalks were replaced at many  locations across the City. As necessary, trees were removed to accommodate installation of  new sidewalk while reducing the possibility of future uplifting from tree roots.       18 | Page                 Capital Improvement Program FY 20/21‐22/23     Section IV: Upcoming Projects; Project Description and Budget Details  FUND 205: STORMWATER FUND  205.1  Rotary Manor Culvert Replacement  Project Information  The damaged corrugated metal pipe (CMP)  culvert located underground at Rotary Manor  requires replacement and reestablishment of  the community gardens above.              Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater  $164,000 $15,000   Construction External T.B.D. Fund Type   $750,000   Subtotal $164,000 $15,000  $750,000  Total Cost Estimate $929,000    205.2  San Quentin Pump Station Reconstruction  Project Information  The San Quentin Pump Station Reconstruction  project will construct a new station to convey  storm drain runoff from low lying areas into  the bay as well as rehabilitate the existing  discharge pipe located between the station  and the bay.           Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater  $375,000   Construction 205 Stormwater  Grant: FEMA (unsecured)      Subtotal $375,000    Total Cost Estimate $375,000    Capital Improvement Program FY 20/21 ‐ 22/23       19 | Page    205.3  Storm Drain Replacement at 2111 Francisco Blvd East  Project Information  The Bay Area Toll Authority (BATA) plans to  construct a widened sidewalk on Francisco  Blvd East from the Bay Park Center office  complex to Grange Way. This work will  complete a gap closure in the  bicycle/pedestrian network connecting the  Richmond San Rafael Bridge to the  Andersen Dr flyover. Existing City storm  drain pipes under the proposed sidewalk  require replacement and should be  performed concurrently with the sidewalk  widening project or in advance in  conjunction with sanitary sewer work.      Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater    Construction 205 Stormwater  $100,000     Subtotal $100,000    Total Cost Estimate $100,000      205.4  MCSTOPPP – Catch Basin Trash Capture Feasibility Study  Project Information  Due to regulations imposed by the Marin  County Stormwater Pollution Prevention  Program, cities in Marin County will soon be  required to implement devices to capture and  remove trash from the storm drain system  before water is conveyed to San Francisco  Bay. This feasibility study will identify means  and methods of how the City of San Rafael  can comply with these requirements.          Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater  206 Gas Tax  $30,000 $100,000    Construction 205 Stormwater      Subtotal $130,000    Total Cost Estimate $130,000      20 | Page                 Capital Improvement Program FY 20/21‐22/23     205.5  East and Jessup Storm Drain Improvements  Project Information  The neighborhood adjacent to East St at  Jessup St is one of the older areas of San  Rafael. Stormwater runoff is conveyed  downhill utilizing surface features such as  gutters and shallow storm drain pipes. The  neighborhood has experienced flooding as a  result of development reducing impervious  areas and antiquated drainage facilities. This  project proposes to install underground storm  drain pipe on Jessup St between West and  East Streets and connect to the City’s existing  system at Second St and East St. At this time,  only the design is proposed to be moved forward  until additional funds can be identified for construction.     Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater  $45,000  Construction 205 Stormwater      Subtotal $45,000   Total Cost Estimate $45,000      205.6 C St Storm Drain Improvements – First to Second  Project Information  The intersection of Second St at C St is subject  to flooding as a result of settlement of storm  drain pipes and the inability to adequately  convey water to the downstream storm drain  system. This project will make pipe repairs as  well as install a new underground drainage  system on C St from Second St to First St.              Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater  $40,000  Construction 206 Gas Tax      Subtotal $40,000   Total Cost Estimate $40,000    Capital Improvement Program FY 20/21 ‐ 22/23       21 | Page  205.7  Los Gamos and Oleander Flood Warning System  Project Information  The intersection of Los Gamos Rd at Oleander  Dr frequently floods during major rain events.  After studying various drainage alternatives, all  of which would require significant storm drain  improvements both in the public right of way  as well as on private property, this project  proposes to install a warning system to inform  motorists of possible flooding.             Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater    Construction 205 Stormwater  $50,000    Subtotal $50,000   Total Cost Estimate $50,000      205.8  First and D St Storm Drain Improvements  Project Information  The intersection of First St at D St has several  storm drain pipes that feed into the San Rafael  Creek. This project proposes to replace a  corrugated metal pipe (CMP) storm drain pipe  on D St between Frances St and First St.               Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater    Construction 205 Stormwater  206 Annual CMP Program  $65,000 $100,000      Subtotal $165,000    Total Cost Estimate $165,000       22 | Page                 Capital Improvement Program FY 20/21‐22/23     205.9  Woodland Ave Storm Drain Improvements  Project Information  Built in the early 1900s, the neighborhood  surrounding Woodland Ave is subject to  occasional flooding as all rainwater is surface  runoff utilizing existing gutters. This project  proposes to install an underground drainage  system on Woodland Ave between Eva St and  Picnic Ave that connects to an open ditch  behind 254 Woodland Ave via a drainage  easement on private property.             Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 205 Stormwater    $100,000 Construction 205 Stormwater      Subtotal  $100,000  Total Cost Estimate $100,000         Capital Improvement Program FY 20/21 ‐ 22/23       23 | Page  FUND 206: GAS TAX    206.1  Southern Heights Bridge Replacement  Project Information  The Southern Heights Bridge is a wood  bridge constructed decades ago with its last  significant renovation occurring in 1981. The  bridge was subject to immediate closure in  December 2017 upon inspection by Caltrans  bridge inspectors. The City has completed  design and construction is scheduled to  begin in 2020.            Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  Grant: Caltrans HBP  $3,000 $718,000    Construction Grant: Caltrans HBP  $4,000,000     Subtotal $721,000 $4,000,000    Total Cost Estimate $4,721,000      206.2  Third Street at Hetherton Street Improvements  Project Information  The intersection of Third Street at Hetherton  Street is one of the busiest in San Rafael with  a large volume of not only vehicles but  pedestrians as well. This project will replace  traffic signal equipment, install one  wheelchair ramp on the northeast corner,  install a new crosswalk on the east leg, and  eliminate the existing crosswalk on the south  leg of the intersectin.          Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  Grant: Caltrans HSIP  $25,000 $60,000    Construction Grant: Caltrans HSIP  $500,000     Subtotal $585,000    Total Cost Estimate $585,000        24 | Page                 Capital Improvement Program FY 20/21‐22/23     206.3  Smith Ranch Road and Lucas Valley Road Resurfacing  Project Information  Lucas Valley Road/Smith Ranch Road from Los  Gamos Drive to Redwood Highway resides  within State of California right of way. This  project will remove the top layer of existing  asphalt pavement and resurface the roadway  with new asphalt. Additionally, new wheelchair  ramps will be installed to comply with ADA  requirements.            Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $8,000   Construction 206 Gas Tax (RMRA)  $1,700,000     Subtotal $1,708,000    Total Cost Estimate $1,708,000      206.4  Francisco Blvd West Multi‐use Pathway Phase II  Project Information  In 2019, the City partnered with SMART to  complete construction of a multi‐use pathway  between Andersen Dr and Rice Dr parallel to  the railroad tracks as part of Phase I of this  project. Phase II will install a bicycle pathway  on Francisco Blvd West between Second St  and Rice Dr by converting the roadway to a  one‐way southbound street allowing the City  to repurpose the other travel lane on the  roadway into a bicycle pathway. This project  completes the regional bicycle facility from  Larkspur to Downtown San Rafael.     Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design Grant: CNRC Urban Green $250,000   Construction Grant: TDA Article 3  Grant: CNRC Urban Green  Grant: TAM Measure AA  Grant: MUP Phase I  Rollover from BAAQMD    $568,000 $950,000 $400,000 $100,000      Subtotal $250,000 $2,018,000    Total Cost Estimate $2,268,000    Capital Improvement Program FY 20/21 ‐ 22/23       25 | Page    206.5  Francisco Boulevard East Sidewalk Widening   Project Information  The existing sidewalk along Francisco  Boulevard East is utilized daily by pedestrians  and bicyclists that must navigate the  congestion of fire hydrants and power poles.  This project will install an 8‐foot‐wide  sidewalk/bike pathway on Francisco Boulevard  East between Vivian Street and Grand Avenue.                Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $318,000   Construction Grant: Caltrans CMAQ  Grant: Caltrans ATP  $4,025,000  $2,100,000     Subtotal $4,343,000 $2,100,000    Total Cost Estimate $6,443,000      206.6  Northbound 101 Offramp – Second Right Turn Lane  Project Information  This project includes the installation of a  second right‐turn lane from the northbound  Central San Rafael offramp onto Second  Street.  Construction for this improvement will  be funded by Caltrans in conjunction with  their bridge replacement project scheduled to  start in late 2020.              Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $41,000   Construction 206 Gas Tax      Subtotal $41,000    Total Cost Estimate $41,000          26 | Page                 Capital Improvement Program FY 20/21‐22/23     206.7  Third Street Safety Improvements: Lindaro Street to Union Street  Project Information  Funded in part by a Caltrans Highway Safety  Improvement Program grant, this project will  install new wheelchair ramps, modify traffic  signals, install a new communications  network, and rehabilitate the asphalt  pavement.               Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  Grant: Caltrans HSIP  $31,000 $280,000    Construction 206 Gas Tax (RMRA)  Grant: TAM Measure A  Grant: Caltrans HSIP  246 Traffic Mitigation      $1,000,000  $1,000,000  $1,295,000  $800,000    Subtotal $311,000 $4,095,000   Total Cost Estimate $4,406,000    206.8 – Third Street Rehabilitation: Miracle Mile to Lindaro Street  Project Information  The City received major allocation from the  Transportation Authority of Marin through  the Measure A program to rehabilitate Third  Street. In 2019, the City completed a  Feasibility Study for Third Street corridor,  since then the corridor has been subdivided  into two City projects with this project  covering Miracle Mile to Lindaro St. The  Third Street Safety Improvements project will  make roadway improvements from Lindaro  to Union. The intent of the improvements is  to provide congestion relief and safety  improvements along Third Street.   Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design Grant: TAM Measure A  $1,300,000   Construction Grant: Local Partnership Grant: TAM Measure A     $1,500,000  $8,700,000    Subtotal $1,300,000 $10,200,000   Total Cost Estimate $11,500,000    Capital Improvement Program FY 20/21 ‐ 22/23       27 | Page  206.9  Canal Neighborhood Pedestrian Improvements  Project Information  The scope of work for this pedestrian  improvement project includes installation of  solar powered flashing beacons, additional  warning signage in advance of crosswalks,  and ADA‐compliant wheelchair ramps at up  to five intersections.                 Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $58,000   Construction 206 Gas Tax  Grant: Lifeline Phase 3    $35,000 $248,000      Subtotal $58,000 $283,000    Total Cost Estimate $341,000      206.10  Francisco Boulevard East Resurfacing  Project Information  This project includes removal of the existing  asphalt and resurfacing Francisco Boulevard  East from Vivian Way to Grand Avenue.  Adjustment of utilities covers and installation  of new striping is included in the scope of  work.                  Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax    Construction 206 Gas Tax  206 Gas Tax (RMRA)    $200,000 $1,200,000  $200,000      Subtotal $1,400,000 $200,000   Total Cost Estimate $1,600,000          28 | Page                 Capital Improvement Program FY 20/21‐22/23     206.11  B Street at Woodland Avenue: Box Culvert Ceiling Repairs  Project Information  Feeding into the upper reaches of San Rafael  Creek is a reinforced concrete box culvert  conveying water away from the Gerstle Park  neighborhood. A small portion of the ceiling of  the culvert requires rehabilitation to provide  better structural stability of the system. This  project will consider alternatives to replacing  or repair the top slab as well as coordination  with utility companies and regulatory  environmental agencies.          Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $10,000 $30,000   Construction 206 Gas Tax  $300,000     Subtotal $10,000 $330,000    Total Cost Estimate $340,000      206.12  Public Safety Center Street Resurfacing  Project Information  With the new Public Safety Center (PSC)  nearing completion and portions of the  roadways surrounding the PSC to be  converted to two‐way traffic, this project will  resurface C St (Mission to Fourth), D St (Fifth  to Fourth), Fifth Ave (C to D), and Via Sessi.                    Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $15,000   Construction 206 Gas Tax  $245,000     Subtotal $245,000    Total Cost Estimate $260,000      Capital Improvement Program FY 20/21 ‐ 22/23       29 | Page  206.13  Woodland Avenue Retaining Wall  Project Information  Adjacent to 132 Woodland Avenue is a wood  retaining wall that supports an asphalt  pathway sidewalk. The retaining wall has  deteriorated and needs rehabilitation or  replacement. This project will review retaining  wall alternatives, construct a concrete  sidewalk, curb, gutter, and other safety  improvements in this location.                Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax   $75,000   Construction 206 Gas Tax  $420,000    Subtotal $75,000 $420,000   Total Cost Estimate $495,000      206.14  San Rafael Highschool Crosswalk Improvements  Project Information  San Rafael Highschool has secured grant  funding to support the design and  construction of a mid‐block pedestrian  crosswalk to safely allow students and the  public to cross Third St east of Union St. The  City, partnering with San Rafael City Schools  District, will administer the construction  contract and contribute to the construction  budget.           Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax     Construction 206 Gas Tax  Grant: TAM Measure A    $100,000 $100,000  $300,000    Subtotal $200,000 $300,000   Total Cost Estimate $500,000          30 | Page                 Capital Improvement Program FY 20/21‐22/23     206.15  Lincoln Avenue Bridge Repair Study  Project Information  Recent Caltrans bridge inspection reports  indicate that the Lincoln Avenue bridge over  Mahon Creek needs repair. This project will  evaluate what rehabilitation work is required  to provide for continued use of the bridge  long term. The City will also seek grant  funding from Caltrans to perform any repairs  to the bridge.              Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $12,000   Construction Grant: Caltrans HBP  Unsecured         Subtotal $12,000    Total Cost Estimate $12,000      206.16  First Street at Mahon Creek Wall Repair  Project Information  During a winter storm, a small portion of an  existing rock retaining wall washed out. This  project includes the repair of the wall, which is  located on First Street between D and E  Streets.                   Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $15,500   Construction 206 Gas Tax  $250,000    Subtotal $15,500 $250,000   Total Cost Estimate $265,500        Capital Improvement Program FY 20/21 ‐ 22/23       31 | Page  206.17  Bungalow Avenue Resurfacing  Project Information  Bungalow Avenue, which is an older street  with a concrete road below, requires  resurfacing. The project will include  installation of wheelchair ramps,  rehabilitation of the underground storm drain  system, and improved drainage to mitigate  flooding at Woodland Ave.                  Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax    Construction 206 Gas Tax   $525,000     Subtotal    Total Cost Estimate $525,000      206.18  Southern Heights Boulevard at Courtright Road Retaining Wall  Project Information  Southern Heights Boulevard at the intersection  of the private driveway of Courtright Road  shows signs of settlement. This project will  install a retaining wall system to support the  roadway.                     Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $148,000 $30,000   Construction 206 Gas Tax    $600,000   Subtotal $148,000 $30,000   $600,000  Total Cost Estimate $778,000          32 | Page                 Capital Improvement Program FY 20/21‐22/23     206.19  Schoen Park Modifications  Project Information  As a result of installing new playground  amenities at the nearby Pickleweed Park, the  City proposes to repurpose the existing area  of Schoen Park to create additional on‐street  parking and help alleviate in part the demand  for public parking in the Canal and Spinnaker  Point neighborhoods.                Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $73,000   Construction 206 Gas Tax  $610,000     Subtotal $73,000 $610,000    Total Cost Estimate $683,000      206.20  Fairhills Drive Slide Repair: Feasibility Study  Project Information  This study will study three separate locations  on Fairhills Drive in which settlement of the  roadway appears possible near 216, 407, and  447 Fairhills Drive.                     Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 206 Gas Tax  $40,000  Construction 206 Gas Tax      Subtotal $40,000   Total Cost Estimate $40,000        Capital Improvement Program FY 20/21 ‐ 22/23       33 | Page  206.21  Center Street Resurfacing  Project Information  Center Street located in the Sun Valley  neighborhood, which is an older street with a  concrete road below, requires resurfacing.  The project will include installation of  wheelchair ramps and improvements to the  storm drain system.                  Funding Source  Prior Funding  FY 2020‐21  FY 2021‐22  FY 2022‐23  Planning/Design 206 Gas Tax    $60,000 Construction 206 Gas Tax      Subtotal  $60,000  Total Cost Estimate $60,000    206.22  Fourth Street Curb Ramp Replacement  Project Information  Fourth Street in Downtown San Rafael is the  heart of the downtown business district with a  large volume of pedestrians. This project will  study and identify pedestrian improvements  at intersections between E Street and Grand  Avenue.                 Funding Source  Prior Funding  FY 2020‐21  FY 2021‐22  FY 2022‐23  Planning/Design 206 Gas Tax    $60,000 Construction 206 Gas Tax      Subtotal  $60,000  Total Cost Estimate $60,000      Capital Improvement Program FY 20/21 ‐ 22/23      34 | Page    FUND 208: CHILDCARE FUND  208.1  Childcare Portable Building Replacement   Project Information  The scope of work includes replacement of  portable buildings used for childcare centers at  the Mary Silveira and Lucas Valley school  campuses as well as the Pickleweed Preschool  adjacent to the Albert J. Boro Community  Center.                 Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 208 Childcare  $166,000   Construction 208 Childcare      Subtotal $166,000    Total Cost Estimate $166,000      Capital Improvement Program FY 20/21 ‐ 22/23      35 | Page    FUND 235: BAYPOINT LAGOON ASSESSMENT DISTRICT  235.1  Cayes Pump Station Control System  Project Information  The Cayes pump station was originally  constructed in the 1960s and is operated  manually with no remote access. The project  will upgrade the pump station controls to allow  for remote monitoring and control of  equipment, include coordination with PG&E to  upgrade the electrical service, and provide  connection to the City’s existing SCADA  system. More automated control of the water  level will reduce the potential odors caused by  hot weather and algae growth in the adjacent  lagoon located within the Baypoint Lagoons  Assessment District.     Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 235 Baypoint Lagoon AD CIP Engineering Operating  Budget  $74,000 $6,000    Construction Grant: CDBG   Grant: Unsecured Funds  $85,328 $324,672      Subtotal $80,000 $410,000    Total Cost Estimate $490,000         36 | Page                 Capital Improvement Program FY 20/21‐22/23     FUND 241: MEASURE A – PARKS   241.1  Park and Recreation Master Plan  Project Information  In consultation with the Parks and Recreation  Commission, the City will review the conditions  of all parks and playground structures to  understand deficiencies and where future  improvements should be focused to meet  current codes and ADA regulations. This  assessment will become part of a Park and  Recreation Master Plan.             Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 241 Measure A‐ Parks  $150,000   Construction 241 Measure A‐ Parks      Subtotal $150,000    Total Cost Estimate $150,000           Capital Improvement Program FY 20/21 ‐ 22/23       37 | Page  FUND 246: TRAFFIC MITIGATION FUND  246.1  Bike Connection from Second/Tamalpais to Third/Tamalpais  Project Information  Beginning in Summer 2020, the City will install  a bicycle cycle‐track on Francisco Boulevard  West between Rice Drive and Second Street.  This project will consider improvements on  Tamalpais Avenue between Second and Third  Streets to receive cyclists exiting the cycle‐ track on the south side of Second Street.              Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 246 Traffic Mitigation  $10,000   Construction 246 Traffic Mitigation  $30,000     Subtotal $40,000    Total Cost Estimate $40,000      246.2  C and D Streets Conversion to 2‐way Streets  Project Information  In conjunction with the opening of the new  Public Safety Center, located on Fifth Avenue  between C and D Streets, the City will convert  C Street (First Street to Fifth Avenue) and D  Street (Second Street to Fifth Avenue) to two‐ way traffic.               Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 246 Traffic Mitigation    Construction 246 Traffic Mitigation  $120,000     Subtotal $120,000    Total Cost Estimate $40,000      38 | Page                 Capital Improvement Program FY 20/21‐22/23     246.3  Innovative Developments to Enhance Arterials (IDEA)  Project Information  The traffic signals in the Downtown San Rafael  area play a critical role in keeping traffic  moving. The Innovative Developments to  Enhance Arterials, or IDEA, project is a grant  funded project to improve traffic signal  equipment throughout the downtown area.                 Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 246 Traffic Mitigation    Construction 246 Traffic Mitigation  $380,000     Subtotal $380,000    Total Cost Estimate $380,000      246.4 – Fourth Street Signal System Improvements: B Street to Cijos Street  Project Information  Fourth Street is the heart of the Downtown  Business District conveying pedestrians,  bicyclists, and motorists through San Rafael. The  existing traffic signal system needs to be updated  to meet current design standards and ensure  reliability of the system for all types of users.                    Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 246 Traffic Mitigation  $50,000   Construction 246 Traffic Mitigation    $300,000   Subtotal $50,000   $300,000  Total Cost Estimate $350,000      Capital Improvement Program FY 20/21 ‐ 22/23       39 | Page    246.5 – North San Rafael Traffic Signal Connections  Project Information  Coordination of traffic signals is a critical  element to keeping traffic moving. This project  includes upgrading existing communication  equipment which allows signals to work in  tandem. The area of focus is traffic signals near  the Northgate Mall.                 Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 246 Traffic Mitigation  $50,000   Construction 246 Traffic Mitigation    $150,000   Subtotal $50,000   $150,000  Total Cost Estimate $200,000      246.6  Second Street Intersection Improvements  Project Information  Second Street is a major thoroughfare through  downtown San Rafael. This project will  rehabilitate critical intersections, and includes  pavement resurfacing, wheelchair ramps, and  traffic signal upgrades with new  communication equipment.                  Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 246 Traffic Mitigation  $280,000 $100,000   Construction 246 Traffic Mitigation    $620,000   Subtotal $280,000 $100,000   $620,000  Total Cost Estimate $1,000,000        Capital Improvement Program FY 20/21 ‐ 22/23      40 | Page    FUND 420: MEASURE E – ESSENTIAL FACILITIES   420.1  Fire Station 54 and 55 Remodel  Project Information  Work includes remodeling of the existing fire stations to meet current state and local codes for the safety of  the fire fighters and the residents they serve. This is part of Phase II of the strategic plan approved in July 2015  for essential public safety facilities.               Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 420 Measure E  $655,000   Construction 420 Measure E  $6,718,000     Subtotal $655,000 $6,718,000    Total Cost Estimate $7,373,000      420.2  Repurposing of Former City Hall Police Station  Project Information  This project includes re‐examining the first‐floor  space at City Hall, which will be vacated as the  Police Department occupies the new Public  Safety Center.  Reconfiguration of the space will  be needed to house other City departments.                   Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 420 Measure E    Construction 420 Measure E  $400,000     Subtotal $400,000    Total Cost Estimate $400,000  Fire Station 54 Fire Station 55    Capital Improvement Program FY 20/21 ‐ 22/23       41 | Page  FUND 501: PARKING SERVICES  501.1 – Seismic Upgrades to Parking Structure – Fifth/C St  Project Information  The parking garage at Fifth/C St will be studied with  improvements designed. This study will build upon  previous work at this location.                        Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 501 Parking Services  $25,000  Construction 501 Parking Services      Subtotal $25,000   Total Cost Estimate $25,000      501.2 – Seismic Upgrades to Parking Structure – Third/Lootens  Project Information  This project will consider the design for  seismic upgrades to the parking structure if it  is determined that development in this area  does not result in the existing structure being  removed and replaced.                    Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 501 Parking Services    $100,000 Construction 501 Parking Services      Subtotal   $100,000  Total Cost Estimate $100,000    42 | Page                 Capital Improvement Program FY 20/21‐22/23     FUND 603: BUILDING MAINTENANCE  603.1 – Albert Park Ball Field: ADA Wheelchair Ramp and Access Improvements  Albert Park Ball Field is utilized throughout the  year for sporting events. This project includes  ADA improvements, including a new  wheelchair ramp adjacent to an existing  staircase as well as improvements to the  disabled parking stall and path of travel to the  ball park field.                   Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 603 Building Maintenance $40,000   Construction 603 Building Maintenance $140,000    Subtotal $40,000 $140,000   Total Cost Estimate $180,000      603.2 – Albert Park Ball Field: ADA Restrooms  This project will review alternatives and  production of design documents for  installation of an ADA compliant, prefabricated  restroom.                       Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 603 Building Maintenance $30,000   Construction 603 Building Maintenance $130,000  $90,000   Subtotal $130,000  $90,000  Total Cost Estimate $250,000      Capital Improvement Program FY 20/21 ‐ 22/23       43 | Page    603.3 – Gerstle Park Restroom Repair  Project Information  The Facility Assessment Study, which was  completed in 2018, identified deficiencies  within several City facilities.  This project is  based of of the recommendations in the study  and includes replacing the siding of an existing  restroom at Gerstle Park.                 Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 603 Building Maintenance   Construction 603 Building Maintenance $30,000    Subtotal $30,000   Total Cost Estimate $30,000      603.4 – Shoreline Park Restroom  Project Information  The restroom has been non‐operational and closed  for several years. Repairs are necessary to restore  proper functioning of the restroom. The new  restroom installed will be built to meet the latest  ADA standards.               Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 603 Building Maintenance   Construction 603 Building Maintenance $140,000     Subtotal $140,000    Total Cost Estimate $140,000              44 | Page                 Capital Improvement Program FY 20/21‐22/23     603.5 – City Hall: Council Chambers Accessibility and Security Improvements  Project Information  The project also includes security upgrades  to the Council Chambers for emergency  access as well as installation of an ADA  compliant wheelchair ramp within the  Chambers.                    Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 603 Building Maintenance $9,000   Construction 603 Building Maintenance $175,000     Subtotal $175,000    Total Cost Estimate $184,000      603.6 – B Street Community Center: Stage Area Electrical Panel Upgrade  Project Information  The B Street Community Center stage has been  well used over many decades. The electrical  panel system for stage lighting requires  replacement to meet current electrical codes.                      Funding Source Prior Funding FY 2020‐21 FY 2021‐22 FY 2022‐23  Planning/Design 603 Building Maintenance   Construction 603 Building Maintenance   $160,000   Subtotal   $160,000  Total Cost Estimate $160,000    Capital Improvement Program FY 20/21 ‐ 22/23       45 | Page    Section V: Rating Categories and Project Ratings  RATING CATEGORIESWEIGHTING7 - 10strong contribution toward public health & safety and/or reduction of city liability7 - 10strong support from community/council aligns with city goals10grant funded, urgent7 - 10urgent repair/rehab/replacement of city asset necessary4 - 6some improvement to public health & safety and/or reduction of city liability4 - 6some support from community/councilmeets city objectives73grant funded, upcoming timelinegrant funded, no timeline4 - 6repair/rehab/replacement of city asset should be completed eventually0 - 3little improvement to public health & safety and/or reduction of city liability0 - 3little support from community/councillittle contribution toward city goals0not time sensitive0 - 3repair/rehab/replacement of city asset can be deferred20%RANK SCORING1 to 1035% 20%Priority Initiative Time-Sensitive Funds25%Health / Safety / LiabilityMaintain/Enhance Functionality Project Rating SystemHealth / Safety / LiabilityPriority InitiativeTime- Sensitive FundsMaintain / Enhance Functionality35% 20% 25% 20%205Stormwater Rotary Manor Culvert Replacement7.510 10 0 10205Stormwater San Quentin Pump Station Reconstruction7.110 8 0 10205Stormwater Storm Drain Replacement at 2111 Francisco Blvd East 5.88609205Stormwater MCSTOPP: Catch Basin Trash Capture: Feasibility Study5.77808205Stormwater East and Jessup Storm Improvements5.48508205Stormwater C St Storm Drain Improvements ‐ First to Second5.16609205Stormwater Los Gamos and Oleander Flood Warning System5.08704205Stormwater First and D St Storm Drain Improvements4.65509205Stormwater Woodland Ave Storm Drain Improvements4.45508205Stormwater Las Casas Drainage Basin Repair4.25507205Stormwater Piombo Pump Station: Electrical Panel Replacement4.04508205Stormwater Levee Analysis Inventory Study3.13802205Stormwater Spinnaker Point Salt Marsh Remediation (Conceptual Design Only)1.72302206Gas Tax ‐ RMRA Third Street Safety Improvements: Lindaro to Union8.998108206Gas Tax Third Street Rehabilitation: Miracle Mile to Lindaro7.88878206Gas Tax Canal Neighborhood Pedestrian Improvements7.39874206Gas Tax ‐ RMRA Francisco Blvd East Resurfacing7.08839206Gas Tax B St at Woodland Ave: Box Culvert Ceiling Repairs7.010 8 0 9206Gas Tax Public Safety Center Street Resurfacing7.09100 9206Gas Tax Woodland Ave Retaining Wall6.89909206Gas Tax San Rafael Highschool Crosswalk Improvements6.78855206Gas Tax Lincoln Avenue Bridge Repair Study6.47739206Gas Tax First Street at Mahon Creek Wall Repair6.49808206Gas Tax ‐ RMRA Bungalow Avenue Resurfacing6.36938206Gas Tax Southern Heights at Courtright Road Retaining Wall6.29708206Gas Tax Schoen Park Modifications5.76100 8206Gas Tax Fairhills Drive Slide Repair: Feasibility Study5.68707206Gas Tax ‐ RMRA Center Street Resurfacing5.35638206Gas Tax Fourth Street Curb Ramp Replacement5.37707206Gas Tax ‐ RMRA Redwood Hwy Resurfacing (Civic Center to Smith Ranch)4.95537206Gas Tax Mission Ave (Boyd Park) Sidewalk Gap Closure (front of Falkirk)4.17503206Gas Tax Merrydale Pathway ‐ North Connector Study4.05803206Gas Tax 121 Irwin St Headwall/Weir3.33407206Gas Tax Lincoln Avenue Curb Ramps3.24405206Gas Tax Riviera Drive Resurfacing ‐ Phase 13.24405206Gas Tax Riviera Drive Resurfacing ‐ Phase 23.24405206Gas Tax Manderly Road Medians2.93504206Gas Tax Freitas Parkway and Montecillo Intersection (K‐rail Only)2.76300RANK SCORING1 to 10PROJECT NAMEFUNDING SOURCE Project Rating SystemHealth / Safety / LiabilityPriority InitiativeTime- Sensitive FundsMaintain / Enhance Functionality35% 20% 25% 20%208Childcare Fund Childcare Portable Building Replacement (Silveira, Pickleweed and Lucas 7.510 10 0 10208Childcare Fund Childcare Portable Building Replacement (Vallecito)5.37707208Childcare Fund Parkside Preschool Playground Tent Replacement5.37608235Baypoint Lagoon AssessmeCayes Pump Station Control System6.16739241Measure A: Parks Park and Recreation Master Plan6.28908241Measure A: Parks Bernard Hoffman Playground Improvements6.086010241Measure A: Parks Gerstle Park Tennis Court Resurfacing and ADA Improvements5.97809241Measure A: Parks Peacock Gap Tennis Court Resurfacing and ADA Improvements5.97809241Measure A: Parks Boyd Park Tennis Court Resurfacing and ADA Improvements5.97809241Measure A: Parks Santa Margarita Tennis/Basketball Court Resurfacing and ADA 5.97809241Measure A: Parks Sun Valley Park Playground Improvements5.57708241Measure A: Parks Peacock Gap Park Playground Improvements4.96707241Measure A: Parks Gerstle Park Playground Improvements4.45706241Measure A: Parks Boyd Park Playground Improvements4.05506241Measure A: Parks Pickleweed Park Field Renovation3.21100 4241Measure A: Parks Terra Linda Community Center: Pool Shade Structure3.13406241Measure A: Parks Terra Linda Community Center: Basketball Court Repaving2.93405241Measure A: Parks Bernard Hoffman Drainage and Irrigation Improvements2.01305241Measure A: Parks Starkweather Park Improvements1.81304246Traffic Mitigation Third Street Intersection Improvements: Grand to Lindarosee 206‐‐‐‐246Traffic Mitigation Fourth Street Signal System Improvements: B Street to Cijos Street6.68738246Traffic Mitigation North San Rafael Traffic Signal Connections6.07737246Traffic Mitigation Second Street Intersection Improvements5.36808246Traffic Mitigation Fifth Avenue Signal System Improvements: Court to E Street5.15637246Traffic Mitigation Freitas and Las Gallinas: Left turn signal head5.16536246Traffic Mitigation Fourth Street at Miracle Mile Intersection Improvements4.95537246Traffic Mitigation Safe Routes to School: Davidson Phase 24.75536246Traffic Mitigation Bellam Blvd and Andersen Dr Intersection Improvements4.75437246Traffic Mitigation North San Pedro and Merrydale Intersection: Feasibility Study3.76305420Measure E: Essential  Fire Station 54 & 55 Remodel7.510 10 0 10420Measure E: Essential  Repurposing of Former City Hall Police Station5.1310010501Parking Services Seismic Upgrades to Parking Structures at Third/A Street and Third/C 6.910 9 0 8501Parking Services Seismic Upgrades to Parking Structure at Fifth/C Street6.910 9 0 8501Parking Services Fifth Street and Garden Parking Lot Resurfacing6.28908501Parking Services Seismic Upgrades to Parking Structure at Third/Lootens4.710 0 0 6RANK SCORING1 to 10FUNDING SOURCE PROJECT NAME Project Rating SystemHealth / Safety / LiabilityPriority InitiativeTime- Sensitive FundsMaintain / Enhance Functionality35% 20% 25% 20%603Building Maintenance Albert Park Ball Field: ADA Wheelchair Ramp and Access Improvements7.510 10 0 10603Building Maintenance City Asset Condition Assessment Study7.510 10 0 10603Building Maintenance Albert Park Ball Field: ADA Restrooms 6.510 10 0 5603Building Maintenance City Hall/Library Fire Sprinkler System (Study/Design Only)6.510 8 0 7603Building Maintenance Gerstle Park Restroom Repair6.310 5 0 9603Building Maintenance Shoreline Park Restroom6.310 5 0 9603Building Maintenance City Hall: Council Chambers Accessibility and Security Improvements6.110 7 0 6603Building Maintenance B Street Community Center: Stage Area Electrical Panel Upgrade5.910 5 0 7603Building Maintenance City Hall: Server Room Sewer Repair5.17706603Building Maintenance Terra Linda Pool House Electrical Upgrades4.97507603Building Maintenance B Street Community Center: Parking Lot Resurfacing4.57505603Building Maintenance Pickleweed Park Resilience Hub4.36605603Building Maintenance Terra Linda Community Center: HVAC Replacement3.13505603Building Maintenance A.J. Boro Community Center: HVAC Repair3.13505603Building Maintenance Resurface City Hall Parking Lots, Lower and Upper2.93405603Building Maintenance Downtown Library: Reroof2.73305603Building Maintenance Victor Jones Park Restroom Repair2.73305603Building Maintenance Court Street Plaza Fountain Repair2.12205603Building Maintenance Downtown Library: Children's Patio Enclosure2.12304603Building Maintenance Terra Linda Recreation Center Hardscape Repair2.12205603Building Maintenance A.J. Boro Community Center: Parking Lot Expansion (Schoen Park)2.00505603Building Maintenance Downtown Library: Restroom Addition0.80202FUNDING SOURCE PROJECT NAMERANK SCORING1 to 10   Capital Improvement Program FY 20/21 ‐ 22/23      50 | Page      Section VI: Project Funding Tables    Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Stormwater System Maintenance 205 $705,300 $623,000 $623,000 $623,000 MCSTOPP: Catch Basin Trash Capture  206 See 205 Fund Below Bridge Maintenance 206 $100,000 $100,000 $100,000 Replace CMP Storm Drains 206 See 205 Fund Below $100,000 $100,000 Sidewalk Repair Program 206 $350,000 $350,000 $350,000 $350,000 Pavement Management Program 206 $500,000 $500,000 $1,200,000 Bike and Pedestrian Master Plan Implementation 246 $100,000 $100,000 $100,000 $100,000 Citywide Crosswalk Improvements 246 $100,000 $100,000 $100,000 $100,000 Facility Repairs 603 $120,000 $120,000 $120,000 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Rotary Manor Culvert Replacement 7.5 $164,000 $15,000 External (Non‐Stormwater Account) Fund $750,000 San Quentin Pump Station Reconstruction 7.1 $375,000 Grant: Unsecured Storm Drain Replacement at 2111 Francisco Blvd East  5.8 $100,000 MCSTOPP: Catch Basin Trash Capture: Feasibility Study 5.7 $30,000 Other Funds: Annual Program 'MCSTOPP: Catch Basin Trash Capture ' $100,000 East and Jessup Storm Improvements 5.4 $45,000 C St Storm Drain Improvements ‐ First to Second 5.1 $40,000 Los Gamos and Oleander Flood Warning System 5 $50,000 First and D St Storm Drain Improvements 4.6 $65,000 Other Funds: Annual Program 'Replace CMP Storm Drains'$100,000 Woodland Ave Storm Drain Improvements 4.4 $100,000 Unfunded Projects Shown Below Las Casas Drainage Basin Repair 4.2 Piombo Pump Station: Electrical Panel Replacement 4 Levee Analysis Inventory Study 3.1 Spinnaker Point Salt Marsh Remediation (Conceptual Design Only)1.7 Grant: Measure AA (Unsecured) Funded Project Total $210,000 $135,000 $100,000 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Southern Heights Bridge Replacement In Progress $3,000 Grant: Caltrans HBP $718,000 $4,000,000 Third Street at Hetherton Street Improvements In Progress $25,000 Grant: Caltrans HSIP $60,000 $500,000 Smith Ranch Road Resurfacing In Progress $8,000 SB1: Road Maintenance & Rehab Account (RMRA) $1,700,000 Francisco Blvd West MUP Phase II In Progress Grant: TDA Funds Article 3 $568,000 Grant: California Natural Resources Agency ‐ Urban Greening Grant $250,000 $950,000 Grant: TAM Safe Pathways $400,000 Grant: Air Quality Management District Grant (MUP Phase I rollover) $100,000 Francisco Blvd East Sidewalk Widening In Progress $318,000 Grant: Caltrans ATP $4,025,000 Grant: Caltrans CMAQ $2,100,000 NB 101 Offramp ‐ Second Right Turn Lane In Progress $41,000 Third Street Safety Improvements: Lindaro to Union 8.9 $31,000 SB1: Road Maintenance & Rehab Account (RMRA)$1,000,000 Grant: Measure A Major Road Improvements $1,000,000 Grant: Caltrans HSIP $280,000 $1,295,000 Transfer from Fund 246 $800,000 Third Street Rehabilitation: Miracle Mile to Lindaro 7.8 Grant: State‐Local Partnership Program $1,500,000 Grant: Measure A Major Road Improvements $1,300,000 $8,700,000 Canal Neighborhood Pedestrian Improvements 7.3 $58,000 $35,000 Grant: Lifeline Phase 3 $248,000 Francisco Blvd East Resurfacing 7 $200,000 $200,000 SB1: Road Maintenance & Rehab Account (RMRA)$1,200,000 B St at Woodland Ave: Box Culvert Ceiling Repairs 7 $10,000 $30,000 $300,000 Public Safety Center Street Resurfacing 7 $15,000 $245,000 Woodland Ave Retaining Wall 6.8 $75,000 $420,000 San Rafael Highschool Crosswalk Improvements 6.7   $100,000 Grant: TAM Safe Pathways $100,000 $300,000 Lincoln Avenue Bridge Repair Study 6.4 $12,000 Grant: Unsecured First Street at Mahon Creek Wall Repair 6.4 $15,500 $250,000 Bungalow Avenue Resurfacing 6.3 $525,000 Southern Heights at Courtright Road Retaining Wall 6.2 $148,000 $30,000 $600,000 Schoen Park Modifications 5.7 $73,000 $610,000 Fairhills Drive Slide Repair: Feasibility Study 5.6 $40,000 Center Street Resurfacing 5.3 $60,000 Fourth Street Curb Ramp Replacement 5.3 $60,000 Grant: Unsecured Unfunded Projects Shown Below Redwood Hwy Resurfacing (Civic Center to Smith Ranch) 4.9 SB1: Road Maintenance & Rehab Account (RMRA) Mission Ave (Boyd Park) Sidewalk Gap Closure (front of Falkirk)4.1 Merrydale Pathway ‐ North Connector Study 4 $181,244 Grant: Unsecured 121 Irwin St Headwall/Weir 3.3 $6,200 Lincoln Avenue Curb Ramps 3.2 $195,000 Riviera Drive Resurfacing ‐ Phase 1 3.2 $19,000 Riviera Drive Resurfacing ‐ Phase 2 3.2 Manderly Road Medians 2.9 Freitas Parkway and Montecillo Intersection (K‐rail Only) 2.7   206‐Funded Project Total $2,150,000 $910,000 $720,000 RMRA Project Total $1,200,000 $1,000,000 $0 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Childcare Portable Building Replacement (Silveira, Pickleweed and Lucas Valley) 7.5 $166,000 Unfunded Projects Shown Below Parkside Preschool Playground Tent Replacement 5.3 Childcare Portable Building Replacement (Vallecito) 5.3 Funded Project Total $0 $0 $0 Project Name Rank Scoring  1 to 10 Prior Funding  FY 2020‐21 FY 2021‐22 FY 2022‐23 FY 2021‐22 FY 2022‐23 Project Name Rank Scoring  1 to 10 Prior Funding Project Name Rank Scoring  1 to 10 FY 2022‐23 Fund 206 ‐ Gas Tax Fund 208 ‐ Childcare Annual Programs FY 2022‐23 Prior Funding  FY 2020‐21 FY 2021‐22 Fund 205 ‐ Stormwater Project Name Funding  Source Prior Funding  FY 2020‐21 FY 2021‐22  FY 2020‐21 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Cayes Pump Station Control System 6.1 $74,000 Transfer from CIP Engineering Operating Budget $6,000 Grant: CDBG 2020‐22 $85,328 Grant: Unsecured $324,672 Funded Project Total $0 $0 $0 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Park and Recreation Master Plan 6.2 $150,000 Bernard Hoffman Playground Improvements 6 Peacock Gap Tennis Court Resurfacing and ADA Improvements 5.9 Grant: Prop 68 Per Capita Santa Margarita Tennis/Basketball Court Resurfacing and ADA Improvements 5.9 Grant: Prop 68 (Unsecured) Gerstle Park Tennis Court Resurfacing and ADA Improvements 5.9 Boyd Park Tennis Court Resurfacing and ADA Improvements 5.9 Sun Valley Park Playground Improvements 5.5 Peacock Gap Park Playground Improvements 4.9 Gerstle Park Playground Improvements 4.4 Boyd Park Playground Improvements 4 Pickleweed Park Field Renovation 3.2 $20,000 Unfunded Projects Shown Below Terra Linda Community Center: Pool Shade Structure 3.1 Terra Linda Community Center: Basketball Court Repaving 2.9 Bernard Hoffman Drainage and Irrigation Improvements 2 Starkweather Park Improvements 1.8 Funded Project Total $150,000 $0 $0 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Third Street Safety Improvements: Lindaro to Union (transfer to Fund 206) See 206 $300,000 $500,000 Bike Connection from Second/Tamalpais to Third/Tamalpais In Progress $10,000 $30,000 C and D Streets Conversion to 2‐way Streets In Progress $120,000 Innovative Developments to Enhance Arterials (IDEA) Grant In Progress $380,000 Fourth Street Signal System Improvements: B Street to Cijos Street 6.6 $50,000 $300,000 North San Rafael Traffic Signal Connections 6 $50,000 $150,000 Second Street Intersection Improvements 5.3 $280,000 $100,000 $620,000 Unfunded Projects Shown Below Fifth Avenue Signal System Improvements: Court to E Street 5.1 Freitas and Las Gallinas: Left turn signal head 5.1 Fourth Street at Miracle Mile Intersection Improvements 4.9 Bellam Blvd and Andersen Dr Intersection Improvements 4.7 Safe Routes to School: Davidson Phase 2 4.7 North San Pedro and Merrydale Intersection: Feasibility Study 3.7 Funded Project Total $200,000 $300,000 $1,570,000 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Fire Station 54 & 55 Remodel 7.5 $655,000 $6,718,000 Repurposing of Former City Hall Police Station 5.1 $400,000 Funded Project Total $7,118,000 $0 $0 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Seismic Upgrades to Parking Structure at Fifth/C Street 6.9 $25,000 Seismic Upgrades to Parking Structure at Third/Lootens 4.7 $100,000 Unfunded Projects Shown Below Seismic Upgrades to Parking Structures at Third/A Street and Third/C Street 6.9 Fifth Street and Garden Parking Lot Resurfacing 6.2 Funded Project Total $0 $25,000 $100,000 Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Planning /  Design Construction Albert Park Ball Field: ADA Wheelchair Ramp and Access Improvements 7.5 $40,000 $140,000 Albert Park Ball Field: ADA Restrooms  6.5 $30,000 $130,000 $90,000 Gerstle Park Restroom Repair 6.3 $30,000 Shoreline Park Restroom 6.3 $140,000 City Hall: Council Chambers Accessibility and Security Improvements 6.1 $9,000 $175,000 B Street Community Center: Stage Area Electrical Panel Upgrade 5.9 $160,000 Unfunded Projects Shown Below Terra Linda Pool House Electrical Upgrades 4.9 B Street Community Center: Parking Lot Resurfacing 4.5 Pickleweed Park Resilience Hub 4.3 A.J. Boro Community Center: HVAC Repair 3.1 Terra Linda Community Center: HVAC Replacement 3.1 Resurface City Hall Parking Lots, Lower and Upper 2.9 Downtown Library: Reroof 2.7 Victor Jones Park Restroom Repair 2.7 Court Street Plaza Fountain Repair 2.1 Downtown Library: Children's Patio Enclosure 2.1 Terra Linda Recreation Center Hardscape Repair 2.1 A.J. Boro Community Center: Parking Lot Expansion (Schoen Park)2 Downtown Library: Restroom Addition 0.8 Funded Project Total $245,000 $300,000 $250,000 Fund 241 ‐ Measure A: Parks FY 2022‐23 Fund 603 ‐ Building Maintenance FY 2022‐23 Project Name Rank Scoring  1 to 10 Prior Funding  FY 2020‐21 Fund 246 ‐ Traffic Mitigation Fund 420 ‐ Essential Facilities Fund 501 ‐ Parking Services FY 2021‐22 Prior Funding  FY 2020‐21 FY 2021‐22 FY 2022‐23 Project Name Rank Scoring  1 to 10 Project Name Rank Scoring  1 to 10 Prior Funding  FY 2020‐21 FY 2021‐22 FY 2021‐22 Project Name Rank Scoring  1 to 10 Prior Funding  FY 2020‐21 Project Name Rank Scoring  1 to 10 FY 2022‐23 FY 2021‐22Prior Funding Anticipated projects to be funded in future years pending  outcome of the Citywide Playground/Park Assessment  Study to be completed during FY 20/21. Fund 235 ‐ Baypoint Lagoon Assessment District  FY 2020‐21 FY 2022‐23 Project Name Rank Scoring  1 to 10 Prior Funding  FY 2020‐21 FY 2021‐22 FY 2022‐23