Loading...
HomeMy WebLinkAboutDRB 2014-08-05 #3Meeting Date' Aug list 5, 2014 Case Numbers, CDR14-004 COll1munity Developmcnt Dcpartment -Planning Division Project Planner: Steve Stafford -(415) 458-5048 Agenda Item: REPORT TO DESIGN REVIEW BOARD SUBJECT: 39 Trellis Drive (Mark Day School; Formerly St. Mark's School) -Conceptual Review requesting preliminary comments on a proposal to demolish an existing 3,935 sq, ft.. slngle- story administt'ation building and construct a new 11.270 sq, ft., multi-story administration/library bldg, with a maximum height of 28' 11" above finished grade, The project proposes to convert the existing library bldg, to a teacher's lounge and meeting spaces, The project also proposes to redesign an existing courtyard 'quad' to an amphitheater with seating and storm water bio-retention areas and to reconfigure an existing 18-stall parking area located adjacent to the project site with no reduction in on-site parking spaces, APN: 175-060-01: Planned Development (1760) District Zones; Ted Lieser for Equity Community Builders, LLC, Applicant; Joe Harvey for Mark Day School. Lessor, Dixie School District. Owner: Northgate Neighborhood PROPERTY FACTS Location Project Site: North, South East: West, Height General Plan Designation LOR LOR P, 0 LOR LOR Required, 30' Proposed 28' 11 9/32" Parkil1g Req u ired: 101 plus 102 overflow on playgrounds P mposed: 101 plus 102 overflow on playgrounds' SUMMARY Zoning Designation PO (1760) R5 P/OS, PO (1566) R5 R5 Tree Removal Existing Land-Use Indepel1dent K-8 school ReSidential Freitas Park, Kaiser Hospital Vallecito Elel1lellta ry Residential Proposed' 31 (1 'Significant') Replacemellt' 21 FAR (Floor Area Ratio) Allowed: 1,0 (435,600 sq, ft) Proposed: Unknown The project IS being refen"ed to tile Design ReView Board (Board) for concept review of site improvements on the Mark Day School (formerly St. Mark's School) or MDS campus The project proposes to demolish an eXisting 3,935 sq, ft., single-story administration building and construct a new, 11,270 square foot multi-story "Learning Commons, Creativity Lab and Administl"ation Building' (library and administration building) and associated parking, drainage and landscaping modifications/improvements, This new library and administration building is proposed to be located in the same location of the existing administration bUilding though its footpl"int will expand Into an adjacent 18-stall. surface parking lot t'equiring reconfigLlI'ation of the parking lot without any loss of on-site parking spaces, (Tile applicant has submitted a "Project Desct'iption" and a "Statement of Intent/Design Narrative'", which are attached to staff's report as Exhibits 2 and 3), whlcil is When tile project is submitted for formal review, it will I"equire Environmental and Design Review Permit and a Use Permit Amendment (update existing Master Use Permit) approvals, a Rezone (amendment of the existing Planned Development District zoning) and Environmental Review (Initial Study/Mitigated Negative The City Council wil! act on the proposed the Planning Commission for all projects requiring a Planning applicant Ilas submitted for conceptual comments on tile proposed project. The for incorporation as revisions to the that the Board review this report and provide with all criteria, BACKGROUND & Setting: MDS canlpus is located in the residential portion of School which is owned by campus is ten (10) acres (435,600 slope It currently operates as private, a maximum enrollment capacity of 380 students, MDS campus is currently developed with individual and arts and sciences bUildings, a large athletic field area, and asphalt or 'blacktop' playground areas during special events, project area is located on the western portion of eXisting library building. south of an existing 1 entrance to the MDS campus from Trellis Drive. and west of COLI rtyard, M campus provides a well-landscaped presence, and between the project area and the closest to M campus is surrounded by standard-sized (R5 Park and Kaiser Hospital to the south, History: was originally established in 1980 as M rnost recent approvals on the MDS campus i • and parking lot improvements, of a new 1,180 sq, ft, wetlands III 0, Planning staff administratively allow a temporary increase in enrollment, from academic years and expiring prior to tile beginning III On July 30,2014, [Vms submitted a Pre-appl Board for conceptual review was printed. project with . It recon! of the Board and Design Review Board to provide early will considered by the submittal. Planning staff project's compliance of tile prior Don long-term to MDS. northeast-to-southwest , school campus library, multi-purpose/gymnasium buildings, 101 on-site parking 1 'overflow' parking inlmedjately north of the the circular driveway turf landscaped 'quad' along the Trellis Drive frontage area along Trellis Drive The Iy residences to the north and School to the east. to current location in 1991. ReView Permit adopted an Initial Inulti- to for a period of three year; and staff's report to tile Pre-application review of the 2 DESCRIPTION Use: project to demolish an existing ft., single-story ministration building and construct a new, 11,270 sq. ft, multi-story "Learning Commons, Creativity and Administration Building" (library and administration building) and parking, and landscaping modifications/improvements. The project to convert eXisting library bldg., located Immediately south of the area, to a lounge and spaces project does to increase the maximum allowable capacity students. Plan: new library and administration building is proposed to located in existing administration though its will slightly into an parking located immediately north, requiring reconfiguration of the parking lot to the existing 18 parking spaces In addition to the new building, the project proposes to courtyard 'quad', im from a turf area to an amphitheater storm water blo-retention areas Vehicular access to the area is to continue along the existing circular driveway from This existing circular driveway is proposed to continue to provide icular access to 1 surface lot The configuration of this parking lot is proposed to from providing 'angled' spaces along a one-way drive aisle to providing or parking a two-way aisle_ Architecture: The project proposes a somewhat contemporary design for new library and administration building, characterized by large glass displays with aluminum "sun shade" and deep eaves. Broad an entry projection pedestrian accentuate building Covered upper-story metal with cable railing the rear elevation, providing access from the courtyard area to second floor library and administrative offices. At time of printing staff's report to Board, the continues examine material aesthetics costs. The submitted project plans propose, primarily, ,'tongue-and-groove', horizontal shiplap siding with wall areas of 'kerfed' wood , "painted" metal window and aluminum 'sun shade' and asphalt roof. The has submitted a Color Rendering/Materials Colors <-<v.",,'"' ..... (Exhibit 4), which identifies exterior options udl textured cladding (Thermocromex) pre-cast (T aktl)_ height of above finished new building is proposed to two-stories, to the top of the roof ridge a maximum height 11 9132" The new building is to provide library space on ground CLower Learning ons") and upper Learning Commons) floors as well as restrooms and a science lab and outdoor ("Maker's Maker's Court") on the ground and more restrooms administrative I"Ittl,f"<:IC! on the upper-story. Landscaping: The proposes to remove a lim amount of landscaping, primarily, along the (west elevation) of the administration building, within central courtyard 'quad' and within the adjacent 1 surface parking lot The project proposes removal 31 existing (15 trees nr''''TJ.;Jr! within cou !quad',9 building and 8 within the surface parking lot), including one (1) 'significant' on its (A 'significant' tree is any tree which is In good form is greater than 1 in diameter as measured 4' the root crown or 6" in diameter for any Oak The project replacement 'in kind' landscaping; 3 a combination of trees, shrubs and groundcovers including, primarily. Amenone japonica, Woodwardia fimbriata, and Nepl1rolepis cordifolia No species are identified on the Plan, the project proposes , 60" box, replacement (11 trees located along the new building frontage 5 trees within the reconfigured surface lot and courtyard 'quad'). The project to the amount of turf lawn area Within the central courtyard by approximately GradinglDrainage: The plans a "Grading Plan" L3.00) though not provide details, such as calculations ('cut' and or show the level or areas of proposed grading. When the project is submitted for formal review, Planning will requ amendment of the Plan to grading calculations and show the location of all proposed grading. ANALYSIS General Plan 2020 The General Plan land use designation for the project site is Low Density Residential LDR designation allows public/quasi-public school uses or facilities, as MDS, owned or operated by non-profit or The project's proposed use, providing enlarged or more science lab library space, is consistent with Land Use (Land Map and Categories), the new Commons, Creativity Lab and Administration will be in accordance Use Policy LU-12 (Building Height) and the maximum 30' building height, on City's current building (Building height is finished pursuant to Uniform Building 1997 , Staff the guidance in evaluating the for conSistency with the following design-related G (Neighborhood Identity) seeks to recognize and promote the the City's residential neighborhoods and the Downtown and strengtllen the "hometown" of San by and enhancing and landscaped cllaraeter the City's residential neighborhoods. e (Neighborhoods) to and enhance the positive qualities give neighborhoods their unique identities, while also allowing flexibiliiy innovative design. New development should respect context scale of existing neighborhoods. II! (Views) seeks respect enhance to the extent views the Bay and islands, Bay wetlands, St. Raphael's church lower, Cana/front, marinas, Mt. Tama/pais, Marin Civic and hills and from public streets, and publicly pathways. <II (NonreSidential Design elements that contribute to the economic vitality mixed-use development should fit with and community as a whole, enhances design commercial areas, New nonresidential and the neighborhood the =.....:...::::. (Landscaping) recognizes landscaping as a significant component of al/ design. <I) (Ughting) requires project lighting at adequate levels for safety purposes while controlling light spHlover and off-site =-=-.:.. (Parking pavement, reduce parking Landscaping) requires parking lot landscaping to control build-up from pollution, provide shade cover for vehicles soften the appearance of the 4 • (New Existing Trees) strives to plant new trees and retain existing trees to maximize energy conservation and carbon sequestration benefits, e (Resource Efficiency in Development) encourages development practices that reduce energy demand, support transportat;on incorporate resource-and energy-efficient infrastructure. of details provided in the concept submittal generally Plan will require additional and building Is at formal application submittal, including: 1) an amended grading/drainage plan with cut' calculations. showing the location all proposed 'cut' and , and storm water bio-retention design details; an amended landscape/preservation plan, the proposed species of all new trees; FAR calculations the and project; 4) a color and material board to assess, with exterior finishes Zoning Ord Consistency: The site IS located within Planned Development (PO 760) zoning district The zoning on site has no development standards se. all existing and future and uses on the MDS are permitted only with an development and the approved Use Permit (UPOO-14). project proposes to incorporate the new development and uses at MOS campus into PO 1 through a Floor Area Ratio (FAR) Under both the (Land LU-9; Intensity of Nonresidential Development) and Section 14.16.150 (C) of the Zoning Ordinance (Floor Area Ratios and Applicable to Nonresidential and Development; Public and Quasi-Public Use the maximum allowable intensity of nonr-esidentiai development on the project site is 1.0 FAR. which may not be exceeded. Though eXisting FAR are not included with conceptual review submittal, Planning staff the project likely the maximum allowable FAR for site; given that, large portions of site are developed with 'common' areas without including the field the north, the playground/overflow parking area wetlands buffer area to the south, Staff will the formal application for the existing, proposed maximum Landscape Section 14_16.370 (Water-efficient Landscape) of City's Ordinance require all nonresrdential development projects ng new or rehabilitated landscape areas to or greater than 1,000 ft. to comply with most recent Marin Municipal Water District's (MMWO) water f'''''r'~t:>r\J'' ordinance (currently, MMWD Ordinance 421), Though amount of new or rehabilitated landscaping proposed by project is not include in review Planning staff the proposed project likely meets the minimum requirement MMWD review; given that. the project comprehensive redesign the existing courtyard , which is approxrmately 11,500-12.000 sq. ft, alone. Pursuant to 14,18.040 (Parking Requirements) of Zoning Ordinance, the project is not required any additional other than 18 parking during reconfiguration of surface parking lot, located immediately north of the project area. The 5 parking requirement for the is based on the standard of 1 space for 100 sq. ft. of new auditorium or 3 spaces new classroom, whichever is greater. project neither auditorium nor classroom specified by existing Master Permit 4), MDS is required to provide 101 parking in the locations and configurations shown in the development plus an additional 1 on-site 'overflow' parking located on the playgrounds, behind core buildings on campus. No parking reconfiguration/restriping plan Is included in the conceptual review. application submittal for the will require a lot reconfiguration/restriping plan, demonstrating that all redesig on-site parking comply with the following parking .. Minimum parking stall dimensions for 'perpendicular' (9) x 19' "standard" or 8' x 16' "compact") space .. area (26'); .. aisle access ovto,",,,,, .. Minimum driveway access width (20'); .. Adequate short-term (1) secure, long-term (1) bicycle parking; .. clean ;3.ir vehicle parking spaces (1); .. Minimum parking lot landscaping planting (1 tree for every 4 parking spaces); .. Minimum parking lot area (36 sq. ft.) width (6'), of curbs, • Parking area and exterior building lighting to provide minimum illumination levels a) (1) foot candle at ground level overlap be provided in in all parking areas; b) Minimum one-half (1/2) foot candle at ground level overlap shall provided along outdoor walkways. community structure" on the Zoning Ordinance}. review criteria for Environmental and Review its, pursuant to ........ '1" .... '""' Criteria; Environmental and DeSign r-r .... "' ... 'M Permits), as follows: Proposed and site development should The development should have to the existing development in circulation and access. convenient areas should access to The traffic of adjoining • The project architecture should harmoniously in relation to the architecture in the vicinity in terms of colors materials, scale building design. design should sensitive to compatible with historic and architecturally significant buildings in tlie vicinity. Design elements and approaches which are encouraged include: a) creation of interest in the building elevation, b) pedestrian-oriented in appropriate locations; c) energy-efficient provision of a sense of entry; e) in building placement and height; f) equal to design to facades e Materials and colors. finishes should consistent with context of the surrounding area. C%r selection shall coordinate with the predominant colors values of the surrounding ''''::>'lAOL'G and architecture. High-quality building materials are Natural and colors in tile earth tone and wood tone range are generally preferred. Concrete surfaces should be f"llf"I,r'l!>rI textured, sculptured, and/or patterned serve design as well as a structural function. 6 • Walls, Fences and Screening. Walls, fences and screening shall be used to screen p arkin g and loading areas, refuse collection areas and mechanical eqUipment from view. Screening of mechanical e quipment shall be designed as an integrated architectural component of the building and the landscape . Utility meters and transformers sha ll be incorporated into the overall project design. • Exterior Lighting. Exterior lighting should provide safety for building occupants, but not create glare or hazard on adjoining streets or be annoying to adjacent properties or residential areas. • Landscape Design Landscaping shall be designed as an integral enhancement of the site and existing tree shall be preserved as much as possible. Water-conserving landscape design shall be required. A landscaped berm around the perimeter of parking 8re8S is encouraged. Smaller scale, seasonal color street tree s should b e prop osed along ped estrian-oriented streets while high- canopy, traffic-tolerant trees should be prop osed for primary vehicular circulation streets. The review criteria for Envi ron men ta l and Des ign Review Perm its re quire that t he proposed design (architecture, for m, sc ale , materials a nd co lor , etc.) of all new dev elopmen t 'relat e' to the predominant design or 'character-defini ng ' d esi gn elements existing in the vicinity . Scale Both the arts an d scien ces build in g and the multi -pu rpos e/g ymnasium are the most recent (2001) expansions with th e ac ademic co re of t he M DS ca m p us . Th e art s and sciences buil ding is 19' In height . (above finish grade) and is located im me diately nort h of th e project area . T he mu lt i-p ur pos e building/gymn asiu m is Sli g ht ly le~s t han 28' in he ig ht (a b ove fin is h grade) an d is loc at ed so uth of the pr oject area (T he existi ng sing le-sto ry library building is located between the m ulti-purpose bu ilding/gymnasi u m and the project a rea). Staff finds an existing two-story scale is well established on t he M DS cam pus a nd the p roject des ign woul d be in context with most recent b uil dings within the academic c ore . The project pr opo ses t o remove 9 eXistin g trees, one (1) of which is 'significant' based on its mature size (A 'significant' tree is any tree which is in goo d he alth and for m and is greater th an 12" in diameter as measured 4' 6" ab ov e t he root crown or 6 " in dia met er for any Oak tree), and to p lant 11 , 60 " box, replac e m ent t re es (sp eci es not identified) along t he new bui lding f rontage . St aff al so f inds this n ew tre e replan ting will hel p re duce or brea k up the perceived mass of the new library and administratio n buildi ng as seen from Trellis Dri ve. Colors and Materials The co nce pt project proposes a somewhat contemporary desig n for the new library and adm inistration building , characterize d by large glass displays with aluminu m "sun shade" louvers and deep eaves, Broad clerestory dorm e rs and an e ntry ca no py projecti on at t he pedestrian level accentuate the front building elevat ion . At the tim e of p rinting sta ff's re po rt to th e Board, the a pplicant contin ues to examine exterior material optio ns fo r ae sthetics and costs , The su bm it ted project pl ans propo se , primarily , 6", 'tongue-and-groo ve', horizontal shiplap cedar siding wit h large w all are a s of 'kerfed' wo od accen t planks, "painted" m et al window trim and aluminum 'sun shade' louvers, and asphalt shi ngle ro o f. T he applic a nt ha s s u bmi tte d a Col o r Rend e ri ng/Materi al s and Colors package (Exhibit 4), whic h ide ntifies ad di ti ona l exter ior material optio ns in cl uding texture d plast er cladding (Thermocromex) and pre-cast textured concrete pa nels (T aktl ), Wh en t he new arts and sciences building and the multi -pu rpose/gy mnas ium were app ro ve d an d con stru cted rec e ntly (2001 ), both structu res incorpora te d a coordinati ng desig n, incl udin g exterio r colors a nd materials an d a clerest ory g able roo f fo rm. T he project proposes to re use the ex isting li brary building, located immediately s outh of th e projec t site, and n ew landscaping alon g t he building frontage. Modifications to the building itsel f are limited t o t he In stallati on of exterior d oor re placement, interior door replacement, new interior partitions, built-in casewo rk a nd sinks, and m inor drop ceiling and lighting recon figur ation Though the level of improvements proposed for th e reuse of th e existing library 7 building not to staff to a 'significant remodel', staff encourages modifications to its and in order to better with the new adnlinistratlon building Guidelines: On (by No. 11 interim San direction in the design new development in accordance with munity Element s n principles that builds on visual unity of area. Planning to improve in evaluating the project fO!" with the following applicable ~-'-"-'~==-'-===-'-" .. of entry arrival as part site's design should be provided 6 entrances from the street views towarels building .. to provicle entrances .. Where possible, sfloulcl be of a of parking areas. e maneuveral)ility in par/{ing onto the street. " Parking areas should be from the street with wnlls, considerations. .. pedestria/! SUell as providecl areas should landscaped cllaracter for <II Ullsigiltly uses iJe zoning parts of development to create a to (I should locatiolls, as along lile clustereel in the parking lot. consistent e visually attractive with planting .. the huilcling the even a or rear the intensity lighting to for aciequate secUi ity amI for peciestrian vehicular .. Shield light sources to glare ane} iIIuminatiolJ /)eyond propelty. III LlUlltmg should tile of tile pedestJino 01 iontation wlJen designing .. [/ well-dofined betweon the and .. eleA/'Iy pedestnan movement parklflg lot. For example, If] pavement or walkways. • Where peciestrian walkways should provided lots. 8 • Special design elements should be included, as bol/ards, pots, benches, unique paving, tree guards and pedestrian lighting add visual richness to areas designed for pedestrian access. e Adequate facilities should be provided bicycle parking, consistent with zoning requirements. II Consider the pedestrian experience w/Jen designing the ground floor of buildings. II A continuity of design, materials, coJor, form and arc/JitecturaJ details is encouraged for al/ portions of a building and between all t/1e buildings on the site. • the development's visual and relationship to adjacent buildings and other structures in the area <II A defined sense of entry with pedestrian orientation s/fOuld be provided. II Building entrances should be defined with architectural elements such as roof form changes, awnings or architectural elements • Use articulation, texturing and detailing on all concrete exposed to exterior View. • Exterior should minimize reflectivity. .. Use color to appropriate accents on a building Planning staff has no additional comments concerning conceptual site and buildrng design beyond . listed elsewhere in this NEIGHBORHOOD CORRESPONDENCE for the was conducted in In of Zoning Ordinance. A Notice of Public property owners and Within a 300-foot of site, the neighborhood group (the Terra Linda Homeowner's Association), and all other interested parties, 15 calendar days prior to the of hearing Additionally. was posted on project site, along Drive. Staff one (1) verbal comment on the concept project resulting from this notice. Alan an adjacent property owner (289 provided the following .. massing of the proposed upper-floor should reduced along the north building elevation (adjacent to the existing 18-stall parking lot) due to slope of the site; • The overall physical environment or site appearance should upgraded, including more drought- tolerant landscaping such as the use of more trees; and 40 While the project does not propose to increase the existing maximum enrollment capacity at MOS. traffiC, particularly parents to drop-off pick-up students. continues to be an CONCLUSION This application submittal is for conceptual review of the project. Conceptual review provides applicant with an informal critique and It both the and the applicant the opportunity to a quality project prioritize concerns and. if , develop a consensus as to appropriateness conceptual design and compliance with deSign review criteria and guidelines. Planning staff believes the level of details provided in the concept design submittal generally applicable design-related General Policies and Zoning Ordinance regulations and standards. Staff finds an two-story scale is well established on the MDS project design would 9 1. 2. 3 4. Ful/-sizecJ cc Idings within tl'18 academic core. Though level of library building does not appear to staff to be a 'significant applicant to propose modifications to its exterior colors and in for the new library and administration n Narrative Package (ORB members only) to tho ORB mernbers only. ulty Community Builders LLC -P.O. Box 29585 San of School, Mark Day School; 39 Trellis Dr.; San Rafael, CA 94903 Francisco, CA 94118 10 39 Trellis Dr. -Mark Day School Exhibit 1 ~ MARK DAY SCI-IOOL Project Description The Mark Day School Learning Conunons, Creativiry Lab and Adnunistnltive Building will be a new 11,270 square foot building, located at the fton t of the Mark Day School (formerly Saint Mark 's School)), an independent K-8 school located at 39 Trellis Drive in the Terra Linda neighborhood of San Ra.fael. The project involves the demolition of its current 3,935 SF, single story administrative building, and replacing it with the new building on apptoxitru.tely the same site . The new building will consist of a new Learn.ing Commons (l1brary) , for both the Lower School (ground floor) and Upper School (second floor) as well as a Creativity Lab and shop (ground tloor), support space and circulatton, Administrative offices (second floor), and six new bathrooms (fout on the ground 1:10ar, one in the administrative space). An existing portal inro the heart of !be campus, a central outdoor quad , will be maintained . Minor improvements to the existing Library building include the add.icion of a wall ro create a teachers lounge and the conversion of the current library into a meeting space. Imptovements to the quad include a reorienting of the existing amphitheater (where school assemblies , graduation and other evenrs occm) as well as improved seating areas for lunch and outdoor education, and bioswales for storm water ueatment. Sustainability and environmental stewa.rdship are being considered ill every aspect of its development. 3 9 Trelli S Drive. Sa n Rafael C A 9490 3 • (41 5) 472·80 00 m arkdayschoo I. org Rec ~ i, .0 JUL 1 a 20·14 PLANNING EXHffiIT2 ~-.. - 1(1« MARK DAY SC~OOL RECE ' ED JUL 1 8 2014 PLANNING Learning Commons, Creativity Lab & Administration Building SITING & VIEWS: Statement of Intent/ Design Narrative EJ-JDD Architects July 18,2014 The Learning Commons, Creativity Lab & Administ..tation Building at the Mark Day School campus is situated on the notthwest end of campus adjacent to the entry drive and parking lot. The new adclItion will occupy roughly the same footptint as the existing adrnin and admissions buildings, which will be demolished to accommodate the new building. The new building will complete the existing campus plan diagram by providing an edge that works with the other existing buildings to enclose the outdoor campus quad and amphitheater. The new building can be seen as the new "front door" and "gateway" into the campus, as one will pass through the outdoor pottal at Level 1 to access the centraJ outdoor quad and existing classroom wings. The new building addition will be paniaJly visible from Trellis Dnve as you enter the campus. The new addition will be partially obscured by existing trees in the parking lot and by newly planted trees along the west elevation of the new addition. The east side of the new addition will be obscured by the adjacent existing campus buildings (the gymnasium, the classroom wings, and the arts & sciences building). ACCESSIBILITY: The existing site accessibility will be unaffected by the new addition. Accessible parking is still retained on the west side of the campus with the same stall count that currently exists. Accessible curb cuts for wheelchair access to the sidewalk adjacent to the new addition will be retained in the new design. All side waU{ paving adJacent to the new addition will be sloped to assist Site dminage, but will not be steeper than allowabJe accessible slopes. The primary vertical ClIculatlon for the new addition is via an interior and extenor stair, but is supplemented by an accessible elevator that serves bOtll levels of the addition and is centrally located to serve those arriving at the new addition via the main outdoor entry portal. All door, circulation, and egress clearances for the new addition ate sized and configured to be accessible . EXITING: Exiting from the new addition is primarily through doors that lead directly [0 an extenor site circulation path or exterior egress balcony . The main stair is an exterior starr and provides existing and access to and from the Level 2 exterior balcony . The other stair is an interior stair and serves the library spaces as a communicating stair . This stair provides and exit that discharges to the exterior covered breezeway at ground level. The elevator discharged directly into the exterior marn eotty ponal at gtound leveJ . All interior and exterior egress components associated with the new addition are code compl1nm. EXHIBIT 3 parking area on th e west side of the campus . There will also be new drainage inlets and weirs as required to accommodate the drainage from the new lan ds cape configuration. The management o f site water around the new addition building and quad will be achieved through tbe use ofbioretention areas in the landscape th at will retain site water that drains from the building roofs . The placement of rainwater leaders will be such that these bioretention areas receive most o f the roof drainage in order to reduce site runoff a nd encourage infiltration of site water into the ground as opposed to hard-piped storm drains . None of the rainwater leaders from th e new addition building will be hard-piped directly into the storm drainage system . EXTERIOR BUILDING MATERIALS: We are still examining a variety of options fo r the materials on the exteriOt of the building. The options being considered at this point include stucco , Thermocromex, Taktyl, tile and whitewashed wood, used in appropriate combinations for both the main building surfaces, as well as acce nts at certain locations (such as under the windows and at the breezeway portal). Final selection will be made during Design Developmen t, after a thorough review of aesthetic and cost considerations, as well as the Design Review Board's comments. Photos of the materials are provided with rbis Conceptual Design Review package, as are building renderings showing the proposed color schemes for the window trim, and siding. •