Loading...
HomeMy WebLinkAboutDRB 2014-11-04 #3Date: November 4, 2014 Community D&v&lopment Departmont -Planning Division Case Numbers. ZC14~001; E014-086; UP14-027 Project Planner: Steve -(415) 458-5048 Agenda REPORT TO DESIGN REVIEW BOARD SUBJECT: 39 Trellis Drive (Mark Day School; Formerly St. Markls School) Request for nrn<:.\nl'':> and Design Permit. Master Amendment and District Amendment to allow the demolition of an 3,935 ft., single-story administration building the construction of a new 11,270 . ft., multi-story administration/library building, with a maximum height of 29' 1 9/32" finished The also to: 1) convert the library building to a faculty/staff lounge/workroom meeting rooms, 2) an courtyard 'quad', behind new administration/library building; 3) an existing 1 parking area located immediately north new administration/library building with no reduction in parking and 4) storm water drainage and improvements the area; APN: 175-060-01; Planned Development (1760) District Zones; Lieser for Equity Community Builders, LLC, Applicant; Joe for Mark School, Dixie School Owner; Northgate Neighborhood. PROPERTY FACTS Location Project Site: North' South: East: West: Height General Plan Designation LDR LOR P,O LOR LOR Required: 30' Proposed: 29' 1 9132" Parking Required: 101 plus 102 overflow on playgrounds Proposed: 101 plus 102 overflow on playgrounds' SUMMARY Zoning Designation PD (1760) R5 R5 R5 PO (1 Tree Removal Existing Land-Use Independent K-8 school Residential Freitas Park, Kaiser Hospital Vallecito Elementary Residential Proposed 31 (1 'Significant') Replacement 32 FAR (Floor Area Ratio) Allowed: 1 0 (435,600 sq. ft.) Proposed: 0.13 (58,054 sq, ft.) The project lS referred recommendation(s} improvements on the Mark The project proposes to an 3,935 ft., administration building construct a new, 11,270 foot) multi-story "Learning Commons, Creativity Lab and Administration (library and administration building) and parking, drainage landscaping modifications/improvements, This new library administration building is proposed to be located, In the same location of existing administration building though its footprint will expand slightly (3-4') to the west, requiring the removal of existing landscaping, to the north to create a secured outdoor courtyard ("Maker's Court") which requires the reconfiguration an 17 -stall, parking lot to provide 18 on-site parking 2 3; DescriptIon" and Statement of Intent/Design Narrative"). proposed project requires and Design Review a Use Permit Amendment '-'!-IU''''''''' existing Master Use a Rezone existing Planned Development District zoning) Environmental Review (Initial Study Declaration or Mitigated Negative Declaration). City Council will act on the with the recommendations of Commission and Design Review Permit and a Use Permit Amendment would typically require Planning Commission approval; however, the Rezone requires City approval, all the project will reviewed concurrently by the City Council review and recommendation(s) by and the Planning Commission). At its August 5, 2014 meeting, proposed project. At that contemporary, energy-efficient, comments on the conceptual unanimous including the two-story recommendations on proposed also provided 4 Board Planning staff has concluded that of details provided in the application design submittal the applicable desig Plan policies and Zoning regulations and Staff further concludes formal application submittal the Board's recommendations provided during design review. Staff requests that the Board provide its recommendations on the compl with all pertinent design including the discussion contained in this report, and specifically consider the followIng: Project Design It Whether the project adequately the design of the clerestory elevation); 2) the additional treatment area adjacent to the height complies with the maximum matches the contemporary level details meets required illumination for the setting; and 7) the BACKGROUND Description & Setting: i.e., that 1) (west building water proposed building roofing material with lighting is appropriate of school security. MDS campus is located in the portion of Terra Linda, on the of the prior Don Elementary School which is 1"\\.,,'01"'1 by the Dixie School District and long-term to MDS. school campus is ten (10) acres sq. ft.) in size with a slight (6%) northeast-to-southwest slope. It currently operates as co-educational, kindergarten-Bin school campus with a maximum enrollment students area, areas with provide another 1 project area is located on the western portion of building, south of an existing 1 M campus from Trellis Drive, and west campus provides a well-landscaped and parking 'overflow' parking MDS campus: parking lot, east the existi ng' turf frontage and the project area and particularty along the Trellis to the project area along The campus 2 is surrounded by standard-sized (R5 District) single-family residences to the north and west, Freitas Park and Kaiser Hospital to the south, and Vallecito Elementary School to the east. History: M DS was originally established in 1980 as 'St. Marks School'. It moved to its current location in 1991. Most Recent Approvals In 2001, the City Council conditionally approved an Environmental and Design Review Permit (EDOO- 39), a Use Permit Amendment (UPOO-14) and a Rezone'(ZCOO-6), and adopted an Initial Study/Mitigated Negative Declaration, to allow the construction of a 9,216 sq. ft. multi- purpose/gymnasium building, slightly less than 28' in height, a 4,896. sq. ft. arts and sciences classroom building, 19' in height, and associated landscape and parking lot improvements, including a small (593 sq. ft.) wetlands loss/fill and the creation of a new 1,180 sq ft. wetlands replacement area Proposed Project II On July 30, 2014, Planning staff completed Pre-Application (PA 14-007) review of the project proposal, providing MA with a 'bluepnnt' of the required permits, meetings and reViews, identifYing additional details required at formal application submittal, and a general discussion on the consistency of the project the City's adopted plans, ordinances and regulations. • On September 25, 2014, the applicant hosted a Neighborhood Meeting In which SIX (6) members of the public attended in addition to the Joe Harvey, Head of School for Mark Day School, the project architect and the project planner. Comments expressed by the public varied (see Exhibit 4) and responses were provided by either Mr. Harvey, the project architect or Planning staff. e On August 5, 2014, the Board subsequently provided Conceptual Design Review (CDR14-004) comments on the proposed project. At that time, the Board expressed unanimous support for the proposed contemporary, energy-efficient, building desi9'n including the two-story scale, and provided comments on the conceptual design. The 8/5/14 Board meeting can be reviewed online at: http://www.cityofsanrafael.org/meetingsl. PROJECT DESCRIPTION Use: The project proposes to demolish an existing 3,935 sq. ft., s ingle-story administration bUilding and construct a new, 11,270 sq. ft., multi-story "Learning Commons, Creativity Lab and Administration Building" (library and administration building) and associated parking, drainage and landscaping modifications/improvements. The project proposes to convert the.existing library bldg., located immediately south of the project area, to a teacher's lounge and meeting spaces. The project does not propose to increase the maximum allowable enrollment capacity beyond its existing 380 students. Site Plan: The new library and administration building is proposed to be located in the same location of the existing administration building though its footprint will expand slightly (3-4') to the west, requiring the removal of existing landscaping, and to the north to create a secured (fenced) outdoor science courtyard (" Maker's Cou rt") which requires the reconfig uration of a 17 -stall, su rface parking lot which will provide 18 on-site parking spaces. In addition to the new building, the project proposes to redesign an existing courtyard 'quad', located immediately east of the new building, redesigning an existing amphitheater and installing new storm water bio-retention areas. Vehicular access to the project area is proposed to continue along the existing circular driveway from Trellis Drive. This existing circular driveway is proposed to continue to provide vehicular access to the reconfigured surface parking lot, located immediately north of the new building. The configuration of this 3 surface parking lot is proposed provide one (1) additional on-site parking space, from 17 to 18 parking stalls, while changing the direction of the parking spaces, from 'angled' parking spaces along a one- way circular drive aisle to 'perpendicular or '90°' parking spaces along a two-way drive aisle. Arc h itectu re: The project proposes a somewhat contemporary, energy-efficient design for the new library and administration building, characterized by large glass displays with aluminum "sun shade" louvers and deep eaves. Broad clerestory dormers and an entry canopy projection at the pedestrian level accentuate the front building elevation. Covered upper-story metal decking with horizontal cable railing extends along the entire length of the rear building elevation, providing staircase access from the renovated courtyard 'quad' area to the second floor library and administrative offices. Exterior colors are proposed to be in earth tone shades. The project proposes a building exterior with, primarily, "Thermocromex" limestone plaster cladding, 'sand' or light beige in color, with 'kerfed' wood accent plank under windows , a medium brown with darker wood grain finish, aluminum window trim and horizontal 'sun shade' louvers, 'burnt umber' or warm bronze in color, and composite asphalt shingle roof, light 'sand' or light beige in color, Exterior colors are proposed to be in earth tone shades . (A Materials and Color Board will be provided during the Board's meeting The height of the new building is proposed to be two-stories, with a maximum height of 29' 1 9/32" above finished grade to the top of the roof ridge and 3~' above finished grade to the top of the clerestory dormers. The applicant has voluntarily installed story poles at the site to help demonstrate the scale of the project (see Exhibit 5). Rooftop mounted mechanical equipment is proposed to be completely screened from view. The new building is proposed to provide library space on the ground ("Lower Learning Commons") and upper ("Upper Learning Commons) floors as well as restrooms and an Indoor science lab and outdoor science courtyard ("Maker's Lab and Maker's Court") on the ground floor and morB restrooms and administrative offices on the upper-story, The project proposes primarily interior modifications to the existing library building only. Landscapi ng: The project proposes to remove a limited amount of site landscaping, primarily, along the frontage (west elevation) of the existing administration building, within the central courtyard 'quad' and within the adjacent 18-stall, surface parking lot. The project proposes removal of 31 existing trees (13 trees located within the central courtyard 'quad', 8 along the building frontage and 5 within the surface parking lot) and two (2) located behind the existing library bldg, including one (1) deemed 'significant' based on its mature size (A 'significant' tree is any tree which is in good health and form and is greater than 12" in diameter as measured 4' 6" above the root crown or 6" in diameter for any Oak tree), The project proposes replacement 'in kind' landscaping; a combination of trees, shrubs and groundcovers including Woodwardia fimbriata , Nephrofepis cordifofia and Ceanothus spp . The project proposes to plant 32, 24-48" box) replacement trees, including 15 new trees located along the building frontage (Raywood Ash trees with 1 Coast Live Oak tree), 10 new trees located within the reconfigured parking lot and between the redesign parking lot and the single-family residences located at 25 and 31 Trellis Drive (White Alder) and 7 new trees located within the redesigned courtyard 'quad' (Red Bud trees with 1 Sycamore tree). The project proposes to remove 11,830 sq, ft . of existing landscape areas and replace with 12,015 sq. ft. of new landscape areas. Grad i ng/D raj nage: The project proposes 'balanced' grading on the site with a no net change In finished elevation; the project proposes approximately 450 CYDS of cut and fill with no off-haul. New engineered bioswale stormwater treatment areas are proposed to be installed behind the existing library bUilding, within the southwest corner of the redesigned courtyard 'quad' and within two (2) new landscaped planter 'islands', 4 Fencing: The project to install to secure access to the clustered buildings on A metal roll-up/down is proposed to hidden in the soffit feature of new building. The proposes to install horizontal butted fencing/gates primarily, the walkway openings buildings with of the rear of buildings, where 6'-tall, vinyl-coated, chainllnk fencing/gates with new Pittosporum tenuifolium sheen" shrub plantings at the base is ANALYSIS General The General use project is designation allows public/quasi-public uses, including churches schools such as FAR (Floor Ratio) and subject development standards for building height and I n addition to continued school use on the site and its eTC '" f'\I wi th """'-'--'-"'-="'-'-~=:L-'=-=~ (Land Use Categories), the project will 12 (Building _Cl'Nn" and the maximum building height, building (Building height is from finished in accordance with Land Use Policy LU- on the City's current measurement for pursuant to the Uniform Building Code 1997 new buildjng is above finished from building to be 29' 1 finished to the top of the calcu lations. Staff the Board's guidance in evaluating the project consistency with following pertinent design-related Plan y Neighborhoods Policy NH-2 (New Development in Neighborhoods) to presetve, maintain the residential character of neighborhoods to make them desirable places to 1) and quality of . 2) Incorporate to reS:De,Cl development character and privacy; 3) Presetve architecturally Respect existing landforms features; 5) Maintain or enhance levels; and 6) Provide adequate parking. ~!..!..!.!..J~.!.!.!L..!:::t.S.~:I..!..!....!.~~~~ (Neighborhood Identity) seeks to recognize promote the and integrity of the City's residential neighbor/lOads and the Downtown and the "hometown" of San Rafael and scale and character of the residential neighborhoods. (Neighborhoods) preS9tve and enhance neigllborhoods their unique Int:>nJlf,':; while also allowing flexibility for ".,,"''''''' should respect context and scale existing neighborhoods. qualities that give design. New (Views) seeks to enhance to the extent possible, views of the Bay and wetlands, Center and hills church bell tower, Canalfront, Mt Tama/pais, ridgelines from public parks and publicly accessible y (Nonresidential Guidelines) design elements that contribute the economic vitality of commercial areas. New nonresidential and development should fit with and improve immediate neigl1borhood and the community as a whole. 5 =~ (Landscaping) recognizes landscaping as a significant component of a/l site design. ~ (Ughting) requires project lighting for safety purposes while controlling light spiJIover and off-site glare. );:-(Parking Lot Landscaping) requires parking lot landscaping to control heat build-up from pavement, reduce air polJution, provide cover vel1icles and soften the appearance of the parking lot. ~~~~~~~~~(Newand to maximize energy conservation Planning concludes that the Plan Policies. In particular, Neighborhoods Policy NH-2 (New that. the new building will property along Trellis Drive and over further finds the project will also in to respect views of the surrounding parks, and trails or pathways. to plant new trees and retain benefits. Development) encourages planning support transportation alternatives and Photo simulations (see Exhibit 6) were submitted by the applicant from publiC vantage points by Planning staff, including: 1) along Montecillo .(3), from the pathway at Park (1) Trellis Drive (1) across from the project photo Simulations indicate no significant of surrounding hills and ridgelines from vantage points due, primarily, to existing mature which help to maintain a natural and an appropriate context of for (Montecillo Rd and Freitas view points). The photo simulation taken along across from the project area, i ng view of the ridgellne is large-scale development, includ 110-unit Quail Hill townhome development of yellow bUilding at 1 Thorndale project will be limited to that of Zoning Ordinance Consistency: site is located within the Planned 1760) zoning district. The PO zoning no specific development standards. future development MDS campus are permitted only with an nr,.VlI<011 development plan and amendment Use Permit (UPOO-14). The r"\rl"lI''''I"'r incorporate the new development the MDS campus into PO 1760 through a .... O·7n .. '", Floor Area Ratio (FAR) Under both the City's General Plan Policy LU-9; Intensity of Nonresidential Development) and Section 14 16.150 (C) of the (Floor Area Ratios and Densities Applicable to Nonresidential and Mixed-Use Development; Public and Quasi-Public Use FAR), the maximum allowable intensity of nonresidential on the project site is 1.0 or ft., which may not be exceeded. The existing is approximately 0.11 or 6 the project the to increase Water-Efficient Landscape FAR to 0.13 or 58,054 well below maximum allowed on 14.16, (Water-efficient of the Zoning require nonresidential development proposing new or rehabilitated landscape areas equal to or greater than 1,000 sq ft to comply with most recent Marin Municipal Water District's (MMWD) water conservation ordinance (currently, MMWD Ordinance 421). project proposes to remove 11,830 sq, ft. existing landscape areas and 12,015 sq. ft. new areas, irrigation plans approved with the project be conditioned to require compliance with the provisions MMWD 1 construction plans for of building/grading permit require pre-approval by MMWD. (Parking Requirements) Zoning Ordinance, the project is not to any parking than the 17 during reconfiguration of the surface parking lot, located immediately north project area. parking for the project is on the standard of 1 space every 100 sq. ft of new auditorium space or 3 spaces for new classroom, whichever is greater. nrn'f'>,rr proposes additional auditorium nor classroom space. to existing library and administration space, while providing new science lab which will by all of existing at similar to library project additional to the reuse existing library space as community/school meeting and faculty/staff work As by the Master Permit (UPOO-14), MDS is required to provide 101 on-site parking spaces, in the locations configurations shown in the approved development plans, an additional 1 on-site parking located on the the new ires the ration existing 1 parking lot, immediately north of the project which is proposed to provide one (1) additional parking space for a total 18 on-site reconflg surface parki lot to comply with the following parking .. Minimum parking stall dimensions for 'perpendIcular' x 19' "standard") parking "'; .. ";;,, ...... ,,;:0 .. Minimum width or minimum parking backup area (26'); .. of drive parking stall access extension (2'); .. Minimum driveway access width .. Adequate short-term (1) and secure, long-term (1) bicycle parking; .. Adequate air vehicle parking (1); .. Minimum parking lot landscaping planting (1 canopy for every 4 parking • parking lot landscaping area (36 ft) and width (6'), exclusive of curbs, and .. area and exterior building lighting ned to provide adequate minimum illumination of: (1) foot at ground overlap be provided in al[ exterior doorways and in all parking areas; b) Minimum one-half (1 pedestrian walkways. Staff concluded the foot candle at ground level overlap shall be provided along all outdoor project complies with the applicable parking standards 7 proposed project to construct a new "public, MDS campus (Major Physical EnvironmentaLand Design it and a Use Permit Amendment would typically require Planning Commission approval However, ce the Rezone requires City Council approval, all the project entitlements will be reviewed concurrently by the City Council after review and recommendation(s) by the Board and the Planning Commission. The project is criteria for Environmental and Permits, pursuant to Section 1 Environmental and Design Review as follows: to the review (Review Criteria; Design. Proposed development should development in the vicinity. The development and convenient entrances. The traffic CalJaC;nV );> Architecture. The project architecture in the vicinity in should be sensitive to vicinity. Design elements the building elevation; b) design; d) provision of a sense attention to design given al/ good vehicular and circulation and access. be designed to provide access to building rnA"rllnN streets must be considered. the The design buildings in the creation of interest in c) energy-efficient height; and f) equal );> Materials and colors, finishes should be consistent with the the surrounding area, C%r selection sl/a/l with the predominant colors and the surrounding landscape and architecture. Higll-quality building materials are required. Natural materials and colors in the earlh tone wood tone range are generally surfaces should be colored, textured, sculptured, patterned to serve deSign as well as a structural function. and the landscape. Utility design to screen parking and view, Screening of of the building > Exterior Lighting. lighting should provide safety for building but not create glare or hazard on adjoining C-Tn:: • .cr", or annoying to adjacent ",,,",,enTf!;;' areas. > Landscape Design. shall be designed 8S an integral of the site and existing tree shaJl be as much as possible. Water-conserving landscape deSign shall be required. A landscaped berm around the perimeter of parking areas is encouraged. SmaJler scale, seasonal color street should be proposed along pedestrian-oriented streets while high- canopy, traffic-tolerant should be proposed for primary vehicular circulation streets. The review criteria for (architecture, form, or 'character-defining' Both the existing and (2001) expansions on the grade) and is located rnrr.c.rll Design Review Permits and color, etc.) of all new existing in the vicinity. that the proposed design to the predominant building and the multi-purpose/gymnasium are the most recent arts and is 19' in height (above finish north of the project areac building/gymnasium is 8 slightly than (above grade) and is located south of the project area (The existing single-story library is located the mu building/gymnasium project area). Staff finds an existing two-story is well established on the MDS campus and the project would in context with most recently approved constructed buildings on the MDS The new building is proposed to be located, generally, in the same location as the admi building on MDS campus, setback approximately 100' any adjacent residential property Trellis Drive, from Trellis itself, over 300' from residential property setback helps to establish scale within the MDS of the Trellis or Arias St., is The project proposes to remove eight (8) trees, one (1) of which is 'significant' on its mature (A 'SIgnificant' is any tree which is in good health and form is greater than 12" in as 4' 6" root crown or in for any and to 15 36-48" box, replacement trees (Raywood trees with 1 Live Oak along the new frontage. While not mitigation, also finds new tree will help reduce or break up the perceived mass of the new library and administration building as seen from Trellis ' Architecture project a somewhat contemporary, energy-efficient n for the new library and administration building, characterized by large glass displays with aluminum "sun louvers and deep eaves. Broad dormers an entry projection pedestrian accentuate front building elevation. upper-story metal decking with horizontal cable railing extends along the entire length of the rear building elevation, providing access from the renovated courtyard 'quad' area to the second floor library and administrative oro'OOlsea to in a building exterior limestone in color, with 'kerfed' wood accent under windows, a medium with darker wood grain aluminum window trim and horizontal 'sun shade' , 'burnt in color, and composite roof, lighter or lighter beige in color. colors are to in earth tone (A will be proVided during the meeting.) and (2001) on MDS campus, new arts multi-purpose/gymnasium, structures incorporated a coordinating cladding sand' or beige in color a gable proposes to reuse the existing library building, located south of the new , without, any additions, with exception of new landscaping along the building frontage. Modifications to the building itself are limited the installation of exterior door replacement, interior door replacement, new Interior partitions, built-in casework sinks, and minor drop ceiling and lighting reconfiguration materials and earthtone/woodtone colors of these existing campus buildings Will or compliment with proposed new building. San Design ines: On November 15,2004, City Council (by Resolution No. 11 the interim San Rafael Guidelines to give the City staff direction in the design af new development in With Rafael Plan 2020 Community Element's implementing programs. These provide a framework of principles builds on strength of of an area and that to improve visual unity of area. Planning staff 9 guidance in project for I ... ,.~nf'\f with following sequence of entry and arrival as part of should be provided. .. possible, design entrances from the views towards the building entry. III Parking should be distributed to provide access to building entrances. .. possible, parking should located to rear or side of a building in order to visual impact of parking areas. .. for adequate vehicle maneuverability in parking areas. Vehicles should not back out from a parking space onto the street. .. areas should be screened from with hedges, wa1Js, fences or berms, considerations. pedestrian entrances into the treatments, such as colored 1"/'\'"'1""0'0 should be easy to find. For .:>Jj'JVllCil planting and sign age entries to tile be provided in n;.c;I"Vn;lrT ordinance. areas should be planned as of the development a strongly landscaped character for the .. Unsightly uses should be screened . ., slJould be planted in a variety such as along the side property in planting areas, or dIstributed throughout the parking lot, consistent with Pedestrian areas should be made visually Where feasible, landscape the area between building is located at the minimum with special planting and flowering building and the property line even when a or rear yard setback. intensity of fighting to safety. adequate site security and for and sources to prevent should rruYln,/&lrr1t:> beyond the boundaries of property. project e Consider pedestrian orientation wilen designing buildmg entries, windows, Go Include a well-defined pedestrian walkway the street and building IIIJ Clearly define pedestrian movement through the parking lot. For provide changes in pavement or separate landscaped walkways. .. Where appropriate, pedestrian walkways should be provided between tlU!iijt.',r:;{ III design elements should included, such as bollards, pots, unique paving, tree grates, tree and pedestrian lighting to add visual designed for pedestrian access, <I> Adequate facilities should be provided for bicycle parking, consistent Wit/i zoning requirements. the pedestrian IIIJ A continuity of design, of a building and .. the developmenfs in the area designing the ground floor of and architectural buildings on the site. spatial relationship to adiacent other 10 ~ Entryways • A defined sense of entry with pedestrian orientation should be provided. • Building entrances should be defjned with archjfectural elements such as roof form changes, awnings or other architectural elements .~ Materials and Colors e Use articulation, texturing and detailing on all concrete exposed to exterior view. • Exterior materials should minimize reflectivity. II Use color to provide appropriate accents on a building Planning staff has no additional issues or concerns with the proposed site and building design of the project beyond those listed in this report. Conceptual Design Review: On August 5, 2014, the Board subsequently provided Conceptual Design Review (CDR14-004) comments on the proposed project At that time, the Board expressed unanimous support for the proposed contemporary, energy-efficient, building design including the two-story scale. The Board, however, provided the following comments on the conceptual design: ~ The proposed design of the clerestory dormer features need to be revisited to ensure they do not dominate the building frontage (west building elevation). >-The existing perimeter landscaping around the redesigned surface parking lot should be "refreshed" with additional plantings (groundcovers, shrubs, grasses and trees) as needed. ~ The project design should comply with the maximum allowable 30' building height for the site. ~ The Board encouraged the applicant to propose an upgraded roofing material, beyond composite asphalt shingles, to match the contemporary design of the proposed building. ).> A Lighting Plan with photometric study of the proposed lighting levels, and a Material and Colors Board should be provided at formal application submittal. );> The Board encourages the applicant to consider, as part of the project, additional fencing as necessary to provide appropriate school safety Staff has concluded that the formal submittal has generally responded well to the Board's August 5, 2014 conceptual review comments II The formal project submittal proposes to reduce the overall height of the new building by reducing the height of the clerestory dormers six Inches (6"). While the formal project submittal proposes a maximum building height of 29' 1 9/32" above finished grade to the top of the roof ridge, the overall building height will be 30' above finished grade to the top of the clerestory dormers, which are architectural features and excluded from building height calculations. Additionally, the previously proposed horizontal sunshades have been removed from the design of the clerestory dormers, which has helps to reduce the perceived visual bulk of the proposed new building. e The formal project submittal include landscape plans proposing new landscaping for the reconfigured, 17-stall surface parking lot located north of the new building, including new trees along the west perimeter of the redesigned parking lot. behind the existing residences at 25 and 31 Trellis Dr. ThiS is an existing bioswale/storm water treatment area and will continue to operate as 11 such, however, project proposes to plant five (5) new, 24" provide better landscape of the new building replacement White Alder trees to adj acent residences. e formal design review submittal includes a Material and Color Board, which will be provided during the meeting. Upgraded composite asphalt roof shingles are proposed by project, CertainTeed Landmark Solaris Platinum roof shingles are highly energy-efficient STAR-rated) by incorporating 'cool roof' technology for solar These roof are to light ("Coastal Tan") in color other earthtone/woodtone colors for new building. e formal project submittal includes a Lighting Plan with photometric lighting for project. This Lighting proposes to the City's minimum lighting levels for building entrances, parking areas walkways between building entrances and parking areas minimizing ",,._cne glare • formal install fencing to secure access to interior of the clustered to install a roll-up/down gate hidden in the soffit of of new building. project also proposes to install 6'- tall horizontal wood for, primarily, the remaining walkway between buildings with exception of the rear of the buildings, where 6'-tall, vinyl-coated, chainlink fenci with new Piltosporum tenuifolium "silver shrub plantings at the base is proposed. on the following: • Whether project responds to conceptual review i. e , that 1) the clerestory. dormers do not dominate the new building frontage (west building elevation), the additional White Alder tree the perimeter bioswale/storm treatment area adjacent to the reconfigured surface parking lot; 3) the proposed building height with maximum al 30' building height for the 4) the roofing material matches the contemporary design of the new building; the proposed Lighting with level meets required illumination levels; 6) the proposed Material and is the and the proposed plan appropriate of school security. NEIGHBORHOOD CORRESPONDENCE Notice of hearing for project was conducted in accordance with noticing requirements contained in 29 of the Zoning Ord A Notice af PubliC was mailed to property owners occupants within a 300-foot of the project , the appropriate neighborhood group (the Linda Association), all 15 prior this hearing. Additionally, notice was posted on the At the time of printing staff's Planning received a considerable amount of public comments both in support and in opposition of the project, via , postcards and 'signed' petition with both 'hard copy' and electronic Generally, the public comments proposed believe: • The new "Learning Commons and Creativity Lab" building is a campus enhancement important to the overall education goals for MDS; .. Meets the maximum allowable building height for the buildings In the .. Provides adequate is in context with the scale of neighborhood; and neighbors. 12 .. trees proposes add trees to help screen the building from Trellis neighbors. Generally, the public comments .:..:...:...:::.===:..:...: of the proposed project believe: .. The two-story scale Is with the surrounding residential neighborhood; .. two-story scale will of the nearly hills; .. The two-story design will of adjacent residence by a direct line- of-sight into windows rear yards of residences; .. The proposed of the building will ~'-"'-""-"''-'--'-'-'-'''-''~~~~=--'== in a residential community; and eo two-story scale is in conflict with the intent of the Linda Master neighborhood Planning response these comments of opposition is: .. to the Ordinance. maximum height of 29' 1 9/32" finished grade to the top of the at the site help demonstrate exterior wall heights the corners of represent the Both arts building the are the recent (2001) on the MDS campus. The arts sciences building is 19' in height (above finish grade) and is located immediately north of area. The multi-purpose building/gymnasium is htly less than in height finish grade) and is located south the project area Single-story library bUilding is between multi-purpose building/gymnasium and project area), finds an twa-story is well established on the campus and project design would be in context with the most recently approved and buildings on M new building is proposed to be I generally, in the same location as existing administration building on the MDS cam setback approximately 100' from adjacent residential property along Drive, approximately 200' Drive itself, from any residential along This deep helps to within the campus of the existing the along either or Arias St., which is predominantly single-story. .. Photo simulations (see Exhibit 6) were submitted by the applicant from public vantage Planning including: 1) Montecillo from at Freitas Trellis Drive (1) across from project area). photo simulations indicate no Significant of view of hills and from public points Iy, to eXisting mature trees which to maintain a natural backdrop and create an context of scale for the (Montecillo Rd. and Freitas Park view points). The photo simUlation taken along Dr, across from the project indicates that view of the is already dominated by existing large-scale development, including the 11 O-unit Quail townhome development by the of yellow awnings) vacant building 1 Thorndale Dr,; Impact of ne from public along by project will to that of approved structures 13 • Privacy Impacts. The project will be setback approximately 100' from the closest adjacent residence which helps to negate impacts to the privacy of adjacent neighbors . If the site were to be rezoned for residential development, any subdivision could be designed to allow structures with a maximum height of 30' to be located directly behind these same residences, sharing the same common rear fencing. • Building Design. The project proposes a somewhat contemporary, energy-efficient design for the new library and administration building, characterized by large glass displays with aluminum "sun shade" louvers and deep eaves. Broad clerestory dormers and an entry canopy projection at the pedestrian level accentuate the front building elevation . Covered upper-story metal decking with horizontal cable railing extends along the entire length of the rear building elevation, providing staircase access from the renovated courtyard 'quad' area to the second floor library and administrative offices. Exterior colors are proposed to be in earth tone shades, The project proposes a building exterior with, primarily, "Thermocromex" limestone plaster cladding, 'sand' or light beige in color, with 'kerfed' wood accent plank under windows, a medium brown with darker wood grain finish, aluminum window trim and horizontal 'sun shade' louvers, 'burnt umber' or warm bronze in color, and composite asphalt shingle roof, lighter 'sand' or lighter beige in color , Exterior colors are proposed to be in earth tone shades. (A Materials and Color Board will be provided during the Board's meeting). When the most recently approved and constructed (2001) building on the MDS campus, the new arts and sciences building and the multi-purpose/gymnasium, both structures incorporated a coordinating design, including exterior plaster cladding facades, sand' or light beige in color and a clerestory gable roof form. The project proposes to reuse the eXisting library building, located immediately south of the proposed new building, without, generally, any exterior additions, alterations, modifications with the exception of new landscaping along th e bUilding frontage. Modifications to the building itself are limited to the installation of exterior door replacement, interior door replacement, new interior partitions, built-in casework and sinks, and minor drop ce ilin g and lighting reconflguration, The exterior plaster materials and earthtone/woodtone colors of these existing campus buildings will coordinate or compliment with those proposed for the new building. • Conflicts with Master Plan. Planning staff has never heard nor seen the "Terra Linda Master Plan of neighborhood schools". The Vision North San Rafael was a 'vision' document created after community-wide efforts to identify the future development of North San Rafael and adopted by the City Council in 1997. At that time, it was a standalone planning document, along with other neighborhood documents (plans and visions). It primarily addressed pedestrian access, linkages, commercial areas, the creation of gathering areas in North San Rafael and the creation of and design guidelines for a promenade, which has begun to take form with the recent upgrades to Northgate Mall. As part of the adoption of the General Plan 2020 in 2004, the City folded all separate neighborhood planning documents (plans and visions), Including Vision North San Rafael, into the specific policies in the Neighborhoods Element of the General Plan, CONCLUSION Planning staff believes the level of details provided in the formal application design submittal meets the applicable design-related General Plan Policies and Zoning Ordinance regulations and standards . Staff requests the Board's recommendations to the Planning Commission and to the City Council on whether the project has adequately responded to the recommendations provided by the Board during conceptual design review. Staff further requests the Board's recommendation as to whether the proposed project is required to provide additional on-site parking. Finally, staff welcomes additional comments or guidance on the any site or building design details that would further improve the project. 14 EXHIBITS 1. Vicinity Map 2. Applicant's Project Description 3. Statement of Intent/Design Narrative 4. Neighborhood Meeting Summary Memo 5. Story Pole Plan -6_ Photo Simulations 7. Public Comments Full-sized and reduced plans and color photometric study provided to the ORB members only. 15 3 9 T rellis Dr. -M ark Day School Exhibit 1 .. MARK DAY SCI-IOOL Project Description The Ma rk Day School Learning Commons , Creativity Lab and Adm.injstrative Building will be a new 11,270 square foot builcling, located at the front of the Mark Day School (fottnerly Saint Mark's School», an independent K-8 school located at 39 Trellis Drive in tbe Terra Linda neighborhood of San Rafael. The ptoject involves the demolition of its current 3,935 SF , single story administrative building, and replacing it with the new building on apptoximately the same sHe. The new building will consist of a new Learning Commons (library) , for both the Lower School (ground floot) and Upper School (second floor) as weU as a Creativity Lab and shop (ground floor), support space and ci.rculation, Administrative offices (second floor), and six new bathrooms (four on the ground floor, one .in the ad.m.i.n1strative space). An existing portal into the heart of the campus, a central outdoor quad , will be maintained . Minor improvements to the eXlSting Library butlding include the addition of a waU to create a teachers lounge and the conversion of the current libnl.lY into a meeting space. Improvements to the quad include a reorienting of the existing amphitheater (where school assemblies, gradu~tion and other events occur) as weU as improved seating areas for lunch and outdoor education, and bioswales for storm water treatment. Sustainability and environmental stewardship are being considered in every aspect of its development. 39 Trelli S Drive. SCli"l Ra f ael CA. 94903 • (4 15) 472-8COI) rna rkdayschoo I.org EXHIBIT 2 OCT 30 2014 P LAN\\l1 \\l G Mark DtfY School OCT 3 U 2014 PLANNING Learning Commons, Creativity Lab & Administration Building SITING & VIEWS: Statement of Intent/ Design Narrative EI-IDD Architects September 2, 2014 The Learning Commons, Creativity Lab & Adm..i.rUstration Building at the Muk Day School campus is situated on the northwest end of campus adjacent to the entry drive and parking lot. The new addition will occupy roughly the same footprint as the existing adnul1 and admissions buildings, which will be demolished to accommodate the new building. The new budding will complete the existing campus plan cliagram by proviwng an edge that works with the orhe:r e.x..isting buildings to enclose the outdoor campus guad and amphicllealer. 1l1e new building can be seen as the new "front door" and "gateway" into the campus, as one will pass through fue outdoor portal at Level 1 to access fue central outdoor quad and existing classroom wings . The new building add..ition will be partiaUy visible from Trellis Drive as you enter rhe campus. The new addition will be partially obscured by existing trees in the parking lot and by newly planted trees along the west elevation . of the new addition . The east side of the new addition will be obscured by the adjacent existlog campus builcliogs (the gymoasium , the classroom w.ings, and the arts & sciences building). ACCESSIBILITY: The existing sire acce ssibility will be unaffected by the new addition . Accessible parking is still retained on the west side of the campus Willi the same staU count that currently exists. Accessible curb cuts for wheelchair access to the sidewalk adjacent to me new addition will be retained In the new design . AU side walk paving adjacent ro llie new adclition will be sloped to assist site cixainage, but will not be steeper than allowable accessible slopes. The primary vertical c.i..tcul>ltion for the new addition is via an interior and exterior still, but is supplemented by an accessible devator that senres both levels of the add..ition and is centrally located to serve those arriving at the new addition via the main outdoor entry portal. AU door, circulation, and egress clearances for the new addttlon are sized and configured to be acceSSible. EXITING: Exiting from the new addition is primarily through doors that lead directly to an exte.tior site circulation path or exteL"ior egress balcony. The main stalr IS ao exteL;or stair and provides existing and access Lo and from the Level 2 exterior balcony. The other stair is an interior stair and selves the libra.ry spaces as a communicating stair . This stair provides and exit that clischarges to the extetior covered breezeway at ground level. The elevator discharged d..irectly toto the exterior main entry portal at ground level. All interior and exterior egress components assoclated with the new addition are code compliant. EXHIBIT 3 • SITE LIGHTING: Any new site lighting for the project will have code compliant levels of illumination while also focusing lighting in a way that minimizes glare and light pollution for the neighbors adjacent to the school All parking aJ:eas with new sIte Lighting will have minimum illumination levels of lEe. All exterior building lighting above doors will have minimum illwnination levels of lfe. Any new Jjghting for the reconftgured parking area will have hoods and / Ot downwardly focused Wwnination as part of the fixture to ensure that the Light is contained and not producing any unwanted glare . Any new pedestrian path lighting will be accomplished through the use of LED lighting boUards or LED building sconces providing rnin.i.mum illumination levels of '12 fc. Up-lighting of any kind will not be incorpol-ated into the site lighting for the project, in order to comply with the revised conditions of the CaLifoll11a Green Building Standards Code . In the case that funds are not to place to complete the new Maker's Court and reconfigured parking area, Lhen the eXIsting site lighting fO( the existing facully parking area shall remain in its current state . All other existing site lighting all the campus shall remajn in its cutrent state. FIRE FIGHTING REQUIREMENTS: All existing hyru-ant locations and fire access lanes will be malOtained and are unaffected by the new plans. The location of aU newly reconfigured stte areas are accessible by fIre truck or fIre hose as required by the code. STORM WATER MANAGEMENT: There will be a lim.ited area of demolition to the existing storm dratnage Lines on the south side of the quad to accommodate the new quad configuration and new addition building. The demolished lines will be replaced and re-routed to work with the new site conditions. These new lines will tie into the existing storn, ckainage mains the run beneath the existing parking area on the west side of lhe campus. There will also be new drainage inlets and weirs as requited to accotnmodate rl1e drainage from the new landscape configuration . The.managemenl of site water around the new addition building and quad will be achieved through the use of bioretention areas in rhe landscape that will retain site water that drains from the bWJc!.i.ng roofs . The placement of ramwater leaders will be such that these bioc~tention area s receive most of the roof drainage in order to reduce slte runoff and encourage infiltration of site water into the ground as opposed to haJd-plped storm drains. None of the tainwate.r leaders from the new addition building will be hard-piped directly into the stocm drainage system. There will also be bioretention areas in the reconfigured parking area adjacent to the new Maker's Court. These bioretention areas will be integrated into the landscape buffers that will be a pal·t of tile reconfigured parking layout. In the case that funds are not in place to complete the !vfaker's Court and reconfigured parking area, then there will be a bioretention area graded into the site along the western edge of the existing faculty parking to accommoda[e additional site t:l.lnoff from the new building addition. This will aUow the additional runoff to inftltrate Into the bioretention area, as opposed to increasing the loads on the existing storm drainage system in this ;lrea ofche site. • Septem 26,2014 Community Development Department MEMORANDUM TO: Council Members, Planning Commissioners and Review Board Members FROM: Steve Stafford, Associate SUBJECT: [ED14-086. UP14-027, NM14-002, IS14-002] Neighborhood Meeting Comments Summary New 11,270 . ft. ILearning Commons, Creativity and Administration Bldg.' 39 lis Dr. ('Mark Day School'; APN: 175-060-01) On Thursday, 2014, a Neighborhood Meeting was held in conjunction with a new proposed 11,270 'Learning Commons, Creativity and Administration Bldg.' on campus of Mark School (formerly St Marks School). The Neighborhood Meeting IS required, given that; proposed will an amendment of Planned Development (PO) District zoning on project will be reviewed by Design Review Board, Planning Commission and City Council. purpose of the Neighborhood Meeting was informational only. It an opportunity for the to the proposed project for the public to ask questions. Neighborhood Meeting was noticed consistent with City requirements; a notice was to all residents occupants within a radius of the fifteen (15) day prior meeting, was site and was announced in the Marin IJ site, (15) prior to the Neighborhood Meeting began at p.m. lasted 1 . hours, It was attended by (6) who signed the register, in addition to the project planner, the project applicant, the project architect and Head of School for Mark Day School. Joe Harvey, project. Scott of School for Mark Day School, provided an overview/the . at EHDD followed introduced following comments were made during Neighborhood Meeting II) The buHding colors should be earthtones/woodtones to blend in with hiilside background colors of other buildings on campus. • The proposed two-story bUilding form is out of with the surrounding residential neighborhood. of project would improved by eliminating the clerestory dormers or reorienting them the front of building the rear. Additional along the driveway entrances exits along Drive may help to screen the new building from view. (New buildings at Kaiser Hospital are not in with the surrounding neig ) ~ The existing front the building should be if or replaced an equal number of the largest available, in an appropriate III reconfigured parking lot lighting should provide a sense of security while minimizing glare onto neighboring EXHIB 4 1 Community Development Department MEMORANDUM • Any security fencing/gates proposed by limited the central campus core and leave portions of the playground area, open and available on weekday evenings and (0 The line of existing mature Pine trees along the north of the parking lot, above the athletic fields, should preserved by ., School District, the property owner, in the review of the project. .. wjll the administrative staff Will portable trailers be use? If so, where? <ll How Will construction proceed at minimal the school (staff, parents) and the e When will construction begin? How long will it e the project include increasing the (0 school currently operating within on campus? II school may have outgrown current relocation to a larger, more appropriate site. e. corner of Arias St. and Trellis Dr. is operations and needs to be monitored for better safety. e Will anticipated intersection imprOVements Pkwy and Las Gallinas Ave. be further delayed by the these i'ltersection improvements are being delayed until Hospital construction is completed,) e. Freitas Park, south of the school campus Rd., is neglected and badly in need of better maintenance and policing, e The school's busing program is appreciated by neighborhood appears to be sUGcessful. Could the busing program expanded from southern Marin County to northern Marin County? 2 NEIGHBORHOOD MEETING New 'Learning Commons, Creativity and Administration Bldg.' @ Mark Day School 39 Trellis Dr. Thursday; September 2014 PLEASE CLEARLY 14 ------ 17 October 2014 Equity Community Builders 38 Keyes Ave Suite 201 San Francisco, CA 94129 Attention: Ted Lieser WRIGHT CONTRACTING GENERAL CONTRACTOR", CONSTRUCTION MANAGEA1ENT p, 707,528 I I72 WRIGHTCONTRACTING.COM F: 707.523,3714 Ref: Mark Day School-learning Commons & Admmistration Building Addition 39 Trellis Drive} San Rafael, CA Mr. Ueser The installation of the Story Poles for the above referenced project was completed yesterday, October 16. They were installed in the IDea tions a nd at the heights depicted on the attached sketch, and are placed to accurately represent the outer limits and heights of the roof eaves at the building perimeter, as well as the highest point/line of the building at the roof ridge. The poles are located as close to the actual proposed locations of these building features as possible, given the limitations of the existing school site that Include trees, buildings, sidewalks, covered walks driveways, and the safety of the students} teache r5 a nd parents. In particula r the poles along the West Edge of the building are located approximately one foot east of the actual proposed building eave line so that they are not located in the middle of the existing sidewalk. We believe that the volumes indicated by these story poles accurately represent the actual vblumes, including height, length & width of the proposed new building. Please cali with any questions or concerns about the above. Thank you. Mike Nonella Wright Contracting Inc EXHIBITS OCT 302014 PLANNING 1'0. Box 1270. SAN1A ROSA. CA 95402 & 3020 DUHON i\VEN\H. SAI'HA ROSA, CA '>5407 liCENSE 417421 I 'i l 1 23"~.' H tM" m"lC 23' .. :2." " '-"1& li ne Story Po le Layout Oct 16 2014 o ~ G) C00p ~-.--:--~-' I --.J .--' I I -r',L ... ___ . ____________ .. ~nOOf~p~~~---------------~-------------------. ~ 'ol.ou •• ,-;;'" 23'-'0" ~ .... -::: .. -.l! Ii rk=J==t~fc\ •. ZJ'-.•.. :;. v MARJ< DAY SCHOOL- LEARNING COMMONS I ADMIN ADDITiON MCI"'/;iC'~t: ''''ICJc PL/lM'YI"'O tlR8I'IA( c>E .. ~ ~DO TREAl AVE ;.Q.O'I $f\N FRM.'CtSC"O CAUF OR NLAt!"\1t) AAQ'@eHCD.COM T 6'~'2 8S-Jj,!) F ",S...tlSS-311t>S ~, ~~~- -. F\HlSllt~~~ t:1~~""'~_ Ef o =~~'r~ v>e> LJ ur:c,; .... ,IlJ\'Ut1.o ~"'~~1oI ~.,1A .. l1IIIIJ a-"tI\~ ... 'rA<'4IKOIoOf~ ROOF PLAN A2.02