HomeMy WebLinkAboutDRB 2017-06-06 #3SAN RAFAEL Meeting Date: Case Numbers: June 6, 2017 CDR17-004 Project Planner: Alan Montes -(415) 485-3397 THE CITY WITH A MISSION Agenda Item: 3 Development De artment -Planning Division REPORT TO DESIGN REVIEW BOARD SUBJECT: 1833 and 1835 Fourth Street (Shell Fueling Station) -Conceptual Design Review of a new gas station and convenience store on two adjacent downtown parcels; APN 011-231-24 and 011-231-25; West End Village (WEV) District; Muthana Ibrahim, Applicant; Nick Goyal, Owner; Case Number: CDR17-004 PROPERTY FACTS Location Project Site: General Plan Designation WEV North: South: East: West: Lot Size Required: Existing: Height" Allowed: Proposed: Parking Required: Proposed: WEV HDR WEV N/A 6,000 sf 14,543 sf 36' 28' 8 8 Landscape Area Required: N/A Existing: 2,800 sf (19.3%) approx. Proposed: 2,474 sf (17%) Tree Removal Total(No.lspede,): 5 Requirement: N/A Proposed: 11 new trees Zoning Designation WEV WEV HR1.8 WEV N/A Lot Coverage Standard: N/A Existing Land-Use Gas Station & Convenience store Commercial/Office Residential Restaurant Fourth Street Proposed: 5,166 sf (35%) Floor Area Ratio (FAR) Allowed: 0.70 Proposed: 0.18 Gross Building Square Footage Existing: 300 sf Proposed: 2,284 sf Setbacks Reguired Existing Front: NR N/A Side(s): NR N/A Ext. side: NR N/A Rear: NR N/A • Measured from established exterior finished grade elevation to mid-point of a sloped roof. Proposed N/A N/A N/A 14" SUMMARY The project is being referred to the Design Review Board (Board) for concept review to allow the replacement of an existing gas station and conven ience store. When the proj ect is subm itted for formal review, it will require an Environmental and Design Review Permit for a newly constructed commercial building and Use Permit for a newly constructed gas station. The Planning Commission (Commission) will act on the proposed project with the recommendations from the Board. As necessary for all projects requiring a Planning Commission-level Environmental and Design Review Permit, the applicant has submitted for conceptual design review to allow the Board to provide early design comments on the proposed project. The Board's recommendations should be considered by the applicant for incorporation as revisions to the project design prior to formal submittal. This item is somewhat unique as it has already been brought before the Commission to gather a policy interpretation , which is discussed in the background section of the report. The Commission provided their support for the tear down and reconstruction of a nonconforming use; given the condition that it be an outstanding design. Planning staff requests that the Board review this report and provide recommendations on the project's compliance with all pertinent design criteria . Architecture • Whether the proposed structures are high-quality design. Materials and Colors • Whether the "Saltillo" and "Pueblo Tan" color scheme is appropriate and blends in with the neighboring structures in the West End Village (WEV) District. Landscaping • Whether the amount and type of landscaping is adequate and appropriate for this location. Signage • The appropriateness of the proposed signage . BACKGROUND Site Description & Setting: The site is composed of two adjacent downtown parcels , triangular-shape , and located at the intersection of Fourth st. and Second St. The site is flat (1-2% average cross slope) with a combined parcel area of 14 ,500 sq. ft. History: In 1972 the site obtained an Environmental and Design Review Permit for the construction of a new gas station. In 1975 the site obtained a Use' Permit to add a film kiosk. Between 1975 and 1993 the gas station had several design reviews permits for minor site and building modifications; and, in 1992, the gas station obtained a Use Permit to sell packaged goods out of the existing building on the site. On September 16, 2016, the applicant submitted a pre-application to tear down the existing gas station and convenience store with a new larger gas station and convenience store. During the pre-application , it was found that the zoning had changed in the mid-2000s and that a fueling station is not an allowable use in the WEV Zoning District. Staff found some ambiguity in the non-conforming prOVisions of the San Rafael Zoning Ordinance (section 14.16 .270) that warranted a determination from the Commission. With Staff's recommendation, the applicant submitted for a letter of determination to go before the Planning Commission to seek input on whether the continuation of a non-conforming use, the gas station use, could be allowed to continue even if the structures on the site are demolished and rebuilt, 2 prior to their submitting a formal application. On January 10, 2017, the item was brought before the Commission. The Commission had a very thoughtful and detailed discussion. Ultimately, the Commission felt it made sense for the site to be a gas station , but were stuck on whether there was procedurally, the right tools for them to allow it without having to amend the General Plan or Zoning Ordinance. Ultimately, the Commission found that since there was an old Use Permit for the convenience store, a slight intensification would be allowed, but would need to comply with parking requirements. They also made it known that this site is a key gateway site and would expect any redevelopment to be an extremely high quality design with lots of landscaping. On February 22, 2017, the project was brought before the Design Review Board for Conceptual Design Review. During the meeting, the Board had stated the design was not high-quality, the colors were too dark, the trash enclosure should not be located along the 4th St. frontage, and that the landscaping should be increased. This revised proposal has lightened the colors of the building , increased the landscaping from the prior submittal, moved the tower element to the 4th St. Frontage, and relocated the trash enclosure closer to 2 nd St. frontage. PROJECT DESCRIPTION Use: The proposed use would continue as a gas station with a convenience store. The use would maintain four (4) fuel pumps and expand the convenience store building from 300 sq. ft. to 2,284 sq. ft. of which 1,214 sq. ft. will be used for retail. Site Plan: The project proposes to construct the fueling canopy in the center of the site and the convenience store along the east property line. The landscaping improvements are gOing in similar locations that are currently landscaped, but with modifications to the planters. The curb cuts are proposed to be modified, but will be in similar locations to the existing curb cuts. The Department of Public Works had required, during the pre-app, that the driveway on 2nd St. not be located directly across from West St., which the applicant has revised on the current plans, and that the lane striping be shown as fueling trucks shall not extend into adjacent lanes. Staff would like to inform the Board that Public Works has not provided any comment on the current submittal as this is a conceptual review and that there may be site plan modifications with a formal submittal. Architecture: The proposed one-story, 2 ,284 square foot building's exterior is proposed to consist of a smooth finish cement plaster painted brown (Saltillo) and tan (Pueblo Tan), stone paneling along the lower quarter of the building in a natural tan color (Cambria), and a concrete plaster finish for the cornice (Distant Gray). The single-story building will be 22' in height and the tower will reach a maximum height of 28'. Landscaping: The current landscape proposal reduces the existing landscaping from 2800 sq. ft. to 2474 sq. ft. The proposed landscaping will remove five (5) and grass turf areas. However, the new landscape plan will plant ten (11) new trees and provide a significant increase in new ground cover. The proposed new ground cover includes Escalonia, Indian Hawthorne, and Boston Ivy. The proposed new trees include Muskogee Crapes (6), Strawberry Trees (4), and a Maidenhair tree (1). Lighting: The applicant hasn't provided any specific lighting details now, but there are eleven (11) proposed wall lanterns along the exterior of the convenience store. The applicant has also provided a written description of the lighting which states "The exterior lighting levels will be enough to ensure the safety of the facility, but to not provide glare or excessive spillage onto adjacent properties or the right- of-way. Exterior lighting is LED fixture , down-lit and fully shielded to avoid potential glare towards the street and adjacent properties". At formal submittal, the project will be required to provide a photometric study showing the site will comply with the City's adopted lighting standards, pursuant to 14.16.227. 3 ANALYSIS General Plan 2020 Consistency: The follow General Plan Policies are relevant to the design aspects of the proposed project: LU-12. Building Height. Recognizes established height limits for specific zoning districts. NH-42. West End Village. This policy also encourages parking in the area to be screened with landscaping and that parking lot entrances should be on side streets where possible. NH-43. West End Village Design Considerations. This policy encourages that the West End Village should create and maintain a distinct Village identity, by having active sign programs, maintaining the historic feel of the community, and respecting the low scale development of buildings by limiting buildings to one (1) to three (3) stories. CD-21 Parking Lot Landscaping. Requires parking lot landscaping to control heat build-up from pavement, reduce air pollution, provide shade cover for vehicles and soften the appearance of the parking lot. Staff Comments: Overall the project complies with the General Plan 2020. The project complies with the maximum building height and parking lot design. The project partially meets the Neighborhood Policies NH-42 and NH-43, in that the proposal does its best to screen the parking lot, does not have cross streets to access the site, and that the convenience store blends in with the character of the West End Village. However, staff is concerned regarding the design of the fueling canopy and the freestanding pole sign as they do not fit with the historic nature of the West End Village District. Zoning Ordinance Consistency: Chapter 14.05 -Base District Section 14.05.010 (Specific Uses West End Vii/age). The WEV is intended to be a unique and desirable place to shop and live. A variety of goods and services is encouraged , ranging from one-of-a-kind shops, neighborhood-serving offices and services , family and youth-oriented entertainment activities, and restaurants. New parking areas are strongly encouraged. Limits on drive-up facilities and late-night activity protect the livability in the West End Village, and promote an attractive pedestrian setting. New development in the West End Village should complement the older buildings in the district. Section 14.05.022 (Land Use Regulations). Gas stations are not an allowed use in the WEV District. However, the existing gas station is a legal non-conforming use, as it was established when a gas station was an allowed use. Staff Comments: The proposal would continue the 24/7 business hours of the existing facility and the convenience store building will complement the architectural style of the district. Chapter 14.16 -Site and Use Regulations Section 14.16.227 (Light and Glare). The Code requirement necessitates that colors , materials and lighting shall be designed to avoid creating undue off-site light and glare impacts. Staff Comments: A photometric study will be required at the time of a formal submittal to ensure lighting levels follow the adopted standards. 4 Section 14.16.270 (Nonconforming structures and uses). As mentioned earlier in the report the existing gas station is a legal nonconforming use. During Pre-application review, staff recommended bringing the item before the Planning Commission to make a policy determination as to whether to allow the rebuild of the gas station. At the Commission meeting, it was determined that the use could be torn down and rebuilt as it has an existing use permit and the fueling station will not be increasing in intensity (no increase in the number of pumps). The Commission strongly recommended the applicant provide exceptional design for the project. Staff Comment. The Commission provided their support for the tear down and reconstruction of a nonconforming use; given the condition that it be an "outstanding" design. Staff finds that the design meets the requirement for a standard gas station remodel. However, given the Commission's heightened threshold due to the gateway location and the legal nonconforming status of the use staff is uncertain of whether this design would qualify for "outstanding" design and is seeking the Board's determination and recommendations. Chapter 14.18 -Parking Standards Section 14.18.040 (Parking Requirements), The site is required to provide eight (8) parking spaces. Three (3) parking spaces for the gas station and an additional one (1) parking space for every 250 square feet of gross retail area is required. The proposed retail area is currently 1,214 sq. ft. and is thus required to provide 5 parking spaces for the retail aspect of the business. The remaining 1070 sq. ft. of the convenience store is proposed to be used as utility storage and bathrooms and is not required to be parked unless it is to be used for storage of retail goods. Section 14.18.100 (Parking space dimensions). All proposed parking spaces comply with the minimum parking space dimensions for the downtown of 8.5' by 18'. The parking spaces take advantage of section 14.18.130(E) which allows for a two (2) foot overhang into landscaped areas. Section 14.18.160 (Parking lot screening and landscaping). Parking areas are required to be screened from the right-of-way using landscaping and to provide canopy trees for every four (4) parking spaces. The plans appear to screen the parking spaces and loading zones to be the best of their ability given the site constraints, with Escalia and Muskogee Crape along the parking spaces. Chapter 14.19 -Signs The conceptual review proposes two (2) signs on the main building, two (2) logo signs on the canopy, and a new monument sign (1). The total square footage for all the signage is 105.2 sq. ft. (less the required price signage, as it is exempt). The maximum number of signs allowed for the property is 3- signs per frontage with a maximum square footage of one (1) square foot for each linear foot of building width per frontage. Staff Comments: The proposed pole sign does not meet the signage requirements as the building is required to provide a 15' setback from all street frontages to have a freestanding sign. Staff is also concerned regarding the appropriateness of a pole sign in the West End Village . To accommodate all the signage for a gas station a sign program would be recommended for the project in order to allow some flexibility in the number, size , type and placement of signs including any signage on the pumps. San Rafael Design Guidelines: The design is mostly consistent with the Design Guidelines in that the design provides a well-defined sense of entry and the building design provides interest points using the tower element, awnings and large storefront Windows. However, there are a few instances where the design, specifically the site planning deviates from the Guidelines . The following are some of the site planning issues staff had noticed with the plans: ~ Buildings should be located to reinforce the street edge. 5 ~ The primary ground floor entrances should be oriented towards the street or, if appropriate, public plazas or courtyards, and not to parking lots. ~ Much of the front or street side facades of the ground floor should ex tend to the property line, with ex ceptions for public plazas, outdoor gathering places, courtyards or landscape setbacks. Staff Comment. The use is driving the site design in a way that the Design Guidelines don 't recommend in the downtown environment However, during the prior conceptual design review the Board had found the site design to be appropriate for the use. NEIGHBORHOOD CORRESPONDENCE Notice of this meeting was mailed to residents and occupants within 300 feet of the site at least 15 days prior to the meeting date. At the time of printing this Staff Report , no comments were received because of this noticing. CONCLUSION Staff requests that the Board provide comments on the conceptual plan , and specifically address the points listed in the Summary secti on . EXHIBITS 1. Vicinity Map 2. Written Project Description Full-sized and reduction plans have been provided to the ORB members only cc: Muthana Ibrahim , 222 Olympic Blvd. Suite 100, Walnut Creek, CA 94595 Nick Goyal of A U Energy LLC , 41805 Albrae St 2,d Floor , Fremont , CA 94538 6 · . ity Map Exhibit 1 -Vlcm 7 I A rch'itects Muthana Ibrahim Architect President Telephone: (925) 287-1174 Facsimile: (925) 943-1581 Cell: (925) 878-9875 Email: muthana@miarchitect.com Website: www.miarchitect.com M I Arc hit e C t s, Inc. A California Corporation ARCHITECTURE. PLANN NG . MANAGEMENT. DESIGN 2221 OLYMPIC BLVD .. SUITE 100, WALNUT CREEK, CALIFORNIA 94595 Written Project Description for: Shell Gas Station &Convenience Store 1833 4th Street San Rafael, CA 94901 On behalf of our Client A U Energy, LLC, we are submitting this written description for the reconstruction of the Shell Gas Station at the above referenced site. The project scope of the work consists of installing a new 2,284 sq. ft. convenience store, a new 2,392 fueling canopy with (4) multi product fuel dispensers. The site improvements include: parking stalls, accessible path of travel to the right-of-way, masonry trash enclosure, site lighting, landscaping & self-service air/water unit. The following are items to be considered in this project: • ITEMS TO BE SOLD AT THIS FACILITY: The gas station will sell gasoline, the Convenience Store will sell pre-packaged food items, sundry items, some automobile accessories (Le.-air fresheners, cell phone accessories, anti-freeze, motor oil, etc.) self-service beverages, fresh and/or pre-packaged pastries & can and/or bottles of soda, water & sports/energy drinks. There will be NO cooking or preparing of food or beverages. • EMPLOYEES: There will be (4) full time employees per shift, (1) manager and (1) assistant manager. There will be (3) shifts per day. Total is (14) full time employees five days a week and (12) part-time employees two days a week. • HOURS OF OPERATION: The current hours of operation of the gas station and snack shop . are: 24 hrs. / day, 7 days a week, 365 days per year and will remain the same. • FUEL DELEIVARY: The fuel delivery truck will make deliveries 7 times / week. There will be truck deliveries to the Food Mart 1 time / week. • SITE LIGHTING: The exterior lighting levels will be enough to ensure the safety of the facility, but to not provide glare or excessive light spillage onto adjacent properties or the public right- of-Way. Exterior lighting is LED fixture, down-lit and fully shielded to avoid potential glare toward the street and adjacent properties. Please don't hesitate to call, if you have any questions. I can be reached at (925) 287-1174 x1. Sincerely, Architect, President M I Architects, Inc. S:\1-Projects\16-5076 1833 4th Stret, San Rafael\Ooc's\Written Statement-revised 02.doc