Loading...
HomeMy WebLinkAboutDRB 2019-11-19 Minutes In the Council Chambers of the City of San Rafael, November 19, 2019 Regular Meeting San Rafael Design Review Board Minutes For a complete video of this meeting, go to http://www.cityofsanrafael.org/meetings. CALL TO ORDER Present: Stewart Summers Don Blayney, Alternate Jeff Kent Samina Saude Absent: Sarah Rege Larry Paul Also Present: Steve Stafford, Senior Planner Alicia Giudice, Senior Planner STAFF COMMUNICATION BOARD COMMUNICATION CONSENT CALENDAR 1. Minutes 10/22/19 Jeff Kent moved and Don Blayney, Alternate seconded to approve Minutes as presented. The vote is as follows: AYES: Stewart Summers, Don Blayney, Alternate, Jeff Kent NOES: None ABSTAIN: Samina Saude ABSENT: Sarah Rege, Larry Paul OLD BUSINESS NEW BUSINESS 2. 52-54 Fremont – Request for a Lot Line Adjustment for property line adjustment and Exception and Environmental and Design Review for a new 3,531 square-foot, single- family residence on the newly created vacant lot and reversion of portions of existing hardscape on the developed lot to natural state; APN: 012-043-11 and -12; Single-family Residential – Hillside Overlay (R10-H) Zoning District; CKD Enterprises, applicant/ Private Money Management Group LLC-Orange Beacon Mkt., owners; File No(s).: LLA18- 005/ED18-066/EX19-010. Project Planner: Alicia Giudice Staff Report Jeff Kent moved and Don Blayney, Alternate seconded to Continue item to date uncertain. The Board made the following consensus comments: • General design (architecture, colors and materials) is appropriate • The visual scale of the retaining walls along frontage should be reduced by breaking the single wall plane into a series of smaller wall planes which step back, add treatment to either clad or color in an earthtone/woodtone, and add landscaping at the base of the retaining walls and/or above. • Landscaping should be all native species with an irregular, more natural planting configuration. • Replace the proposed California Buckeye tree species with a more appropriate alternative. • Replace proposed 5-gallon tree sizes with larger container size trees. • Incorporate greater stepback along the frontage; the applicant is encouraged to explore pursuing a front setback waiver to help achieve greater stepback. • The applicant is encouraged to investigate and respect the historic drainage pattern on the sites and the potential presence of an underground spring on the sites. • The Board has difficulty supporting the findings for the proposed Exceptions to both Natural State and Gross Building Square Footage; the applicant is encouraged to reduce the size of the project and/or the configuration of the LLA to eliminate the required Exceptions. ADJOURNMENT ___________________________________ ANNE DERRICK, Administrative Assistant III APPROVED THIS _____DAY OF_______, 2019 _____________________________________ Stewart Summers, Chair