HomeMy WebLinkAboutDRB 2015-05-19 #2Meeting Date: May 19, 5 '-Case Numbers: ZC14-002/ED14-097/UP14-052
Project Planner: Kennings (415) 11
Community Development Department -Planning Division
REPO TO DESIGN REVIEW BOARD
SUBJECT: 755 Lindaro Street (San Rafael Corporate Center New Office Building and Phase II
Parking Structure expansion) -Request for Design of a 54~foot tall, fou
building on the western surface lot and a story expansion of the
approved Uncoln parking structure of the Rafael Corporate Center: APN: 013-01
39; Development (PD1 ) Zone; David McAdams, Applicant; BioMarin, Owner;
Downtown Activity Center neighborhood area.
PROPERTY FACTS
Location
Project Site:
North.
South.
East
West
Height
Allowed' 54
Parking
Required:
Proposed:
54
General Plan
Undaro Office
Secondffhird Mixed Use
Albert's Field
Rafael Corporate
Llndaro Office
Landscape Area
Required: Per DP
Proposed: Per DP
Grading
Total.
Cut
FlU:
Off-Haul:
SUMMARY
Not provided at this time
tbd
tbd
tbd
Zoning Designation
PD(1901)
2/3 MUE
GC-WO
GC-WO/GC
PD(1901)
Lot Coverage (Max.)
ExIsting Land-Use
Surface parking lot
Paint storesl AutomotivelOffice
Mahon
Mahon
San Rafael Corporate Center
Standard: Per Development Plan (DP)
Proposed: Per DP
Gross Building/Floor Area
Allowed: Per DP
Proposed: Per DP
Upper Floor Area (Non-hillside residential)
Allowed: n/e
Proposed: nla
Setbacks
Ext. side.'
Ped. side
Bldg. sep:
Rear:
Per DP
Per DP
n/a
nla
nla
Per DP
nla
n/a
nla
n/a
n/a
tbd
tbd
tbd
tbd
tbd
subject project is being referred to the Board for review a four story office building and a story
parking addition (LPG2) the approved 788 Lincoln parking structure on Parcels 1 and 8 of
the Rafael Center as required pursuant to the San Municipal Zoning
14.25.050. The proposed project is not by the 1 San Corporate Center
master plan approvals for the A Conceptual n Review application was by
the ORB on September 14, 2014 and preliminary comments were provided on that The
applicant since modified the project on their program and City comments and submitted their
formal application.
The proposed office building and parking structure addition are generally consistent with the approved
master formal entitlements would review and approval by Design
Board, Planning Commission and City Council prior to a building permit in order to proceed.
Staff request that the Board make a formal motion vote to approve the project at The
Board's recommendations will be forwarded to Planning Commission. on the review of the
final plans applicable which are in has that
project adequately addresses applicable criteria. Specifically, staff asks the Board to
the following:
Plan
" Is the proposed office building consistent with other
" Is the proposed LPG2 addition located appropriately on
Architecture
.. Is the proposed office building appropriately designed for the subject properly
• Is the design concept for LPG2 consistent with the overall deSign the approved Lincoln
parking structure (LPG1) and it adequately break up mass the two structures
Materials and Colors
«I Are the proposed materials and colors consistent with the campus design
Landscaping
.. Is proposed landscaping plan for the office site enough satisfy landscape requirements for
the subject property.
.. Are the proposed landscape materials consistent with the greater SRCC campus design
BACKGROUND
Site Description & Setting:
building 1 the Corporate Center, of
approximately 2.66-acres and is bordered by the 775 Undaro Street parking structure and power
station to the north. Andersen Drive is south of the site and Albert's Park baseball field
is south across Andersen. San Rafae! Corporate Center campus is west of the project across
Lindaro Street site is relatively flat with a elevation of 10' NAVD 88.
IS currently developed with a surface parking lot that serves the San Rafael Corporate Center
as well as public events, most notably parking the Rafael Pacific's team. The existing
development of Rafael Corporate Center is directly west of the existing surface parking lot.
Parcel 3, 781 Lincoln is currently with a office building. 7, 791
Lincoln Avenue, will be the site of the Building E as proposed under the current master
development Vehicular access to the lot is from Lincoln Avenue near the Mahon
Creek bridge.
The parking structure site, Parcel 8, is currently developed with a parking lot that serves
the Corporate Center. This is location of recently approved 788 Lincoln parking
structure ) which will cover approxim 60% the northern portion of the project site. The
development of the Rafael. Corporate is directly of existing surface parking
lot. Parcel 781 Lincoln Avenue is currently developed with a three-story office building. Parcel 7.
791 Lincoln Avenue, be site of the Building E as proposed under the current SRCC master
2
plan.
the Mahon Creek
access to the parking lot an 8 is provided from Lincoln Avenue near
History:
In February 1 the San Rafael City Council a Development (PD-1) and
approved Resolution #10025 for Environmental Design Review permit, Tentative Map and Use
Permit 10) for 406,000 square foot Issac Park Development on 15+ acres of
located south of and fronting Lindaro and Lincoln Avenues. complex was designed
to hold 1,300 employees at build-out. project I as modified by conditions of approval, was
with all architectural and and
Zoning Ordinance. The originally approved project included development in two
site and installation on the western
and the construction of Building A, Building surface parking on the western parcel,
and landscaping. Total for I was spaces which equated 3 per 1000
square feet of office building area.
II of project included the of the San Corporation Yard from the eastern
parcel, build out of Buildings C, D, E and the construction a 414 parking structure on
western and a 478 parking structure on eastern To the project has
out 31 160 feet of office and 693 parking spaces. This includes the spaces in
the structure at 775 Lindaro Recently, the Applicant received approval for the remaining
building, and Parcel 8 parking structure to complete Phase II the original Master Use
.As approved and proposed, the Rafael Corporate will include the following buildings and
parking
A
Building B
Building C
Building D
Building E"
Proposed
Office
Parking
Bui A and C
Building Band E
Square
square
,039 square
83,360 square feet
71,919 square feet
86,540 square
72,396 square
4, structure
Western parcel
788 Lincoln"
LPG2 -788 Lincoln addition
788
" Building E and 7888 are currently
Height
76 (tower structure)
feet
feet, 11 inches
73 feet, 11 inches
48 feet
construction
Required
290
235
275
264
1,586
24
13
390
1
271
41
As shown in the above summary. the
The applicant. as part of the proposed
spaces will be less than the 1,586 spaces at a 3.311 000 ratio.
s minor modification.
The original SRCC application was reviewed by the n Review Board on October 21, 1997.
voted to support approval of the project in concept in 2000 amendments were made to the
original Master Use Permit (UP97 -10) zoning district development in to
accommodate mUlti-tenant use of the office park and to m public use requirements. The
3
Use Permit UP97 -10 (UP97-1 Ob) was mod again in 2011 to allow med and
development use (U 1-033). The principle amendment to the Use Permit was an allowance for
up 68,068 square of medical office out of approved 401,000 square feet of the office
park. This included a modification for office use, from
1,000 feet of building area to the currently 3.3 space 1,000 gross
of building area. The final the eastern parcel parking by the DRB
on July 8,2014.
At this time, the Applicant is submitting the proposed project to complete the total build-out of the site
on last developable parcel, 1 (western As a requirement for Building E, and the
proposed R&D building on 1, the project includes a proposed addition of parking
structure 788 Lincoln to accommodate the parking demand for the entire project.
On 16,2014 the Board provided Conceptual Review In
was pleased with the proposed in of mass but had a few
questions to siting and program for the overall project. The applicant's response to these
questions is detailed below.
On November 3, 2014, applications for development of the new office building parking
were
DESCRIPTION
following is a description on project plans (Exhibit 2).
In early 2014 final approval was granted for a fifth bUilding (Building E, also referred to as NLB1) on the
parcel for a parking structure (Lincoln Parking Phase 1 or LPG1) on the
two projects are in progress and are anticipated to be in 2015. BioMarln is the
owner and the largest of C campus
BioMarin to ultimately occupy the campus.
BloMarin, a global biopharmaceutical company headquartered in Rafael, is proposing to develop a
new office building on 1 of the San Corporate Center (SRCC) campus.
currently developed as surface parking, is located to the west of Lindaro Street and to the
existing Parking at Undaro. support the parking requirements for proposed new
office building a 2 addition is to approved Parking (LPG1) on
Parcel 8 of the at 788 Lincoln Avenue. .
15.54 acre campus is bounded to the north by 2nd to the south west by
Anderson Drive; and the south and by Mahon Creek Rafael Creek). overall
development is divided into three main parcels (west, and east) by Street to
and Lincoln Avenue to the The existing campus consists of four office buildings (A, in
the center parcel, a parking garage (Lindaro and surface on west and
su parking on the parcel.
This proposed new project square foot office building on Parcel 1 and a
second addition (LPG2) to the approved 8 parking (LPG 1) with approximately
271 structured stalls and approximately 41 surface stalls. proposed building & parking structure
and site developments would be to be compatible with architectural
of campus and in compliance with the established design, planning development
of the City of Rafael. is designed to meet CalGreen Mandatory measures plus
Tier 1 Voluntary measures in accordance with San Rafael standards for ity and efficiency,
and will be to minimize impact to the site and surrounding areas.
4
Office Building
Use: A four story office building (755 Lindaro) and surface level parking on the
parcel, The use includes total parking spaces to remain on the subject
portion of the
(Parcel 1),
Plan: of bui Iding is responsive to is ped by its site
existing SRCC campus i Parcel 1 is overlain with a variety of
related both to PG&E's access to the sUbstation to PG&Es access to and
monitoring facilities pertaining to the 1998 remediation of the site. The extraction trenches and
monitoring facilities are required to be at the ground level and thus footprint
the building. Furthermore, building footprint has reduced from the previously reviewed project
to avoid a access that the has also been taken to maintain
(50' minimum) between the building and the overhead distribution lines exiting the
substation. The proposed design maintains existing intersection and crosswalk at the
entry to the campus as I as access to the Lindaro Parking parcel 1
Architecture: The of the building SRCC buildings via use corner
and entry tower elements, mansard roof forms, and punched window openings. The design intent is to
closely match color palette and detailing of the existing buildings create consistency on the
campus.
755 Lindaro is located within Office District and a mandated
building height 54 for the primary structure as measured by 1997 UBC standards. Additional
features including roofs, mechanical enclosures and towers are designed to
extend above the height limit. The proposed design is consistent with the height limits as the main
portion of the building is 54' to the roof deck. The design includes mansard consistent in
size, shape and material with the character of the campus. The design also includes roof top
mechanical equipment in tower structures which approximately 13 above 54'
limit. Rooftop equipment to City of San
office building is constructed with a structural frame, utilizing W
section columns and beams. The primary farce resisting system will be SMRF (Steel
Moment Resisting or BRBF (Buckling Restrained Braced Frame). Iding is desig to a
voluntary increased seismic importance factor of 1.50. Roof elevated will filion
deck, and designed for 150 live loads. Elevated floor vibration properties are anticipated
limited to 8,000 MIPs over about 90% of lab areas. The ground floor would be a
slab, approximately 1 thick and the building would supported on Auger Grouted Displacement
Piles with perimeter grade and caps. The AGDP's would be to mitigate soil spoils
and haul, loud and vibrations during installalion. The exterior fa~ade would be supported by
light gauge metal will include recycled materials and greater than 3,000
concrete to provide sustainability enhancements and meet CALGREEN recommendations. Major
equipment at the exposed rooftops would be supported on concrete housekeeping
and enclosed within roof screens.
Landscaping: The office building landscape plan is consistent with the existing landscaping
util site features, paving, stone mulches plantings to provide a cohesive continuity with the
previous plant will consist trees, shrubs, ground covers,
grasses perennials that conform to Marin Municipal Water District requirements, the California
water (WELO) and new Marin County storm water pollution prevention
practices.
The plants would selected for low water use and law maintenance would be i with an
emitter type spot application system. The plantings in bioretention areas would selected for
ability to handle seasonal inundation and for compatibility with the draining bioretention
areas would be irrigated by low precipitation stream spray rotors. tree palette
5
would be a continuation of street and trees in the previous phases of the campus
development with deep root watering irrigation elements.
Lighting: No lighting has been proposed at this time but final submittal will include
to current
GradlnglDrainage: The 755 Lindaro site is currently developed as a surface parking lot. The
Lindaro would designed to storm water runoff consistent with CalGreen and Marin
County there will be no to the runoff
hardscape is assumed not to increase). and pretreatment will be included prior discharge to the
public drainage system (e.g. bioswales). utilities will connect existing mains within Lindaro
Street.
Contaminated soil and groundwater are present beneath Central and Western parcels (the latter of
which includes proposed 755 Lindaro site on Parcel 1) in association with historical Manufactured
Plant (MGP) support activities on the properties. conducted in
the 1980s found that soil and groundwater onsite contain polynuclear aromatic hydrocarbons (PNAs)
and, to a extent, volatile organic compounds (VOCs). On February 1998, in association with
City of Rafael entitled redevelopment , the Department of Toxic Substance Control
(DTSC) approved a Soil Management Work Plan ("SWMP"), which addressed and groundwater
management with construction. A Soil Management Work Plan Addendum
("SWMP Addendum"), with slightly modified procedures for construction and the Western Parking
Structure, was approved by in 2008. In 2014, continued concurrence with
procedures established in the 2008 SWMP Addendum construction of Building NLB1.
Similarly, SWMP Addendum will for managing contaminants construction of
755 on Parcel 1 .
Lindaro building will require removal of approximately 74 surface
parking spaces on 1 spaces will remain on the subject however, the proposed project
an addition to the recently approved structure that constructed on east
parcel at 788 Lincoln Avenue below). The Applicant intends to provide parking that or
the 3. 000 (3,3 to 1,000 occupied space) for the
campus. Due to site constraints, easements and setbacks from the creek bed and slurry wall,
proposed design includes 1 campus wide stalls 1,586 stalls required by proposed
building area. The applicant is requesting a minor parking of 6 stalls which would essentially
yield a parking ratio 3.3/1000.
Lincoln Avenue Parking Structure Addition: LPG Phase II
A six parking structure addition surface parking on the portion of the
development footprint. The proposed use includes 312 total parking spaces (surface, ground floor
levels).
Architecture: architectural style the Lincoln Parking 2 (LPG2) is designed to fit
the context of existing SRCC and Phase 1 portion of parking
flat and will allow the architectural features to follow the rectilinear shapes
buildings. are no new, or in proposed addition;
circulation will be shared with Phase 1 portion of the garage. The overall height building will
remain below the height limit by providing all required ADA on grou which will be
set one foot below the datum elevation. The garage is proposed to be on a pad of
approximately 15)000 feet.
Structural': The is to be a hybrid /"'n'''f''rOTC structure with columns and
beams, slabs. The lateral system is shear walls with boundary
6
foundations would consist of grouted displacement piles (AGDP's) with caps
to the and on AGDPs would likely selected to mitigate
soil and off haul, loud and vibrations during installation. The use of cast in concrete
and will structural strength, durability will required
maintenance. The main structural elements finished with materials colors to complement the
campus buildings.
Landscape: The landscape design will continue existing campus treatments site
features, paving, stone and plantings to provide continuity with the previous campus
The plant palette will consist of trees, ground covers, and
conform to Marin Water District requirements, the California water efficient
landscape ordinance (WELO) and new Marin County storm water pollution prevention practices. Plants
will be for low water use low maintenance will with an emitter spot
application system. The plantings in the bioretention areas will be selected for ability to handle
seasonal inundation and the draining bioretention soils. areas will be irrigated by overhead,
low precipitation stream rotors. tree palette be a continuation of street shade
in previous of the campus development with deep watering irrigation elements.
GradinglDrainage: Storm water management for LPG2 will be consistent with CalGreen and Marin
ndards there will no net increase to current runoff rates (overall hardscape is
assumed not to increase). Storm water treatment for portion of the project will either consist of a
bioswale only the southern portion of the site, or the runoff will be routed to the north where it
will be treated by way of a mechanical treatment vault serving the entire for the 2
Garage will connect to existing within Lincoln Street.
Soil management: area LPG2 addition on Parcel 8 is currently as surface
parking. Contamination by petroleum hydrocarbons motor oils), metals, methane
have been found in and groundwater beneath the property. remedial measures were
overseen approved by the San Francisco Water Quality Control Board in 2009 2010.
some residual contamination potentially remains in subsurface and because site
redevelopment with a parking was anticipated, a SOil Management Plan ("SMP") was developed
in 2009 and approved by the RWQCB in o. The SMP describes soil groundwater handling
procedures and methane mitigation measures to used during development and construction. This
plan was developed to consistent with procedures in the 2008 SWMP Addendum the Central and
Western In the RWQCB confirmed its continued concurrence with the procedures
in the SMP for of the 8
REVISIONS TO PROJECT SINCE PTUAL REVIEW
This current submittal is consistent with previous submittals in and One major change is
that this no longer includes elevated pedestrian bridges linking buildings within the
The most notable in the project is the primary use Lindaro Street
building. In the previous submittal, this building had a wider footprint that covered more of the
surface parking lot. to concerns by regarding continued access over
lot, the applicant pared down the overall footprint to avoid any potential conflicts with use
and access requirements. the applicant that additional laboratory space
is not needed the SRCC campus location. Therefore, the design is comprised of a four
office building instead of a three laboratory building due to the fact that office heights are
lower than those required for lab The current proposal adheres all the development
standards height and is not than the previously proposed lab building.
The proposal for the 788 Lincoln Parking rage II has not changes the previous submittal
provides required parking for the entire campus on six in the structure and
adjacent parking.
7
ANALYSIS
Staff has reviewed project and offers some preliminary feedback
proposed design is evaluated in the report, followed a general consistency
with the Plan Zoning Ordinance and Design
The applicant, BioMarin is the owner of San Rafael Corporate Campus and intends to
the undeveloped to on site space program capabilities.
constructed buildings on are mainly office buildings, but completion of the
would the all laboratory nctionality requirements BioMarin. thi~
final building will provide the needed space total build out of the pus. The project site, as
above, was once used by the historical Manufactured Gas Plant (MGP) for
As a result. there are and groundwater onsite conditions containing polynuclear aromatic
hydrocarbons (PNAs) and volatile organic compounds (VOCs), As a result, the property
in with the has by PG&E through their
Because the property several easements and encumbrances related to access. design of the
755 Lindaro building a specific configuration to accommodate the easements
allowing PG&E continued monitoring and management of the easements. includes the driveway
access through ground floor of the building gap between the south tower and the
building on the corner. The applicant has that has granted permission to
configure building as proposed. proposed building although unorthodox atypical to
other campus buildings, is in bulk mass eXisting buildings and
replicates the asymmetrical footprints for all SRCC buildings, Although the proposed building
design elements to other SRCC buildings, requests that the Board comment on
following:
e Is proposed
.. Is the proposed
Undaro building consistent with other SRCC campus building placement
Lindaro building appropriately for the subject property
resulting uare footage from the proposed 755 Lindaro building will require additional
on-site parking as req by the City and the Phase I! build-out of the Rafael Corporate
Center. Furthermore. construction of proposed R&D removal of
approximately 120 parking on 1 of the The applicant would
provide the required parking by constructing an additional 1 square feet parking structure
to the portion of LPG1, eastern parking (approved but not
constructed) on Parcel 8 of the SRCC. proposed parking structure expansion of stalls on
and surface on Parcel 8 appears to be a good solution to the required parking
problem for SRCC campus.
The proposed exterior of the parking structure elements as
the approved (but not constructed) parking structure at design elements are
intended to up the including use of colors on portions of
structure. renderings in conceptual plan set fac;:ade treatments or
but the intends structure to consistent the design composition of
Rafael Center complex. The top level of the parking structure does not currently
covered areas to shade vehicles or possibility of hosting solar panels but include
similar design elements like trellises and light standards on the perimeter the roof The Zonlng
Ordinance a requirement for shade in parking lots. including on top parking
structures, ual to one tree for every four spaces. proposed landscaping plan includes
8
for the surface parking areas. Staff finds that
is logical would have the least
that the on the
the design
parking (LPG1).
overall design of Lincoln
• the addition to parking structure provide separate and breaking up of the
mass.
• Is the proposed addition located appropriately on the sits.
General Plan 2020 Consistency:
site is designated as Office" on the mixed-use
campus with development as well as office is an use within this
In terms of height and intensity allowed by the General area, the
Office land use and this site allows floor area and 54 ft
height limit. As proposed, would result and within the 54 height limit. Overall,
recommends that the design approach to to not conflict with any of these
~~,_~~ on the definition FAR, parking structures not count as FAR
Zoning Ordinance Consistency:
is designated as a Development PD 1921. In general, the proposed
with the PO standards in that it continues the use on the project and
480,700 square and the 15,000
structure proposed on is under the maximum
approved for the site, and would below the 0.75 maximum allowed FAR for the property new
building would not height limit. Since
plan approved for does not include this project, the nrnl"'>I~r
to update plan. Similarly, structure
height limit. A copy the PD is attached (Exhibit
The proposed design is also in the report with an on the applicant's to
the comments provided on the Conceptual Review at its September 16, 2014 meeting. The
of responses to review comments would outstanding
Specifically, addressing site considerations with regards to of the two buildings and
",rt'l'UOI"1 pedestrian access Lindaro,
configuration.
the mass, use of the
are intended to composition of the S
facade treatments parking structure wood-
steel trellises to roof. It was noted in the concept review
for 1 project that the Ordinance has a for shade trees in parking
including on top levels of parking structures, equal to one for every four spaces. It was
top level included a structure for solar (not included in this submittal),
noted
Board
comments supported a shade cover to tree planting on the structure.
9
Board were in the size, materials utilized in the
conceptual design were appropriate for the two proposed structures. Overall, staff recommends the
proposed design height is appropriate it would maintain and bulk of the and
would complete the intended design and development along Andersen. Lindaro and Lincoln ,rr"""TC
Response Conceptual Review Comments
The applicant has evaluated the comments made by the 0 the conceptual review and applied
them the current submittal. pedestrian bridges been removed, this component of the
project was not addressed. Chair Lentini that applicant the location of the proposed
in relation to the entire The has not configuration in the
new proposal, but has a response as part of their presentation. board members were
tower the 755 building with regards to pedestrian access.
applicant has addressed this comment by featuring a more visible street frontage for the pedestrian
entrance and desig a more receded vehicular access point Vehicular ingress and
red from lanes two lanes to visual Many comments by the
centered on the proposed parking and overall long range traffic patterns, circulation and
ity downtown near the SReC. not included any n
to specifIcally address comments, but will continue to allow for public parking on the
west lot in accordance with previous conditions of approval. The applicant was limited
in their ability to provide additional park or pathway connections through the site, but updated the
landscape plan to respond to comments by ORB about appropriate planting selections and internal
pathway designs.
San Rafael Design
The San Rafael DeSign (City Council Resolution No. 11667; November 15, 2004)
design all residential development. Overall, staff
with the proposed and compliance with non-residential design
9 proposed structures are consistent with San Design Guidelines non-
residential structures. In reference to comments by the Board during conceptual review, care was
taken to a prominent pedestrian entrance to 755 Lindaro, Similarly, the applicant explored
several combinations of and parking the various and determined that,
pursuant to the non-residential development guidelines, proposed configuration addressed
project relationships, form continuity. design, color materials the site~
Review by City Staff for Technical and Code Compliance:
In addition the prior review, the applicant has submitted to the City to for
review by various Department on preliminary compliance with technical code issues. Fire
and Engineering be reviewing ci and exiting requirements
from the parking structure and accessibility fire eqUipment to all portions of the Public Works is
reviewing and to the parking lot/structure as well as compliance with FEMA flood control
elevation requirements. Building Division is reviewing the preliminary compl with building codes as
they to the structure access requirements. At this point in review of the
project, there are no technical anticipated that would the as
NEIGHBORHOOD CORRESPONDENCE
Notice hearing was posted on and to the su property owners
within as as the Park Neighborhood Association, Harte HOA, Federation of
San Neighborhoods, Montecito Area Association the SR Hill/Lincoln Association 15 days
prior to this Review meeting. of the reproduction of this staff report, comments
received on this application from the Park Neighborhood Association and Sustainable San
Rafael. letters are attached as Exhibit 4.
10
Gerstle Neighborhood Association have a comments to the design
including, why does BioMarin need blocky building that will alter the sight lines from the Lofts,
There was a question about the archway entrance to the west rking lot, from
is the perception that blic is no welcome to here in
comment
With native
extended
also that the area west of parking structure extension landscaped
Oe(;le8 since it borders Mahon Creek and a public access path through the campus
Mahon where parking lot is under construction with a porous in case
of flooding,
GPNA also requested that a portion of the parking structure expansion set aside for public
parking for SMART commuters, Finally. is concern that City Council Resolution #1 (Master
Use Permits UP97-1 0 and UP97-1 Db), guarantees public meeting access to SR Corporate Center,
along with parking might Jeopardized,
Sustainable San did not specifically comment on the elements of the project but
monu:,,.., on include impacts in the area, consolidating parking
demand, supporting workforce housing, providing adequate visitor parking and completing the Mahon
Creek
CONCLUSION
that the project design is with overall n aesthetic of
The and configu of the initial component of the proposed
the parking structure addition are with the overall appearance and
Center. Proposed landscaping for new additions is also
plan for SRCC.
Staff requests that the review the final design. make a motion and
prov1de recommendation to the Comm on the n of proposed new
building and parking structure expansion. Following ORB recommendation, this project will to
preparation of a staff environmental analysis presentation to the Planning
Commission.
Furthermore, the Board, in fulfilling its providing professional advice to the may have
additional concerns, information and may provide any additional recommendations it
appropriate for this Review application.
EXHIBITS
1.
2.
3.
4,
Development Zoning
Letters
(PD1901) Standards
Hard copies of the plan sets have been provided to the members only.
cc: DaVid McAdams
Architects
201 Filbert
San
of Rafael Neighborhoods
PO Box 151485
San Rafae~, CA 94915-1485
11
BioMarin Pharmaceutical
Jim Redenbarger
105 Digital Drive
CA 94949
Montecito Area Residents' Association
PO Box 150266
San Rafael, CA 94915
Sustainable San
Bill Carney
166 Greenwood
San Rafael, CA 94901
N e ig h bo rhood ".;:),;>U'U'ICI
150644
CA 94915
12
Vicinity Map -755 Lindaro & 788 Lincoln (Phase 2 Parking Garage)
o Sites
SCALE 1 : 4,786
jeiOOi E"'\
200 0 200 400
FEET
N
600
Thursday, May 14,20152:07 PM
Q{\.{C! t! \, ( LX POCC;, ,,"c,
(ev\~
Rc> \' \ 0..( t" S
._~ ___ u __ ~.~
ORDINANCE NO,
AN ORDINANCE OF THE CITY OF SAN RAFAEL AMENDlNG THE PLANNED
DEVELOPMENT DISTRICT ADOPTED FOR THE SAN RAFAEL
CORPORATE CENTER (750-'190 LINDARO STREET AND '181-791 LINCOLN
A VENUE) TO EXPAND THE ALLOWABLE LAND USES TO INCLUDE MEDICAL
OFFICE AND RESEARCH AND DEVELOPMENT LAND
ZCll·002
(APN 013-012-38 & 29; 013-021-41, 50, 51, 52. 54 & 55)
in 1998, the San Rafael City Council adopted a Planned
Development District (PD-In!) approving a Master Plan for the development of a 406,000
square foot office on a 15,54-3cre located south Second in Downtown San
Rafael. The PD-Inl District zoning and standards for development of the
with buildings (totaling 406,000 square feet), two parking structures, sUiface
parking, campus landscaping and publicly-accessible area Mahon Creek. The zoning
I im its land use of the office 10 administrative and general office use only; and
WHEREAS, in August 2000, San Rafael City Council adopted an amendment to the
Planned Development (PD-In!) District to approve in the development
standards in oreler Lo accommodate multi-tenant use of the office (San Rafael
Cen1er). TI.e amended Planned Development District 1754) is and
WHEREAS, since 2000, much 0' the San Rafael Center office park campus
has been developed and Jargely occupied administrative and professional office businesses.
To four of the five office and one parking structure have been
along with surface campus landscaping and the park area, When the
remaining of the office is developed office and one parking
structure), the San Rafael Center will be built-out at 40 l,OOO square feet; and
WHEREAS, on May 17, 2011, plann ing applications were filed by the San Rafael
Center Phase I LLC, owner, an amendment to the Planned
(PD-1754) zoning to expand the allowed land uses for the office to
include medical use and research and development use defined as
):;-Medical use is defined as medical office, clinic or
(daytime, for patients/visitors). A total of 68,068 square feet of medical
lise is proposed as an allowance, that of the 40 1,000 square feet of office
area approved for and adm office use, up to 68,068
square feci could be IIsed for medical Hse. The modification proposes that the medical
use allowance be generally applied to the park and that it not be approved any
one building or concentrated in anyone area the park site.
» Research and use is as a use
medical or technological research with limited testing and
production. This use excludes full industrial-type manufacturing and
generally operates similar to and characteristic of low-intensity, general office usc.
Med ieal laboratories established for research (as opposed to labs providing
services for patients/visitors) would be considered a research and development use.
\ 5~
WHEREAS, the proposed amendment to the PD-17S4 District includes a to
modify the office parking requirements jncluded in the Master Pian (Exhibit A). The request
proposes a parking reduction to the City's parking requirements for medical use. While the San
Rafael Municipal Code requires a parking standard for medical use (4.4 parking spaces per
1 gross square feet building than the standard established and adopted the Master
Plan (3.3 parking spaces per 1,000 gross squar,e feet for multi-tenant administrative and
office usc), the proposes to maintain the currently adopted standard in the Master
Plan. The would result in a maximum, potentia! parking reduction for the office of
and
AXJ:,J.'U""",,.::>. on October 2011, the Planning held a duly lloticed public
hearing to review and consider the proposed amendment to the San Rafael Corporate Center
Planned Development (PD-1754) District 11-002). On a 5-0 vote (Commissioners and
Pick the Planning Commis.sion Resolution No. 11-J3 recommending to the City
Council the adoption of the amendment to PD-l and
WHEREAS, on December 5, 20 II, the Council held a noticed public hearing
to review the proposed amendment to the San Rafael Corporate Center Planned Development
District and considered all oral and written public testimony and the writlen repOli of the
Community Development Department; and
WHEREAS, by resolution, the Council recommended to the City
of a Negative Declaration 11-002), which adequately addresses the
potential impacts proposed amendment to the PD-1754 District; and
WHEREAS, the custodian of documents which constitute the record of proceedings
upon which this decision is is the Community Development Department.
NOW. THEREFORE, BE IT RESOLVED. that the Council adopts an
1754) District based amendment to the San Corporate Center Planned Development
on the following and to the amended Plan Use and
Standards
1. The amendment to the San Rafael Center PD-1754 District and Rrr"mT'!1',V
Master Plan (Exhibit to the allowable uses to include medical and research and
development uses would be consistent with the applicable goals and policies of the San
Ra fael General Plan 2020,
3. As proposed, the medical and research and development land uses are consistent with
Land Use Element Policies LU-23 (Land Use Map and Categories), LU-I 0 (Planned
Development), LU-9 (Intensity of Nonresidential Developmelll), LU-14 Use
Compatibility) In that these uses would be: allowable under the adopted Lindaro
Office land use designation; compatible with the current land uses aJlowed under the
PO-1754 District adopted for tbls and compatible with existing land uses found
in the sun-ound ing area.
b. As proposed, the and research and development land uses would
cons istent and not in con fiicl with Circulation Element Policies C-S of
Standards) C-7 (Circulation Improvements Funding) and C-12
(Transportation Demand Management) in that: the increase in traffic estimated for
these uses would not impact or change level of service conditions at local
nor wourd they warrant new improvements; the medica!
use component be subject to the adopted citywide traffic m iligation fees which
would be used to rund long-term transportation and the project wau Id
not change the current City requirement and obligation of the office park owner to
implement transportation demand measures such as encouraging tenants, through
incentives to carpool and use public transIt.
c. As proposed, the medical and research and land uses would be
consistent with Element Policies NH-IS (Downtown Vision), NH-16
(Economic NH-38 (Lindam and NH-ll (Parking) in it
would; additional and future economic success ill the
Downtown area; promote build-out of the San Rafael Corporate Center by
allowing a land use thal is appropriate and marketable; allow compatible land uses
thaI would fill ClII'rent and long-term projected vacancies in and
administrative office space; and promote a reasonable reduction in
supported by the proxim ity to Downtown, the Transit
planned SMART rail stations,
d. As the medical and research and development land uses would be
consistent with newly-adopted Sustainability Element Policies SU-J (Land and
SU-2 (Promote Alternative TrnnSpOliation), and the adopted Change Action
Plan in that: the uses are proposed within an existing and approved development
office park that is close to public tmnsit and Downtown; the project proposes a
reduction in the amount of required parking for the medical lise component,
thermal and shflfed parking; and the additional mix in I(!nd tlses would
facilitate the implementation transportation demand measures such as encouraging
tenants, through incentives to and use public transit.
e. The approval of medical and research and development land uses would be consistent
with QUr Vision of Downtown San in that it would further promote new
businesses and employment in the Downtown area. .
2. The proposed addition of and and development llses would not be
detrimelltal to the health, or general welfare of the residents or community ill that:
i:l. These lIses would be compatible with the currently approved and
administrative and office use, Medical and research and development uses
are commonly m within office complexes that are by administrative
and office use.
b. These uses would be consistent and not in conflict with the deed restriction ,·p.('(W(;;>ri
for the San Rafael Corporate Center, which permits commercial and office land uses
but prohibits lise and with residential and care land uses.
c. The addition of these land uses would not in any physical changes or additions
to the currently approved and developed San Rl'IJael COlvorate Center
The Corporate is adequately by local facilities and utilities,
d. The scope and definition of the me.dical and research and development land uses
would not allow industrial development, heavy production or laboratory
that would be more appropriate for a site that is zoned for light industrial or industrial
land lise.
3. The reduction in parking for the medical use (68,068 square
autl10rizes use of Ihe general Hnd administrative office parkins standard currently adopted
in the San Rafael Corporate Center Master Plan spaces/l,OOO square feet), rather
than the parking standard established for medical use in the San Rafael Municipal
Code (4.4 spaces/I,OOO square feet). The initial approval of the San Rafael
Center found that this development has to address the
automobile, and pedestrian traffic systems, Consistent with SRMC Section
14.1S.040B. the City Traffic has studied parking needs for medical
office use at this localion finding that the lise of the currently adopted parking standard
for office park is reasonable, appropriate and adequate in that:
a. The cun'ently adopted standard of 3.3 parking spaces per 1,000 square of
building are~ is consistent with Ihe medical use standard studied and
recommended by the Institute or Transportation The ITE standards
are based on cftse studies of developed medical land uses, and are widely Llsed by
local agencies and licellsed traffic engineers.
b. The 5-6% reduction in the requirement is a nominal amoLJnt, which is far
below the typically re'luested and approved reduction for office nCIl,li-r."
(20% reduction is are when 8 site
is developed and occupied with a mix of land uses that have different peaks in
parking demand.
c. The approvals and agreements established for the Rafael Center
require that the parking lot on the western parcel be made available for public use
evening hours and on weekends. The reduction would not
with this in that the parking use for medical use !lrc during
weekdays.
d. The San Rafael Corporate Center is in immediate proximity to the Bettini Transit
Center (mass transil hub Marin County) and the planned SMART rail station.
The immediate access to mass transit reduces parking demand, which appropriately
supports lower standards.
NOW, THE CITY COUNCIL OF THE CITY OF SAN DOES
HEREBY ORDAIN AS FOLLOWS:
Ordinance No. 1754 (PD-1754 District) is amended to: a) medical use (a
68,068 research and development use; and b) establish a 3.3
space per 1,000 gross square-foot standard the San Rafael Corporate Center
Orne;;; Park as set forth in attached incorpOfated herein by rPTi'rp,nC'l"
If any subsection, sentence clause or of this ordinance amendment for any reason, held
to be invalid, such decision shall not affect the validity or the remail1ing portions of this added
ordinance
This Ordinance shall be published once, in full or in summmy form, at least five days before its
final passage, in a newspaper of circulation published and circulated in the or San
California, and shall be in full force and effect tliirty (30) days after its final passage. If
published in summary fonn, the ordinance shall simultaneously be posted in full in the City
Clerk's office, and the summary shall also be published with in fifteen (J5) days after the
adoption, together with the names of those Councilmembers for or same, in a
newspaper of general circulation published and circulated in the of San Rafael, Califomia.
Within fifteen (15) days after adoption, the City Clerk shall also post in the Office of the City
Clerk, a certified copy of the full text of this ordinance amendment along with the names of those
Councilmembers voting for or against the amendmenl.
ATTEST:
~ C-. !Secl}~
ESTHER C BEIRNE,
The foregoing Ordinance No. 1901 was read and introduced at a regular meeting of the City
Council of the City of San Rafael on the Slh day of Decem bel" 2011, and was ordered passed to
print by the following vote, to wit:
AYES: Councilmembers: Connolly, Heller, Levine, McCullough & Mayor Phillips
NOES: Couoci Imembers: None
ABSENT: Councilmembers: None
and will come up for adoption as an Ordinance of the City of San Rafael at a regular meeting of
the City Council to be held on the 19'" day of December 20 ll.
~a-J2.. c::.~~~ •
---'=----
ESTHER C. BEIRNE, City Clerk
ATTACHMENT:
Exhibit A-San Rafael Corporale Center Master Plan.
Exhibit 8-Legal Properly Description
2-5
1.
2.
3.
4.
EXHIBIT
Office Park) Master Plan is
the Enviromnental and
EXHIBIT A
DEVELOPMENT STANDARDS
The following standards shall to all development of the Center
(formerly Fair, Isaac
1 Maximum floor area
2. Building
3. Landscaping:
4. On-'site Parking:
5. Building coverage:
6. Development
7. Park Facility:
nC",,,\I,'" under the office
Environmental
granted by City
Pennit
and Design Review
building height bonus
which is addressed below.
=..::....::..-=--"="-'
Landscaping shall be
Development Plan approved
Envirorunental and ~~VL"'''L
24).
Minimwn of~llParking
square feet
two
park Use
Environmental and
and
(ED-97-
park development shall a
privately maintained park with public access
adjacent to Mahon Creek) as set forth in the
park use pennit (UP 97 I-BbUP1I-033).
EXHIBIT A
"B":
lighting shall be
park
Property Description
(APN 013-012-38 AND 39)
Reference: ~~~':'."'=!~~~
ill from F. M. Neely and Sara
Neely> his wife, to recorded Volume 11 of Official Records at
209, Mar:in 'County Records and being more particularly described as follows:
at intersection of the southerly boundary of the
with boundary line of the city street Imo'Wll as LJH .... ~''''
running thence along westerly boundary:
(1) 06°45'00" west thence
(2) south 08°53'00" west 405.54
the northerly boundary line Northwestern Pacific Railroad RJght of Way;
said northerly boundary fine
54°38'00" west 396.88
thence said northerly boundary
(4) north 06°38'05" east 238.95 feet;
(5) south east 241
to a for called Point" A"; thence
(6) north 06°38'05" east 27354 feet
to a point in the southerly boundary line Street, thence running along said
southerly boundary
(7) south '00" east 123.00 feet, more or
to point of beginning.
used are based on the Record StuVey filed for
Book
Reserving
Two.
L
2.
at 47, Marin COWlty Records.
""-A-h-nFn the following easements over across
The Gas Meter Easement";
The "Nonexclusive
Page
May 10, 1985 in
portions Parcel
3. Parcel WaIl
4, ('Area 5AExtraction Easement";
5 . 5B Trench Easement" ;
6. The Electric Facilities
which are more described as follows:
land hereinbefore
line of Undaro
south 08°53'00" west
said easterly bOlmdary
to the
parcel of hereinbefore
westerly
thence the nr\14rnp,<,
to the northwest corner along westerly
boundary said Gas
(6) 08°53 '~Ol' west 30.00
to
B-2
of said
Beginning at a point in general northerly boundary
Point "N' south 83°33'00" east 21 feet; leaving said
line
1 west 206.97 thence
tanJtellt curve to left with a radius of 100.00 feet and tangent at
tenninus thereof to the course, an arc distance of feet, more or less, to a point
southwesterly boundary line of said TWO.
\
Beginning at said Point" A" running thence along the general westerly boundary
said TWO
(1) north 06°38'05" east 273.54
to a point the northerly boundary line PARCEL also southerly
boundary line of said Second Street, thence along northerly boundary
(2) 83°33'00" east I feet; thence
said northerly boundary line
(3) south 05°41 west 457.82
(4) 84°18'25" west 16 more or less,
in the southerly prolongation westerly boundary of said PARCEL
. thence
(7) north 06°38' 05" east 184.60 feet, more or to point beginning.
width of 16 feet from the
on
at a point in the easterly boundary line of said ":u.'-'~.LJL< TWO, the
westerly boundary Lindaro from which
TWO bears south '00" west thence leaving said
corner of PARCEL
boundary
(1) north 80°40 1 14" west 135.97 feet
to a point within boundary lines of PARCEL TWO.
as
to a
portion of said TWO
at said
westerly boundary of
(1) south 06°38'05" west
(2) south 54°38' 00" east
in the easterly boundary
(APN
8.280 acre parcel ofland as
Book 20 of Surveys at
easements over and across
A. The "Central Parcel Slurry
B "Centnil
The «Central Parcel
westerly and
along the southerly
more or less,
PARCEL TWO.
the Record of Survey
County Records. Reserving f"", .. t>1,'f'\Yn
portions ofllie Parcel
Easement"; and
are more as follows:
of the
from the westerly boundary
ONE easterly
on each side
~~e>A"~','O at a point in the westerly PARCEL ONE, from a
<l"t,,,,.,.,n6.r! "LS 4545", herein for COIlVeltllelllCe called Point I<B", accepted as
tern:rinus of a course line of the 8.280 acre
upon said May 10,1985, which comse
as shown upon said map has a of S8°5T Wand n length
08°53'00" east 364.35 leaving said westerly boundary
to a
(1) south 76°44'52" east 70.89 thence
(2) south 84" IT 14" east
(3) south 79"'31 east 111
(4) south 76°52'26" 104.
(5) north east 1
(6) 31.
(7) north 46°27'46" east
(8) north 33"08'08" east 1
(9) north 19°37'58" east thence
(10) north 00°14'58" east 46.69 feet; thence
(11) north 10°10'31" 41 feet; f11ence
(12) north 06°57'47" 97.03 thence
(13) north 04°56'07" thence
(14) north 03°58'51" east
(15) north 09°00'19" east
(16) north 08°34'11" east 106.14
(17) north 07"26'47"
in the northerly
more or less,
PARCEL ONE.
A strip ofland
line of said
umtonn width of 16 feet extending easterly
lying 8 feet on each of
follows:
Beginning at a point in boundary line of said
bears north
the westerly
described as
HB" bears north 08°53'00" east
(l)-south 80°42'05" east
leaving said westerly line
(2) south 79°43'14" east
to a within the boundary
That portion of said PARCEL lying and southerly oftbe
line of the strip ofland described and designated Central
(APN 013-021-50)
certain property the City
as follows:
BEGINNTNG at a in the Southerly line
from point of intersection ofthe Southerly
Street; thence iunning Easterly along said
Southerly line Rafael Quentin Turnpike or
and along
Turnpike running South 14°59' West
EXCEPTING
Avenue.
have
BEGINNING at
Easterly
line
of beginning.
all that ,,(17'i1l""" thereof
bed of any
of Petaluma Avenue;
feet to ofbegi:nning.
Rafael, State of
djstant 496.5 Easterly
with the .b~>terJlY line of
140.1
within the of Lincoln
THEREFROM all that portion LLlJ •• ,j,>.JV.I.
City of a municipal corporation, to
corporation, recorded 1961 in
November 19, 1961 in Book 1 9 of
EXCEPTING all that thereof ~~"'VU'JV'" as foHows:
A STRIP OF LAND, feet in wid~
Southeasterly ofthat certain
a municipal corporation, to
recorded 1961 in B
19
THEREFROM
Avenue.
AND
have
sewer
ofland uniform width
COMMENCEMENT at a
of two courses bearing South
that entitled,
Southeasterly perpendicular to
tangent curve to the teft,
arc 191.37
. easement and
a from the
October IS, 1961
Paoe 8-7
Company, a
.n."'\~Ull'" at Page re-recorded
at Page 508, Marin County Records.
portion meree)r within of
above property which
elevation of ordinary high
as
feet, the ('PI"ITPrl of which is
as an arc
Company,
Marin Records.
as
,an
of
property situate
California, more particularly described as
Rafae!, County of Marin, of
COMMENCING at the intersection of the southerly
easterly of Lincoln Avenue, being located South 50°10'00" a
lead set in a concrete and as on tile ."".",,,"ViU. of Survey Map
May 1O~ in Book Surveys Page 47; Marin County Records;
140.70 to
thence the line of southwesterly line of
LLl1l .. ,;''''I.-U Boulevard, South 51 °37'29" to line 4) conveyed
l\.<J,Jla"",-Redevelopment deed recorded October 30, 1997* Document No.
thence
Beginning;
said westerly line South 11 °32'07" 95.76 to the True of
continuing along 11 °32'07" West 1 feet;
line of
along easterly on a curve to the whose radius
point North 60 0 08'08 H feet, of 0 1 °17'20", an arc length
of 1 0.64 feet;
thence leaving said easterly line on a curve to the left whose radius
point West} a distance of315.00 feet, a central of
50°24'27", an arc of277:13
thence North 12°06'01" 102.01
North 06°1 East 109.66 feet;
the westerly of tidal slough West 13.96 to
the
Said contaii:ts an area acres, more or less.
oMarin Devel t Application GPNA
. com> From: Amy r <alikove
Sent: Friday, May 01,
To: sean@lakassociates.
Cc: esther.beirne@ci
subject: BiOMarin
Ge e Park Nei
PO BOx 150644,
2:50 PM
rafael.orgi bod@gerstlepark.com
opment Appllcation, GPNA Feedback
on
-0644
.txt
http://cp. .com/d/FZsS83hJ5xB5xwQSIcFCXCSnphOMUed7a9J nphoMUed7b9JBNC
QSCZBWVEVdBox8zQz181z2k90GQFBGKQS4ttTP-OOcxi ohRTvfU02rvvtjjvvvw_cZXNEVSpowzowrb
xRXFCZB7BHEshjlLt7BgY-F61KlFJ4syrLorbSS4TTS PpjyfNFC_RJylvsTjZw2zzaxiBriSvQvsSM
MuesKrloQAq81wSygAaxMb6jhOcjRRQQgOLRGNCaTVd429EVd42buGx7npCkugHosMurodzCULXw
nings, The Community
n SRCC opment plan,
Depa rtment, ci
788
Rafael TO: Sean
Re: SioMa
park4ng
cc: Ge
rage phase II
e Park ghborhood AS on (GPNA) Board, Esther rne, Ci
you for in uding our ghborhood
input on s important proposal.
requires anned Development Re-zoning.
Below is a list of comments from GPNA members
1. There is much concern about another
ation in
tell me
culling of ci
this submi
r your consi on:
9 block building at BioMarin:
9," "why
does BioMa n
Lofts," "Our
another building?," "It will alter sight lines from the
erk
is sta ng to look 1i
moves out, the
an i park," " nesses fail, and if BioMarin
ty is stuck with another big
2. There is concern
uP97-10 and lOb),
Corporate center, along
structure."
use Permits
SR
on about the archway entrance to the west parking lot,
rson: "there is pe o.n that the publ i cis no
here in ngs"
4. There suggestion
extension r conside on be
borders Mahon Creek.
was the
extended a1
construction.
t of parking structure
with native spe es since it.
a public
the parking
ght work there in
the campus
ooding.
6. There e suggestion that a portion of the extended garage be
aside for ic parki . This is ext y important given the needs
SMART commuters.
7. One commentator indicated he
Yours truly,
Amy L i r
no objections.
page 1
May 1,2015
San Community
1400 Fifth Avenue
San Rafael, CA 94901
RE: BioMarin Lindaro Street Office and Lincoln Avenue Phase 2 Garage
Dear Planners,
According to its April 8 BioMarin is to exceed the established
of the Center campus by 6 square feet of offices and 182 cars
Although there may be economic benefits to this proposal, the City must: condilion any such
significant additional entitlements on measures that reduce the impact of the new development and
assure its positive contributlon to the surrounding area. These measures include:
<""""""",,,.,"'!:::>-'~"'-"'''''''''''''''''"'''--''.c=.= through a proactive employee transit program incentivizing
campus employees to arrive via bus and train, for example by providing free transit passes.
~~~~:.!..!..!..I~~~~!<"'lo!~~~Uh'..l~"~ (and offsetting the costs of employee transit
benefits) by providing for public in the newly combined structures, for
aside the 100 ground floor spaces for public use. With such a
the City could the downtown parking distnct throughout the
Station Area, traffic, improving site designs, and enhancing street level retail and
aetivity in accordance with the Downtown Station Area Plan.
=J;:."" .. "'~'.,'''''.'-U~'-'''-'--'='~'''.:: .. '.'.'''.''~= to further reduce commuter impacts, for example
more than required to the City's housing fund and/or by
construction of nearby affordable housing
., .... , ... ''" ... ,,'.'''''-!~'''-'''-'''-'1-'=.;,'''-.!~'''''-'-'''-'''-'-'-'~ to support the public meeting room uses required by the
original Center approval, for by the surface east of
Lincoln and at Lindaro and Andersen for visitor use. Continuation and formalization of the
evening use of the Andersen parking for Albert Park patrons should also be required.
, .. , .. ,.<,' .. ' .. " . .!"~~""",-l;'."J"'."' .. '.J ... ~~,,,,",,,~~'-'-""~ between Lincoln and Second Street (at Tamalpais),
extending the public amenity and access previously required and established north of the
creek between Lincoln and Lindaro and helping humanize the east walls of the garages. The
appear to the property line in this area omit any treatment
of the 'top of bank' setback zone that seems ideal for native plantings and a simple pathway_
We encourage both the and its new anchor corporate citizen to 'think outside the box' to
elegantly this huge additional development into the fabric of downtown San Rafael.
Sincerely,
William Camey,
Sustainable San Rafael