HomeMy WebLinkAboutDRB 2015-02-18 #2 Attachment930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A2.6 SCHEME 2 PRECEDENT IMAGES
BUILDING MASSING AND GENERAL ARTICULATION
LOCATIONS FOR POTENTIAL ART WORK AND HISTORIC IMAGES
BASE AND UPPER WALLS TREATMENT ALONG TAMALPAIS AVE.
GROUND FLOOR PUBLIC ARCADE
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A3.1 SCHEME 3 VIEW FROM FOURTH STREET
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A3.2 SCHEME 3 VIEW FROM TRANSIT CENTER
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A3.3 SCHEME 3 VIEW FROM FOURTH STREET
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A3.4 SCHEME 3 VIEW FROM FREEWAY
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A3.5 SCHEME 3 ELEVATIONS 14'-0"10'-0"10'-0"9'-0"±64' PARAPET
HEIGHT
14'-0"
SECOND
28'-0"
THIRD
+3'-8" GROUND
THIRD STREET
38'-0"
FOURTH
48'-0"
FIFTH
57'-0"
PLATE
±66' STAIR
PARAPET14'-0"10'-0"10'-0"9'-0"14'-0"
SECOND
28'-0"
THIRD
38'-0"
FOURTH
48'-0"
FIFTH
57'-0"
PLATE
14'-0"10'-0"10'-0"9'-0"14'-0"
SECOND
28'-0"
THIRD
38'-0"
FOURTH
48'-0"
FIFTH
57'-0"
PLATE
TAMALPAIS AVENUE ELEVATION (WEST)
S.M.A.R.T. RIGHT OF WAY ELEVATION (EAST)FOURTH STREET ELEVATION (NORTH)
THIRD STREET ELEVATION (SOUTH)
0 30'60'15'