Loading...
HomeMy WebLinkAboutDRB 2015-02-18 #2 Attachment 3930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015 WHISTLESTOP | A1.6 SCHEME 1 PRECEDENT IMAGES GROUND FLOOR PUBLIC ARCADE ROOF, BALCONY AND CORNER TREATMENTS BUILDING MASSING AND GENERAL ARTICULATION BASE AND UPPER WALLS TREATMENT ALONG TAMALPAIS AVE. LOCATIONS FOR POTENTIAL ART WORK AND HISTORIC IMAGES 930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015 WHISTLESTOP | A2.1 SCHEME 1 VIEW FROM FOURTH STREET 930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015 WHISTLESTOP | A2.2 SCHEME 2 VIEW FROM TRANSIT CENTER 930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015 WHISTLESTOP | A2.3 SCHEME 2 VIEW FROM FOURTH STREET 930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015 WHISTLESTOP | A2.4 SCHEME 2 VIEW FROM FREEWAY 930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015 WHISTLESTOP | A2.5 SCHEME 2 ELEVATIONS 14'-0"10'-0"10'-0"9'-0"14'-0" SECOND 28'-0" THIRD +3'-8" GROUND THIRD STREET 38'-0" FOURTH 48'-0" FIFTH 57'-0" PLATE ±65' ROOF HEIGHT 66'-0" PARAPET14'-0"10'-0"10'-0"14'-0" SECOND 28'-0" THIRD +6" GROUND FOURTH STREET 38'-0" FOURTH 48'-0" FIFTH ±65'-0" ROOF HEIGHT 14'-0"10'-0"10'-0"14'-0" SECOND 28'-0" THIRD 38'-0" FOURTH 48'-0" FIFTH ±65'-0" ROOF TAMALPAIS AVENUE ELEVATION (WEST) S.M.A.R.T. RIGHT OF WAY ELEVATION (EAST)FOURTH STREET ELEVATION (NORTH) THIRD STREET ELEVATION (SOUTH) 0 30'60'15'