HomeMy WebLinkAboutDRB 2015-02-18 #2 Attachment 3930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A1.6 SCHEME 1 PRECEDENT IMAGES
GROUND FLOOR PUBLIC ARCADE
ROOF, BALCONY AND CORNER TREATMENTS
BUILDING MASSING AND GENERAL ARTICULATION
BASE AND UPPER WALLS TREATMENT ALONG TAMALPAIS AVE.
LOCATIONS FOR POTENTIAL ART WORK AND HISTORIC IMAGES
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A2.1 SCHEME 1 VIEW FROM FOURTH STREET
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A2.2 SCHEME 2 VIEW FROM TRANSIT CENTER
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A2.3 SCHEME 2 VIEW FROM FOURTH STREET
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A2.4 SCHEME 2 VIEW FROM FREEWAY
930 TAMALPAIS AVENUE, SAN RAFAEL CA| 2/03/2015
WHISTLESTOP | A2.5 SCHEME 2 ELEVATIONS 14'-0"10'-0"10'-0"9'-0"14'-0"
SECOND
28'-0"
THIRD
+3'-8" GROUND
THIRD STREET
38'-0"
FOURTH
48'-0"
FIFTH
57'-0"
PLATE
±65' ROOF
HEIGHT
66'-0"
PARAPET14'-0"10'-0"10'-0"14'-0"
SECOND
28'-0"
THIRD
+6" GROUND
FOURTH STREET
38'-0"
FOURTH
48'-0"
FIFTH
±65'-0" ROOF
HEIGHT
14'-0"10'-0"10'-0"14'-0"
SECOND
28'-0"
THIRD
38'-0"
FOURTH
48'-0"
FIFTH
±65'-0" ROOF
TAMALPAIS AVENUE ELEVATION (WEST)
S.M.A.R.T. RIGHT OF WAY ELEVATION (EAST)FOURTH STREET ELEVATION (NORTH)
THIRD STREET ELEVATION (SOUTH)
0 30'60'15'