Loading...
HomeMy WebLinkAboutPlanning Commission 2016-02-09 #4• Community Development Department -Planning Division P. O. Box 151560, San Rafael, CA 94915-1560 PHONE: (415) 485-3085/FAX: (415) 485-3184 Meeting Date: February 9, 2016 Agenda Item: 4 Case Numbers: ED15-068; SP15-001 Project Planner: Steve Stafford /(415) 458-5048 REPORT TO PLANNING COMMISSION SUBJECT: 990 Francisco Blvd. E. ("Royal Coach Carwash") -Environmental and Design Review Permit and Sign Program Amendment requests to allow demolition of an existing automated car wash facility and construction of a smaller, 2,030 sq. ft .. , automated car wash facility and associated signage and landscaping improvements on a 22,000 sq. ft. site; APN: 008-103-01; General Commercial (GC) District Zone; Bill Poland for BlueWave Express Development II, LLC, Applicant; Wilma C. Thomas, Owner; ED15-068; SP15-001. EXECUTIVE SUMMARY Project sponsor, BlueWave Express, proposes to replace an existing 4,000 sq. ft., single-story automated car wash facility with a smaller, 2,030 sq. ft., more efficient, automated car wash facility. The project also proposes to construct a new 14-stall self-service vacuum canopy, located along the rear or west property boundary shared with westbound 1-580 off-ramp. The project also proposes to significantly increase landscaping on the site, from 5% (1,000 sq. ft.) to 31% (6,820 sq. ft.), plus an additional 4,200 sq. ft. of landscaping located within the City's ROW along the Francisco Blvd. E. frontage, plus an additional unknown square footage of landscaping located within the adjacent Caltrans-owned parcel along the Bellam Blvd frontage. BlueWave is pursuing a lease or licensing agreement with Caltrans to allow improvement of the neighboring Caltrans property with landscaping and irrigation. Planning staff finds that the proposed project meets all applicable General Plan Policies and Zoning Ordinance regulations and standards. The Design Review Board (Board) reviewed the project at two (2) separate meetings; a concept review and a formal review. At both meetings, the Board provided unanimous support for the project design, subject to minor modifications, which have been incorporated into the project plans presented to the Planning Commission. The project requires an Environmental and Design Review Permit (site and building design) and a Sign Program Amendment (update existing Sign Program). The Planning Commission will act on the project following the recommendation of the Board. RECOMMENDATION It is recommended that the Planning Commission adopt the attached resolution (Exhibit 1) approving the project (Environmental and Design Review Permit ED15-068 and Sign Program Amendment SP15-001) with conditions. PROPERTY FACTS REPORT TO PLANNING COMMISSION -Case Nos.: ED15-068; SP15-001 Page 2 I Address/Location: I 990 Francisco Blvd E. I Parcel Number(s): I 008-103-01 I Property Size: I 22,000 sq. ft. (approx.) I Neighborhood: I Canal Site Characteristics General Plan Designation Zoning Designation Existing Land-Use Project Site: GC GC Automated Carwash Facility North: GC GC Gas Station; Motor Vehicle Repair; Commercial Retail South: NA NA Bellam Blvd. Off-Ramp; Westbound 1-580 East: NA NA Francisco Blvd. E. West: NA NA Bellam Blvd. Site Description/Setting: The subject site is an isolated or 'island' parcel, surrounded by public right-of-ways; the Bellam Blvd. off- ramp from westbound 1-580 is located immediately to the south and west; Bellam Blvd. is located immediately to the west and north, and Francisco Blvd. E. is located along the frontage, immediately to the east. It is a long (368' avg.) and narrow (51' avg.) 'flat' parcel (no cross-slope or grade change), approximately 22,000 sq. ft. in size. The site is currently developed with a single-story, 4,000 sq. ft. (approx.), automated, car wash with customer service waiting, restrooms, mechanical, equipment and storage, office and cashier areas. A 1,600 sq. ft. (approx.) detailing canopy is attached to the southern portion of the building. A smaller, 600 sq. ft. (approx.) freestanding canopy is located immediately north of the building providing vacuum service prior to entering the automated car wash. The site has six (6) dedicated on-site parking spaces, located at the south end of the site. All carwash operations have ceased, though the structures remain on the site. BACKGROUND Pertinent development and permitting history on the site includes: • On May 12, 1964, the Planning Commission conditionally approved a Use Permit (No. 6446) and Architectural Approval to allow construction of the existing development on the site and the operation of an automated car wash. • On April 27, 1976, the Planning Commission approved a Sign Program (SR76-028) to allow installation of the existing three (3) signs on the site totaling 100 sq. ft. of combined sign area (two freestanding signs with one a changeable copy sign, each 32 sq. ft. of sign area, and one 36 sq. ft. wall sign). PROJECT DESCRIPTION Planning Applications: The project requires an Environmental and Design Review Permit (new commercial building) and a Sign Program Amendment (new sign design, sizes and locations). The Planning Commission acts on the proposed project following the recommendations of the Design Review Board. REPORT TO PLANNING COMMISSION -Case Nos.: ED15-068; SP15-001 Page 3 Use: The project proposes to replace the existing automated car wash facility on the site with a smaller, more water-efficient, automated carwash facility , install a 14-stall self-service vacuum canopy with fabric awning and landscape enhancements. l?ite Plan: The project proposes to demolish and replace the existing 4,000 sq. ft., single-story automated car wash building with a smaller, 2,030 sq. ft. single-story automated car wash building . All existing ancillary structures are also proposed to be demolished and new ancillary structures are proposed to be constructed, including a 14-stall (3,700 sq. ft.), self-service vacuum canopy, a 198 sq. ft. self-service pay station canopy, a 85 sq. ft. trash enclosure and a 75 sq. ft. vacuum pump enclosure. The primary site entry/exit would continue to be located immediately across from Castro Avenue. The existing on-site vehicular circulation pattern is proposed to remain the same , though the location of the carwash building is proposed to shift approximately 35' east, from the rear of the site to the · front, closer to the Francisco Blvd. E. frontage. Vehicles are proposed to enter the automated carwash at the south building elevation and exit at the north building elevation along the Francisco Blvd . E. frontage , then wrap around to the rear of the building to access the self-service vacuum stalls before exiting the site. A new self-service pay station canopy is also proposed to be located along the Francisco Blvd. E. frontage , south of the carwash building. The new self-service vacuum canopy is proposed to be located along the rear western property line, behind the carwash building , and the two small enclosures are proposed to be located south of the vacuum canopy. An existing, 12'-wide, 'exit lane' is proposed to be relocated approximately 60 ' south of its current location, between the carwash building and the self-service pay station canopy. Architecture: The project proposes a rectangular-shaped, contemporary design for the new automated car wash building, characterized by multiple exterior fagade textures in a tan-brown color palette, with a small 'wrap-around' metal awning projection over the cashier entrance. Proposed exterior materials would include stacked ledge stone wrapped around the ends of the building with a mixture of brick veneer and stucco for the remainder of the building , in a unique 'wave-like' pattern . The vehicular exit from the automated car wash , and the most dominant architectural feature of the project , is proposed to be defined by 1" x 6 " horizontal aluminum slat 'sign tower', with 2.5 " spacing between boards and dark brown in color. A curvilinear metal roof , in both dark and medium shades of blue, is proposed to 'cascade' over vehicles exiting the automated car wash. A parapet cap and the metal awning projection are proposed also to be dark blue in color. The height of the new, single-story , carwash building is proposed to be a maximum height of 16' 8" above finished grade to the top of the parapet and 27.5' to the top of the proposed sign tower element. The design of both the self-service vacuum and pay station canopies are proposed to be similar tubular curvilinear metal material, dark blue in color, with fabric awnings, medium blue in color. The height of the new accessory canopies is proposed to be approximately 10-11' above finish grade The design of both the trash and vacuum pump enclosures are proposed to incorporate the same stacked ledge stone exterior facade texture , in a tan-brown color palette , as proposed on the new carwash building. The heights of the new accessory enclosures are proposed to be 6' above finish grade for the trash enclosure and 8' for the vacuum pump enclosure. . The applicant will provide a Materials and Color Board, with samples of the proposed exterior colors and ' treatments , during the meeting. . REPORT TO PLANNING COMMISSION -Case Nos.: ED1S-068; SP15-001 Page 4 Landscaping: The project proposes to substantially increase the landscape character on the site, by enhancing existing landscape planter areas and by creating new additional landscape planter areas , particularly along the Francisco Blvd. E. frontage. Four (4) existing conifer and three (3) palm trees , located along north property line closest to the intersection of Bellam Blvd. and Francisco Blvd. E., are proposed to be preserved. The project proposes to plant eight (8) new Brisbane Box trees (Lophostemon confertus), 24"- box size, and 11 new Queen Palm trees (Syagrus romanzoffiana) 10'-exposed trunk height. New understory shrubs in existing and new planting areas include Sherwood Abelia (Abelia grandiflora 'Sherwood), Mediterranean Fan Palm (Chamaerops humilis), Hopseed Bush (Oodonaea viscosa), Rainbow Warrior Flax (Phormium 'Rainbow Warrior), Yellow Wave Flax (Phormium 'Yellow Wave'), and Xylosma (Xylosma congestum), all in 5-gallon container size with the exception of the Mediterranean Fan Palms which are proposed to be a 24"-box size. New understory groundcover and vines in existing and new planting area include Emerald Carpet Manzanita (Arctostaphylos 'Emerald Carper), Sunset Gold Coleonema (Coleonema pulchellum 'Sunset Gold) and Lowfast cotoneaster (Cottoneaster '1owfast), all in 1-gallon container size with the exception of the Sunset Gold Coleonema which are proposed to be a 5-gallon container size. The project proposes a 570 sq. ft. storm water treatmentlbioretention area , located behind the carwash building and extensive landscaping in the public right-of-way (ROW) along the Francisco Blvd. E. frontage . The project also continues to independently seek the appropriate approvals from Caltrans to landscape their parcel, located between the north property line of the site and Bellam Blvd., with the same planting palette as proposed for the site. Signage: The project proposes two (2) new signs to be located exclusively on the proposed sign tower feature; one, 48.9 sq. ft. 'wall' sign , located along the north elevation facing the intersection of Bellam Blvd. and Francisco . Blvd. E., and a second, 48.9 sq. ft. 'wall' sign, located along west elevation facing the westbound 1-580 off ramp and the westbound 1-580 freeway. Both signs are proposed to be internally- illuminated LED, individual channel letters with 'white' faces and dark blue returns to match the dark blue color trim on the parapet cap and 'wave' or curvilinear metal roof feature ANALYSIS San Rafael General Plan 2020 Consistency: The General Plan land use designation for the project site is General Commercial (GC). The GC deSignation allows general retail and service uses , including motor vehicle sales and service uses such as the existing and proposed automated car wash facility, consistent with Land Use Policy LU-23 (Land Use Map and Categories). The project has been reviewed by staff for consistency with all applicable San Rafael General Plan 2020 poliCies, a complete analysis of which is provided in Exhibit 2. Staff finds that the project, a.s conditioned, would be consistent with all applicable General Plan policies related to Land Use , Community Design , Circulation, Sustainability, Safety, Noise, Conservation and Air and Water Quality. Zoning Ordinance Consistency: . The project site is located within the General Commercial (GC) District zone, which allows motor vehicle washing facilities to operate subject to Use Permit approval by the Planning Commission (Commission). The existing automated cash wash facility on the site was originally approved by the Planning Commission in 1964 (Use Permit #6446). Though the operation was shuttered just prior to the holidays (December 2015), the project proposes to continue the legally permitted automated cash wash facility use with a new, smaller, more efficient, car wash facility; the current Use Permit approval remains in effect and no amendment is necessary. The project has been reviewed by staff for consistency with all applicable standards and regulations of the Zoning Ordinance, a complete analysis of which is provided REPORT TO PLANNING COMMISSION -Case Nos.: ED15-068; SP15-001 Page 5 in Exhibit 3 . Staff finds that the project, as designed , would be consistent with all applicable development standards, including maximum building height , maximum FAR (Floor Area Ratio), minimum landscaping and minimum on-site parking requirements . Use Permit On May 12 , 1964, the Planning Commission approved a Use Permit (#6446) to allow the operations of an automated car wash on the site , subject to following conditions: . • The project plans shall be revised to incorporated all requirements of the City Engineer; and • Landscaping shall be provided along the Francisco Blvd. E. frontage. While the existing car wash operations on the site was recently shuttered (December 2015), the current Use Permit approval remains in effect and would allow the proposed project to operate without amendment the existing Use Permit or obtaining a new Use Permit approval. Sign Program Amendment In 1976, a Sign Program (SR76-028) was approved by the Planning Commission, allowing three (3) signs on the site totaling 100 sq. ft . of combined sign area (two freestanding signs with one a changeable copy sign , each 32 sq . ft . of sign area , and one 36 sq . ft. wall sign). Though the prior automated carwash use was recently shuttered (December 2015), the site structures and their signs remain . The project proposes to amend the Sign Program by both reducing the number of signs on the site and their total sign area while upgrading their sign type and location. The project proposes two (2) new signs to be located exclusively on the proposed sign tower feature ; one, 48.9 sq. ft. 'wall ' sign , located along the north elevation facing the intersection of Bellam Blvd. and Francisco Blvd. E., and a second, 48.9 sq. ft. 'wall ' sign, located along west elevation facing the westbound 1-580 off ramp and the westbound 1-580 freeway . Both signs are proposed to be internally-illuminated LED, individual channel letters with 'white' faces and dark blue returns to match the dark blue color trim on the parapet cap . and 'wave' metal roof feature. Pursuant to Section 14.19.046 D (Sign Programs; Findings) of the Zoning Ordinance , a Sign Program may be amended if: • All s igns contained in the program shall have common design elements , such as placement , colors , materials , architecture , illumination , sign type , sign shade , letter size and letter type ; • All signs contained in the program shall be consistent with general design standards specified in Section 14.19.054 (i.e. all site signage shall be " ... an integral part of, compatible with , and complement the design of buildings and improvements on the site where th e sign is to be located and shall be compatible with the character and design of signs in the immediate neighborhood of the site. Creative and unique design is encouraged provided that the design is appropriate for the site and improvements and compatible with the character of the surrounding area."); and • All signs contained in the program shall be in scale with the site and the immediate surrounding neighborhood. Staffs Comments. The proposed site signage is a unique design which integrates well with and complements the unique design of the new building . The relocated sign elevations and signage located high on building elevations is in character with existing signage along both Francisco Blvd . E . and Bellam Blvd ., includ ing 863 , 901 and 986 Francisco Blvd . E. and 115 Bellam Blvd . Both 'wall ' signs on the tower element are identical in design , size , color and illumination ; they are distinct only by their location on different building elevations. The curvilinear blue metal roof, which 'cascades ' downward over the vehicles exiting the automated car wash , is as important to the 'BlueWave ' sign concept as the actual sign lettering . As such, the proposed sign tower element is itself a four-sided freestanding sign, which the Board agreed with during conceptual review of the project. As requested by the Board during conceptual review , modifications have been made to both the sign tower and the signs to improve the scale signage to fit better with that of the site, the project and existing freestanding signage in the immediate vicinity. A REPORT TO PLANNING COMMISSION -Case Nos.: ED1S-068; SP1S-001 Page 6 detailed discussion of the Board's recommendations during concept review on the project, and how the formal project design has responded to these comments, is below in staff's report. Environmental and Design ReviewPermit Pursuant to Section 14.25.040 (A)(1) (Environmental and Design Review Permits; Major Physical Improvements) of the Zoning Ordinance, the project requires Environmental and Design Review Permit approval by the Planning Commission for the proposed replacement of an existing automated car wash facility with a smaller, more water-and energy-efficient car wash facility. The project is subject to the review criteria for Environmental and Design Review Permits, pursuant to Section 14.25.050 (Review Criteria; Environmental and Design Review Permits), as follows: • Site Design. Proposed structures and site development should relate to the existing development in the vicinity. The development should have good vehicular and pedestrian circulation and access. Safe and convenient parking areas should be designed to provide easy access to building entrances. The traffic capacity of adjoining streets must be considered. • Architecture. The project architecture should be harmoniously integrated in relation to the architecture in the vicinity in terms of colors and materials, scale and building design. The design should be sensitive to and compatible with historic and architecturally significant buildings in the vicinity. Design elements and approaches which are encouraged include: a) creation of interest in the building elevation; b) pedestrian-oriented design in appropriate locations; c) energy-efficient design; d) provision of a sense of entry; e) variation in building placement and height; and f) equal attention to design given to all facades in sensitive location. • Materials and colors. Exterior finishes should be consistent with the context of the surrounding area. Color selection shall coordinate with the predominant colors and values of the surrounding landscape and architecture. High-quality building materials are required. Natural materials and colors in the earth tone and wood tone range are generally preferred. Concrete surfaces should be colored, textured, sculptured, and/or patterned to serve design as well as a structural function. • Walls, Fences and Screening. Walls, fences and screening shall be used to screen parking and loading areas, refuse collection areas and mechanical equipment from view. Screening of mechanical equipment shall be designed as an integrated architectural component of the building and the landscape. Utility meters and transformers shall be incorporated into the overall project design. • Exterior Ughting. Exterior lighting should provide safety for building occupants, but not create glare or hazard on adjoining streets or be annoying to adjacent properties or residential areas. • Landscape Design. Landscaping shall be designed as an integral enhancement ofthe site and existing tree shall be preserved as much as possible. Water-conserving landscape design shall be required. A landscaped berm around the perimeter of parking areas is encouraged. Smaller scale, seasonal color street trees should be proposed along pedestrian-oriented streets while high-canopy, traffic-tolerant trees should be proposed for primary vehicular circulation streets. Staffs Comments. The review criteria for Environmental and Design Review Permits require that the proposed design (architecture, form, scale, materials and color, etc.) of all new development 'relate' to the predominant design or 'character-defining' design elements existing in the vicinity. Site Design The project proposes to replace the existing automated car wash facility with a smaller, new car wash building in, generally, the same location on the site. The new carwash building is proposed to be relocated approximately 35' east on the site, closer to the Francisco Blvd. E. frontage. The current REPORT TO PLANNING COMMISSION -Case Nos.: ED15-068; SP15-001 Page 7 carwash facility and on-site circulation and queuing pattern has existed since it was originally approved in 1964. The project design proposes to re-orient the vehicle entrance to the carwash, from the north building elevation to the south building elevation. This re-orientation will result in a shorter queuing or vehicle stacking lane; however, the applicant has provided adequate documentation to the City Engineer to review and support the new site design with a shorter stacking lane, due to the projected shorter vehicle wash cycles and the relocated 'exit only' driveway, which allows vehicles to bypass the automated carwash facility quickly, if needed. Scale The proposed single-story scale with two-story tower element relates well to the existing scale of buildings in the vicinity of the site, which is a combination of both single-and two-story structures. The site is located up to 20' below the grade of the westbound 1-580 flyway over Bellam Blvd before it merges into northbound U.S. Highway 101. Colors and Materials The project proposes a cohesive contemporary design accentuating the 'blue wave' theme of their business name, given that; • The new building would be characterized by multiple exterior fagade textures and earthtone/woodtine/bluetone colors, including stacked stone 'wrap-around' at the ends of the building with a mixture of thin brick and stucco for the remainder of the building, in a unique 'wave-like' pattern; .• The sign tower to the new building includes a curvilinear metal roof, in both a dark and medium shade of blue, which appears to 'cascade' downward onto vehicles exiting the automated car wash; and • The new accessory canopies and enclosures proposed for the site are designed with the exterior colors and materials to match those proposed on the new carwash building. Landscaping The project proposes to increase on-site landscaping from its current 5% (1,000 sq. ft.) presence to 31% (6,820 sq. ft.), plus an additional 4,200 sq. ft. of landscaping within the City's ROW along the Francisco Blvd. E. frontage, plus an additional unknown square footage within the adjacent Caltrans-owned parcel along the Bellam Blvd frontage (pending lease or licensing agreement between the project sponsor and Caltrans). This landscaping proposes a variety of new trees, shrubs and groundcover plantings along the entire perimeter of the site and along the Francisco Blvd. E. and Bellam Blvd. frontage ROWs. All new landscaping will be drip-irrigated to meet current MMWD water-conservation requirements. The landscape design will also provide an approximate 570 sq. ft. storm water retention or bioswale area, located behind the car wash building to meet current MCSTOPPP storm water run-off requirements. DESIGN REVIEW BOARD RECOMMENDATION The Design Review Board (Board) has reviewed the project at two (2) separate meetings; a concept review and a formal review. At both meetings, the Board expressed unanimous support for the new, more efficient, automated car wash facility and landscape enhancements. The Board, in general, recommended reducing the height of the sign 'tower', redesigning the signs to improve proportionality on the tower element and readability and increasing the landscaping along the entire perimeter of the site July 21, 2015 On July 21, 2015, the Board (Commission Liaison Paul) provided conceptual design review recommendations on the proposed project. At that time, the Board expressed unanimous support for the new, more efficient, automated car wash facility and landscape enhancements. The Board, in general, recommended reducing the height of the sign 'tower', redesigning the signs to improve proportionality on the tower element and readability and increasing the landscaping along the entire perimeter of the site. REPORT TO PLANNING COMMISSION -Case Nos.: ED15-068; SP15-001 Page 8 In direct response to the Board's concept review comments, the formal design submittal was modified as follows: o The height of the sign tower was reduced from 29' 9" to 27' 6"; o The number of signs proposed on the tower feature was reduced from three (3) to two (2); signage was eliminated along the east elevation; o The color of the sign facing on the individual channel lettering was changed from navy blue to white; o The proportionality among the sign lettering was made to be more uniform and lettering determined to be unnecessary ("Express") was removed' o The spacing between the horizontal aluminum slats that provide the backing for the signage was reduced, from 4" to 2.5", to improve readability; and o Site landscaping was increased substantially along the entire perimeter of the site. The formal design submittal was additionally modified as follows: o The location of the carwash building was relocated approximately 35' east, from the rear of the site to the front, closer to the Francisco Blvd. E. frontage, which allows the elimination of the previously proposed sign on the east elevation as repetitive due to the high visibility of the proposed sign on the north elevation from both Bellam Blvd. and Francisco Blvd. E. o The orientation of the car wash building was reversed; vehicles now enter the car wash from the south elevation and exit from the north elevation. This re-orientation allows the more interesting building fagade to face the Francisco Blvd. E. frontage. o On-site parking was increased from six (6) to 14 parking spaces/vacuum stalls. January 20, 2016 On January 20, 2016, the Board (Commission Liaison Schaffer) expressed unanimous support for the proposed smaller, automated carwash facility, with contemporary design and coordinating colors and materials, and a significant increase in on-site and off-site landscaping, and recommended approval of the project, subject to the following recommendations for minor revisions, which have been incorporated into the design; o The blue. metal awning, along the south elevation, should be aligned better with door to the cashier's office; o Articulate the storefront windows, along the east elevation, with mullions; and o substitute a 'compacta' species of Xylosma for 'congestum' for those areas adjacent to the drive aisle or relocated the 'congestum' to provide a greater setback from the drive aislebuilding design characterized by multiple exterior fagadetextures in a tan-brown color palette, including stacked ledge stone wrapped around the ends of the building with a mixture of brick veneer and stucco for the remainder of the building, in a unique 'wave-like' pattern site improvements. The Board, however, provided the following comments on the conceptual design: Both the July 21, 2015 and January 20, 2016 Board meetings may' be reviewed online at: http://www.cityofsanrafael.org/meetings/ and clicking on the link to the specific Design Review Board meeting date. ENVIRONMENTAL DETERMINATION The proposed project is exempt from the requirements of the California Environmental Quality Act (CEQA), pursuant to Section 15302 (Rep/acement or Reconstruction) of the CEQA Guidelines which exempts the replacement or reconstruction of an existing commercial structure or facility where the new structure or facility will have substantially the same size, purpose and capacity as the structure or facility replaced. The project proposes to replace an existing 4,000 sq. ft. automated car wash facility on the site with a smaller, 2,030 sq. ft., automated carwash. While the project proposes to increase on-site parking, from six (6) uncovered parking spaces to a 14-stall, 3,700 sq. ft. self-service vacuum canopy, this is an ancillary function (Le., providing self-service vacuuming opportunities) of the new carwash facility rather than an expansion of new carwash facility capacity .. REPORT TO PLANNING COMMISSION -Case Nos.: ED15-068; SP15-001 Page 9 NEIGHBORHOOD MEETING I CORRESPONDENCE No Neighborhood Meeting was required for the proposed project since it does not include a request a General Plan Amendment, Rezoning or any other action requiring the preparation of an Environmental Impact Report (EIR). Notice of hearing for the project was conducted in accordance with noticing requirements contained in Chapter 29 of the Zoning Ordinance. A Notice of Public Hearing was mailed to all property owners and occupants within a 300-foot radius of the project site, the appropriate neighborhood group (the Marin Villa-Canal Housing Alliance), and all other interested parties, a minimum of 15 calendar days prior to the date of all hearings, including this hearing. Additionally, public notice was posted on the project site, along the Francisco Blvd. E. frontage, a minimum of 15 calendar days prior to the date of all hearings, including this hearing. At the time of printing staff's report to the Planning Commission , staff has received no comments as a result of this noticing. OPTIONS The Planning Commission has the following options: 1. Approve the application as presented (staff's recommendation); 2. Approve the application with modifications or additions to conditions of approval. 3. Continue the applications to allow the applicant to address any of the Commission's comments or concerns; or 4. Deny the project and direct staff to return with a revised resolution. EXHIBITS 1. Draft Resolution of Approval 2. GP Consistency Table 3. ZO Consistency Table 4. Vicinity/Location Map 5 . Interim Nonresidential Design Guidelines Color 11" x 17" reduced plans provided to the Planning Commission only. RESOLUTION NO. 16-XX . RESOLUTION OF THE CITY OF SAN RAFAEL PLANNING COMMISSION CONDITIONALLY APPROVING AN ENVIRONMENTAL AND DESIGN REVIEW PERMIT (ED15-068) AND A SIGN PROGRAM AMENDMENT (SP15-001) TO ALLOW THE DEMOLITION OF AN EXISTING AUTOMATED CARWASH FACILITY AND CONSTRUCTION OF A NEW, SMALLER, 2,030 SQ. FT., AUTOMATED CARWASH FACILITY AND ASSOCIATED SIGNAGE AND LANDSCAPING IMPROVEMENTS ON A 22,000 SQ. FT. SITE LOCATED AT 990 FRANCISCO BLVD. E. (APN: 008-103-01) WHEREAS , on May 12 , 1964, the City of San Rafael Planning Commission (Planning Commission) conditionally approved a Use Permit (No. 6446) and Architectural Approval to allow construction, essentially , of the existing development and operation of an automated carwash facility at the site , located at 990 Francisco Blvd. E.; and WHEREAS, on April 27 , 1976, the Planning Commission conditionally approved a Sign Program (SR76 -028) to allow installation of the existing three (3) signs on the site totaling 100 sq . ft . of combined sign area (two freestand ing signs with one a changeable copy sign , each 32 sq . ft. of sign area, and one 36 sq . ft. wall sign); and WHEREAS, on June 19, 2015 , a Pre-Application for Conceptual Design Review (CDR 15-003) was submitted to the City proposing to demolish the existing carwash facility and construct a new, smaller, 2,030 sq. ft., carwash facility with associated signage and landscaping improvements on the site; and WHEREAS, on July 21, 2015 , the Design Review Board (Board) reviewed the Conceptual Design Review in a duly-noticed public hearing and provided preliminary comments on the proposed project. At that time , the Board expressed unanimous support for the new, smaller, more efficient , automated carwash facility and landscape enhancements . The Board , in general, recommended reducing the height of the sign 'tower', redesigning the signs to improve proportionality on the tower element and readability and increasing the landscaping along the entire perimeter of the site ; and WHEREAS, on August 21 2015 , Formal Planning appl ications for an Environmental and Design Review Permit (ED15-068) and Sign Program Amendment (SP15-001) were submitted, proposing to construct a new, smaller, 2 ,030 sq. ft., carwash facility with associated signage and landscaping improvements on the site. The formal design submittal revised the project, as follows: 1) The height of the sign tower was reduced from 29 ' 9" to 27 .5'; 2) The number of signs proposed on the tower feature was reduced from three (3) to two (2); signage was eliminated along the east elevation ; 3) The color of the sign facing on the individual channel lettering was changed from navy blue to white ; 4) The proportionality among the sign lettering was made to be more uniform and lettering determined to be unnecessary ("Express") was removed; 5) The spacing between the horizontal aluminum slats that provide the backing for the signage was reduced , from 4" to 2 .5", to improve readability; 6) Site landscaping was increased substantially along the entire perimeter of the site ; 7) The location of the carwash building was relocated approximately 35' east , from the rear of the site to the front , closer to the Francisco Blvd . E. frontage , which allows the elimination of the previously proposed sign on the east elevation as repetitive due to the high visibility of the proposed sign on the north elevation from both Bellam Blvd. and Francisco Blvd . E.; 8) The orientation of the car wash building was reversed ; vehicles now enter the car wash from the south elevation and exit from the north elevation . This re-orientation allows the more interesting building facade to face the Francisco EXH IBITl Blvd. E. frontage; and 9) On-site parking was increased from six (6) to 14 parking spaces/vacuum stalls; and WHEREAS, on January 20, 2016, the Board reviewed the formal Planning applications and unanimously (Board Member Spielman motion, Board Member Lentini second) recommended approval of the project, subject to the following recommendations for minor revisions, which have been incorporated into the design; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articulate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' species of Xylosma for 'congestum' for those areas adjacent to the drive aisle or relocated the 'congestum' to provide a greater setback from the drive aisle; and WHEREAS, Planning staff has determined that the proposed project is exempt from the requirements of the California Environmental Quality Act (CEQA), pursuant to Section 15302 (Replacement or Reconstruction) of the CEQA Guidelines, which exempts the replacement or reconstruction of an existing commercial structure or facility where the new structure or facility will have substantially the same size, purpose and capacity as the structure or facility replaced. The project proposes to replace an existing 4,000 sq. ft. automated car wash facility on the site with a smaller, 2,030 sq. ft., automated carwash. While the project proposes to increase on-site parking, from six (6) uncovered parking spaces to a 14-stall, 3,700 sq. ft. self-service vacuum canopy, this is an ancillary function (i.e., providing self-service vacuuming opportunities) of the new carwash facility rather than an expansion of new carwash facility capacity; and WHEREAS, on February 9, 2016, the Planning Commission held a duly-noticed public hearing on the proposed project, accepting all oral and written public testimony and the written report of the Community Development Department staff and closed said hearing on that date; and NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Rafael does hereby approve Environmental and Design Review Permit (ED15-068) and Sign Program Amendment (SP15-001) to allow demolition of an existing carwash facility and construct a new, smaller, 2,030 sq. ft., replacement carwash facility with associated signage and landscaping improvements on the site, based on the following findings: Environmental and Design Review Permit (ED15-068) Findings A. The project design is in accord with the General Plan, the objectives of the Zoning Ordinance, and the purposes of Chapter 14.25 of the Zoning Ordinance; in that: 1. As documented in the General Plan 2020 Consistency Table attached to the staff report to the Planning Commission, the project will be consistent with Land Use Policies LU-2 (Development Timing), LU-9 (Intensity of Nonresidential Development), LU-12 (Building Heights), LU-16 (Building and Automotive Services) and LU-23 (Land Use Map and Categories), Neighborhoods Policies NH-4b (Improve Property Maintenance; Design Review Conditions of Approvaf), NH-51 (Existing Business Areas), NH-53 (Building and Automotive Services) and NH-73 (I-58011011Bellam Blvd. Interchange Improvements), Community Design Policies CD-1d (City Image; Landscape Improvement), CD-2 (Neighborhood Identity), CD-5 (Views), CD-9 (Transportation Corridors), CD-10 (Nonresidential Guidelines), CD-15 (Participation in Project Review), CD-18 (Landscaping), CD-19 (Lighting) and CD-20 (Commercial Signage), Economic Vitality Policies EV-2 (Seek, Retain and Promote Business that Enhance San Rafaef), EV-7 (Environmentally-Friendly Business Practices), EV-8 (Diversity of our Economic Base), 2 EV-13 (Business Areas) and EV-14 (Support for Business Areas), Circulation Policy C- 22 (Attractive Roadway Design), Infrastructure Policies 1-2 (Adequacy of City Infrastructure and Services), 1-3 (Availability of Utilities) , I-Sb and I-Sd (Street Trees; Street Trees for New Development; Landscape Maintenance Next to Sidewalks), Sustainability Policies 8U-5a (Reduce Use of' Non-Renewable Resources; Green Building Regulations) and 8U-6 (New and Existing Trees), Safety Policies 8-17 (Flood Protection of New Development), 8-1Sa (Storm Drainage Improvements) and 8-32 (Safety Review of Development Projects), Noise Policy N-4 (Noise from New Nonresidential Development), and Air and Water Polices AW-4a (Particulate Matter Pollutions Reduction; Pollution Reduction), AW-7 (Local, State and Federal Standards) and AW-S (Reduce Pollution from Urban Runoff). 2. As documented in the Zoning Ordinance Consistency Table attached to the staff report to the Planning Commission, the proposed project will be consistent with the objectives of the Zoning Ordinance, which is to promote and protect the public health safety, peace, comfort and general welfare, given that; a. The proposed project will implement and promote the goals and policies of the San Rafael General Plan 2020, as identified in Finding A1 above; b. The project will reduce or remove negative impacts caused by inappropriate location, use or design of buildings and improvements, given that; 1) the Board is recommending approval of the project, subject to the following minor revisions which have been incorporated into the design: a) the height of the sign tower element has been reduced from 29' 9" to 27' 6" above grade; b) the number of signs proposed on the tower feature has been reduced from three (3) to two (2) with; signage eliminated on the east elevation; c) The color of the sign facing on the individual channel lettering has changed from navy blue to white; d) the proportionality among the sign lettering is more uniform and lettering determined to be unnecessary ("Express") has been removed; e) the spacing between the horizontal aluminum slats that provide the backing for the signage has been reduced, from 4" to 2.5", to improve readability; and f) site landscaping has been increased substantially, including along the entire perimeter of the site; 2) the Board is recommending approval of the project, subject to the following recommendations for minor revisions, which have been incorporated into the design; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articulate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' species of Xylosma for 'congestum' for those areas adjacent to the drive aisle or relocated the 'congestum' to provide a greater setback from the drive aisle; and 3) the project proposes to substantially exceed the 15% landscape requirement for the site, which will both beautify the site and the public right-of-ways (ROW) along the Francisco Blvd. E. and Bellam Blvd. frontages but will also increase permeable surface on-site and immediately adjacent to the site to capture particulate matter pollution surface and roof stormwater runoff before it enters the City's stormwater drainage system; c. The project will protect, strengthen and diversify the economic base of the City, given that; the project proposes to continue operating .an automotive service use (automated carwash facility) on the site for the convenience of the both San Rafael residents and businesses, which has been in operations as an automated carwash facility on the site continuously since 1964; d. The project will provide for adequate, safe and effective off-street parking and loading facilities, given that; the project proposes to voluntarily increase on-site parking 3 from six (6) spaces, as required under the existing Use Permit (#6446), to 14 by constructing a 14-stall, 3,700 sq. ft. self-service vacuum/parking canopy along the western (rear) property boundary line while reducing the size of the carwash building, from approximately 4,000 sq. ft. to 2,030 sq. ft.; e. The proposed project will promote a safe, effective traffic circulation system, and maintain acceptable local circulation system operating condition, given that; 1) Vehicular access to/from the carwash building is proposed to continue in a counterclockwise circulation pattern, however, the carwash building is proposed to be relocated approximately 35' east, closer to the Francisco Blvd. E. frontage, where vehicular queuing or stacking will be compressed, which has been reviewed and approved by the City Engineer; and 2) the City Engineer has determined the proposed project would not adversely affect the LOS for the nearby intersections and the payment of traffic mitigation fees to fund the project's fair share of local circulation improvement projects by the City is not required; f. The project will preserve and enhance natural resources and key visual features in the community, including the bay, shoreline, canal, wetlands and hillsides, given that; while the proposed sign tower element would likely create a view impact of the hillside north of the site as seen from both the westbound 1-580 flyover and off-ramp, this impact is minor and insignificant due to the limited size (20' x 20') of the sign tower and the grade difference of up to 20' between the site and the westbound 1-580 flyover over Bellam Blvd. This view impact has been further mitigated by a recommendation by the Board during concept review of the project that the sign tower be reduced in height "by a couple of feet" to improve proportionality with the new carwash building and proposed new signage. The formal project design submittal reduced the height of the sign tower from 29' 9" to 27' 6" and the Board is recommending approval of the project design, including the reduced sign tower height; and g. The proposed project will provide for effective citizen participation in decision- making, given that; the City has provided opportunities for public involvement in the review of the project through: 1) the referral, notice and hearings of the Conceptual Design Review submittal to the appropriate neighborhood group (Marin Villa-Canal Housing Alliance) and in compliance with Chapter 29 of the Zoning Ordinance (Public Notice); and 2) the referral, notice and hearings of the 'formal' project review in compliance with Chapter 29. Notice of two (2) separate Board meetings and this hearing were mailed to all property owners and occupants within a 300-foot radius of the site, and the appropriate neighborhood groups, a minimum of 15 calendar days prior to the meetings or hearing, and notice was posted on the project site along the Francisco Blvd. E. frontage. At the time of printing staff's report to the planning Commission, staff has received no public comments as a result of any noticing for the project. Comments received from other City departments and non-City agencies on the project have been incorporated in the review, revisions and/or conditions of approval of the project. 3. As documented in the Zoning Ordinance Consistency Table attached to the staff report to the Planning Commission, the proposed project will be consistent with the purposes of Environmental and Design Review Permits, given that; a. The project will ensure that the location, design and materials and colors of development blends with and enhances the natural setting, given that; the proposed project has been reviewed and recommended for approval by the Board; 4 b. The project will maintain and improve the quality of, and relationship between, development and the surrounding area to contribute to the attractiveness of the City, given that; 1) as identified in Finding A3 (a) above, proposed project has been reviewed and recommended for approval by the Board; and 2) the project proposes to increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City's ROW, between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. Conditions of approval have been included requiring all new project landscaping, both on-site and within these adjacent ROW areas, be maintained in a healthy condition at all times and replace all dying or dead plantings in a timely fashion, if necessary. (see Condition #7; ED15-068); and c. The proposed project will preserve and enhance views from other buildings and public property, given that; as identified in Finding A2 (f) above, the new sign tower element is proposed to impact public views briefly and minimally, and the Board has required reductions on the height of the sign. tower to further mitigated view impacts resulting from the project design. B. The project design is consistent with all applicable site, architecture and landscaping design . criteria and guidelines for the GC District in which the site is located, given that; 1. The proposed project will be consistent with property development standards for the GC District (Chapter 5 of Zoning Ordinance), including: a. Maximum building height (36' allowed; 16' 8" proposed to the top of the parapet above finish grade and 27' 6" to the top of the sign tower); b. Minimum landscaping (15% or 3,300 sq. ft. required; 6820 sq. ft. proposed plus 4,200 sq. ft. within the ROW along the Francisco Blvd. E. frontage plus additional unknown square footage within the adjacent Caltrans-owned parcel along the Bellam Blvd frontage) and ; c. Maximum floor area ratio (FAR) (0.21 FAR or 4,620 sq. ft. allowed; 0.09 FAR or 2,030 sq. ft. proposed). 2. The provisions of Marin Municipal Water District's most recent water conservation requirements apply to the project, as specified by MMWD Ordinance 421. Any project that proposes 500 sq. ft. of new landscaping or rehabilitated existing landscape areas equal to or greater than 2,500 sq. ft. shall require review and approval prior to the issuance of any building or grading permit. This requirement has been made a condition of approval (see Condition #42; ED15-068); 3. The proposed project will be consistent with all applicable parking standards (Chapter 14.18 of the Zoning Ordinance) for all new or relocated parking, with the exception of three (3) requests for 'Parking Modification', including: a. Minimum one-way drive aisle width (12'); b. Minimum on-site parking (14; one space at each vacuum stall); c. Adequate clean air vehicle parking spaces (1) (see Condition #10; ED15-068); d. Minimum parking lot landscaping (1 canopy tree for every 4 parking spaces); e. Parking area and exterior .building lighting designed to provide adequate minimum illumination levels of: • One (1) foot candle at ground level overlap shall be provided in all exterior doorways and in all vehicle parking areas; 5 • Minimum one-half (1/2) foot candle at ground level overlap shall be provided along all outdoor pedestrian walkways; and • Less than one (1) foot candle at ground level overlap shall be provided in all property boundary lines . 4 . The proposed project will be consistent with review criteria for Environmental and Design Review Permits (Chapter 14.25 of the Zoning Ordinance), given that; the Board reviewed the formal application submittal at their January 20, 2016 meeting and, after determining the project adequately met the review criteria for Environmental and Design Review Permits, unanimously (3-0) recommended approval of the proposed site and building design, subject to the following recommendations , which have been incorporated into the project plans provided to the Planning Commission at their February 9, 2016 hearing on th.e project ; a) the blue metal awning , along the south elevation , should be aligned better with door to the cashier's office ; b) articulate the storefront windows , along the east elevation, with mullions; and c) .substitute a 'compacta ' species of Xylosma for 'congestum ' for those areas adjacent to the drive aisle or relocated the 'congestum ' to provide a greater setback from the drive aisle . C. The project design minim izes adverse environmental impacts , given that: 1. The project proposes to significantly increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City 's ROW , between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. Conditions of approval have been included requiring all new landscaping, both on- site and within these adjacent ROW areas, be maintained in a healthy condition at all times and replace all dying or dead plantings in a timely fashion (Condition #7; ED15- 068). This increased landscaping on-site and off-site, within the adjacent ROWs, will both beautify a busy transportation corridor (1-580/Bellam Blvd/Francisco Blvd . E.) but will also help filter particulate matter pollution from surface and roof stormwater runoff prior to entering the City;s stormwater drainage system; 2 . The project design includes an approximate 570 sq. ft . storm water retention area or 'bioswale ', located behind the new carwash building , which will have the effect of reducing peak flow runoff to or below pre-redevelopment levels ; and 3. The site neither contains , nor is contiguous to, recognizable wetlands , creeks or similarly sensitive environmental features , and it has not been identified in the San Rafael General Plan 2020 (Exhibit 38 -Threatened and Endangered Species) as a general location were threatened and endangered species have been previously observed or maintain a suitable habitat for their likely presence to be found. D. The project design will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity , given that ; the project has been reviewed by appropriate City departments , non-City agencies, the appropriate surrounding neighborhood group (Marin Villa-Canal Housing Alliance), and the Board and .conditions of approval have been included to mitigate any potential negative impacts anticipated to be generated by the proposed project. Sign Program Amendment (SP15-001) Findings 1. All signs contained in the proposed Sign Program Amendment have one or more common design elements such as placement , colors, architecture, materials , illumination, sign type, sign shape, letter size and letter type, in that; both signs proposed by the project are identical in placement (at the same height on the tower element) size (48 .9 sq. ft. each), 6 colors (white facing; dark blue returns), materials (acrylic), illumination (internally-illuminated LED or light-emitting diode), sign type (slanted and stacked individual letters), letter size (2' 5" for "BlueWave" above approximately l' 8" for "Car Wash") and letter type (combination upper-and lower-case for "BlueWave" and upper-case only for "Car Wash"); they are distinct only by their location on different elevations of the tower element. (proposed on north and west elevations of tower element); 2. All signs contained in the proposed Sign Program Amendment are in harmony and scale with the materials, archtiecture, and other design features of the buildings and property improvements they identify, and the Sign Program Amendment is consistent with the general design standards specified in Section 14.19.054 ( (i.e. all site signage shall be "". an integral part of, compatible with, and complement the design of buildings and improvements on the site where the sign is to be located and shall be compatible with the character and design of signs in the immediate neighborhood of the site. Creative and unique design is encouraged provided that the design is appropriate for the site and improvements and compatible with the character of the surrounding area."), in that; during concept review of the project, the Board recommended minor modifications to project signs to improve readability and to reduce the scale of the sign tower element. In response, the formal project submittal incorporated the following revisions: a) the height of the sign tower element has been reduced from 29' 9" to 27' 6" above grade; b) the number of signs proposed on the tower feature has been reduced from three (3) to two (2) with; signage eliminated on the east elevation; c) The color of the sign facing on the individual channel lettering has changed from navy blue to white; d) the proportionality among the sign lettering is more uniform and lettering determined to be unnecessary ("Express") has been removed; and e) the spacing between the horizontal aluminum slats that provide the backing for the signage has been reduced, from 4" to 2.5", to improve readability. The Board, at its January 20,2016 meeting, recommended approval of the new sign design; and 3. The amount and placement of signage contained in the Sign Program Amendment is in scale with the subject property and improvements, as well as the immediately surrounding area, in that; the existing Sign Program approved three (3) signs on the site totaling 100 sq. ft. of combined sign area (two freestanding signs with one a changeable copy sign, each 32 sq. ft. of sign area, and one 36 sq. ft. wall sign). The project proposes to reduce the number of signs on the site, from 3 to 2 signs, while increasing the size of each sign, from 32-36 sq. ft. to 48.9 sq. ft., and relocating the signs to the tower feature on the new carwash building. The total sign area for the site is proposed to be reduced from 100 sq. ft. to 97.8 sq. ft. Signage located high on building elevations is in character with existing signage along both Francisco Blvd. E. and Bellam Blvd., including 863, 901 and 986 Francisco Blvd. E. and 115 Bellam Blvd. California Environmental Quality Act (CEQA) Finding 1. The proposed project is exempt from the requirements of the California Environmental Quality Act (CEQA), pursuant to Section 15314 (Minor Additions To Schools) ofthe CEQA Guidelines which exempts the replacement or reconstruction of an existing commercial structure or facility where the new structure or facility will have substantially the same size, purpose and capacity as the structure or facility replaced. The project proposes to replace an existing 4,000 sq. ft. automated car wash facility on the site with a smaller, 2,030 sq. ft., automated carwash. While the project proposes to increase on-site parking, from six (6) uncovered parking spaces to a 14-stall, 3,700 sq. ft. self-service vacuum canopy, this is an ancillary function (i.e., providing self-service vacuuming opportunities) of the new carwash facility rather than an expansion of new carwash facility capacity: 7 BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Rafael approves Environmental and Design Review Permit (ED15-068) and Sign Program Amendment (SP15-001), subject to the following conditions: Environmental and Design Review Permit (ED15-068) Conditions of Approval General and On-Going Community Development Department, Planning Division 1. The building techniques, colors, materials, elevations and appearance of the project, as presented to the Planning Commission at their February 9, 2016 hearing, labeled B/ueWave Express Carwash; 990 Francisco B/vd. East, San Rafae/, California; Planning Commission Package, November 11, 2015, and on file with the Community Development Department, Planning Division, shall be the same as required for issuance of all building/grading permits, subject to these conditions. Minor modifications or revisions to the project shall be subject to review and approval of the Community Development Department, Planning Division. Further modifications deemed not minor by the Community Development Director shall require review and approval by the original decision making body, the City's Planning Commission, and may require review and recommendation by the City's DeSign Review Board. 2. The approved exterior materials and colors for the project are on file with the Community Development Department, Planning Division. Any future modification to the color palette shall be subject to review and approval by the Planning Division and those modifications not deemed minor shall be referred to the Design Review Board for review and recommendation prior to approval by the Planning Division. 3. This Environmental and Design Review Permit (ED15-068) allows the construction of a new automated carwash building, approximately 2,030 sq. ft., and new ancillary structures, including a 14-stall (3,700 sq. ft.), self-service vacuum canopy, a 198 sq. ft. self-service pay station canopy, a 85 sq. ft. trash enclosure and a 75 sq. ft. vacuum pump enclosure. 4. The emergency exit or 'exit-only' egress driveway shall be designed with a minimum 12- width. 5 .. All "off-haul" of excavation and delivery/pick-up of construction materials and/or equipment shall occur during off-peak traffic trip hours -between 9:00 a.m. and 4:00 p.m., Monday through Friday only or between 9:00 a.m. and 6:00 p.m. Saturdays. Sunday and federally- recognized holiday work is strictly prohibited. 6. All grading and construction activities shall be limited to 8 a.m. to 5 p.m., Monday through Friday and 9:00 a.m. and 6:00 p.m. Saturdays. Sunday and federally-recognized holiday work is strictly prohibited. 7. All new landscaping shall be irrigated with an automatic drip system and maintained in a healthy and thriving condition, free of weeds and debris, at all times. Any dying or dead landscaping shall be replaced in a timely fashion. This requirement to replace and maintain all project landscaping shall include any right-of-way access or right-of-improvement agreements entered into with either the City's Public Works Department or the State of California (Caltrans) by BlueWave and its successors for grading activities and/or the installation of landscaping and irrigation on the adjacent land located immediately east of the site, along the Francisco Blvd. E. frontage, or north of the site, along the Bellam Blvd. frontage. 8 8. All public streets that are impacted by the grading and/or construction operation for the project shall be kept clean and free of debris at all times. The general contractor shall sweep the nearest street adjacent to the site on a daily basis unless conditions require greater frequency of sweeping. 9. All new lighting shall include a master photoelectric cell with an automatic timer system, where the intensity of illumination shall be reduced or turned off when the carwash operations on the site are not in use. 10. The 14-stall self-service vacuum/parking canopy shall designate one (1) parking space for low-emitting, fuel-efficient, clean air vehicles. The designated parking space shall be painted, using the same paint color as the parking stall striping, with "CLEAN AIR VEHICLE" which shall be aligned with the end of the stall striping and is Visible beneath the parking vehicle. 11. All submitted Building Permit plan sets shall include a plan sheet incorporating these conditions of approval. 12. If archaeological or cultural resources are accidentally discovered during excavation/grading activities, all work will stop within 100 feet of the resource and the qualified archaeologist will be notified immediately. The qualified archaeologist will contact Federated Indians of Graton Rancheria (FIGR) and the Planning Division and coordinate the appropriate evaluation of the find and implement any additional treatment or protection, if required. No work shall occur in the vicinity until approved by the qualified archaeologist, FIGR and Planning staff. Prehistoric resources that may be identified include, but shall not be limited to, concentrations of stone tools and manufacturing debris made of obsidian, basalt and other stone materials, milling equipment such as bedrock mortars, portable mortars and pestles and locally darkened soils (midden) that may contain dietary remains such as shell and bone, as well as human remains. Historic resources that may be identified include, but are not limited to, small cemeteries or burial plots, structural foundations, cabin pads, cans with soldered seams or tops, or bottles or fragments or clear and colored glass If human remains are encountered (or suspended) during any project-related activity, all work will halt within 100 feet of the project and the County Coroner will be contacted to evaluate the situation. If the County Coroner determines that the human remains are of Native American origin, the County Coroner shall notify FIGR within 24-hours of such identification who will work with Planning staff to determine the proper treatment of the remains. No work shall occur in the vicinity without approval from Planning staff. 13. This Environmental and Design Review Permit (ED15-068) shall run with the land and shall remain valid regardless of any change of ownership of the project site, subject to these conditions, provided that a building/grading permit is issued and construction commenced or a time extension request is submitted to the City's Community Development Department, Planning Division, within two (2) years of this approval or until February 9, 2018. Failure to obtain a building permit and construction commenced or a time extension by the specified date will result in the expiration of this Environmental and Design Review Permit. 14. This Environmental and Design Review Permit (ED15-068) shall run concurrently with the Sign Program Amendment (SP15-001) approval. If the Environmental and Design Review Permit expires, the Sign Program Amendment approval shall also expire and become invalid. The Use Permit (#6446) approval, allowing the operation of an automated car wash facility on the site, shall remain in effect in perpetuity. 9 Prior to Issuance of Grading/Building Permits Community Development Department. Planning Division 15. The applicant shall provide copies of any right-of-access or right-of-improvement agreements entered into with the State of California (Caltrans) to the Planning Division for any grading or installation of landscaping and irrigation on the adjacent land located immediately north of the site, along the Bellam Blvd. frontage. Public Works Department 16. Provide excavation ('cut', 'fill' and 'off-haul') calculations for the project. A grading permit, from the Public Works Department, is required for earthwork over 50 CYDS. If a grading permit is required, the project shall also provide soil erosion control plans and a construction management plan. 17. All work in the public right of way requires the issuance of an encroachment permit from the Public Works Department. The project engineer shall submit three (3) sets of plans showing all work proposed in the public right-of-way, including details of all utilities, to the City Engineer for review and approval. 18. Provide a stormwater pollution control plan in compliance with MCSTOPPP requirements. For assistance on the required stormwater pollution control plan, please refer to the MCSTOPPP section of the Marin County website, "Tools and Guidance", "Post Construction Requirements" (http:www.marincounty.org/depts.lpw/divisions/mcstoppp/developmentlnew- and-redevelopment-projects). 19. A construction vehicle impact fee shall be required prior to building permit issuance, calculated at 1 % of the project valuation with the first $10,000 of valuation exempt. 20. Include the attached sheet "Pollution Prevention -Its Part of the Plan" with each construction drawing set submitted for building permit. San Rafael Sanitation District 21. Complete Civil/Utility plans shall be submitted to the San Rafael Sanitation District (SRSD) which comply with all San Rafael Sanitation District requirements for review and approval. 22. Sewer connection fees may be required and shall be paid prior to building permit issuance. The applicant shall provide an inventory of all existing plumbing fixture units inside the existing building on the site prior to demolition, including complete photo documentation. Without this inventory, the SRSD will be unable to credit the project for existing fixture units when calculating new connection fees. 23. If the applicant intends to use the existing sewer lateral serving the old building, the existing sewer lateral shall be televised to determine its condition. The results of this televised survey shall be submitted to SRSD for review. In the event the televised survey recommends improvements or repairs to the sewer lateral, the applicant shall be responsible for completing the improvements or repairs in coordination with SRSD staff. Community Development Department. BuildingDivision 24. The design and construction of all site alterations shall comply with the 2013 California Residential Code, 2013 California Building Code, 2013 Plumbing Code, 2013 Electrical Code, 2013 California Mechanical Code, 2013 California Fire Code, 2013 California Energy Code, 2013 Title 24 California Energy Efficiency Standards, 2013 California Green Building Standards 10 Code and City of San Rafael Ordinances and Amendments, or as amended at the time of building permit submittal. 25. A building permit is required for the proposed work. Applications shall be accompanied by four (4) complete sets of construction drawings to include: a) Architectural plans b) Structural plans c) . Electrical plans d) Plumbing plans e) Mechanical plans f) Fire sprinkler plans g) Site/civil plans (clearly identifying grade plan and height of the building) h) Structural Calculations i) Truss Calculations j) Soils reports k) Green Building documentation I) Title-24 energy documentation 26. The occupancy classification, construction type and square footage of each building shall be specified on the plans in addition to justification calculations for the allowable area of each building. Site/civil plans prepared by a California licensed surveyor or engineer clearly showing topography, identifying grade plane and height of the building. 27. Each building must have address identification placed in a position that is plainly legible and visible from the street or road fronting the property. Numbers painted on the curb do not satisfy this requirement. In new construction and substantial remodels, the address must be internally or externally illuminated and remain illuminated at all hours of darkness. Numbers must be a minimum 6 inches in height with 'h inch stroke for commercial applications. The address must be contrasting in color to their background SMC 12.12.20. 28. If any portion of new fencing exceeds 6' in height, a building permit is required. 29. With regard to any grading or site remediation, soils export, import and placement; provide a detailed soils report prepared by a qualified engineer to address these procedures. In particular the report should address the import and placement and compaction of soils at future building pad locations and should be based on an assumed foundation design. This information should be provided to Building Division and Department of Public Works for review and comments prior to any such activities taking place. 30. Any demolition of existing structures shall require a permit. Demolition permit submittal shall include three (3) copies of the site plan, asbestos certification and PG&E disconnect notice. All required permits from the Bay Area Air Quality Management District shall be obtained and documentation provided prior to building permit issuance and any work commencing .. 31. The site development of items such as common sidewalks, parking areas, stairs, ramps, common facilities, etc. are subject to compliance with the accessibility standards contained in Title-24, California Code of Regulations. Pedestrian access provisions should provide a minimum 48" wide unobstructed paved surface to and along all accessible routes. Items such as signs, meter pedestals, light standards, trash receptacles, etc., shall not encroach on this 4' minimum width. Also, note that sidewalk slopes and side slopes shall not exceed published minimums per California Title 24, Part 2. The civil, grading and landscape plans shall address these requirements to the extent possible. 11 32. Public accommodation disabled parking spaces must be provided according the following table and must be uniformly distributed throughout the site: Total Number of Parking Minimum Required Number of Spaces HIC Spaces Provided 1 to 25 1 26 to 50 2 51 to 75 3 76 to 100 4 101 to 150 5 151 to 200 6 201 to 300 7 301 to 400 8 401 to 500 9 501 to 1,000 Two 'percent of total 1,001 and over Twenty, plus one for each 100 or fraction thereof over 1,001 33. As a new building, the project is required to comply with the California Green Building Code, including Tier 1 standards. The specific requirements are as identified in San Rafael Municipal Code (SRMC) Section 12.23.020. 34. Prior to any use or occupancy of this building or structure or any portion there of a "Certificate of Occupancy" must be issued by the Chief Building Official pursuant to California Building Code Section 111.1. Failure to secure a "Certificate of Occupancy" is a violation and will result in a $500 citation per day that the violation continues. San Rafael Fire Department. Fire Prevention Bureau 35. The design and construction of all site alterations shall comply with the 2013 California Fire Code and City of San Rafael Ordinances and Amendments. 36. A building permit is required for the proposed work. Applications shall be accompanied by four (4) complete sets of construction drawings to include: a) Fire sprinkler plans (Deferred submittal to the Fire Prevention Bureau). b) Fire underground plans (Deferred submittal to the Fire Prevention Bureau) c) Fire alarm plans (Deferred submittal to the Fire Prevention Bureau) 37. Show the location of address numbers on the building elevation. Each building must have address identification placed in a position that is plainly legible and visible from the street or road fronting the property. Refer to Fire Prevention Bureau Premises Identification Standard 09- 1001, Table 1. 38. A Knox Box is required at the primary point of first response to the building. A recessed mounted Knox Box # 3275 Series is required for this project; the Knox Box shall be clearly visible upon approach to the main entrance. Note the Knox Box must be installed from 72" to 78" above finish grade; show the location on the plans. 39. Hazardous Materials Placard shall be installed in accordance with NFPA 704. 12 40. Provide a copy of the Hazardous Materials Management Plan which has been submitted to Marin County Department of Public Works, CUPA. 41. Contact the Marin Municipal Water District (MMWD) to make arrangements for MMWD to provide adequate water supply service for the required fire protection system. Marin Municipal Water District 42. Final landscape and irrigation plans for the project shall comply with the proVisions of Marin Municipal Water District's (MMWD) most recent water conservation ordinance (currently Ordinance 421). Construction plans submitted for issuance of building/grading permit shall be pre-approved by MMWD and stamped as approved by MMWD. The building permit application submittal shall include a letter from MMWD approving the final landscape and irrigation plans. Modifications to the final landscape and irrigation plans, as required by MMWD, shall be subject to review and approval of the Community Development Department, Planning Division. During Construction Marin Municipal Water District 43. The project shall comply with all indoor and outdoor requirements of District Code Title 13 - Water Conservation. Landscape, irrigation, grading and fixture plans shall be submitted to the District for review and approval. Any questions regarding District Code Title 13 -Water Conservation should be directed to the District's Water Conservation Department at (415) 945- 1497. You may also find information on the District's water conservation requirements online at www.marinwater.org: 44. The project shall comply with the backflow prevention requirements, if upon the District's review determines backflow protection is. warranted, including installation, testing and maintenance. Questions regarding backflow requirements should be directed to the Backflow Prevention Program Coordinator at (415) 945'1558. Pacific Gas & Electric 45. Electric and gas service to the project site will be provided in accordance with the applicable extension rules, which are available on PG&E's website at http://www.pge.com/myhome/customerservice/other/newconstruction or contact (800) PGE- 5000. It is highly recommended that PG&E be contacted as soon as possible so that there is adequate time to engineer all required improvements and to schedule any site work. 46. The cost of relocating any existing PG&E facilities or conversion of existing overhead facilities to underground shall be the sole responsibility of the applicant or property owner. 47. Prior to the start excavation or construction, the general contractor shall call Underground Service Alert (USA) at (800) 227-2600 to have the location of any existing underground facilities marked in the field. Prior to Occupancy Community Development Department, Planning Division 48. Final inspection of the project by the Community Development Department, Planning Division, is required. The applicant shall contact the Planning Division to request a final inspection upon completion of the project. The final inspection shall require a minimum of 48- hour advance notice. 13 49. All landscaping and irrigation shall be installed prior to occupancy. In the alternative, the applicant or property owner shall post a bond with the City in the amount of the estimated landscapinglirrigation installed cost. In the event that a bond is posted, all areas proposed for landscaping shall be covered with bark or a substitute material approved by the Planning Division prior to occupancy. Deferred landscaping through a bond shall not exceed 3 months past occupancy. 50. The landscape architect for the project shall submit a letter to the' Planning Division, confirming the landscaping has been installed in compliance with the approved project plans and the irrigation is fully functioning. 51. All exterior lighting shall be shielded down to reduce off-site glare and include a master photoelectric cell with an automatic timer system, where the intensity of illumination shall be reduced or turned off when the carwash facility is not in use. A minimum of one (1) foot candle at ground level overlap shall be provided at all exterior doorways and throughout the vehicle parking area. A minimum of one-half (1/2) foot candle at ground level overlap shall be provided on all outdoor pedestrian walkways and common areas. Less than one (1) foot candle at ground level overlap shall be provided at all property boundary lines. Following the issuance of a certificate of occupancy, all exterior lighting shall be subject to a 60-day lighting level review by the City to ensure that all lighting sources provide safety for the building occupants while not creating a glare or hazard on adjacent streets or be annoying to adjacent residents. During this lighting review period, the City may require adjustments in the direction or intensity of the lighting, if necessary. 52. All ground-and rooftop-mounted mechanical equipment shall be fully screened from public view. Public Works Department 53. Do Not Enter (R5-1) signs shall be placed at all one-way drives. Sign Program Amendment (SP1S-001) Conditions of Approval Community Development Department, Planning Division 1. The building techniques, colors, materials, elevations and appearance of the Sign Program Amendment as presented to the Planning Commission at their February 9, 2016 hearing, labeled BlueWave Express Carwash; 990 Francisco Blvd. East, San Rafael, California; Planning Commission' Package, November 11, 2015, and on file with the Community Development Department, Planning Division, shall be the same as required for issuance of all building/grading permits, subject to these conditions. Minor modifications or revisions to the project shall be subject to review and approval of the Community Development Department, Planning Division. Further modifications deemed not minor by the Community Development Director shall require review and approval by the original decision making body, the City's Planning Commission, and may require review and recommendation by the City's Design Review Board. 2. This Sign Program Amendment approves 97.8 sq. ft. of total signage for the site; one, 48.9 sq. ft., internally-illuminated LED, wall sign on the north elevation of the tower feature (facing Bellam Blvd.) and one, 48.9 sq. ft., internally-illuminated LED, wall sign on the west elevation of the tower feature (facing the westbound 1-580 off-ramp). 3. This Sign Program Amendment shall supersede all previous Sign Program (SR76-028) approvals. 14 4. This Sign Program Amendment shall run shall run concurrently with Environmental and Design Review Permit (ED15-068) approval. If the Environmental and Design Review Permit expires, Sign Program Amendment approval shall also expire and become invalid. The foregoing Resolution was adopted at the regular meeting of the City of San Rafael Planning Commission held on the 9th day of February 2016. Moved by Commissioner XXX and seconded by Commissioner XXX: AYES: COMMISSIONERS NOES: COMMISSIONERS ABSENT: COMMISSIONERS SAN RAFAEL PLANNING COMMISSION ATTEST:~~~ ____ ~~ __ Paul A. Jensen, Secretary BY: ---:-;---;'--:---;------;---::-;---, Mark Lubamersky, Chair 15 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 LAND USE ELEMENT LU-2 .. Development Timing. For health, safety and general welfare reasons, new development should only occur when adequate infrastructure is available consistent with the following findings: a. Project-related traffic will not cause the level of service established in the Circulation Element to be exceeded; b. Any circulation improvements needed to maintain the level of service standard established in the Circulation Element have been programmed and funding has been cOJIDnitted; c. Environmental review of needed circulation improvement projects has been completed; d. The time frame for completion of the needed circulation improvements will not cause the level of service in the Circulation Element to be exceeded, or the rmdings set forth in Policy C-5 have been made; and e. Sewer, water, and other infrastructure improvements will be available to serve new development by the time the development is constructed LU-9. Intensity of Nonresidential Development. Commercial and industrial areas have been assigned floor area ratios (FAR's) to identify appropriate intensities (see Exhibits 4, 5 and 6): Maximum allowable FAR's are not gnaranteed, particularly in environmentally sensitive areas. Intensity of commercial and industrial development on any site shall respond to the followin g factors: site resources and constraints, traffic and access, potentially hazardous conditions, adequacy of infrastructure, and City design policies. New "Blue Wave Express Carwash " Facility 990 Francisco Blvd E. Consistent The project proposes to demolish an existing automated car wash facility, approximately 4,000 sq. ft. in size, and construction of a smaller, 2,030 sq. ft., automated car wash facility and associated signage and landscaping improvements on a 22,000 sq. ft. site. While the existing carwash facility has been shuttered since December 2015 , it has been and continues to be currently served by City infrastructure and services. The City's Engineer has reviewed the project and determined that the smaller carwash would not impact the LOS (Level of Service) for the nearby intersections and the payment of traffic mitigation fees are not required. Additionally, the quasi-governmental agencies that would provide water and sewer service to the site have reviewed the proposed project and determined that there is adequate capacity to service the new project. Consistent The project proposes to demolish all existing structures on the site and to construct 2,030 sq. ft. of new gross floor nonresidential development. The maximum allowable floor area ratio (FAR) or intensity of development within the General Commercial (GC) District is 0.21. For the site, this constitutes a maximum allowable 4,620 sq. ft. of nonresidential development, based on a lot area of22,000 sq. ft. The existing FAR on the site is approximately 0.18 or 4,000 sq. ft. and the project proposes to reduce the FAR nearly in half to 0.09 or 2,030 sq. ft., well below the maximum allowed on the site. File #: ED15-068; SP15-0017 Title: General Plan 2020 Consistency Table Exhibit: 2-1 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 LU-12. Building Heights. Citywide height limits in San Rafael are described in Exhibits 7 and 8 . For Downtown height limits see Exhibit 9. LU-16 Building and Automotive Services. Maintain availability of sites for building, automotive and service industries important to San Rafael's economy and the convenience of its residents and businesses. LU-23. Land Use Map aod Categories. Land use categories are generalized groupiogs of land uses and titles that define a predominant land usc type (See Exhibit II). All proposed projects must meet density and FAR standards (See Exhibits 4,5 and 6) for that type of use, and other applicable development standards. Some listed uses are conditiona l lIses in the zoniog ordioance and may be allowed only in limited areas or under limited circumstances. Maintain a Land U s e Map that illustrates the distribution and location ofland uses as envisioned by General Plan policies. (See Exhibit II). NEIGHBORHOOD S ELEMENT New "Blue Wave &press Carwash" Fa c ility 990 Francisc o Blvd. E. Consistent Accordiog to Exhibit 7 (Building Heights Limits in Central San Rqfael) of the General Plan, the maximum height limit for this property is 36 feet, like the surroundiog General Commercial neighborhood. The General Plan defines height of a bui(ding for non-hillside as the vertical distance above a reference damm measured to the highest point of the copiog of a flat roof or to the deck line of a mansard roof. The reference datum is determined as follows: if the difference in grade between the lowest and highest grade point is greater than 10 ', the reference datum is located 10' vertically from the lowest grade point. The project proposes to construct the new carwas!l building on a flat, previously graded site, with no perceivable cross-slope and which is currently developed with a single-story commercial building. The project proposes a building height of 16' 8" to the top of the parapet from finished grade and 27' 6" to the top ofthe sign tower feature. The project also proposes four (4) accessory structures ; a self-s ervice vacuum stall/parking canopy and a self-service pay s tation canopy, 10-11 ' io height each, and a va cuum enclosure and a trash enclosure, 8 ' 6" and 6 ' in height, respectively. The propos ed project is therefore consistent with the height limits for this site. Consistent The existing carwash facility operates in compliance with a Use Permit (#6446) approved by the Planning Commission in I 964.This use permit approval remains valid. The project proposes to continue operating an automotive service use (automated carwash facility) on the site for the convenience of the both San Rafael residents and businesses. Consistent According to Exhibit II (Land Use Categories) of the General Plan, the GC land use category defines allowable land use s as "General retail and service uses, restaurants, automobile sales and service uses, and hotels/motels. Offices as secondary uses except along Francisco Blvd. West where retail re development is strongly encouraged'. The site currently operates as a automated carwash facility or automotive service use. The project proposes to continue to operate under the tenus of the approved (Use Permit #6446) carwash facility use on the site, which would be consistent with the automotive service uses allowed io the GC land lise category. File #: EDl5-068; SPIS-0017 Title: General Plan 2020 Consistency Table Exhibit: 2-2 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 NH-4b. Improve Property Maintenance; Design review Conditions of Approval. Through development review, require that design r eview approval include langnage whereby owners maintain lands caping in good condition. : NH-Sl. Existing Business Development. Support and encourage the upgrading of existing business areas, consistent with infrastructure needs. Encourage redevelopment and upgrading of exi sting sites. NH-S3. Building and Antomotive Services. Maintain availability of sites for building, automotive and related service indnstries important to San Rafael 's economy and needed for the convenience of its residents and businesses . NH-73. I-S80/1011Bellam Blvd. Interchange Improvements. Pursue improvement of the 1- 5801l01IBellam Blvd. interchange. NH-73a. Caltrans. Work with Caltrans on an effective and attractive design for the Highway 101 and 1-580 interchange. -- New "Blue Wav e Express Carwash" Facility 990 Francisco Blvd. E. - Consistent with Condition The project proposes to increase the site land scaping from approximat ely 1,000 sq. ft. (5%) to 6,820 sq. ft. (31 %). The project also proposes to landscape 4 ,2 00 sq. ft. of exi sting right-of-way (ROW), located between the site and Francisco Blvd. E., which is supported by th e City's Public Works Department. The project sponsor is also currently in final negotiations with Caltrans for approvals neces s ary to allow the installation of lands caping and irrigation on their property located inunediately nortil of the site, between the site and the Bellam Blvd. frontage. Property development standards for the site require a minimmn of 15% or 3,300 sq. ft . of landscaping. Conditions of approval have been included in the Planning Conunission's Resolution for the project requiring all new landscaping to be irrigated with an automatic drip system and maintained in a healthy and thriving condition, free of weeds and debris , at all times and any dying or dead landscaping shall be replaced in a timely fashion. This condition also requires replacement and maintenance of all project landscaping includes landscaping located within the public right-of-way (ROW), along the Francisco Blvd. E. frontage, or on the State of California (Caltrans) property, located immediately north of the site, along the Bellam Blvd. frontage. (Condition #7 ; EDI5- 068) Consistent See NH-4b discnssion above. The project proposes to replace the existing automated carwash facility in the site with a smaller, more efficient, automated carwash facility. The project proposes to increase the landscape character on the site, with the ROW along Francis co Blvd. E. and on the adjacent Caltrans property significantly. The project also proposes to increase on the on-site parking from s ix (6), as approved for the existing carwash facility , to 14 (l4-stall, self-service vacuum/parking canopy), which will be consistent Witil the applicable parking standards (I parking space at each vacumn stall). Consistent See LU-16b discussion above. Consistent with Condition See NH-4b discussion above. File #: ED15-068; SP15-0017 Title: General Plan 2020 Consistency Table Exhibit: 2-3 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 COMMUNITY DESIGN ELEMENT CD-I. City Image. Reinforce the City's positive and distinctive image by recognizing the natural features of the City, protecting historic resources, and by strengthening the positive qualities of the City's focal points, gateways, corridors and neighborhoods. CD-ld. Landscape Improvements. Recognize that . landscaping is a critical design component. Encourage maximum use of available landscape area to create visual interest and foster sense of the natural environment in new and existing developments. Encourage the use of a variety of site appropriate plant materials. CD-2. Neigbborbood identity. Recognize and promote the unique character and integrity of the city's residential neighbornoods and Downtown. Strengthen the "bometown" image of sari Rafael by: • Maintaining the urban, historic, and pedestrian character of the Downtown; • Preserving and enhancing the scale and landscaped character of the City's residential neighborhoods; • Improving the appearance and function of commercial areas; and • Allowing limited commercial uses in residential neighborhoods that serve local residents and create neighborhood gathering places .. CD-S. Views. Respect and enhance to the greatest extent possible, views of the Bay and its islands, Bay wetlands, St. Raphael's church bell tower, Canalfront, marinas, Mt. Tamalpais, Marin Civic Center and hills and ridgelines from public streets, parks and publicly accessible pathways. New "Blue Wave Express Carwash " Facility 990 Francisco Blvd E. Consistent with Conditions See NH-4b discussion above. According to Exhibits 17 (San Rafael Community Design) and 18 (Central San Rtifael Community Design) of the General Plan, Francisco Blvd. E. is identified as a "transportation corridor" which contribute to the City based not only on land use and transportation function but also how it is experienced by the public. While specific corridor design guidelines do not currently exist, landscaping within ROWs is highly encouraged. The project proposes to increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City's ROW, between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. Conditions of approval have been included in the Planning Commission's Resolution for the project requiring allqew landscaping, both on-site and within these adjacent ROW areas, be maintained in a healthy condition at all times and replace all dying or dead plantings in a timely fashion, if necessary. (Condition #7; ED15-068) Consistent with Conditions See NH-4b discussion above. Consistent While the proposed sign tower element would likely create a view impact of the hillside north ofthe site as seen from both the westbound 1-580 flyover and off-ramp, this impact is minor and insignificant due to the limited size (20' x 20') of the sign tower and the grade difference of up to 20' between the site and the westbound 1-580 flyover over Bellam Blvd. This view impact has been further mitigated by a recommendation by the Design Review Board (Board) during concept review of the project that the sign File #: ED15-068; SPJ5-0017 Title: General Plan 2020 Consistency Table Exhibit: 2-4 --------------_. --... - Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 CD-9. Transportation Corridors. To improve the function and appearance of corridors, recogoize those shown on Exhibi ts 17 and 18 and derme each corridors contribution to the City based upon its land use and transportation function and how it is experienced by the public. CD-9b. Right-or-Way Landscaping. Encourage Caltrans to install and maintain landscaping along its right-of-ways. CD-IO. Nonresidential Design Guidelines. Recogoize, preserve and enhance the desigo el ements that contribute to the economic vitality of commercial areas. Develop design guidelines to ensure that new nonresidential and mixed-use development fits within and improves the immediate neighborhood and the commuuity as a whole. CD-IS. Participation in Project Review. Provide for public involvement in the review of new development, renovations, and public projects with the following: a) design goide lines and other information relevant to the project as described in the Community Desigo Element that would be used by residents, de sigoers , project developers, City staff, and City decis ion makers; b) distribution of the procedures of the development process New "BlueWave Express Carwash" Facility 990 Francisco Blvd E. tower be reduced in height "by a couple offeet" to improve proportionality with the new carwash building and proposed new sigoage. The formal project desigo submittal reduced the height of the s igo tower from 29' 9" to 27' 6" and the Board is recommending approval of the project, subject to minor modifications to the carwash building fa~ade and s ite plant materials whicb have been incorporated into revi sed plans for r e view by the Planning Commission which have been incorporated into revised plans for review by the Planning Commission. Consistent with Conditions See CD-IICD-ld and NH-4b discussions above. Consistent As part of the General Plan 2020, the City adopted interim desigo guidelines for residential, non- residential, Downtown projects and projects in close proximity to buildings identified as historic resources . During their revie w of the project, the Board determined that the proposed site and building desigo was consistent with the City's interim Nonresidential Desigo Guidelines in terms of parking lot, landscaping, lighting, building scale and architecture and material and colors, s ubject to minor modifications to the carwash building fa,ade and site plant materials which have been incorporated into revi sed plans for review by the Planning Commission (A copy of these interim Nonresidential Desigo Guidelines is attached to staff's report to the Planning Commiss ion , Exhibit 5) Consistent with Conditions The proposed project has provided for effective citizen participation in decision-making, given that; the City has provided opportunities for public involvement in the review of the project through: I) the referral, notice and hearings of the Conceptual Desigo Review submittal to the appropriate neighborhood groups (i.e., Marin Villa-Canal Housing Alliance) and in compliance with Chapter 29 of the Zoning Ordinance (Public Notice); and 2) the referral, notice and hearings of the 'formal ' project review in compliance with Chapter 29. Notice of two (2) separate Board meetings and this hearing were mailed to all property owners and occupants within a 300-foot radius of the site, and the appropriate neighborhood grouJ'S , a minimum of File #: EDl5-068; SP15-00J7 Title: General Plan 2020 Consistency Table Exhibit: 2-5 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 that include the following: submittal information, timelines for public review, and public notice requirements; c) standardized thresholds that state when design review of projects is required (e.g. residential conversions, second- story additions); and d) effective public participation in the review process. CD-I8. Landscaping. Recognize the unique contribution provided by landscaping, and make it a significant component of all site design. CD-I9. Lighting. Allow adequate site lighting for safety purposes while controlling excessive light spillover and glare. CD-20. Commercial Signage. Provide sign regulations and guidelines that allow adequate visual identification necessary for successful commercial uses, while also taking into consideration the visual impact along any given roadway. New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. 15 calendar days prior to the meetings or hearing, and notice was posted on the project site along the Francisco Blvd. E. frontage. At the time of printing staff's report to the Plarming Commission, staff has received no public comments as a result of any noticing for the project. Comments received from other City departments and non-City agencies on the project have been incorporated in the review, revisions andlor conditions of approval of the project. Consistent with Conditions See CD-IICD-ld and NH-4b discussions above. Consistent with Condition The lighting plan (location, type and design) with photometric study (lighting levels) was reviewed by the Board, along with the other design elements of the project, and recommend approval with the project. The proposed photometric lighting levels generally meet the City's minimum illumination standards: • All exterior lighting shall be design or shielded down to minimum off-site glare. • A minimum of one (1) foot candle at ground level overlap shall be provided at all exterior doorways and throughout the vehicle parking area. • A minimum of one-half (112) foot candle at ground level overlap shall be provided on all outdoor pedestrian walkways and common areas. • Less than one (I) foot candle at ground level overlap shall be provided at all property boundary lines. • Following the issuance of a certificate of occupancy, all exterior lighting shall be subject to a 90-day lighting level review by the City to ensure that all lighting sources provide safety for the building occupants while not creating a glare or hazard on adjacent streets or be annoying to adjacent residents. These lighting standards have been incorporated into conditions of approval (Condition #51; ED 15-068). Consistent The existing carwash facility operated with both a Use Pernlit (#6446) and a Sign Program (SR76-028). The existing Sign Program approved three (3) signs on the site totaling 100 sq. ft. of combined sign area (two freestanding signs with one a changeable copy sign, each 32 sq. ft. of sign area, and one 36 sq. ft. wall sign). The project proposes to amend the Sign Program to reduce the number of signs on the site, from 3 to 2 signs, while increasing the size of each sign, from 32-36 sq. ft. to 48.9 sq. ft., and relocating the signs to the tower feature on the new carwash building. The total sign area for the site is proposed to be reduced from 100 sq. ft. to 97.8 sq. ft. During concept review of the project, the Board recommended minor modifications to improve sign readability and to reduce the scale of the sign tower element. These recommendations were incorporated into revisions to the project at formal application submittal and the File#: EDIS-068; SP15-0017 Title: General Plan 2020 Consistency Table Exhibit: 2-6 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 ECONOMIC VITALITY ELEMENT EV-2. Seek, Retain and Promote Businesses that Enhance San RafaeL Recruit and retain businesses that contribute to our economic vitality, thus helping to provide needed local goods, services and employment, and enhance the City's physical environment. EV-7. Environmentally-Friendly Business Practices. Promote environmentally friendly business practices that reduce the need for non-renewable resources. EV-S. Diversity of Economic Base. Keep San Rafael a full-service city by retaining and supporting a broad and bealthy range of businesses. EV-13. Business Areas. Promote San Rafael's economy and the strengths and benefits of all of its business areas. Pursue actions that revitalize and sustain San Rafael's business areas such as: • Planning and managing the supply and operations of parking . • Beautification efforts along City public areas, such as New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. Board has recommended approval of the project design, including amendments to the Sign Program, to the Planning Connnission. Consistent See LU -16b discussion above. Consistent with Conditions The project design proposes to incorporate the most recent water-efficiency technologies into the operations of the new automated carwash facility. Additional environmentally-friendly business practices include: • All landscaping is designed, and required by condition, to be migated with an automatic, water- efficient, drip system (Condition #7; ED 15-068); and • All site lighting, with the exception of the building sconce fixtures , is designed with energy-saving LED (light-emitting diode) technology and is required by conctition to include a master pbotoelectric cell with an automatic timer system, where tbe intensity of illumination shall be reduced or turned off when the carwash operations on the site are not in use (Condition #9; ED15-068). • The project is required to be designed and constructed in compliance with all applicable current California Building Codes, including the 2013 California Green Building Standards Code (Condition #24; EDl5-068). Consistent See LV -16b discussion above. Consistent with Conditions Bee LU-16b and NH-4b ctiscussions above. File#: EDIS-068: SP15-0017 Title: General Plan 2020 Consistency Table Exhibit: 2-7 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 installation and maintenance of planters, street trees, and lighting . • Housing and economic development . • Multi-modal circulation improvements for residents, workers, suppliers and customer. EV-14. Support for Business Areas. Support and encourage public and private redevelopment and upgrading of both existing and underdeveloped commercial and industrial properties, while retaining economic and architectural diversity . CIRCULATION ELEMENT C-S. Traffic Level of Service Standards. a. Intersection LOS. In order to ensure an effective roadway network, maintain adequate traffic levels of service (LOS) consistent with standards for s ignalized intersections in the A.M. and P.M. peak hours as shown below, except as provided for under (B) Arterial LOS . C-22. Attractive Roadway Design. Design roadway projects to be anractive and, where possible, to include trees, lands cape buffer areas, public art, integration of public spaces and other visual enbancements. Emphasize tree planting and landscaping along aH streets. ~TRUCTUREELEMENT 1-2. Adequacy of City Infrastructure and Services. Assure that development can be adequately served by the City's infrastructure and that new facilities are well planned and well designed. 1-3. Availability of Utilities. Promote the availability of New "Blue Wave Express Carwash " Facility 990 Fran cisco Blvd E. Consistent See LU-16b discussion above. Consistent with Condition See LU-2 discussion above. C onsistent with Conditions See CD-I/CD-ld and NH-4b discussions above. Consistent See LU-2 discussion above. File #: EDl5-068; SP15-00l7 Title: General Plan 2020 Consistency Table Exbibit: 2-8 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 reliable and reasonably priced utilities necessary for business es and residences to prosper. 1-3b. Water Supply Impacts. Work with Marin Municipal Water District to meet the projected water demand and to ensure reduction of existing and projected water supply impacts. I-g. Street Trees. Create street tree planting and maintenance programs and encourage the use oflarge canopy trees where appropriate in order to control temperatore, improve air quality, control wind, define neighborhoods, and improve street appearance. I-Sb. Street Trees for New Development. Require street trees at frequent spacing in all new developments and property upgrades, and consider mitigation for tree removal by planting s treet trees in locations other than the project site. SUST AINABILITY ELEMENT SU-S. Reduce Use of Nonrenewable Resources. Reduce dependency on non·renewable resources. SU-6. New and Existing Trees. Plant new and retain existing trees to maximize energy conservation and carbon s equestration benefits. SU-6d. Carbon Ofrset Program. Consider the feasibility of a local carbon offset program to support tree planting and maintenance. SAFETY ELEMENT New "Blue Wave Express CanvQsh" Facility 990 Francisco Blvd E. ---- - Consistent with Conditions See NH-4b discussion above. The project design proposes to increase landscaping on the site and within ROW areas along the Francisco Blvd. E. and Bellam Blvd frontages with a consistent diverse planting palette of trees (both deciduous and evergreen), shrubs and groundcovers. The Board reviewed and recommended approval of the project design, including the proposed landscape plan , at their January 20, 2016 meeting, subject to minor modifications to the carwash building fa9ade and the site plant material s which have been incorporated into revised plans for review by the Planning Commission. Consistent The project will comply with the most recently adopted CBC (California Building Code) Green Building r egulation and Title-24 Energy regulations, and the Marin Municipal Water District's most recently adopted water conservation regulations (Ordinance #421). Consistent with Conditions See EV -7 discussion above. ------ File #: ED15-068; SP15-0017 Title: General Plan 2020 Consi stency Table Exhibit: 2-9 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 S-17. Flood Protection of New Deyelopment. Design new development within the bay mud areas to minimum floor elevation that provides protection from potential impacts of flooding during the "IOO-year" flood. The fmal floor elevation (elevation of the first floor at completion of construction) shall acconnt for the ultimate settlement of the site due to consolidation of the bay mud from existing and new loads, taking into acconnt soils conditions and the type of structure proposed. Design for settlement over a 50-year period is typically considered sufficient. 8-18. Storm Drainage Improvements. Require new development to improve local stonn drainage facilities to 'accommodate site rnnoffanticipated from a "IOO -year" stonn. S-32. Safety Review of Deve lopment Projects. Require .crime prevention and fire prevention techniques in new development, including adequate access for emergency vehicles. NOISE ELEMENT N-4. Noise From New Nonresidential Development. Design nonresidential development to minimize noise impacts on neighboring uses. a. Performance Standards for Uses Affecting Residential Districts. New nonresidential development shall not increase noise levels in a residential district by more than Ldn 3 dB, or create noise impacts that would increase noise levels to more than Ldn 60 dB at the property line of the noise receiving use, whichever is New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. Consistent The site is located within the "IOO-year" floodplain. The project design has been reviewed by the City Engineer and found that it would not pose potential flooding danger. Consistent The proposed project has been reviewed by the City Engineer which implements the Stonnwater Pollution Prevention standards and regulations. The City Engineer has detennined the project design includes adequate measures to reduce stonnwater rnn-off consistent with the standards established by the RWQCB (Regional Water Quality Control Board). The project design includes an approximate 570 sq. ft. storm water retention area or 'bioswale', located behind the new carwash building, which is anticipated will have the effect of reducing peak flow runoff to pre-redevelopment levels : Consistent The San Rafael Fire Department, Fire Prevention Bureau, has reviewed the proposed project and recommended approval, subject to Conditions #35-41, EDI5-068. Consistent The project proposes to demolish an existing automated car wash facility, approximately 4,000 sq. ft. in size, and construction of a smaller, 2,030 sq. ft., automated car wash facility and four ancillary structures on the 22,000 sq. ft. site. it is not anticipated to generate any new, permanent traffic impacts, including noise, and would therefore not increase noise levels by more than Ldn 3 db .. While the project design includes a new 14-stall (3,700 sq. ft.), self-service vacuum canopy and a 75 sq. ft. vacuum pump enclosure, it is not anticipated to increase noise levels by more than Ldn 3 dB due to the relatively higb ambient noise surronnding the site created by high-volume City (Bellam Blvd. and Francisco Blvd. E.) and State (I-580) transponation corridors. File #: EDI5-068; SP15-00l7 Title: General Plan 2020 Consistency Table Exhibit: 2-10 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 the more restrictive standard. AIR AND WATER QUALITY ELEMENT AW-4. Particulate Matter Pollution Reduction. Promote the reduction of particulate matter pollution from roads, parking lots, construction sites, agricultural lands and other activities. AW-4a. Pollution Reduction. Through development review, ensure that any proposed new sources of particulate matter use latest control technology (such as enclos ures, paving unpaved areas, parking lot sweeping and landscaping) and provide adequate buffer setbacks to protect existing or future sensitive receptors. AW-7. Local, State and Federal Standards. Continue to comply with local, state and federal standards for water qUality . A W-S. Reduce Pollution from Urban Runoff. Address non-point source polJution and protect receiving waters from pollutants discharged to the storm drain system by requiring Best Management Practices quality. • Support a lternatives to iropervious surfaces in new developm ent, redevelopment or public iroprovement projects to reduce urban runoff into storm drain system, creeks and the Bay. • Require that site designs work with the natural topograpby and drainages to the extent practicable to reduce the amount of grading necessary and limit disturbance to natural water bodies and natural New "Blue Wa ve Express Carwash" Facility 990 Francisco Blvd E. Consistent See NH-4b discussion above. The project proposes to significantly increase site landscaping plus convert existing impermeable hardscape located within the public ROW, between the site and Francisco Blvd. E., into new landscape areas. This substantial increase in permeable surface on-site and within the adjacent ROW will help to filter particulate matter polJution and reduce its runoff into the City's storm drainage syst em. Consistent The project would be required to comply with the City 's Stormwater Pollution Prevention standards which are derived from the Regional Water Quality Board. The proposed drainag e plan is des igned to be consistent with the storm water pollution standards by treating surface and roof rainwater runoff on-site in a landscape bioswale filtration area, located bebind the new carwash building, before it enters into the City 's storm drain system. Consistent See NH-4b, AW-4 and AW-7 discussions above. -- File #: EDl5-068; SP15-0017 Title: General Plan 2020 Con sistency Table Exbibit: 2-I 1 Exhibit 2 TABLE ANALYZING PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020 drainage systems. • Where feasible, use vegetation to absorb and filter fertili zers, pesticides and other pollutants. New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. File #: EDlS-068; SPIS-0017 Tide: General Plan 2020 Consistency Table Exhibit: 2-12 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) CHAPTER 5 -COMMERCIAL AND OFFICE DISTRICTS 14.05.010 -Specific Purposes. in addition to the general purposes listed in Section 14.01.030, the specific purposes of the connnercial and office districts include the following: A. To promote specialized commercial environments which provide appropriately located areas for retail, service and office development, and provide the city with a wide range of neighborhood, local and regional serving uses;. C. To promote commercial and office projects at appropriate building intensities and trip-generation characteristics which will maintain acceptable traffic-operating standards; D. To promote high-quality design in new or remodeled connnercial and office development consistent with design guidelines. 14.05.020 -Land Use Regulations. Motor vehicle sales and service (including automobiles, motorcycles, trailers, trucks and recreational vehicles) • Coin-o!, washing C New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. Consistent • The existing carwash facility operates in compliance with a Use Permit (#6446) approved by the Planning Commission in 1964.This use permit approval remains valid. The project proposes to continue operating an automotive service (automated carwash facility) on the site for the convenience ofthe both San Rafael residents and businesses. • The project proposes to demolish all existing structures on the site and to construct 2,030 sq. ft. of new gross floor nomesidential development. The maximum allowable floor area ratio (FAR) or intensity of development within the General Commercial (GC) District is 0.21. For the site, this constitutes a maximum FAR of 4,620 sq. ft., based on a lot area of22,000 sq. ft. The existing FAR on the site is approximately O.IS or 4,000 sq. ft. and the project proposes to reduce the FAR nearly in half to 0.09 or 2,030 sq. ft., well below the maximum allowed on the site. The City's Engineer has reviewed the project and determined that the smaller carwash would not impact the LOS (Level of Service) for the nearby intersections and the payment of traffic mitigation fees are not required. • The Design Review Board (Board) reviewed the project at their January 20, 2016 meeting and recommended approval of the proposed site and building design, rmding the project design is adequately consistent with the nonresidential design guidelines, review criteria for Environmental and Design Review Permits and the findings required for amending the existing Sign Program, subject to the following recommendations for minor revisions, which have been incorporated into the design; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articulate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' specieS ofXylosma for 'congeslum' for those areas adjacent to the drive aisle or relocated the 'congeslum' to provide a greater setback from the drive aisle. Consistent In 1964, the Planning Commission approved a Use Pennit (#6446) to allow the development and operation of the existing automated carwash facility, which has remained in operation continuously until December 20 15 .The existing Use Permit approval remains File #: EDI5 -06S; SP15-001 Tide: Zoning Ordinance ConSistency Table Exhibit: 3-1 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) 14.05.030 -Property Development Regulations • Maximum density: 1,000 sq. ft. oflot area/unit • Maximum height: 36 ' • Mioimum landscaping: 15% CHAPTE R 16 -SITE AND USE REGULATION S 14.16.110 -Drive-Through Facilities. Drive-through facilities shall comply with the following standards: A. Traffic and· Circulation. 1. The drive-through stacking lanes shall be separated physically (i.e ., by raised curb or landscape planter) from the parking lot, and shall comply with the following capacity ·standards: Use Len gth of Stacking LaneCs)' Financial Institutions 3-{) cars, depending upon volume Fast Food Restaurants 8-12 cars, depending upon volume Kiosks 2 cars .. - New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. valid, allowing the project and no amendment of the Use Pennit is propos ed or required at this time. Consistent • The project proposes to demolish an approximate 4,000 sq. ft. automated carwash building facility and construct a new, smaller, 2,0030 sq. ft. automated carwash facility with no residential units. • .The project proposes a building height of 16' 8" to the top of the parapet from finished grade and 27' 6" to the top of the sign tower feature. The project also proposes four (4) accessory structures; a self·service vacuum stall/parking canopy and a self-service pay station canopy, 10-11' in height each, and a vacuum enclosure and a trash enclosure, 8' 6" and 6' in height, respectively. • The project proposes to increase the site landscaping from approximately 1,000 sq. ft. (5%) to 6,820 sq. ft. (31%). The project also proposes to landscape 4,200 sq. ft. of existing right-of-way (ROW), located between the site and Francisco Blvd. E., which is supported by the Public Works Department.. The project sponsor is also currently in final negotiations with Caltrans for approvals necessary to allow the in s tallation of landscaping and irrigation on the ir property located immediately north of the s ite, between the site and the Bellam Blvd. frontage. Property development standards for the site require a minimum of 15% or 3,300 sq. ft. oflandscaping. Consistent • • The City Engineer has reviewed the project design, including the queuing or stacking proposed between the entrance to the site and the self-service pay station canopy, and recommends approval of the project due to the anticipated frequency of carwash turrover and the requirement that the existing 'exit-only' driveway remain, relocated between the self-service pay station canopy and the carwash building. The proposed landscape plan for the project includes dense planting along the perimeter of the site to help screen the off-site glare from vebicles proceeding through the automated carwash facility . File #: ED1S-068; SP1S-OOI Title: Zoning Ordinance Consi stency Table Exhibit: 3-2 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) II Other I Determined on an individual basis • Provide 20 feet per car length. 2. The drive-through stacking lane shall be situated so that any overflow parlcing from the stacking lane shall not ·spill out onto public streets or major circulation aisles of any parking lot. If the overflow is directed to the street, additional overflow capacity shall be eighty percent (80%) of required stacking. 3. Pedestrian crossings of the drive-through lane are discouraged. 4. Entrances and exits to drive-through facilities near high volume intersections shall be located so as to maxiroize the di stances to the intersection. 5. Confus ing on-site circulation shall be avoided. Entrances to and exits from drive-through facilities should be at least twenty feet (20') from the property line. 6. Parking spaces for drive-through special orders may be required. B. Noise. Speakers at drive-through facilities shall not be audible from adjacent residential uses or disturbing to adjacent nonresidential uses. Sound attenuation walls or other mitigation measures shall be required as necessary. C. Hours of Operation. Liroited hours of operation shall be required where a drive-through facility could affect nearby residential us es . D. Emission Control. Drive-through stacking lanes shall not be located adjacent to patios and other pedestrian use areas, other than walkways, and should be discouraged where adjacent nonresidential buildings are within thirty feet (30') of the proposed lane . Drive-through stacking lanes shall not be located within fifty feet (50') of any residential uses. E. Design Review. All drive-through facilities are a minor pbysical improvement subject to tbe provis ions of Chapter 14.25, Environmental and Design Review Permits. Generally, the drive-through facility s hall be architecturally compatible with nearby structures, provide landscaping to buffer adjacent uses and provide adequate lighting which is shielded from adjacent propetties. Trash receptacles adequate to control litter will also be required. New "Blue Wav e Express Carwash" Facility 990 Francisc o Blvd. E. File #: ED15-068; SPJ5-001 Title: Zoning Ordinance Consistency Table Exhibit: 3-3 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) 14.16.150 -Floor Area Ratio (FAR). In conjunction with Exhibit 4 (Floor Area Ratios in Central San Rafael) of the General Plan, the maximum allowable F loor Area ration (FAR) for "General Retail and Service" uses in the General Commercial (GC) District is 0.21. 14.16.227 -Light and Glare Colors, materials and lighting shall be des igned to avoid creating undue off- site light and glare impacts. New or amended building or site colors, materials and light ing shall comply witb the fo llowing standards, subject to review and recommendation by the police department, public works department, and community development department: A. Glossy finishes and reflective glass such as glazed or mirrored snrfaces are discouraged, and prohibited where it would create an adverse impact on pedestrian or automotive traffic or on adjacent structures; particularly within the downtown environs and in commercial, industrial and hillside areas. E. Lighting fixtures shaH be appropriately designed and/or shielded to conceallig b t sources from view off-site and avoid spillover onto adjacent properties. C. The foot-candle intensity of lighting should be the minimum amount necessary to provide a sense of security at building entryways, walkways and parking lots. In general terms, acceptable lighting levels would provide one (1) foot-candle ground level overlap at doorways, one-balf (V,) fo ot-candle overlap at walkways and parking lots, and fall below one (I) foot-can dl e at the property line. D. Lighting shall be reviewed for compatibility with on-site and off-sight light sonrces. This shall include review of lighting intensity, overlap and type ofiIlumination (e.g., high-pressure sodium, LED, etc.). This may include a review by the city to assnre that lighting installed on private property would not cause conflicts with public street lighting. E. Installation of new lighting fixtures or changes in lighting intensity on mixed use and non-residential properties shall be subject to environmental and design review permit review as required by Chapter 14.25 (Design Review). F. Maximum wattage oflarnps shall be specified on the plans submitted for New "BlueWave Express Carwash" Facility 990 Francisco Blvd E. Consistent The project proposes to demolish all existing structures on the site and to construct 2,030 sq. ft. of new gross floor nonresidential development. The maximum allowable FAR for the site (0.21 FAR) would allow a maximum allowable 4,620 sq. ft. of nonresidential development, based{)lI a lot area of22,000 sq. ft. The existing FAR on the site is approximately 0.18 or 4,000 sq. ft. and the project proposes to reduce the FAR nearly in half, to 0.09 or 2,030 sq. ft., well below the maximum allowed on the site. Consistent with Condition The lighting plan (location, type and design) with photometric study (lighting levels) was reviewed by the Board, along with the other design elements of the project, and recommend approval with the project. The proposed photometric lighting levels generally meet the City's minimum illumination standards: • AU exterior lighting shall be design or shielded down to minimum off-site glare. • A minimum of one (I) foot candle at ground level overlap sball be provided at aU exterior doorways and throughout the vehicle parking area. • A minimum of one-half (1 /2) foot candle at ground level overlap shall be provided on all outdoor pedestrian walkways and common areas. • Less than one (1) foot candle at ground level overlap shall be provided at all property boundary lines. • Following the issuance of a certificate of occupancy, all exterior lighting shall be subject to a 90-day lighting level review by the City to ensure that all lighting sources provide safety for the building occupants while not creating a glare or hazard on adjacent streets or be annoying to adjacent residents. These lighting standards and lighting review period have been incorporated into conditions of approval (Condition #51; ED 15-068). In addition, all site lighting, with the exception of the building sconce fixtures, is designed with energy-saving LED (light- emitting diode) technology and is required by condition to include a master photoelectric cell with ari automatic timer system, where the intensity of illumination shall be reduced or turned off when the carwash operations on the site are not in use (Condition #9; ED 15- 068). File #: EDI5-068; SP15-001 Title: Zoning Ordinance Consistency Table Exhibit: 3-4 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) electrical permits. G. All new lighting shall be subject to a 90-day post installation inspection to allow for adjUS1ment and assure compliance with this section. 14.16.243 -Mechanical Equipment Screening. Equipment placed on the rooftop of a building or in an exterior yard area shall be adequately screened from public view. See Chapter 14.16 for exclusions to maximum height requirements and Chapter 14.25 for design review requirements 14.16.370 -Water-Efficient Landscaping A. Purpose and)\utbority. Effective January 1,2011, certain new construction and rehabilitation projects that include landscape and irrigation improvements are required to comply with water-efficient landscape requirements and to monitor water usage for irrigation, as mandated under California Government Code Section 65595(c). For the purpose of administering this state. mandate, the City of San Rafael hereby adopts by reference, the Marin Municipal Water District (MMWO) Ordinance (Water c;onservation), as adopted and periodically amended, and designates MMWD, tile local water provider, to implement. enforce, and monitor the requirements of this ordinance. For projects that are subject to the water-efficient landscape requirements, the c ity defers to MMWD to administer the provisions of this chapter, which include: I. The application and monitoring of a "maximum applied water allowance," that is established for applicable projects. 2. The review of required landscape and irrigation plans, specifications and supportive documents prepared for applicable projects for compliance with water-efficient landscape restrictions, including limitations on the type and amount oflandscape materials and plant species. 3. The review, inspection and approval oflandscape and irrigation that is installed for applicable projects to ensure compliance w ith the approved landscape and irrigation p lans and specifications. 4. The post-installation monitoring of water usage for irrigation by applicable projects. B. Applicability. ThCjJTovisions of this section and the MMWD New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. Consistent with Conditions The project design include roof mechanical equipment which is fully-screened from public view by the carwash building parapet. In addition, a condition of approval (Condition #52; EDI5-068) has been incorporated requiring all ground-and rooftop-mounted mechanical equipment to be fully screened from public view. Consistent with Conditions. The project proposes to increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City 's ROW, between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. These proposed landscape improvements would both ereate more than 500 sq. ft. of new landscaping and rehabilitated existing landscape areas equal to or greater than 2,500 sq. ft. on an existing nonresidential and is, therefore, required to comply with the provisions of Marin Municipal Water District's (MMWD) most recent water-conservation ordinance (currently Ordinance 42 I). Final landscape and irrigation plans for the project shall be included in all construction drawing sets submitted for issuance of building/grading pennit and shall be pre-approved by MMWD and stamped as approved by MMWD. A condition of approval (Condition # 42; ED 15-068) has been included requiring the building pennit application submittal include a letter from MMWD approving the final landscape and irrigation plans. Modifications to the fmallandscape and irrigation plans, as required by MMWD, shall be subject to review and approval of the Community Development Depar1ment, Planning Division. File #: EDI5-068; SPlS-OOl Title: Zoning Ordinance Consistency Table Exhibit: 3-5 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) Ordinance as adopted and periodically amended are applicable to the following projects: 1. Any project that proposes new or rehabilitated landscapes which are developer-installed in single-family residential and all other residential developments, regardless of size, where the proposed landscape area is equal to or greater than two thousand five hundred (2,500) square feet; 2. Any project that proposes new or rehabilitated la ndscap es which are homeowner provided and/or homeowner-hired in single-family residential, two-family residential and multiple-family res idential deve lopments, where the proposed landscape area is equal to or greater than five thousand (5,000) square feet; 3. Any new nonres idential construction projects exceeding one thousand (l,OOO} square feet oflandscaped area; 4. Any project that proposes new or rehabilitated landscapes which are developer-installed in nonresident ial developments where the proposed landscape area is equal to or greater than two thousand five hundred (2,500) square feet. C. City Review of Applicable Projects. City review of ap plicable projects shall be processed as follows: I. Projects Requiring Approval of an Environmental and Design Review Permit. When an applicable project is subj ect to an environmental and design review permit pursuant to chapter 14 .25 of this title, the landscape and irrigation plans required by and submitted with this permit application shall be designed and prepared to comply with the provisions and requirements of MMWD Ordinance as adopted and periodically amended. The approval of an environmental and design review permit shall be conditioned to r equire the applicant to provide written verification of plan approval from MMWD prior to the issuance of a building permit and/or grading permit. 2. Projects Requiring a Building Permit and/or Grading Permit only. When an applicable project is not subject to an environmental and design review permit but is required to secure a building permit and/or grading permit, such permits shall not be issued until the applicant has secured, in writing, MMWD approval of the landscape and irrigation plans confrrming compliance with MMWD Ordinance as adopted and periodically amended. D. Inspections and Post-Installation Monitoring and Enforcement. New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. File #: ED1S-068; SP I S-OO I Title: Zoning Ordinance Consistency Table Exhibit: 3-6 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) MMWD shall be responsible for: I . In s pecting and approving aU landscape and irrigation installed for applicable projects prior to project completion and/or occupancy; and 2. Monitoring water usage for installed landscapes to ensure compliance with MMWD Ordinance as adopted with amendments. All enforcement actions for ordinance noncompliance or violations shall be adminis tered by MMWD. CHAPTER IS-PARKING STANDARDS 14.18.040 -Parking Requirements A. Off-street parking shall be provided in accord with the following chart: • I space at each washing or vacuum ing stall . 14.18.045 -Designated Parking For Clean Air Vehicles A. Applicability. Parking spaces serving new nonresidential buildings shall be designated for any combination of low-emitting, fuel-efficient, and carpooVvan pool vehicles, as defined by Section 5.102 of the California Green Building Standards Code, California Code of Regulations, Part II of Title 24. B. Number of Short-Term Spaces Required . Parking spaces for clean air vehicles shall be provided in accord with the following chart: Total Number of Parking Spaces 0-9 10-25 26-50 51-75 76--100 101-150 151 -200 New "Blue Wave &press Carwash" Facility 990 Franc;'co Blvd. E. Number of Required Clean Air Vehicle Spaces 0 1 3 6 8 11 16 ------ Consistent The project design includes a 14-stall, self-service vacuum canopy. The parking requirement for the project is based not on building square footage like traditional commercial development but, rather a one (I) on-site parking space at each vacuum stall. Essentially, the 14-slall, self-service vacuum canopy is the required parking for the project.. Consistent with Conditions The project design includes a 14-stall, self-service vacuum canopy or 14 on-site parking spaces. A condition of approval (Condition #10; EDI5-068) has been incorporated requiring the project provide one (1) clean air vehicle parking space and designated appropriately with paint markings. The building permit plan submittal will show clean air vehicle parking space code compliance prior to issuance. File #: ED1S-068; SPIS-OOI Title: Zoning Ordinance Consi sten cy Table Exhibit: 3-7 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) I 20 I and over I At least 8% oftotal C. Parking Stall Marking. The following characters shall be painted , using the same paint for stall striping, such that the lower edge of the last word aligns with the end oftbe stall striping and is visible beneatb a parked vehicle: "CLEAN AIR VEffiCLE". D. Prewiring for E lectric Vehicle Charging Stations. In new or substantially renovated parking facilities of twenty-five (25) or mor e spaces electrical co nduit cap able of supporting suitable wiring for an electric vebicle charging station shall be installed between an electrical service panel and an area of clean a ir vehicle parking spaces as required by this section. The conduit shall be capped and labeled for pote ntial future use 14.18.130-Parking Facility Dimensions and Design A. Minimum Standards. 1. The following shows the minimum dimensions for aisle widths and parking s paces for parking facilities. Where the configuration and/or layout angle for proposed parking differs from those shown, the dimensions shall be prorated and adjusted accordingly, as approved by the city traffic engineer. 2. Aisle widths and parking space dimensions in excess of the minimwn standards may be required on the recommendation from the city traffic engineer, city engineer or fire department where indicated by traffic , grade or site conditions. An exception to the minimum aisle widths may be granted, subject to Section 14.24.020(F), Parking. 14.18.140 -Access to Public Right-of-Way A. Driveway Widths. The minimum driveways width for nonresidential uses serving 7 to 24 spaces is 12' (I-way) or 20' (2-way). 14.18.160 -Parking Lot Screening and Landscaping. New or substantially renovated parking lots with more than five (5) spaces shall provide landscaping in accordance with the following standards. Substantially renovated parking lots shall be those for which paving material and curbing is removed and the resulting lot is reconfigured. The following provisions shall also be used as guidelines for parking lot New "Blue Wave Express Carw~sh" Facility 990 Fran cisco Blvd. E. I Consistent The project proposes a parking space design where the City's Parking Standards do not provide minimum dimens ion requirements. The City's Parking Standards provide minimum dimension requirements minimum dimension requirements for parallel parking spaces and 60°, and 90° angled parking spaces only and standard parking space dimensions of9' x 19 '. The project proposes 45 ° angled parking spaces. Generally, the City Engineer allows deviations from the 'standard' parking space dimensions if the parking spaces are design e d to be wider and , sometimes, deeper. The project proposes both wider (12') and deeper (20') parking s pace dimensions . The City Engineer has review the project, including the parking space design, and recommends approval of the project. Consistent The project design includes a 14-stall, self-service vacuwn canopy or 14 on-site parking spaces and a 12'-wide, one-way drive aisle accessing these on-site parking spaces. Consistent The project proposes to remove no existing trees on-site though four (4) existing conifers, located on the adjacent Caltrans parcel, are proposed to be removed. The project proposes to increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City 's ROW, between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. These proposed landscape File #: EDI5-068; SP15-001 Title: Zoning Ordinance Consistency Table Exhibit: 3-8 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) improvements on remodel projects. A. Screening. Parking areas visible from the public right-of-way shall be screened to headlight height through the use of landscaped earth berms, low walls, fences, hedges, or combination thereof, with trees and plantings, or similar means. Fences, walls, and hedges need not be solid B. Minimum trees. A minimum of one (1) canopy tree shall be provided for every four (4) parking spaces. Trees shall be distributed throughout the parking area to shade cars and paved areas. Clustering of trees may be considered subject to approval of the decision making body, where it is demonstrated that the intent will be met to provide ample shading and screening of parking areas and enhance the visual appearance of parking lots. In downtown, this section does not apply to parking lots for twenty (20) or fewer cars, and the standards in this section may be reduced for parking lots for twenty-one (21) to forty (40) cars, subject to recommendation by the design review board and approval of a minor design review permit. C. Bio-filtration. Persons owning or operating a parking lot, gas station, area of pavement or similar facility developed with hardscape surfaces shall undertake all practicable measures to minimize discharge of pollutants to the city storm drain, in compliance with city standards, including utilization of all best management practices and the requirements of San Rafael Municipal Code Title 9.30 (Urban Runoff) enforced by the department of public works. To facilitate compliance with city storm drain pollution discharge requirements, innovative landscape design concepts may be substituted for the above standards subject to the approval of the appropriate review body, including use of permeable pavers, bio-swales, at grade curbs and openings in curbs to allow filtration of runoff through landscape areas. Landscape plans and alternative measures shall subject to compliance with any recommendations of the department of public works. CHAPTER 19 -SIGNS New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. improvements inclnde five (5) new evergreen canopy trees (Marina Strawberry trees) and eight (8) new pahn trees (Queen pahn trees) on-site and another nine (9) new Marina Strawberry trees and three (3) new Queen pahn trees within the City's ROW, along the Francisco Blvd. E. frontage, and within the Caltrans property, located immediately north of the site, along the Bellam Blvd. frontage. These new trees will be distributed throughout the site though not the specific parking area. The parking area is, instead, already covered by a 3,700 sq. ft., canopy, 1O-1l' in height above grade. The project design also includes an approximate 570 sq. ft. storm water retention area or 'bioswale' area, located behind the new carwash building, in compliance with MCSTOPPP requirements, which will have the effect of reducing peak flow storm water runoff to or below pre-redevelopment levels. ---- File #: EDl5-068; SP15-001 Title: Zoning Ordinance Consistency Table Exhibit: 3-9 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) 14.19.046 -Findings Required for Sign Programs. The planning commission shall make the following findings in rendering a decision on a sign program: I.All of the s igns contained in the program have one or more common design elements such as placement, colors, architecture, materials, illumination, sign type, sign shape, letter size and letter type; 2.All of the signs contained in the program are in harmony and scale with the materials, architecture, and other design features of the buildings and property improvements they identify, and the program is consistent with the general design standards specified in Section 14.19.054 ; and 3.The amount and placement of s ign age contained in the program is in scale with the snbject property and improvements, as well as the immediate ly s urrounding area New "Blue Wav e Express Carwash" Fa c ility 990 Franci sco Blvd E. Consistent 1. All signs contained in the proposed Sign Program Amendment have one or more common design elements such as placement, colors, architecture, materials, illumination, sign type, s ign shape, letter size and letter type , in that; both s igns proposed by the project are identical in placement (at the same height on the tower element) size (48.9 sq. ft. each), colors (white facing; dark blue returns), materials (acrylic), illumination (internally-illuminated LED or light-emitting diode), sign type (slanted and stacked individual letters), letter size (2 ' 5" for "BlueWave" above approximately l' 8" for "Car Wash") and letter type (combination upper-and lower-case for "BlueWave" and upper-case only for "Car Wash"); they are distinct only by their location on different elevations of the tower element.(proposed on north and west elevations of tower element); 2. All signs contained in the proposed Sign Program Amendment are in harmony and scale with the materials, archtiecture, and other design features of the buildings and property improvements they identify, and the Sign Program Amendment is consistent with the general design standards specified in Section 14 .19.054 ( (i.e. all site s ignage shall be " ... an integral part oj, compatible with, and complement the desig n of buildings and imp rovements on th e site wher e the sign is to be located and shall be compatible with the character and des ign of s igns in the immediate ne ighborhood of the site. Creative and unique design is encouraged provided that the design is appropriate for the site and improvements and compatible with the character afthe surrounding area."), in that; during concept review of the project, the Board recommended minor modifications to project signs to improve readability and to reduce the scale of the sign tower element. In respoDBe, the formal project submittal incorporated the following revisions: a) the height of the sign tower element has been reduced from 29 ' 9" to 27' 6" above .grade; b) the number of signs proposed on the tower . feature has been reduced from three (3) to two (2) with; signage eliminated on the east elevation; c) The color of the sign facing on the individual channel lettering has changed from navy blue to white ; d) the proportionality among the sign lettering is more uniform and lettering determined to be unnecessary ("Express") has been removed; and e) the spacing between the horizontal aluminum slats that provide the backing for the signage has been reduced, from 4 " to 2.5", to improve readability. The Board, at its January 20, 2016 meeting, recommended approval of the new sign design; and File #: EDlS-068; SPJS-OOJ Title: Zoning Ordinance C onsistency Table Exhibit: 3-10 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) 14.19.054 -General Design Standards. All signs subject to the approval of a sign permit shall comply with the following design and performance standards: A. Sign Design. The design of the sign, including the shape shall be: I. An integral part of, compatible with, and complement the design of the buildings and improvements on the site where the sign is to be located and shall be compatible with the character and design of signs in the immediate neighborhood of the site. Creative and unique design is encouraged provided that the design is appropriate for the site and improvements and compatible with the character of the surrounding area. 2. The sign message, including the nse of graphic symbols shall be simple. Lettering shall be legible, uncomplicated, and appropriate to the image of the building. B .Sign Type. The type of sign shall be appropriate for the building and improvements on the site where the sign is to be located. The following sign types are encouraged: I. The use of individual letters incorporated into the building design is encouraged and preferred over signs contained in a canister or frame, or signs directly painted 00 the surface of a building. 2. Monument-type free standing signs are encouraged and preferred over pylon or pole-type signs. Upon request, a bonus sign area often percent (10%) above the maximum permitted sign area will be granted as an incentive to select one of the encouraged sign types. A request for bonus sign area must be included in the application for a sign permit. New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. 3. The amount and placement of signage contained in the Sign Program Amendment is in scale with the subject property and improvements, as well as the immediately surrounding area, in that; the existing Sign Program approved three (3) signs on the site totaling 100 sq. ft. of comhined sign area"(two freestanding signs with one a changeable copy sign, each 32 sq. ft. of sign area, and one 36 sq. ft. wall sign). The project proposes to reduce the number of signs on the site, from 3 to 2 signs, While increasing the size of each sign, from 32-36 sq. ft. to 48.9 sq. ft., and relocating the signs to the tower feature on the new carwash building. The total sign area for the site is proposed to be reduced from 100 sq. ft. to 97.8 sq. ft. Signage located high on building elevations is in character with existing signage along both Francisco Blvd. E. and Bellam Blvd., including 863, 901 and 986 Francisco Blvd. E. and 115 Bellam Blvd. Consistent The Board reviewed the proposed project, including new signage, at their January 20, 2016 meeting and recommended approval, subject to the following recommendations for minor revisions, which have been incorporated into the design ; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articulate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' species ofXylosma for 'congesturn' for those areas adjacent to the drive aisle or relocated the 'congestum' to provide a greater setback from the drive aisle. File #: EDIS-068; SPIS-OOI Title: Zoning Ordinance Consistency Table Exhibit: 3-11 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) C Sign Colors and Materials. The colors and materials for the sign shail be compatible with and complement the colors and materials of the buildings and improvements on the site where the sign is to be located. The following standards are required: I. Sign colors shall be subtle . Bright and reflective colors shall be avoided, unless such colors are proposed to promote a creative or unique sign design. The use of contrasting colors between sign background and the sign script or logo is encouraged to maximize legibility. 2. Sign materials shall be compatible with the materials used on the buildings and improvements found on the site. 3. Sign materials that are metal or have reflective qualities shall have a matte or non-g1are surface . CHAPTER 22 -USE PERMITS 14.22.130 -Approval to Run With the Land. Any use permit approval shall run with the land and shall continue to be valid for the time period specified whether or not there is a change of ownership of the site or structure to which it app lie s. CHAPTER 25 -ENVIRONMENTAL AND DESIGN REVIEW PERMITS 14.25.050 -Review Criteria Projects must meet the following design review criteria: A. Consistency with General Plan design polices. B. Consistency with Specific Plans C. Design criteria must meet the objectives of Chapter 25 (Design Review), which include ensuring that the design blends with the oannal setting, maintains and improves the quality of and relationship between the development and the surrounding area, preserve the balance and hannony within a neighborhood, promotes excellence in design, and preserves and enhances views. D. Site design is harmonious amongst structures within the development New "BlueWave Express Carwash" Facility 990 Francisco Blvd E. Consistent The existing carwash facility operates in compliance with a Use Pennit (#6446) approved by the Planning Commission in 1964. This use permit approval remains valid. The project proposes to continue operating an automotive service (automated carwash facility) 00 the site for the convenience of the both San Rafael residents and businesses. Consistent As designed, the project is consistent with all applicable design-related policies of the General Plan as well as the review criteria of this chapter. At their January 20, 2016 meeting, the Board (Commission Liaison Schaeffer) reviewed the proposed project and unanimously recommended approval of the site and building design for a new automated carwash facility subject to the following recommendations for minor revisions, which have been incorporated into the design ; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articuJate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' species of Xylosma for 'congestum ' for those areas adjacent to the drive aisle or relocated the 'congesturn' to provide a greater setback from the drive aisle. File #: EDI5-068; SP15-001 Title: Zoning Ordinance Consistency Table Exhibit: 3-12 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) and existing development in the vicinily, natural site features should be protected and preserved, safe access and adequate parking should be provided, drainage should be designed to be ensure proper surface drain~ge. 14.25.090 -Findings The following findings must be made to approve a Design Review Pennit A. Project design is in accord with the general plan, the objectives of the zoning ordinance and the purposes of this chapter; B. Project design is consistent with all applicable site, architecture and landscaping design criteria and guidelines for the district in which the site is located C. Project design minimizes adverse environmental impacts D. Project design will not be detrimental to the public health, safely or welfare nor materially injurious to properties or improvements in the vicinity. New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. Consistent A. The project design is in accord with the General Plan, the objectives of the Zoning Ordinance, and the purposes of Chapter 14.25 of the Zoning Ordinance; in that: 1. As documented in the General Plan 2020 Consistency Table attached to the staff report to the Planning Commission, the project will be consistent with Land Use Policies LU-2 (Development Timing), LU-9 (Intensity of Nonresidential Development), LU-12 (Building Heights), LU-16 (Building and Automotive Services) and LU-23 (Land Use Map and Categories), Neighborboods Policies NH-4b (Improve Property Maintenance; Design Review Conditions of Approval), NH-SI (Existing Business Areas), NH-S3 (Building and Automotive Services) and NH-73 (/-580/10 IIBeliam Blvd Interchange Improvements), Communily Design Policies CD-Id (City Image; Landscape Improvement), CD-2 (Neighborhood Identity), CD-S (Views), CD-9 (Transportation Corridors), CD-IO (Nonresidential Guidelines), CD-IS (Participation in Project Review), CD-18 (Landscaping), CD-19 (Lighting) and CD-20 (Commercial Signage), Economic Vitalily Policies EV-2 (Seek, Retain and Promote Business that Enhance San Rafael), EV-7 (Environmentally-Friendly Business Practices), EV-8 (Diversity of our Economic Base), EV-13 (Business Areas) and EV-14 (Supportfor Business Areas), Circulati,on Policy C-22 (Attractive Roadway Design), Infrastructure Policies 1-2 (Adequacy of City Infrastructure and Services), 1-3 (Availability of Utilities) , 1-8b and 1-8d (Street Trees; Street Trees for New Development; Landscape Maintenance Next to Sidewalks), Sustainabilily Policies SU-Sa (Reduce Use of Non-Renewable Resources; Green Building Regulations) and SU-6 (New and Existing Trees), Safely Policies 8-17 (Flood Protection of New Development), 8-183 (Storm Drainage Improvements) and 8-32 (Safety Review of Development Projects), Noise Policy N-4 (Noise from New Nonresidential Development), and Air and Water Polices A W-4a (Particulate Matter Pollutions Reduction; Pollution Reduction), A W -7 (Local, State and Federal Standards) and A W- File #: ED 15-068; SP 15-00 1 Title: Zoning Ordinance Consistency Table Exhibit: 3-13 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) New "Blue Wave Express Carwash" Facility 990 Francisco Blvd. E. 8 (Reduce Pollution from Urban RunofJ). 2. As documented in the Zoning Ordinance Consistency Table attached to the staff report to the Planning Commission, the proposed project will be consistent with the objectives of the Zoning Ordinance, which is to promote and protect the public health safety, peace, comfort and general welfare, given that; a. The proposed project will implement and promote the goals and policies ofthe San Rafael General Plan 2020, as identified in Finding AI above; b. The project will reduce or remove negative impacts caused by inappropriate location, use or design of buildings and improvements, given that; I) the Board is recommending approval of the project after the following minor revisions were incorporated into the design: a) the height ofthe sign tower element has been reduced from 29' 9" to 27' 6" above grade; b) the number of signs proposed on the tower feature has been reduced from three (3) to two (2) with; signage eliminated on the east elevation; c) The color of the sign facing on the individual channel lettering has changed from navy blue to white; d) the proportionality among the sign lettering is more uniform and lettering determined to be unnecessary ("Express") bas been removed ; e) the spacing between the horizontal aluminum slats that provide the backing for the signage has been reduced, from 4" to 2.5", to improve readability; and f) site landscaping has been increased substantially, includiug along the entire perimeter of the site; 2) the Board is recommending approval of the project, subject to the following recommendations for minor revisions, which have been incorporated into the design; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articulate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' .species of Xylosma for 'congestum' for those areas adjacent to the drive aisle or relocated the 'congestum' to provide a greater setback from the drive aisle; and 3) the project proposes to substantially exceed the 15% landscape requirement for the site, which will both beautify the site and the public right-of-ways (ROW) along the Francisco Blvd. E. and Bellam Blvd. frontages but will also increase permeable surface on-site and immediately adJ!lcent to the site to capture particulate matter File #: EDI5-068; SP15-001 Title: Zoning Ordinance ConSistency Table Exbibit: 3-14 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) pollution surface and roof storm water runoff before it enters the City's stormwater drainage system ; c. The project will protect, strengthen and diversify the economic base of the City, given that; the project proposes to continue operating an automotive service use (automated carwash facility) on the site for the convenience of the both San Rafael residents and businesses, which has been in operations as an a utomated carwash facility on the site continuously since 1964; d. The project will provide for adequate, safe and effective off-street parking and loading facilities, given that; the project proposes to voluntarily increase on-site parking from six (6) spaces, as required under the existing Us e Permit (#6446), to 14 by constructing a 14-stall, 3,700 sq. ft . self-service vacuum/parking canopy along the western (rear) property boundary line while reducing the size of the carwash building, from approximately 4 ,000 sq. ft. to 2,030 sq. ft.; e. The proposed project will promote a safe, effective traffic circulation system, and maintain acceptable local circulation system operating condition, given that; I) Vehicular access to/from the carwash building is proposed to continue in a counterclockwise circulation pattern, however, the carwash building is proposed to be relocated approximately 35' east, closer to the Francisco Blvd. E. frontage, where vehicular queuing or stacking will be compressed, which has been reviewed and approved by the City Engineer; and 2) the City Engineer has determined the proposed project would not adversely affect the LOS for the nearby intersections and the payment of traffic mitigation fees to fund the project's fair share of local circulation improvement projects by the City is not required ; f. The project will preserve and enhance natural resources and key visual features in the community, including the bay, shoreline, canal, wetland s and hillsides, given that ; while the proposed sign tower element would likely create a view impact of the hillside north of the site as seen from both the westbound 1-580 flyover and off-ramp, this impact is minor and insignificant due to tlle limited size (20' x 20') of the sign tower and the New '"Blue Wave Express Carwash'" Facility File #: ED\5-068; SP\5-001 990 Francisco Blvd. E Title: Zoning Ordinance Consi stency Table Exhibit: 3-15 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL WNING ORDINANCE (TITLE 14) New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. grade difference of up to 20 ' between the site and the westbound 1·580 flyover over Bellam Blvd. This view impact has been further mitigated by a recommendation by the Board 'during concept review of the project that the sign tower be reduced in height "by a couple offeet" to improve proportionality with the new carwash building and proposed new signage. The formal project design submittal reduced the height of the sign tower from 29' 9" to 27' 6" and the Board is recommending approval of the project design, including the reduced sign tower height; and g. The proposed project will provide for effective citizen participation in decision·making, given that; the City has provided opportunities for public involvement in the review of the project through: I) the referral, notice and hearings of the Conceptual Design Review submittal to the appropriate neighborhood group (Marin Villa-Canal Housing Alliance) and in compliance with Chapter 29 of tbe Zoning Ordinance (Public Notice); and 2) the referral , notice and hearings of the 'formal' project review in compliance with Chapter 29, Notice of two (2) separate Board meetings and this hearing were mailed to all property owners and occupants within a 300·foot radius of the site, and the appropriate neighborhood groups, a minimum of 15 calendar days prior to the meetings or hearing, and notice was posted on the project site along the Francisco Blvd. E. frontage. At the time of printing staft's report to the planning Commission, staff has received no public comments as a result of any noticing for the project. Comments received from other City departments and non·City agencies on the project have been incorporated in the review, revisions and/or conditions of approval of the project. 3. As documented in the Zoning Ordinance Consistency Table attached to the staff report to the Planning Commission, the proposed project will be consistent with the purposes of Environmental and Design Review Permits, given that; a. The project will ensure that the location, design and materials and colors of development blends with and enhances the natural setting, given that; the proposed project has been reviewed and recommended for approval by the Board; File #: EDIS·068; SP1S·001 Title: Zoning Ordinance Consistency Table Exhibit: 3·16 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) New "Blue Wave Express Carwash" Facility 990 Francisco Blvd E. b. The project will maintain and improve the quality of, and relationship between; development and the surrounding area to contribute to the attractiveness of the City, given that; I) as identified in Finding A3 (a) . above, proposed project has been reviewed and recommended for approval by the Board; and 2) the project proposes to increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City's ROW, between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. Conditions of approval have been included requiring all new project landscaping, both on-site and within these adjacent ROW areas, be maintained in a healthy condition at all times and replace all dying or dead plantings in a timely fashion, if necessary. (see Condition #7; EDl5-068); and c. The proposed project will preserve and enhance views from other buildings and public property, given that; as identified in Finding A2 (f) above, the new sign tower element is proposed to impact public views briefly and minimally, and the Board has required reductions on the height of the sign tower to further mitigated view impacts resulting from the project design. B. The project design is consistent with all applicable site, archltecture and landscaping design criteria and gnidelines for the GC District in which the site is located, given that; I. The proposed project will be consistent with property development standards for the GC District (Chapt er 5 a/Zoning Ordinance), including: a. Maximum building height (36 ' allowed; 16' 8" proposed to the top of the parapet above fmish grade and 27' 6" to the top of the sign tower); b. Minimum landscaping (15 % or 3,3 00 sq. ft. required; 6820 sq . ft. proposed plus 4 ,200 sq . ft . within the ROW along the Francisco Blvd. E. frontage plus additional unknown square footage within the adjacent Caltrans-owned parcel along the Bellam Blvd frontage) and ; c. Maximum floor area ratio (FAR) (0 .21 FAR or 4 ,620 sq. ft. allowed; 0.09 FAR or 2,030 sq. ft. proposed). 2. The provisions of Marill Municipal Water District's most recent water File#: EDlS-068; SPIS-OOI Title: Zoning Ordinance Consistency Table Exhibit: 3-17 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) conservation requirements apply to the project, as specified by MMWD Ordinance 4 2 1. Any proj ect that proposes 500 sq. ft. of new landscaping or rehabilitated existing landscape areas equal to or greater than 2 ,500 sq. ft . shall require review and approval prior to the issuance of any buildi.ng or grading permit. This requirement has been made a condition of approval (see Condition #42; ED 15-068); 3. The proposed project will be consistent with all applicable parking standards (Chapter 14.18 of the Zoning Ordinance) for all new or relocated parking, with the exception of three (3) requests for' Parking Modification', including: a. Minimum one-way drive aisle width (12'); b. Minimum on-site parking (14 ; one space at each vacuum stall); c. Adequate clean air vehicle parking spaces (I) (see Condition # I 0; ED15- 068); d. Minimum parking lot landsCaping (I canopy tree for every 4 parking spaces); e. Parking area and exterior building lighting designed to provide adequate minimum illumination levels of: • One (I) foot candle at ground level overlap shall be provided in all exterior doorways and in all vehicle parking areas; • Minimum one-balf(lI2) foot candle at ground level overlap shall be provided along all outdoor pedestrian walkways; and • Less than one (I) foot candle at ground level overlap shall be provided in all property boundary lines. 4. The proposed project will be consistent with review criteria for Enviromnental and Design Review Permits (Chapter 14.25 of the Zoning Ordinance), given that; the Board reviewed the formal application submittal at their January 20, 2016 meeting and, after determining the project adequately met the review criteria for Envirorunental and Design Review Permits, unanimously (3-0) recommended approvaL of the proposed site and building design, subject to the following reconunendations, which have been incorporated into the project plans provided to the Planning Commission at their February New "Blue Wave Expres s CQ/w ash " Facility File #: ED 15-068; SP15-00 1 990 Francisco Blvd. E. Title: Zoning Ordinance Consi stency Table Exhibit: 3-18 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) New "Blue Wave Express Carwash " Facility 990 Francisco Blvd E. 9 ,2016 hearulg on the project; a) the blue metal awning, along the south elevation, should be aligned better with door to the cashier's office; b) articulate the storefront windows, along the east elevation, with mullions; and c) substitute a 'compacta' species ofXylosma for 'congestum' for those areas adjacent to the drive aisle or relocated the 'congestum' to provide a greater setback from the drive aisle. C. The project design minimizes adverse environmental impacts, given that: I. The project proposes to significantly increase the site landscaping from 5% to 31 %. Additionally, the project proposes to landscape both the City's ROW, between the site and Francisco Blvd. E., and the State (Caltrans) ROW, between the site and Bellam Blvd. Conditions of approval have been included requiring all new landscaping, both on -site and within these adjacent ROW areas, be maintained in a healthy condition at all times and replace all dying or dead plantings in a time ly fashion (Condition #7; ED15-068). This increased landscaping on-site and off-site, within the adjacent ROWs, will both beautify a busy transportation corridor (I-580/Bellarn BlvdIFrancisco Blvd. E .) but will also help filter particulate matter pollution from surface and roof stormwater runoff prior to entering the City;s stormwater drainage system; 2. The project design includes an approximate 570 sq. ft. storm water retention area or 'bioswale', located behind the new carwash building, which will have the effect of reducing peak flow runoff to or below pre- redevelopment levels; and 3. The site neither contains, nor is contignous to, recognizable wetlands, creeks or similarly sensitive environmental features, and it has not been identified in the San Rafael General Plan 2020 (Exhibit 38 -Threatened and Endangered Species) as a general location were threatened and endangered species have been previously obseTVedor maintain a suitable habitat for their likel y presence to be found. D. The project design will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity, given that; the project has been reviewed by appropriate City departments , non- City agencies, the appropriate surrounding neighborhood group (Marin Villa- File#: ED1S-068; SP1S-OOI Title: Zoning Ordinance Consistency Table Exhibit: 3-19 Exhibit 3 TABLE ANALYZING PROJECT COMPLIANCE WITH SAN RAFAEL ZONING ORDINANCE (TITLE 14) New "Blue Wave Express Cm'Wash" Facility 990 Francisco Blvd E. Canal Housing Alliance), and the Board and conditions of approval have been included to mitigate any potential negative impacts anticipated to be generated by the proposed project. File #: EDl5-068; SP15-001 Title: Zoning Ordinance Consistency Table Exhibit: 3-20 ~.-~--~- u.i ~ -Q) , 0 c.> (f) .-c.> r: E u. 0 0) 0) r - I / I v" -""-, -----.....' , .f I I I I I I I I San Rafael Design Guidelines NONRESIDENTIAL DESIGN GUIDELINES As modifications are made to San Rafael, whether through public improvements or as private development affects neighborhoods or the Downtown, the design quality of these changes should improve the quality of life in San Rafael. These guidelines provide a framework of design principles that builds on the strength of the existing character of an area and that strives to improve the visual unity of the area. . Parking Lots .:. A logical sequence of entry and arrival as part of the site's design should be provided . • :. Where pOSSible, design entrances from the street to direct views towards the building entry . • :. Parking should be distributed to provide easy access to building entrances . • :. Where poSSible, parking should be located to the rear or side of a building in order to reduce the visual impact of parking areas . • :. Design for adequate vehicle maneuverability in parking areas. Vehicles should not back out from a parking space onto the street. .:. Parking areas should be screened from the street with hedges, walls, fences or berms, subject to security considerations . • :. On major arterials, where possible and appropriate, consolidate curb cuts and reduce entry and exit conflicts . • :. Auto and pedestrian entrances into the development should be easy to find. For example, special entry treatments, such as colored concrete, special planting and signage should be located at the entries to the site . • :. Shade trees should be provided in parking lots per the zoning ordinance. Landscaping .:. Landscaped areas should be planned as integral parts of the development and to create a strongly landscaped character for the site . • :. Unsightly uses should be screened . • :. Commercial signage or displays should not be hidden with landscaping . • :. Trees should be planted in a variety of locations, such as along the side property lines, clustered in planting areas, or distributed throughout the parking lot, consistent with the zoning ordinance. EXHIBIT 5 5 San Rafael Design Guidelines .:. Pedestrian areas should be made visually attractive with special planting and flowering trees . • :. Where feasible, landscape the area between the building and the property line even when a building is located at the minimum required side or rear yard setback . • :. Retain and maintain existing public street trees and add additional street trees where practical. Lighting .:. Limit the intensity of lighting to provide for adequate site security and for pedestrian and vehicular safety . • :. Shield light sources to prevent glare and illumination beyond the boundaries of the property . • :. Lighting fixtures should complement the architecture of the project. Pedestrian Circulation .:. Consider pedestrian orientation when designing building entries, windows, signage and doors . • :. Include a well-defined pedestrian walkway between the street and building entries . • :. Clearly define pedestrian movement through the parking lot. For example, provide changes in pavement or separate landscaped walkways . • :. Where appropriate, pedestrian walkways should be provided between adjacent lots . • :. Special design elements should be included, such as bollards, pots, benches, trash cans, unique paving, tree grates, tree guards and pedestrian lighting to add visual richness to areas designed for pedestrian access . • :. Where appropriate, include outdoor gathering places and seating for the public . • :. Adequate facilities should be provided for bicycle parking, consistent with zoning requirements. Building Form .:. Where appropriate, locate the building, or a substantial portion of the building along the front yard setback or street edge to create spatial enclosure in relation to the street. .:. Consider the pedestrian experience when designing the ground floor of buildings . • :. A continuity of design, materials, color, form and architectural details is encouraged for all portions of a building and between all the buildings on the site . • :. Consider the development's visual and spatial relationship to adjacent buildings and other structures in the area. 6 San Rafael Design Guidelines Entryways .:. A defined sense of entry with pedestrian orientation should be provided . • :. Building entrances should be defined with architectural elements such as roof form changes, awnings or other architectural elements. Towers .:. If a tower is included in the design, it should perform a definite on-site function, such as delineating an entrance to a site or a building entry, or emphasizing a display window . • :. The tower should provide an attractive distinctive silhouette against the sky . • :. Where appropriate, the visual bulk of the upper portion of the tower should be reduced to reduce its apparent bulk, for example with openings through it or with open latticework. Arcades .:. Arcades may be used in shopping areas to provide weather protection for shoppers, add a sense of unity to a larger project and/or provide depth to the building . • :. Arcades may be topped with a simple broad band for tenant signing . • :. Internal illumination may be used to emphasize arcade forms at night. Awnings .:. Where appropriate, provide well-designed awnings to enhance the design of the building, provide weather protection, and add liveliness, interest and a sense of human scale . • :. Provide a uniform treatment of awnings on multi-tenant buildings . • :. Awning colors may be varied and should be compatible with the colors of the building and of adjacent buildings . • :. Signs may be provided on an awning, consistent with the zoning ordinance . • :. Translucent, internally illuminated awnings are not encouraged . • :. The following building code standards are included for reference: Minimum height above grade: 8 feet; 14 feet at alleys, parking lots or other areas with vehicular traffic Maximum horizontal projection (from face of building): 7 feet, or 66% of the distance between the building and curb, whichever is less Minimum distance to curb: 2 feet between the awning and curb Materials and Colors .:. Use articulation, texturing and detailing on all concrete exposed to exterior view . • :. Exterior materials should minimize reflectivity . • :. Use color to provide appropriate accents on a bUilding. 7 -, _."---------- #1 -From 1-580 Offramp looking Northwest #4 -From Francisco looking West ~ewave ~ss CAR WASH San Rafael, Califom ia ~.~ ~ ~ Aerial -Photo Key Map ' #2 .. From 1-580 Offramp looking North #3 -From Bellam Looking East #3 -From Francisco looking Southwest #6 -From Francisco looking Sorth Existing Site Context Photo's AO.2 a ~i lii!l ~~ i5::?g ~o II ;<t;;; ;i ~~~ ~!i 0 8h ~,.~ ~I!i ~~~ ~~ ~~ ~ -« AREA TO BE U'GRAIlID PENJiNG CAl·TRAMS AGREEMENT APPROVAl.. ~ ~ewave San Rafaer,CaR/om;a \\ ~~CAR WASH . ",. , ,. - .F" ~ •• -.. • I ~ EJCJSTm STREET PARAllEL -:-,:"4 ..... I CAR PARKING "iii;" .' .I ~PAYSTATIONWJCAOOF'( . /rolE . ~ REDUCEflASPHAl.TPAVlNG AREA A1 .1 BACK-I..I" S'ACE FOR VAClkRoI STAI.lS @4S'. CAHOPY SlJIPORTS ON 24' HI6l114"0 (X)tI(;RETE BASES .... ~ =0." ,old 0 " .~~l"t~ .., .... <>< --L ~ .... , .. 1I Ii··· .......... ···;:1---' ."J ® ® * .<n~": i ~ i~ <& i ~ ~ ~ ~-------------------..... ~ t ,-- 0 ! <i> !~ i , I , I- 0 ~ V-' , I i~ , 0 12 l- I ~ <i> p~ ! , ,-- \! t~ ~ , ~ • • - ! <i> ~. l~ ~ ! I -, " ® ~ § ! i0 m!I , ~ ~ I~ --r--~ g ,---- ~ = """ . ~ r····-iZLd····-l i , = ® F , .. .... ,.f ~ ~.~ ." '''f ''~' STAO<EO STONE CANOPIES POLES AND SUPPORTS TO BE P.1, SN'PtiIRE ewE (NOT YIllOW) VAClJ'JM STALL CANOPIES iii ToPa ....... 2 ~$ FABRIC CANOPIES TO SE J'..2, ~MAN BLUE """""-OW) .BI.u~Waye Express Car Wash ,. _ l ---"'a s FO.OM _ -----11 , , ----""'! II I ! II ! HI I I I I I - TojiOr ~s • '~ ...Im.."' ........... i! _~,-::~_~ ~ -I --,~ ------------------------·~~s _....!2e.aIJ',~ ---..!..O....~ PAYSTA1l0N CANOPIES A3 .1 T<>\ffiBEYMl~ l\JNt£l OPEN NRMETAI. "'""" MECKAtfIC,I..L EQU TPMENT ON ROOF -TOP OF UNIT BELOW PARAPET UNE T.eAR~GA8OVE OFFICE AREA EQOO'loIENT 17\ SUCUJlKG S£C11ON • SHORT Ie/--- TUNNel OPEN NR METAl. 'maus t2\ BUILDING SECTION -LONG 'el""~''''' ~eWave San Rafael, Ca ln"",;a '-\" ~~~ CAR WASH ... ,. ': ,. - ~ ~~ .. 'l'OF'OF!LUEwAVev 16'.fI"A TOPOFPARAPEf~ "~ .. ~v t • • Jl!!!!!!, i ~ 1 ~ '" I ~ @!.~CN. VACUUN-STAu.s CANOPY ,----souc GflOOTTOP ~AS OVER METAL- ;>QU' ""'" YACUUNrutJlPMENT . ~3· ROCKVS,NEER TO MATCH aUILDIN(l ..LlJ:J: S"lS"l8"CJoI,U.WALl I 1·1 I158AAS 0 32'O.c. 1\0 I r1==t5IlAAS O l2"O.c. HORIZONTAL rh'-I @.:-rAIL-TRASHENCLOSURE&VACUUMPlJII.'lPENCLOSUREWALL SECTION ZI'·S"A "TOP1:)I'-aLiJE wAVEV FCIA ROUA.'" DOOR 16'_B".-io, TOP OF F'AAAPET V , , t N - 4"0ARCHEOMETAI. CANOPY SUPPORTS D"O METAl-POlE """"" """"'''' f5\ seCTION if! PAY STATIONS 'e/"" .... ~..:.;. ~ . ) . . . ALl1M!NI.lMSl..A.TSW SPACING SHOWN -23" BEtNG PROPOSED! f7\ DETAIL · METAL ROOF AT TOWER ~;m- ,.~ @DETAlL'IAAINWAUSTOROCK _.- ______ 2X Woop fRAMING & PLYWOOD ~:~~~ OVI!R I'RIMARY WIUJ.. MESH WTSCRAfCH & BROWN COI\.T OVER MOIStURE BARRIER OVER 11Z" mwc'MW.~~ @DETAIL 'BRlCK&STUCCOTOROCKSIOING .- A3.2 ..c In ~ ... ~ :a e ~ 0) >. ~ 0)- ~ I~ i h i' .,2 - CC I I. EF., ~~ IT 'r . .. : {I IT. ~,' '1', . , 11: ::. ,SI~, . "o;J ."" '~ iT ';T . ..,-'"'-,.:~ ,." '.t:' • ·1 EF_2 BRICK"'"VENE±R "":;'T:~~", -. Proposed Exterior Color Palette @;~}~~~!H • "2t) I .. -San Rafael, California EF·2 $ Proposed West Elevation ~. i*~.p. "'~; .~4~~ &.~~"",~~J ~~.&~~ ."..~...,' 'ifit.~"'X!.""" ... ~;"-!o?J!?' ... -...; r. ~~~:~ '1_ ~;;""~~A;" ;~-"''-: ...... ~ ~ ~ -.:!;< .... A .. II.,.,..~~ ,-;,~,.t..~ ~~ ' ..... ' . ..:.:::~ '. "" • -... :1' ... , '" _""row.~~~'''"11'''':;''10 -'- ,., BLUE T~!~CENTS ,., "BLUEWAWACCENT $ TR{M~OORS ---,,,'''",,,,,0101 SLATTOW~ACCENT ~ .. A4,O #1 -Tunnel In -long elevation .. end elevation #3 -Butldmg '~ewave Sa n Rafae \ Cal iforn ia ~\~~CARWASH .--~ . #2 -Tunnel in 3/4 View #4 -Interior tunnel view with clear roof panels EXisting BlueWave Building Photo's AS .O --------- ~ ~ I l It 0 1 l ~ ~ It,) ~ I l j f S 4J ~ u , ~ N· i ~ ~ I . ~ CQ ~ .' 0 ~:t B il: hi ~. .' ~! m ~ ." ~ ~ .' i Ii: .. : .' I , . ~i . , ------------------. __ . ~ ~ , ~ ! ~ u i l'IJ 0 ~ gj , "'1 «< UI-1.1 i:Q~ ;, ~1l1 8 ! ! , I , i • , " " LAM BOU/..EVARD BEL ! I ! ! " I " ! I ! i ! l , I I I I I I II , , lBl ! I • • ~ ~ Hi! II<! < ,. lHl~ 11"',,5 Illl w > ~ w 3 t • " w ~ ~ ~ w ~5_ ij 0 • .,.... ~~ w ,,; -I " Z , ~ ~ ! ~~ w h I 0 " , OZ l OJ !~ l ~ j ffi<1i ,-.N u ~ dlfW :lIHdlf~90dO.L ""'1-5 Y:l,...,..... ..... --.is'''''' C1A1B OOSIJNVtl::l 086 , , ~-l --":':;::j ........ - • I / • , " I = l ' ·10" l ' ·4 - " ~I ;; '" ~ "' "' b , Co , ~ ~ ,,:, t 2' ·2" ~ '" 14' ·1" 6' OVERHEAD AL UMI NUM TUBI NG --------DU AL USE R PALM ARC H 4' LED LI GHT STRAND ____ W A STE RECEPTA CL E ______ CLAW VACUUM TOO L ____ MA.TRACK -~ ,', j Vi'J'" ~.: ~~~ ~ '<l!. ~~> ~;---~ --,---~ _____ 1112"x1S' VACUUM HOSE • -;"~'";,~~~. :-, '--:-r~ -= ) ,l _jf ~ I ~'~) ___ ~.:L' I ," 1 ·;..TA}~f_j . -, ' .' ~, ..... ~ol ' ;':c:"·""'·,,\ .. .i' ....-. ;; 1 1 1 1 ~,' ~ ',-' ~-I I I I I I I {r-= ~~ '--::~ CD PARKING ELEVA TION 1/2" = 1'-0" ~I I IIII n"11 11 111 11 111111 11 111 111 111 111 111 11 1111111 111 1111 11111 IIII I II II II I IIII III II IIII II IIIII I III III III IIII II III Iill I ~IIIW TIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII I IIIIIIIIIIIIIIII1111111111111111111111111111111111111111111111111 ill- II ~~ ::: ::: TI~III~III~III~III~III~III~III~III~III~III~III~III~III~III~III~1II' 11 :- THE SE DRAWINGS ARE THE PROPERTY OF VACUTECH, IT IS A PREUMINARY DRAWING AND [S NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WfTHOlJI' THE WRITTEN CON SENT OF VACUTECH. NO OTHER PERSON, AGENCY, DEALER, AFFILIATED WITH OR NOT AFFILIATED WITH VAClITECH IS ALlTHORlZED TO PROVIDE WRITTEN CONSENT. ,«9 VAC:UT ECH 1350 HI-TEat DRIVE, SHERIDAN WY,82801 PHONE: (307 ) 675-1982 EMAIl.: info@vacut8chUc ."11; C1T/: •• _._..__.a.-........ BLUE WAVE CARWASH SAN RAFAEL, CA No. R.~s;on By D.,. PARKING ELEVATION , Projecln umbe r CW 15-2 13 Date 811311 V6 D_by 11: I ~---' .. ~--. ---.. _. ..- t¥:lRTH EI..E\IATPI It«)fI([lUALLETTERS l....r ~ "01 WESTELEVATlON ""-.. , "'~ INOIVlDUAL LETTl:RS mSITEPLAN P.O. BOX 3664 SANTA ROSA. CA 95402 7n7."A ..... RRQ" eWE WAVE eXPRESS CAR WASH FRANOSCO & 6EUAM 80Ul£VARDS '<;AN RA"~FI r""'FORNIA BUILDING SIGN .CONCEPT AS NOTED 1<. t t\ '" San Rafael , .. --" . f J LPCATION MAP ... ,~ APPROVED SIGNAGE UNDER SIGN PROGRAM: 1-POLE MOUNTED SIGN: 32 S.F.± 1 -CHANGEABLE COPY SIGN: 32 S.F'± 1 -BUILDING MOUNTED SIGN: 38 S.F.± l OOS.F . • SIGNAGE PROGRAM PER (SR76-028) PROPOSED SIGNAGE UNDER SIGN PROGRAM: 1· BUILDING SIGN EAST: 41l.9 S.F. 1 -BUILDING SIGN NORTH: 41l.9 S.F. ~ ANC II..lARY SIGNAG E WILL BE lASS THAN 5 SQ. FT. PER SIGN AND EXEMPT FROM REVIEW SIGN PROGRAM SUMMARY 01.11.16 0.1 ... "._--_ ...... __ ... _-_ ..... __ .. __ ... _ ...... ...-. .................... ----.... ~ .. -.......... -... ----....... ,-- I • Two sets internally illuminated letters (wha. LED,). Colors: -'Faces-white -Retums-Wrisco .... Pep si" blue -Trim cap-std . light blue WEST ELEVATION P.O. so x 366.<1 SAN TA RO SA, CA 95.<1 02 r 2'·5- L T 1'-7 11 /16- -L ~ ,f-------------13'·6 '/"-1 [fJOm@ r!l/fIJW@ @[iJ[fJ ow [iJ ~ [XJ ~. 9'-10 7/16 ' .~ 71'4- II UILD1 NG SIGN S CONCE PT AS NOTE D ., 11.05.15 Area Calculation: [(29', 162.3125") + (19.6875", 118.4375')] + lA4 =48.9 'q. h. (1/2'=1'-0') LO II LUE WAVE EXPRESS CAR WASH fRANCI SCO & HEllAM BOULEVARDS ~"\"' •. ""!'":":"":"""-_~~~~_~~.~~.~~_~"':.~~..=.:.~Z:;--==_'"::7' 31'·10" SOUTH ELEVATION EAST ELEVATION P.O. BOX 3664 SANTA ROSA, CA 954.02 BLUE WAVE EXPRESS CAR WASH FRANCISCO & BELlAM BOULEVARDS BUILDING SIGNS NORTH ELEVATION CONCEPT AS NOTED 11.05.15 1.1 ~."?~~.'.~'.:":!~~~~'!:"!~:::.~"""-'."':W:"~"'''?".~~~''' __ ''''~"':-''''~':'''':'_'':'"''''''''''''_