HomeMy WebLinkAboutPW Highway 101 to Interstate 580 Connector Project PPTNorthbound US-101 to
Eastbound I-580 Direct
Connector
San Rafael City Council
December 7, 2020
Marin NB 101 to EB 580 Direct Connector
Reduce congestion on US 101 and local streets
US 101 in Larkspur and San Rafael
East Sir Francis Drake Boulevard to Richmond
Bridge
Bellam Boulevard
Build a new freeway-to -freeway connection
Northbound US 101 to eastbound I-580
Improve bicycle, pedestrian, and transit access
NB US 101 to EB I-580 Direct Connector Project
Project History & Upcoming Work
History
Several studies over two decades
Various alternatives considered
Latest study (2017) used to secure funding through Regional Measure 3
Upcoming Work
Review alternatives to identify feasible alternatives to carry forward into
environmental review
Engage the community via Stakeholder Working Group and briefings
Work with Caltrans to obtain necessary approvals
Obtain environmental clearance for selected alternative
Craft a Memorandum of Understanding among agencies to document
agreement on the selected alternative
Include conceptual design of future WB 580 to SB 101 connectorNB US 101 to EB I-580 Direct Connector Project
NB US 101 to EB I-580 Direct Connector Project4
2021 2022 2023 2024 2025 2026 2027 2028 2029
Public Meetings
Open to Traffic
Targeted Project Schedule
* Pending Available Funding
Project Development Committees
NB US 101 to EB I-580 Direct Connector Project•Agency
Technical
Staff
•Community
Interests
•Agency
Executive
Staff
•TAM Board
Members
Ad Hoc
Committee
Executive
Steering
Committee
Technical
Advisory
Committee
Stakeholder
Working
Group
Agencies
Caltrans
Metropolitan Transportation
Commission (MTC)/BATA
Transportation Authority
Marin (TAM)
Contra Costa Transportation
Authority (CCTA)
San Rafael
Larkspur
County of Marin
Stakeholder Working Group (20 stakeholders)NB US 101 to EB I-580 Direct Connector ProjectSan Rafael Chamber of Commerce
Bus Passenger Advisory Committee
Bret Harte Community Assoc
Marin Country Mart
Marin Conservation League
East San Rafael Working Group
San Rafael City Schools
Multicultural Center of Marin
East Bay to/from Larkspur
Sustainable Marin
College of Marin
League of Women Voters
Marin County Bicycle Coalition
East Bay to/from San Rafael
Federation of San Rafael Neighborhoods
Larkspur Chamber of Commerce
Canal Alliance
Sustainable San Rafael
Pt. San Quentin Village Homeowners Association
San Rafael Bicycle & Pedestrian Advisory Committee
NB US 101 to EB I-580 Direct Connector Project7
Consensus Building Schedule
NB US 101 to EB I-580 Direct Connector ProjectDevelop, Analyze, and Refine Preliminary Alternatives
Caltrans Project Initiation Document (PID)
SWG Meetings
June
2020
July
2020
Sept
2020
Spring
2021
Fall
2021
Jan
2021
Summer
2021
Ad-Hoc
Exec Steering
TAC
NB US 101 to EB I-580 Direct Connector Project8
Summary of recent project actions
Six Technical Advisory Committee (TAC) meetings
Two Executive Steering Committee (ESC) meetings
Three Stakeholder Working Group (SWG) meetings
Presentations to City of San Rafael BPAC, League of Women Voters,
Multicultural Center of Marin, Federation of San Rafael Neighborhoods, East
San Rafael Working Group, Resilient Shore representative, TAM Citizens’
Oversight Committee
One-on-One meetings with Marin Sanitary Service (MSS), Central Marin
Sanitation Agency (CMSA), and Canal AllianceNB US 101 to EB I-580 Direct Connector Project
Important Project Considerations NB US 101 to EB I-580 Direct Connector ProjectDesign speed
Traffic & congestion
Environmental impacts
Air quality & GHG emissions
Noise
Habitat and SF Bay
Visual impacts
Sea level rise considerations
Costs and funding
Property impacts
Economic impacts & benefits
Neighborhood connectivity
Bike/pedestrian/transit access
Equity
NB US 101 to EB I-580 Direct Connector ProjectRegional Measure 3 (bridge toll funding):
•$135M for project planning and construction
Local Funding (Marin County ½ cent transportation sales tax):
•$16.5M to expedite project planning and to fund local improvements
Current Project Funding
NB US 101 to EB I-580 Direct Connector Project11
Seven Alternatives Considered
NB US 101 to EB I-580 Direct Connector Project
Alternative 1A –Hillside A
NB US 101 to EB I-580 Direct Connector ProjectCost: $323M
Design Speed: 50mph
Height: Up to 60 ft
Vertical scale is exaggerated 10:1
Marin
Recovery
Center
PG&E
Service
Center
Central Marin
Sanitation
Agency
Modify
Access
Alternative 1A: Bird’s Eye View
Maintain Access
Marin
Recovery
Center
Alternative 1B
Cost: $446M
Design Speed: 50 mph
Height: Up to 60 ft
Vertical scale is exaggerated 10:1
Marin
Recovery
Center PG&E
Service
Center
Central Marin
Sanitation
Agency
Re-Align
Reconstruct
SFD Flyover
Alternative 1B Bird’s Eye View
Cut slopes
will be
landscaped
/vegetated
Marin
Recovery
Center
PG&E
Service
Center
Alternative 1A/1B View at Exit from NB US 101
Alternative 2 –Simms St
Cost: $ 174M
Design Speed: 45 mph
Height: 25 to 45 Ft
Vertical scale is exaggerated 10:1
Alternative 2 View From Cal Park Path
Alternative 3A –“Low Speed A”
Cost: $131M
Design Speed: 35 mph
Height: Up to 25 ft
Vertical scale is exaggerated 10:1
Alternative 3A Rendering
Span over
existing off-
ramp
New Cul-de-
Sac at end of
Gary Pl Combined
Direct
Connector
/Bellam Blvd
Exit
Alternative 3B –“Low Speed B”
Cost: $104M
Design Speed: 35 mph
Height: Up to 22 ft
Vertical scale is exaggerated 10:1
Alternative 3B Rendering
Close 580
off-ramp to
Bellam
New Cul-de-
Sac at end of
Gary Pl
Combined
Direct
Connector
/Bellam Blvd
Exit
Alternative 4 –
“Swing Out”
Cost: $214M
Design Speed: 35 mph
Height: 90 to 100 ft
Vertical scale is exaggerated 10:1
Close 580
off-ramp to
Bellam Maintain NB
US 101 off-
ramp to
Bellam
Alternative 5 –“Medium Speed”
Cost: $179M
Design Speed: 40 mph
Height: up to 45 ft
Vertical scale is exaggerated 10:1
Alternative 5 (Medium Speed)NB US 101 to EB I-580 Direct Connector ProjectMaintain all 580
and 101 off-ramps
to Bellam
Additional
Bridges over
Bellam
NB US 101 to EB I-580 Direct Connector Project26
Alternatives Overview
NB US 101 to EB I-580 Direct Connector ProjectAlternatives Naming Design Speed
(mph)Preliminary Cost
1A Hillside A 50 $ 323M
1B Hillside B 50 $ 446M
2 Simms St 45 $ 174M
3A Low Speed A 35 $ 131M
3B Low Speed B 35 $ 104M
4 Swing Out 35 $ 214M
5 Medium Speed 40 $ 179M
26
* Costs do not include cost of Bellam Blvd Improvements
Concepts for WB I-580 to SB US101
NB US 101 to EB I-580 Direct Connector ProjectWB I-580
TO SB US -101
NB US-101
OFF RAMP
TO BELLAM
NB US-101
TO EB I -580
TO NOVATO
TO RICHMOND
MARIN
SQUARE
NB US 101 to EB I-580 Direct Connector Project28
Bellam Improvements –Replace Existing Structure
28
NB US 101 to EB I-580 Direct Connector Project29
Protected Bikeway Options Under Consideration
•Option 1: Directional Protected Bikeways
•Option 2: Two-way Protected Bikeway (North Side)
•Option 3: Simms/Castro Protected Bikeway and Bridge
•Note: All options would provide protected/separated
bikeways and would include pedestrian enhancements
29
NB US 101 to EB I-580 Direct Connector Project30
Preliminary Feedback
Don’t close Bellam Blvd off-ramp from I-580 (Alt’s 3B & 4)
Bellam Blvd improvements have support
Project needs to address equity
Concerns from some property owners
High cost of Alts 1A/1B could be prohibitive
Need to further assess compatibility with future WB to SB connector
Need to assess distance traveled from SFD to new connector –people may choose
to stay on SFD if they have to travel too far
NB US 101 to EB I-580 Direct Connector Project30
NB US 101 to EB I-580 Direct Connector ProjectThank you
Questions?