Loading...
HomeMy WebLinkAboutPW Preliminary Capital Improvement Program____________________________________________________________________________________ FOR CITY CLERK ONLY Council Meeting: May 16, 2022 Disposition: Accepted report Agenda Item No: 8.b Meeting Date: May 16, 2022 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Department of Public Works Prepared by: Bill Guerin, Director of Public Works Nadine Atieh Hade, Administrative Services Director City Manager Approval: ______________ TOPIC: PRELIMINARY CAPITAL IMPROVEMENT PROGRAM SUBJECT: INFORMATIONAL REPORT ON PRELIMINARY THREE-YEAR CAPITAL IMPROVEMENT PROGRAM RECOMMENDATION: Accept the informational report regarding the preliminary three-year Capital Improvement Program for FY 2022-23 through FY 2024-25. INTRODUCTION: The purpose of this report is to present the preliminary three-year Capital Improvement Program (CIP) for Fiscal Year (FY) 2022-23 through FY 2024-25 for review. This presentation will provide the City Council and community members an opportunity to participate in reviewing and sharing feedback relating to the CIP. While the CIP will be formalized in a full, detailed report and incorporated into a final, proposed citywide budget for FY 2022-23 to be presented to the City Council for approval in June 2022, staff seeks City Council feedback of the preliminary CIP project list at this time. BACKGROUND: The CIP is a multi-year planning tool used to identify and implement the City’s capital needs over the upcoming three-year period: FY 2022-23 through FY 2024-25. The CIP document summarizes the City’s planned capital and infrastructure improvement projects, including their funding sources, and prioritizes projects after analysis and coordination with other City departments to ensure that all department needs are represented. Project selection and priority is based on recommendations by various City departments and existing planning documents to accommodate high priority needs, which focused on life/safety, maintenance and repair, public and Council input, and other factors. The CIP is intended to provide a comprehensive three-year project list for the City’s known capital and infrastructure needs. ANALYSIS: Project List Development: Projects identified for the CIP are recommended by Public Works staff in the course of their work, studies and reports, including, but not limited to, the 2018 Bicycle and Pedestrian Master Plan (BPMP), the Facility Assessment Study, and the 2021 Downtown Precise Plan. Department Directors may also SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 recommend projects for the CIP, and projects may arise from direct community or City Council input. Additionally, projects with specific discrete funding sources are included in the CIP. While most street and transportation projects are informed by the General Plan, BPMP, or traffic studies and observations, improvement projects to City parks and buildings/facilities have historically been informed by Department Directors, the publicly appointed Park and Recreation Commission, and the Facilities Maintenance division of Public Works. Continuing our collaborative planning process from previous years, a group consisting of staff from various City departments assisted in the development of the CIP. This group met to discuss proposed projects and rank them based on the following criteria: 1) health/safety/liability; 2) priority initiatives/City goals; 3) time sensitive funds; and 4) maintain/enhance functionality. Furthermore, these four criteria were all weighted, with the category of health/safety/liability worth 35% of the overall points available. Having a weighted system allows for the most important projects to rise to the surface and ensure they are a priority. As previously done, the CIP this year involves the use of a 15% contingency in which not all available funding is allocated to deliver CIP projects. Prior experience suggests that unanticipated needs arise mid-year and having a contingency fund to cover these ensures staff are not unnecessarily performing adjustments to the current CIP priority list. In some fund types, the number of projects exceeds available funding. In this case, these future projects are identified in the CIP as “unfunded.” Major new projects/studies identified in the FY 2022-23 to FY 2024-25 CIP include: • 20 Meyer Road Slide Repair • North San Pedro Medians at SMART Railroad Crossing • Center Street Resurfacing – Phases I and II • Francisco Blvd West at Irwin St: Trash Rack • Sun Valley Park Playground Improvements • Grand Ave (Second St to Fourth St) Class IV Cycle Track • Bike & Pedestrian Master Plan 2022 Update and Trails Master Plan Project Funding: The five major annual funding sources for the CIP, including Measure A Parks, are: Fund # Fund Name (CIP Category) Average Annual Revenues Description 603 Building Maintenance (City Owned Property, Parks) $500,000 The Building Maintenance Fund supports both routine maintenance and capital improvement projects associated with the City’s buildings, parks and other facilities. The Building Fund is an internal revenue fund, which means General Fund monies are the sole source of revenue for the fund. Historically, $500,000 in General Fund monies has been contributed annually to the Building Fund. 241 Measure A (Parks) TBD: Measure A renewal on June 2022 ballot. Measure A was a nine-year ¼ percent transactions and use tax that was passed in 2012 and expired in March 2022. This tax was managed by the County of Marin. The purpose of the tax is to care for existing parks and open spaces, support regional community parks, projects, and programs and to further farmland restoration. Pending the June election results, Measure A work plan for FY 22- 23 will be prioritized by Library and Recreation, in concert with the SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3 Prior years: $400,000 Park and Recreation Commission. This work plan will be brought to the City Council in the first quarter of FY 22-23 for review and approval. 205 Stormwater Fund (Drainage) $840,000 Established to fund Stormwater maintenance, programs, and improvements throughout the City—including maintenance and repair of the City’s 12 storm water pump stations. This fund receives annual revenues of approximately $840,000 from the City’s Stormwater Activity fee (Municipal Code Chapter 9.40). 206 Gas Tax (Streets/ Transportation) $3,300,000 The Gas Tax is a revenue distributed from the state based on a percentage tax on each gallon of gas purchased in San Rafael. Gasoline tax is collected and distributed to jurisdictions by the State on an annual basis and may be used for capital projects and maintenance to local streets, roads, traffic, and bicycle pedestrian facilities. Fund #206 also collects annual Measure A Transportation Sales Tax dollars (distributed by Transportation Authority of Marin), a, ½- cent sales tax approved initially by voters in 2004 and reapproved in November 2018. 246 Traffic Mitigation Fee (Transportation) ~$350,000 average (depends on development) Traffic Mitigation Fees are charged to a developer in connection with the approval of a development project. The funds are used to support improvements to the traffic/transportation network. The City utilizes Traffic Mitigation Fees for circulation projects identified in Exhibit 21 of Policy 6A of General Plan 2040 and similar qualifying projects. Fund 246 is a subset of Fund 206 projects. Due to limited available funds in Fund 246, projects that are eligible for both Fund 246 and Fund 206 have been ranked together under Fund 206 until additional funding is collected for Fund 246. As has been noted in prior year CIPs, the long-term capital and infrastructure improvement needs for City-owned property, parks, and drainage far exceed the available revenues each year. Therefore, a considerable number of projects are identified as real capital and infrastructure needs (and maintained on the CIP project list) but are categorized as “Unfunded”. City staff continues to actively pursue grant funding, congressional earmarks, and other infrastructure funding sources. Several of these funding sources require a local funding match. The funding tables included as an attachment list outline projects that would require grant funding to move forward. These are designated by “Grant: unsecured” and the local match is listed in the associated fund category. If the City’s effort to get grant funding is unsuccessful, the funding identified as the local match will be used to fund other, currently unfunded, projects in the same fund category. Historically, staff transfers a flat amount each year from the Gas Tax to the General Fund to support personnel costs of Streets Maintenance staff, which we propose to do again this year. Personnel costs of employees preforming street and road maintenance and repairs total over $2M annually in the General Fund and are an allowable use of State gas tax monies. CIP Prior-Year Completed Projects: As a part of the annual CIP, the Department also recaps major projects completed in the prior fiscal year, including the following: • Southern Heights Blvd. Bridge Replacement SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 4 • Francisco Blvd East Sidewalk Widening and Street Resurfacing Projects • Canal Neighborhood Pedestrian Improvements • Albert Park Field restroom and accessibility improvements Projects currently under construction or underway: • Third Street Rehabilitation & Safety projects • Fire Stations 54 and 55 remodels • Parks and Recreation Master Plan • Bungalow Avenue and Woodland Avenue Resurfacing • 20 Meyer Slide Repair • B Street at Woodland Avenue Box Culvert Repairs • Parks and Recreation Master Plan FISCAL IMPACT: There is no direct fiscal impact associated with the preliminary Capital Improvement Program because the information being provided is for the purpose of discussion, public input, and direction to staff. However, for planning purposes, the funding source by project phase and year is identified for each project in the CIP. The figures in the CIP are engineer’s estimates and are not based on actual bids received. It is important to note that while the City Council is accepting an informational report relating to a preliminary list and prioritization of projects within the CIP, including which projects are funded vs. those that remain unfunded, all CIP projects are subject to the City’s Purchasing Policy, including the City Council and City Manager contract thresholds, at the time a contract is awarded. For example, when a construction contract is awarded for a project and the contract amount is above City Manager’s award authority ($175,000 for Public Works projects), the contract and project would be brought forth to the City Council for approval. OPTIONS: The City Council has the following options to consider relating to this item: 1. Accept the informational report regarding the preliminary Capital Improvement Program and provide direction to staff. 2. Do not accept the informational report. 3. Direct staff to return with more information. RECOMMENDATION: Accept the informational report regarding the preliminary three-year Capital Improvement Program for FY 2022-23 to FY 2024-25 and provide direction to staff. ATTACHMENTS: 1. Preliminary FY 2022-23 CIP Project Rankings 2. Preliminary FY 2022-23 to FY 2024-25 CIP Funding Tables CIP Documents Rating Definitions: Page 2 Project Ratings System: Pages 3-5 Project Funding Tables: Pages 6-9 RATING CATEGORIES WEIGHTING 7 - 10 strong contribution toward public health & safety and/or reduction of City liability 7 - 10 strong support from community/Council aligns with City goals 10 grant funded, urgent 7 - 10 urgent repair/rehab/ replacement of City asset necessary 4 - 6 some improvement to public health & safety and/or reduction of City liability 4 - 6 some support from community/Council meets City objectives 7 3 grant funded, upcoming timeline grant funded, no timeline 4 - 6 repair/rehab/replacement of City asset should be completed eventually 0 - 3 little improvement to public health & safety and/or reduction of City liability 0 - 3 little support from community/Council little contribution toward City goals 0 not time sensitive 0 - 3 repair/rehab/replacement of City asset can be deferred 20% RANK SCORING 1 to 10 35%20% Priority Initiative Time-Sensitive Funds 25% Health / Safety / Liability Maintain/Enhance Functionality HeaH'h I Safety/ Liabili,ty.: Projects t h at are cr it ical to publ ic health a n d safety or sign if icantly red u ce the Cit y 's risk of liability wil l rece ive a h ig h er rating . T h is category i n cludes projects which may be the result of litigation. Pr1iority Initiative: T h is category assigns prior ity t o project s based on the City's guiding principles including equ ity, comm u nity and/or City Council support, Together Sa n Rafae l, and the General Plan. Time-Sensiti1ve Funds: CIP projects funded by state/federal grants ofte n have funding deadlines. Grant-funded projects wit h t imely-use-of-fun d in g requireme nts w ill be rated higher than those without upcoming dead lin es. Maintain Functionality: T h is catego r y rat es projects acco r ding to the importan ce and urgency of t h e proposed repa ir, rehabilitation, or replacement. Proposed ma i ntenance that can be deferred w ill be rated lower than pressing maintenance on a critica l city asset . Project Rating System Health / Safety / Liability Priority Initiative Time- Sensitive Funds Maintain / Enhance Functionality 35% 20% 25% 20% 205 Stormwater East San Rafael Shore Feasibility Assessment 8.8 10 10 5 10 205 Stormwater Rotary Manor Culvert Replacement 7.5 10 10 0 10 205 Stormwater Storm Drainage Master Plan 7.5 10 10 0 10 205 Stormwater City Adaptation Plan 7.5 10 10 0 10 205 Stormwater San Quentin Pump Station: Reconstruction 7.1 10 8 0 10 205 Stormwater Francisco Blvd West at Irwin St: Trash Rack 6.4 9 6 0 10 205 Stormwater MCSTOPPP: Kerner Pump Station Trash Capture 6.3 7 8 5 5 205 Stormwater MCSTOPPP: 400 Canal Pump Station Trash Capture 5.8 7 8 3 5 205 Stormwater MCSTOPPP: N. Francisco Pump Station Trash Capture 5.8 7 8 3 5 205 Stormwater MCSTOPPP: Rossi Pump Station Trash Capture 5.8 7 8 3 5 205 Stormwater MCSTOPPP: Redwood Hwy 5.8 7 8 3 5 205 Stormwater MCSTOPPP: San Quentin Pump Station Trash Capture 5.8 7 8 3 5 205 Stormwater 121 Irwin St Erosion Control 4.4 5 4 0 9 205 Stormwater Las Casas Drainage Basin Repair 4.2 5 5 0 7 205 Stormwater Piombo Pump Station: Electrical Panel Replacement 4.0 4 5 0 8 205 Stormwater Cayes Pump Station Control System 3.4 5 3 0 5 205 Stormwater Spinnaker Point Salt Marsh Remediation (Conceptual Design Only)1.7 2 3 0 2 206 Gas Tax Canal Active Transporation Experience Improvements 6.8 9 9 0 9 206 Gas Tax North San Pedro Medians at SMART Railroad Crossing 6.6 9 8 0 9 206 Gas Tax BPMP Rank-2: Project F-12 Bellam Blvd- Andersen to Baypoint Drive feasibility Class IV 6.5 10 10 0 5 206 Gas Tax Canal Transportation Plan Draft: Street lighting 6.4 8 9 0 9 246 Traffic Mitigation Bike & Ped Master Plan: Update 6.4 8 10 0 8 206 Gas Tax Lincoln Ave Bridge Repairs 6.2 7 7 3 8 206 Gas Tax Fairhills Dr Roadway Rehabilitation 6.2 9 7 0 8 206 Gas Tax Canal St Powerline Undergrounding 6.1 7 9 0 9 246 Traffic Mitigation Grand Ave (Second St to Fourth St) Class IV Cycle Track 6.1 6 8 3 8 206 Gas Tax First St at Mahon Creek Wall Repair 6.0 8 8 0 8 206 Gas Tax Second St Multimodal Improvements 6.0 8 8 0 8 206 Gas Tax Lincoln Ave Rehabilitation 6.0 8 8 0 8 206 Gas Tax Woodland Ave Ped Improvements 5.8 8 8 0 7 206 Gas Tax Spinnaker Point Dr Parking Modifications 5.7 6 10 0 8 206 Gas Tax Intersection Improvements: Fourth St/Second St at Miracle Mile & W Crescent 5.6 8 7 0 7 246 Traffic Mitigation BPMP Rank-1: Project D-1 Downtown East-West connection: Feasibility study 5.6 8 6 0 8 206 Gas Tax Mission Ave (B St to E St) Sidewalk Gap Closure 5.6 8 7 0 7 246 Traffic Mitigation BPMP Rank-5: Project B-6 Class I on both sides Freitas from Montecillo to Del Presidio. Or bi-directional 6 5.5 7 7 0 8 206 Gas Tax BPMP Rank-6: Project D-2 West Tamalpais Ave from Second Street to Mission Ave- Class IV/ improved 5.4 8 6 0 7 206 Gas Tax Southern Heights Blvd at Courtright Rd: Retaining Wall 5.4 8 6 0 7 206 Gas Tax Drainage Improvements: East St at Jessup St 5.4 8 5 0 8 246 Traffic Mitigation BPMP Rank-14: Project D-21 Puerto Suello Pathway- implement lighting on Hill pathway 5.4 8 7 0 6 246 Traffic Mitigation Catalina Traffic Calming 5.4 8 7 0 6 RANK SCORING 1 to 10 FUNDING SOURCE PROJECT NAME Project Rating System Health / Safety / Liability Priority Initiative Time- Sensitive Funds Maintain / Enhance Functionality 35% 20% 25% 20% RANK SCORING 1 to 10 FUNDING SOURCE PROJECT NAME 206 Gas Tax Fourth St Curb Ramp Replacement 5.3 7 7 0 7 206 Gas Tax Center St Resurfacing 5.1 5 5 3 8 206 Gas Tax Drainage Improvements: C St from First St to Second St 5.1 6 6 0 9 206 Gas Tax Los Gamos Rd at Oleander Dr Flood Warning System 5.0 8 7 0 4 206 Gas Tax Redwood Hwy & Pro Center Pkwy Resurfacing 4.9 5 5 3 7 206 Gas Tax Drainage Improvements: Bayview St 4.7 6 6 0 7 246 Traffic Mitigation Fourth St Signal System Improvements: B St to Cijos St 4.7 6 7 0 6 206 Gas Tax BPMP Rank-20: Project C-13 Miramar/First Street from Second St to E Street- convert Class III to Class III 4.7 7 7 0 4 246 Traffic Mitigation Point San Pedro & Loch Lomond mast arms 4.7 7 5 0 6 206 Gas Tax Drainage Improvements: First St at D St 4.6 5 5 0 9 206 Gas Tax Las Gallinas Channel Study 4.5 6 7 0 5 206 Gas Tax Merrydale Rd (Puerto Suello Pathway to North San Pedro Rd) Bicycle Facility Study 4.5 6 7 0 5 206 Gas Tax Embarcadero/Mission/Sea View/Mission/Marina Intersection 4.5 7 6 0 4 206 Gas Tax BPMP Rank-3: Project C-12 D Street/C Street- feasibility study for Class IV or Class III+ north-south from 4.5 7 5 0 5 206 Gas Tax Drainage Improvements: Woodland Ave 4.4 5 5 0 8 206 Gas Tax Bayview Retaining Wall 4.3 6 4 0 7 206 Gas Tax Intersection Improvements: Irwin St & DuBois St 4.3 7 4 0 5 206 Gas Tax BPMP Rank-7: Project A-19 Feasibility study: WB Class IV on North San Pedro Road from Los Ranchcitos 4.3 7 6 0 3 206 Gas Tax BPMP Rank-8: Project A-17 North San Pedro Road Class I South side from Los Ranchcitos to Civic 4.3 7 6 0 3 246 Traffic Mitigation Intersection Improvements: Bellam Blvd & Andersen Dr 4.3 6 4 0 7 206 Gas Tax Merrydale Northgate Promenade 4.2 5 7 0 5 206 Gas Tax Drainage Improvements: Second St between C & E St 4.1 6 4 0 6 246 Traffic Mitigation B St 2-Way Conversion (transfer to 206 Third St Rehab)4.1 3 10 0 5 206 Gas Tax Merrydale Pathway - South Connector Study 4.0 5 8 0 3 206 Gas Tax Scenic Ave Debris Wall 4.0 5 4 0 7 246 Traffic Mitigation Safe Routes to School: Davidson Phase 2 4.0 5 5 0 6 246 Traffic Mitigation Merrydale Rd/Civic Center connection 4.0 5 5 0 6 206 Gas Tax Fair Dr/Coleman Retaining Wall 3.8 5 3 0 7 206 Gas Tax Francisco Blvd East Rehabilitation 3.6 5 3 0 6 206 Gas Tax Riviera Dr Resurfacing 3.2 4 4 0 5 206 Gas Tax Manderly Rd Medians 2.9 3 5 0 4 206 Gas Tax BPMP Rank-9: Project D-5 Third Street: Grand Ave to East city limit/ Embarcadero Way- Class I multi-use 2.8 4 4 0 3 206 Gas Tax Freitas Pkwy and Montecillo Intersection (K-rail Only)2.7 6 3 0 0 206 Gas Tax Drainage Improvements: Ross Valley/Terrace Ave 2.7 3 4 0 4 206 Gas Tax BPMP Rank-4: Project D-20 Highway 101 undercrossing lighting and public art (3rd, 4th, 5th, and Linden)2.6 5 2 0 2 206 Gas Tax Drainage Improvements: Corrillo Dr 2.5 3 2 0 5 206 Gas Tax Canal Bike-Ped Swing Bridge 2.4 1 7 0 3 206 Gas Tax Intersection Improvements: Courtright Rd & Pearce Rd 2.3 3 3 0 3 206 Gas Tax BPMP Rank-11: Project C-21 Fifth Ave Study parking occupancy rates and potential bikeway connecting 2.3 3 3 0 3 Project Rating System Health / Safety / Liability Priority Initiative Time- Sensitive Funds Maintain / Enhance Functionality 35% 20% 25% 20% RANK SCORING 1 to 10 FUNDING SOURCE PROJECT NAME 208 Childcare Fund Childcare Portable Building Replacement (Pickleweed)7.5 10 10 0 10 208 Childcare Fund Childcare Portable Building Replacement (Silveria/Lucas Valley/Vallecito)5.3 7 7 0 7 208 Childcare Fund Parkside Preschool Playground Tent Replacement 5.3 7 6 0 8 214 Memorial Fund Downtown Carnegie Library Preservation and Expansion 7.8 8 8 7 8 241 Measure A: Parks Sun Valley Park Playground Improvements 7.2 7 7 7 8 241 Measure A: Parks Pickleweed Park Enhancements/Field Renovation 6.4 7 10 3 6 241 Measure A: Parks Park and Recreation Master Plan 6.2 8 9 0 8 241 Measure A: Parks Albert Park Field Fencing 6.1 10 5 0 8 241 Measure A: Parks Montecito Promenade 1.5 2 2 0 2 501 Parking Services Seismic Upgrades to Parking Structures at Third St/A St and Third St/C St 6.9 10 9 0 8 501 Parking Services Seismic Upgrades to Parking Structure at Fifth Ave/C St 6.9 10 9 0 8 501 Parking Services Fifth Ave/Garden Ln Parking Lot Resurfacing 6.2 8 9 0 8 501 Parking Services Seismic Upgrades to Parking Structure at Third St/Lootens Pl 4.7 10 0 0 6 603 Building Maintenance A.J. Boro Community Center: Fire water lines BFP installation 7.5 10 10 0 10 603 Building Maintenance Building Maintenance Master Plan 7.1 10 8 0 10 603 Building Maintenance Los Ranchitos Park: Sewer Lateral Replacement 6.8 9 8 0 10 603 Building Maintenance A.J. Boro Community Center: Leveling & jack replacement & rear deck 6.7 10 7 0 9 603 Building Maintenance A.J. Boro Community Center: HVAC & Roofing Replacement 6.6 8 7 3 8 603 Building Maintenance A.J. Boro Community Center: Multipurpose Room Flooring Replacement 6.6 8 9 0 10 603 Building Maintenance City Hall/Library Fire Sprinkler System Feasibility Study 6.5 10 8 0 7 603 Building Maintenance City Hall: HVAC Replacement 6.4 8 8 0 10 603 Building Maintenance A.J. Boro Community Center: Rear Deck 6.2 8 7 0 10 603 Building Maintenance Downtown Library: Bathroom Conversion 6.2 8 8 0 9 603 Building Maintenance Falkirk Cultural Center: ADA Improvements 6.0 9 7 0 7 603 Building Maintenance San Rafael Community Center: Generator Hookup 5.7 7 7 0 9 603 Building Maintenance City Hall: Server Room Sewer Repair 5.1 7 7 0 6 603 Building Maintenance Terra Linda Pool House Electrical Upgrades 4.9 7 5 0 7 603 Building Maintenance Terra Linda Community Center: HVAC Replacement 4.7 6 5 0 8 603 Building Maintenance San Rafael Community Center: Parking Lot Resurfacing 4.5 7 5 0 5 603 Building Maintenance Las Gallinas Trail Pavement Rehabilitation 4.2 5 5 0 7 603 Building Maintenance Court Street Plaza Fountain Repair 2.1 2 2 0 5 603 Building Maintenance Downtown Library: Children's Patio Enclosure 2.1 2 3 0 4 Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction Freitas Roundabout (funded by Caltrans) In Construction $100,000 Canal Active Transporation Experience Improvements 6.8 TAM Measure A, AA $700,000 Grant: Unsecured $500,000 $3,000,000 North San Pedro Medians at SMART Railroad Crossing 6.6 TAM Measure AA, BB, A $100,000 BPMP Rank-2: Project F-12 Bellam Blvd- Andersen to Baypoint Drive feasibility Class IV 6.5 TAM Funded Canal Transportation Plan Draft: Street lighting 6.4 $100,000 Lincoln Ave Bridge Repairs 6.2 $100,000 Grant: Unsecured HBP Fairhills Dr Roadway Rehabilitation 6.2 $150,000 Grant: Unsecured Canal St Powerline Undergrounding 6.1 $500,000 Grant: PG&E Rule 20A $4,000,000 First St at Mahon Creek Wall Repair 6 $15,500 $400,000 Second St Multimodal Improvements 6 SB1: Road Maintenance & Rehab Account (RMRA) $250,000 $750,000 Grant: Unsecured Lincoln Ave Rehabilitation 6 SB1: Road Maintenance & Rehab Account (RMRA) $100,000 $2,000,000 Grant: Unsecured $2,500,000 Woodland Ave Ped Improvements 5.8 SB1: Road Maintenance & Rehab Account (RMRA) $1,000,000 TAM Measure A, AA $200,000 $600,000 Grant: Unsecured Spinnaker Point Dr Parking Modifications In Construction $60,000 TAM Measure AA, BB, A $1,100,000 Mission Ave (B St to E St) Sidewalk Gap Closure 5.6 $75,000 Intersection Improvements: Fourth St/Second St at Miracle Mile & W Crescent 5.6 $100,000 $1,000,000 Grant: Unsecured $3,000,000 BPMP Rank-6: Project D-2 West Tamalpais Ave from Second Street to Mission Ave- Class IV/ improved crossings5.4 Marin Transit Funded Grant: Unsecured (Local Match) $100,000 $200,000 Southern Heights Blvd at Courtright Rd: Retaining Wall 5.4 $40,000 $800,000 Total Funds at Start of FY $7,500,000 $5,465,000 $5,465,000 Operating $3,750,000 $3,750,000 $3,750,000 15% Contingency $560,000 $250,000 $250,000 Available for Projects $3,190,000 $1,465,000 $1,465,000 FY Expenses $3,125,000 $1,400,000 $1,400,000 Remaining $65,000 $65,000 $65,000 Total RMRA at Start of FY $2,180,000 $3,130,000 $1,680,000 FY Expense $350,000 $2,750,000 $1,000,000 ↓ Unfunded Projects Listed Below ↓Remaining $1,830,000 $380,000 $680,000 BPMP Rank-14: Project D-21 Puerto Suello Pathway- implement lighting on Hill pathway 5.4 Drainage Improvements: East St at Jessup St 5.4 Fourth St Curb Ramp Replacement 5.3 Center St Resurfacing 5.1 Drainage Improvements: C St from First St to Second St 5.1 Los Gamos Rd at Oleander Dr Flood Warning System 5 Redwood Hwy & Pro Center Pkwy Resurfacing 4.9 Drainage Improvements: Bayview St 4.7 Drainage Improvements: First St at D St 4.6 BPMP Rank-3: Project C-12 D Street/C Street- feasibility study for Class IV or Class III+ north-south from Gerstle Park to downtown4.5 Fund 206 - Gas Tax FY 2024-25 FY 2023-24 Project Name Rank Scoring 1 to 10 Prior Funding FY 2022-23 Las Gallinas Channel Study 4.5 Merrydale Rd (Puerto Suello Pathway to North San Pedro Rd) Bicycle Facility Study 4.5 $25,000 Embarcadero/Mission/Sea View/Mission/Marina Intersection 4.5 Drainage Improvements: Woodland Ave 4.4 Bayview Retaining Wall 4.3 Intersection Improvements: Irwin St & DuBois St 4.3 BPMP Rank-7: Project A-19 Feasibility study: WB Class IV on North San Pedro Road from Los Ranchcitos to Civic Center Drive4.3 BPMP Rank-8: Project A-17 North San Pedro Road Class I South side from Los Ranchcitos to Civic Center Drive4.3 Merrydale Northgate Promenade 4.2 $80,000 Drainage Improvements: Second St between C & E St 4.1 Merrydale Pathway - South Connector Study 4 Scenic Ave Debris Wall 4 Fair Dr/Coleman Retaining Wall 3.8 Francisco Blvd East Rehabilitation 3.6 Riviera Dr Resurfacing 3.2 Manderly Rd Medians 2.9 Freitas Pkwy and Montecillo Intersection (K-rail Only) 2.7 Drainage Improvements: Ross Valley/Terrace Ave 2.7 BPMP Rank-4: Project D-20 Highway 101 undercrossing lighting and public art (3rd, 4th, 5th, and Linden)2.6 Drainage Improvements: Corrillo Dr 2.5 Canal Bike-Ped Swing Bridge 2.4 Intersection Improvements: Courtright Rd & Pearce Rd 2.3 Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction East San Rafael Shore Feasibility Assessment 8.8 Grant: Coastal Conservancy & Marin Community Foundation Rotary Manor Culvert Replacement 7.5 $175,000 External (Non-Stormwater Account) Fund $1,000,000 Storm Drainage Master Plan 7.5 $300,000 City Adaptation Plan 7.5 Grant: Unsecured San Quentin Pump Station: Reconstruction In Construction $375,000 ARPA Funding $4,300,000 Francisco Blvd West at Irwin St: Trash Rack 6.4 $50,000 MCSTOPPP: Kerner Pump Station Trash Capture 6.3 $278,466 Grant: EPA $188,000 $409,000 Grant: Caltrans (Unsecured) $600,000 Total Funds at Start of FY $1,210,000 $875,000 Operating $815,000 $815,000 Contingency $50,000 Available for Projects $345,000 $60,000 FY Expenses $300,000 $50,000 ↓ Unfunded Projects Listed Below ↓Remaining $45,000 $10,000 MCSTOPPP: 400 Canal Pump Station Trash Capture 5.8 MCSTOPPP: N. Francisco Pump Station Trash Capture 5.8 MCSTOPPP: Rossi Pump Station Trash Capture 5.8 MCSTOPPP: Redwood Hwy 5.8 MCSTOPPP: San Quentin Pump Station Trash Capture 5.8 Grant: Unsecured 121 Irwin St Erosion Control 4.4 Las Casas Drainage Basin Repair 4.2 Piombo Pump Station: Electrical Panel Replacement 4 Cayes Pump Station Control System 3.4 Assessment District Funds Spinnaker Point Salt Marsh Remediation (Conceptual Design Only) 1.7 Grant: Measure AA (Unsecured) Storm Drain Master Plan to dictate future projects FY 2024-25 FY 2023-24 Fund 205 - Stormwater Rank Scoring 1 to 10 Prior Funding FY 2022-23 Project Name Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction Childcare Portable Building Replacement (Pickleweed) 7.5 Grant: Unsecured $55,000 $1,200,000 ↓ Unfunded Projects Listed Below ↓ Childcare Portable Building Replacement (Silveria/Lucas Valley/Vallecito) 5.3 Parkside Preschool Playground Tent Replacement 5.3 Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction Sun Valley Park Playground Improvements 7.2 $50,000 $238,000 Grant: Prop 68 Per Capita $177,952 Pickleweed Park Enhancements/Field Renovation 6.4 Additional 603 Funds $120,000 Additional Funds (unsecured) Park and Recreation Master Plan 6.2 $285,000 Albert Park Field Fencing 6.1 $200,000 Additional 603 Funds $6,000 Additional Funds (unsecured) $400,000 Trails Master Plan - Integrated with Bike & Ped Master Plan (transfer to Fund 246) In Design $100,000 Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction Bike & Ped Master Plan: Update 6.4 $100,000 Additional 241 Funds for Trails Master Plan $100,000 Grand Ave (Second St to Fourth St) Class IV Cycle Track 6.1 $500,000 Additional 206 Funds $100,000 $75,000 Grant: Unsecured Bay Trail grant $225,000 Grant: TFCA grant $335,000 BPMP Rank-1: Project D-1 Downtown East-West connection: Feasibility study 5.6 $50,000 BPMP Rank-5: Project B-6 Class I on both sides Freitas from Montecillo to Del Presidio. Or bi-directional 6 foot wide sidewalks5.5 $50,000 Catalina Traffic Calming 5.4 $100,000 Total Funds at Start of FY $1,200,000 $605,000 $475,000 Operating $350,000 $350,000 $350,000 15% Contingency $120,000 $30,000 $10,000 Available for Projects $730,000 $225,000 $115,000 FY Expenses $700,000 $100,000 $0 ↓ Unfunded Projects Listed Below ↓Remaining $30,000 $125,000 $115,000 Fourth St Signal System Improvements: B St to Cijos St 4.7 Point San Pedro & Loch Lomond mast arms 4.7 $40,000 Intersection Improvements: Bellam Blvd & Andersen Dr 4.3 Safe Routes to School: Davidson Phase 2 4 Merrydale Rd/Civic Center connection 4 Projects dependent on fees collected in previous years FY 2024-25 FY 2024-25 FY 2024-25 FY 2023-24 Prior Funding FY 2022-23 FY 2023-24 Fund 208 - Childcare Fund 241 - Measure A: Parks FY 2022-23Project Name Rank Scoring 1 to 10 Prior Funding Fund 246 - Traffic Mitigation FY 2023-24 Project Name Rank Scoring 1 to 10 Measure A funds sunset during FY 21-22. Future funding will not be available unless a ballot measure is approved by the voters FY 2022-23Project Name Rank Scoring 1 to 10 Prior Funding Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction ↓ Unfunded Projects Listed Below ↓ Seismic Upgrades to Parking Structures at Third St/A St and Third St/C St 6.9 Seismic Upgrades to Parking Structure at Fifth Ave/C St 6.9 Fifth Ave/Garden Ln Parking Lot Resurfacing 6.2 Seismic Upgrades to Parking Structure at Third St/Lootens Pl 4.7 City Hall parking resurfacing (Upper lot 501, lower general) + A Street garage $230,000 603 funding moved to General Fund Contingency $110,000 Planning / Design Construction Planning / Design Construction Planning / Design Construction Planning / Design Construction A.J. Boro Community Center: Fire water lines BFP installation 7.5 $100,000 Building Maintenance Master Plan 7.1 $200,000 Los Ranchitos Park: Sewer Lateral Replacement 6.8 $30,000 A.J. Boro Community Center: Leveling & jack replacement & rear deck 6.7 $10,000 $150,000 A.J. Boro Community Center: Multipurpose Room Flooring Replacement 6.6 $200,000 A.J. Boro Community Center: HVAC & Roofing Replacement 6.6 $225,000 City Hall/Library Fire Sprinkler System Feasibility Study 6.5 $75,000 City Hall: HVAC Replacement 6.4 $100,000 Downtown Library: Bathroom Conversion 6.2 $60,000 Donated Funds $20,000 Total Funds at Start of FY $1,500,000 Operating $200,000 Contingency $150,000 Available for Projects $1,150,000 FY Expenses $1,140,000 ↓ Unfunded Projects Listed Below ↓Remaining $10,000 Falkirk Cultural Center: ADA Improvements 6 San Rafael Community Center: Generator Hookup 5.7 City Hall: Server Room Sewer Repair 5.1 Terra Linda Pool House Electrical Upgrades 4.9 Terra Linda Community Center: HVAC Replacement 4.7 San Rafael Community Center: Parking Lot Resurfacing 4.5 Las Gallinas Trail Pavement Rehabilitation 4.2 Court Street Plaza Fountain Repair 2.1 Downtown Library: Children's Patio Enclosure 2.1 Building Maintenance Master Plan to dictate future projects FY 2024-25 FY 2024-25 FY 2023-24 FY 2023-24 Fund 603 - Building Maintenance Fund 501 - Parking Services Project Name Rank Scoring 1 to 10 Prior Funding FY 2022-23 Project Name Rank Scoring 1 to 10 Prior Funding FY 2022-23