Loading...
HomeMy WebLinkAboutPW Third & Union Improvements; NOC RecordedCITY OF n�. . 1� Agenda Item No: 7 Meeting Date: February 1, 2010 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Public rksw Prepared by: mow;.,.. -° City Manager Approval: ec lic Wor (LB) File No. 18.01.66 SUBJECT: ACCEPT COMPLETION OF THE THIRD STREET AND UNION STREET IMPROVEMENT PROJECT, PROJECT #11025, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION. RECOMMENDATION: Staff recommends that the City Council accept completion of the project and authorize the City Clerk to file the Notice of Completion. BACKGROUND: As part of routine traffic monitoring, intersection analysis, signal inspection and response to requests from citizens, staff analyzed the intersection of Third Street and Union Street for necessary improvements. After the analysis, it was determined that the intersection was in need of improvements including extension of the eastbound and westbound left turn pockets, installation of a new westbound right turn pocket, various utility relocations, AC pavement dig out repairs, AC pavement overlay, drainage system modifications, signing, striping and street lighting modifications, various ADA enhancements, installation of landscaping and irrigation facilities and other corresponding work. The City Council adopted Resolution numbers 11340, 12328 and 12731 authorizing the Public Works Director to enter into and amend an agreement with Kimley-Horn & Associates, Inc. to design the above mentioned intersection improvements. Design of the landscaping and irrigation system was completed by City staff. Total cost of the design portion of the project totaled $146,976.05 which was completed in March of 2009. The City Council also adopted Resolution number 12723 dedicating 2,480 square feet of City owned property to the public right of way, Resolution number 12764 authorizing the Public Works Director to enter into an agreement with MMWD to relocate three fire hydrants and Resolution number 12730 authorizing the Public Works Director to enter into an agreement with Ghirardelli Associates order to perform inspection services. On March 16, 2009 City Council adopted the project plans and specifications which were advertised in accordance with San Rafael's Municipal code and policies on March 20, 2009. Bids were opened on April 15, 2009 at 2:30 PM. The City Council adopted Resolution number 12722 authorizing the Public Works Director to enter into an agreement with Ghilotti Construction Company, Inc. (the low bidder) to FOR CITY CLERK ONLY File No.: 14 —1-160Q Council Meeting: •X11 ho/O Disposition: GQCC¢,4t;� C044.vP ao1 AiArU - o fo 2,E eawechcl SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 construct the project. After a 6 -week lead period to obtain the traffic signal materials construction commenced on June 15th, 2009. PROJECT UPDATE: The project construction was completed on October 8`h, 2009 and the new facilities and improvements were opened to the public. However, the project was fully completed on January 15`h, 2010 after completion of some punch list items and utility coordination. The engineer recommends acceptance of the project and recordation of a Notice of Completion. PROJECT SUMMARY: The following summarizes the project costs: Category Amount Construction Aril 20, 2009 Contract Amount based on Estimated Quantities $718,733.08 Actual Contract Amount based on Measured Quantities* $725,602.13 Change Orders* $51,553.54 Extra Work* $65,513.25 Total" $842,668.92 City Supplied Traffic Signal Equipment $46,075.42 Construction Design Support $14,953.95 Utility Relocations $68,167.48 Advertisement Costs $2,578.41 Furniture and Equipment $2,032.38 Construction Inspection $72,703.18 Total Construction Cost $1,049,179.74 :'. includes the retention to be paid 35 days after Notice of Completion is filed. On April 20, 2009 the City Council allocated $1,107,640.30 for the Third/Union Construction. The total construction cost of the project fell below the allocated project amount. The following summarizes the project milestones and working days: Item Date Working Days Date of Contract Aril 20, 2009 - Date of Notice to Proceed Aril 30, 2009 - 6 -Week Lead Period Ends and Construction Begins: June 15, 2009 0 Turn on new Traffic Signal September 30, 2009 65 Paving Work Complete, Road Open for Complete Use October 8, 2009 82 All Work Complete (including Utility Coordination and Minor Punch List Items January 15, 2010 147 Working Days allowed by contract 90 Working Days allowed by change order 25 Non -Working Days due to weather 19 Working Days allowed by adjustment 2 Working Days requested by extension 15 Actual Working Days Allowed 151 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3 The extension of working days was requested and approved for the scheduling of utility inspection and approval. ANALYSIS: Pursuant to Civil Code Section 3093 the City, owner of the improvements, is required to record a Notice of Completion upon acceptance of the improvements by the City. This acceptance initiates a time period during which project sub contractors may file Stop Notices seeking payment from the City out of the funds owed to the Contractor for the project work. ACTION REQUIRED: Accept completion of the Third Street and Union Street Improvement Project (Project #11025) and authorize the City Clerk to file a Notice of Completion. When recorded mail to: City of San Rafael Esther C. Beirne, City Clerk 1400 Fifth Avenue P. O. Box 151560 San Rafael, CA 94915-1560 iliil Iiil lip fll� re^er•ded ;;+r; iciaf 52cc--rdi5 Ylqr� P. iHAYEER �=Se55Gr-rec�r•Cer 12:54PM 03-Fer-2010 3 PcLe 1 G e t SPACE ABOVE THIS LINE FOR RECORDER'S USE CITY OF SAN RAFAEL NOTICE OF COMPLETION OF IMPROVEMENT TO ALL PERSONS WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of California, that there has been a cessation of labor upon the work or improvement and that said work or improvement was completed upon the 15th day of January, 2010 and accepted by the City Council the 1st day of February 2010; that the name, address and nature of the title of the party giving this notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the boundaries of which said work or improvement was made upon land owned by said City and/or over which said City has an easement; that said work or improvement is described as follows: THIRD STREET AND UNION STREET IMPROVEMENT PROJECT PROJECT #11025 and reference is hereby made for a further description thereof to the plans and specifications approved for said work or improvements now on file in the office of the City Clerk of said City, and said plans and specifications are hereby incorporated herein by reference thereto; and that the name of the Contractor who contracted to perform said work and make such improvement is Ghilotti Construction Company, Inc. 246 Ghilotti Avenue Santa Rosa, CA 95407 I declare under penalty of perjury that the foregoing is true and correct. Executed at San Rafael, California, on �f5.& 20j,-:. CITY OF SAN RAFAEL A Municipal Corporation LB RV H I, P.E. Pub orks Director STATE OF CALIFORNIA COUNTY OF MARIN On this 3RA day of fEWDAtl 20J before me, ESTHER C. BEIRNE, City Clerk of the City of San Rafael, County of Marin, State of California, residing therein, personally appeared PARVIZ MOKHTARI, P.E., (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. I certify under PENALTY OF PERJURY tinder the laws of the State of California that the foregoing paragraph is truce and correct. Signature 1`A . G - 'e`'. , ESTHER C. BEIRNE, City Clerk File: 18.01.66.19 CITY OF SAN RAFAEL ROUTING SLIP / APPROVAL FORM INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT, ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY. SRRA / SRCC AGENDA ITEM NO. FROM DEPARTMENT DATE PARVIZ MOKHTARI,RECEIVED Public Works 01/25/2010 TITLE OF DOCUMENT: DATE OF MEETING: 02/01/2010 CITY ATTORNEY ACCEPT COMPLETION OF THE THIRD STREET AND UNION STREET IMPROVEMENT PROJECT, PROJECT #11025, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION. (LOWER HALF OF FORM FOR APPROVALS ONLY) APPROV AS COUNCIL / AGENCY AGCND ITEM: A t Manager (signatu NOT APPROVED REMARKS: APPROVED AS TO FORM: City Attorney (signature) File No.: 18.01.66 When recorded mail to: City of San Rafael Esther C. Beirne, City Clerk 1400 Fifth Avenue P. O. Box 151560 San Rafael, CA 94915-1560 SPACE ABOVE THIS LINE FOR RECORDER'S USE CITY OF SAN RAFAEL NOTICE OF COMPLETION OF MPROVEMENT TO ALL PERSONS WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of California, that there has been a cessation of labor upon the work or improvement and that said work or improvement was completed upon the 15th day of January, 2010 and accepted by the City Council the 1st day of February 2010; that the name, address and nature of the title of the party giving this notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the boundaries of which said work or improvement was made upon land owned by said City and/or over which said City has an easement; that said work or improvement is described as follows: THIRD STREET AND UNION STREET IlVIPROVEMENT PROJECT PROJECT #11025 and reference is hereby made for a further description thereof to the plans and specifications approved for said work or improvements now on file in the office of the City Clerk of said City, and said plans and specifications are hereby incorporated herein by reference thereto; and that the name of the Contractor who contracted to perform said work and make such improvement is Ghilotti Construction Company, Inc. 246 Ghilotti Avenue Santa Rosa, CA 95407 I declare under penalty of perjury that the foregoing is true and correct. Executed at San Rafael, California, on CITY OF SAN RAFAEL A Municipal Corporation By PARVIZ MOKHTARI, P.E. Public Works Director STATE OF CALIFORNIA COUNTY OF MARIN On this day of 20— before me, ESTHER C. BEIRNE, City Clerk of the City of San Rafael, County of Marin, State of California, residing therein, personally appeared PARVIZ MOKHTARI, P.E., (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature ESTHER C. BEIRNE, City Clerk File: 18.01.66.19 When recorded mail to: City of San Rafael Esther C. Beirne, City Clerk 1400 Fifth Avenue P. O. Box 151560 San Rafael, CA 94915-1560 SPACE ABOVE THIS LINE FOR RECORDER'S USE CITY OF SAN RAFAEL NOTICE OF COMPLETION OF IMPROVEMENT TO ALL PERSONS WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of California, that there has been a cessation of labor upon the work or improvement and that said work or improvement was completed upon the 15th day of January, 2010 and accepted by the City Council the 1st day of February 2010; that the name, address and nature of the title of the party giving this notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the boundaries of which said work or improvement was made upon land owned by said City and/or over which said City has an easement; that said work or improvement is described as follows: THIRD STREET AND UNION STREET IMPROVEMENT PROJECT PROJECT #11025 and reference is hereby made for a further description thereof to the plans and specifications approved for said work or improvements now on file in the office of the City Clerk of said City, and said plans and specifications are hereby incorporated herein by reference thereto; and that the name of the Contractor who contracted to perform said work and make such improvement is Ghilotti Construction Company, Inc. 246 Ghilotti Avenue Santa Rosa, CA 95407 I declare under penalty of perjury that the foregoing is true and correct. Executed at San Rafael, California, on 120— CITY 20. CITY OF SAN RAFAEL A Municipal Corporation By PARVIZ MOKHTARI, P.E. Public Works Director STATE OF CALIFORNIA COUNTY OF MARIN On this .,,,,,_,.,_„ day of 20, before me, ESTHER C. BEIRNE, City Clerk of the Ra City of San Rafael, County of Marin, State of California, residing therein, personally appeared PARVIZ MOKHTARI, P.E., (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature ESTHER C. BEIRNE, City Clerk File: 18.01.66.19