Agenda Item No: 7
Meeting Date: February 1, 2010
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public rksw
Prepared by: mow;.,.. -° City Manager Approval:
ec lic Wor (LB)
File No. 18.01.66
SUBJECT: ACCEPT COMPLETION OF THE THIRD STREET AND UNION STREET
IMPROVEMENT PROJECT, PROJECT #11025, AND AUTHORIZE THE CITY CLERK TO
FILE THE NOTICE OF COMPLETION.
RECOMMENDATION:
Staff recommends that the City Council accept completion of the project and authorize the City Clerk to
file the Notice of Completion.
BACKGROUND:
As part of routine traffic monitoring, intersection analysis, signal inspection and response to requests from
citizens, staff analyzed the intersection of Third Street and Union Street for necessary improvements.
After the analysis, it was determined that the intersection was in need of improvements including
extension of the eastbound and westbound left turn pockets, installation of a new westbound right turn
pocket, various utility relocations, AC pavement dig out repairs, AC pavement overlay, drainage system
modifications, signing, striping and street lighting modifications, various ADA enhancements, installation
of landscaping and irrigation facilities and other corresponding work.
The City Council adopted Resolution numbers 11340, 12328 and 12731 authorizing the Public Works
Director to enter into and amend an agreement with Kimley-Horn & Associates, Inc. to design the above
mentioned intersection improvements. Design of the landscaping and irrigation system was completed by
City staff. Total cost of the design portion of the project totaled $146,976.05 which was completed in
March of 2009.
The City Council also adopted Resolution number 12723 dedicating 2,480 square feet of City owned
property to the public right of way, Resolution number 12764 authorizing the Public Works Director to
enter into an agreement with MMWD to relocate three fire hydrants and Resolution number 12730
authorizing the Public Works Director to enter into an agreement with Ghirardelli Associates order to
perform inspection services.
On March 16, 2009 City Council adopted the project plans and specifications which were advertised in
accordance with San Rafael's Municipal code and policies on March 20, 2009. Bids were opened on
April 15, 2009 at 2:30 PM. The City Council adopted Resolution number 12722 authorizing the Public
Works Director to enter into an agreement with Ghilotti Construction Company, Inc. (the low bidder) to
FOR CITY CLERK ONLY
File No.: 14 —1-160Q
Council Meeting: •X11 ho/O
Disposition: GQCC¢,4t;� C044.vP ao1
AiArU - o
fo 2,E eawechcl
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
construct the project. After a 6 -week lead period to obtain the traffic signal materials construction
commenced on June 15th, 2009.
PROJECT UPDATE:
The project construction was completed on October 8`h, 2009 and the new facilities and improvements
were opened to the public. However, the project was fully completed on January 15`h, 2010 after
completion of some punch list items and utility coordination. The engineer recommends acceptance of
the project and recordation of a Notice of Completion.
PROJECT SUMMARY:
The following summarizes the project costs:
Category Amount
Construction
Aril 20, 2009
Contract Amount based on Estimated Quantities
$718,733.08
Actual Contract Amount based on Measured Quantities*
$725,602.13
Change Orders*
$51,553.54
Extra Work*
$65,513.25
Total"
$842,668.92
City Supplied Traffic Signal Equipment
$46,075.42
Construction Design Support
$14,953.95
Utility Relocations
$68,167.48
Advertisement Costs
$2,578.41
Furniture and Equipment
$2,032.38
Construction Inspection
$72,703.18
Total Construction Cost
$1,049,179.74
:'. includes the retention to be paid 35 days after Notice of Completion is filed.
On April 20, 2009 the City Council allocated $1,107,640.30 for the Third/Union Construction.
The total construction cost of the project fell below the allocated project amount.
The following summarizes the project milestones and working days:
Item Date Working Days
Date of Contract
Aril 20, 2009
-
Date of Notice to Proceed
Aril 30, 2009
-
6 -Week Lead Period Ends and Construction Begins:
June 15, 2009
0
Turn on new Traffic Signal
September 30, 2009
65
Paving Work Complete, Road Open for Complete Use
October 8, 2009
82
All Work Complete (including Utility Coordination and
Minor Punch List Items
January 15, 2010
147
Working Days allowed by contract
90
Working Days allowed by change order
25
Non -Working Days due to weather
19
Working Days allowed by adjustment
2
Working Days requested by extension
15
Actual Working Days Allowed
151
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
The extension of working days was requested and approved for the scheduling of utility
inspection and approval.
ANALYSIS:
Pursuant to Civil Code Section 3093 the City, owner of the improvements, is required to record a
Notice of Completion upon acceptance of the improvements by the City. This acceptance
initiates a time period during which project sub contractors may file Stop Notices seeking
payment from the City out of the funds owed to the Contractor for the project work.
ACTION REQUIRED:
Accept completion of the Third Street and Union Street Improvement Project (Project #11025)
and authorize the City Clerk to file a Notice of Completion.
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
iliil Iiil lip fll�
re^er•ded
;;+r; iciaf 52cc--rdi5
Ylqr� P. iHAYEER
�=Se55Gr-rec�r•Cer
12:54PM 03-Fer-2010
3
PcLe 1 G e t
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 15th day of January, 2010 and accepted by the City Council
the 1st day of February 2010; that the name, address and nature of the title of the party giving this
notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of
California, within the boundaries of which said work or improvement was made upon land owned by
said City and/or over which said City has an easement; that said work or improvement is described as
follows:
THIRD STREET AND UNION STREET IMPROVEMENT PROJECT
PROJECT #11025
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on �f5.& 20j,-:.
CITY OF SAN RAFAEL
A Municipal Corporation
LB
RV H I, P.E.
Pub orks Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this 3RA day of fEWDAtl 20J before me, ESTHER C. BEIRNE, City Clerk of the
City of San Rafael, County of Marin, State of California, residing therein, personally appeared PARVIZ
MOKHTARI, P.E., (or proved to me on the basis of satisfactory evidence) to be the person whose name
is subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OF PERJURY tinder the laws of the State of California that the foregoing
paragraph is truce and correct.
Signature 1`A . G - 'e`'. ,
ESTHER C. BEIRNE, City Clerk
File: 18.01.66.19
CITY OF SAN RAFAEL
ROUTING SLIP / APPROVAL FORM
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRRA / SRCC AGENDA ITEM NO.
FROM
DEPARTMENT
DATE
PARVIZ MOKHTARI,RECEIVED
Public Works
01/25/2010
TITLE OF DOCUMENT:
DATE OF MEETING: 02/01/2010
CITY ATTORNEY
ACCEPT COMPLETION OF THE THIRD STREET AND UNION STREET IMPROVEMENT PROJECT,
PROJECT #11025, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION.
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROV AS COUNCIL / AGENCY
AGCND ITEM: A t
Manager (signatu
NOT APPROVED
REMARKS:
APPROVED AS TO FORM:
City Attorney (signature)
File No.: 18.01.66
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF MPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 15th day of January, 2010 and accepted by the City Council
the 1st day of February 2010; that the name, address and nature of the title of the party giving this
notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of
California, within the boundaries of which said work or improvement was made upon land owned by
said City and/or over which said City has an easement; that said work or improvement is described as
follows:
THIRD STREET AND UNION STREET IlVIPROVEMENT PROJECT
PROJECT #11025
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on
CITY OF SAN RAFAEL
A Municipal Corporation
By
PARVIZ MOKHTARI, P.E.
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this day of 20— before me, ESTHER C. BEIRNE, City Clerk of the
City of San Rafael, County of Marin, State of California, residing therein, personally appeared PARVIZ
MOKHTARI, P.E., (or proved to me on the basis of satisfactory evidence) to be the person whose name
is subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Signature
ESTHER C. BEIRNE, City Clerk
File: 18.01.66.19
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 15th day of January, 2010 and accepted by the City Council
the 1st day of February 2010; that the name, address and nature of the title of the party giving this
notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of
California, within the boundaries of which said work or improvement was made upon land owned by
said City and/or over which said City has an easement; that said work or improvement is described as
follows:
THIRD STREET AND UNION STREET IMPROVEMENT PROJECT
PROJECT #11025
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 120—
CITY
20.
CITY OF SAN RAFAEL
A Municipal Corporation
By
PARVIZ MOKHTARI, P.E.
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this .,,,,,_,.,_„ day of 20, before me, ESTHER C. BEIRNE, City Clerk of the
Ra
City of San Rafael, County of Marin, State of California, residing therein, personally appeared PARVIZ
MOKHTARI, P.E., (or proved to me on the basis of satisfactory evidence) to be the person whose name
is subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Signature
ESTHER C. BEIRNE, City Clerk
File: 18.01.66.19