HomeMy WebLinkAboutPW NTPP Northgate Gap Closure Bikeway Improvement ProjectCITY of Agenda Item No: 8 Meeting Date: March 1, 2010 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Pub ' rks Prepared by. City Manager Approval: File No.: 16.01.241.03 SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AWARDING A CONTRACT FOR THE NTPP — NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS, PROJECT NO. 11117, TO GHILOTTI CONSTRUCTION COMPANY, INC., IN THE AMOUNT OF $185,238.12. RECOMMENDATION: Staff recommends that the City Council adopt the resolution awarding the contract to Ghilotti Construction Company, Inc. in the amount of $185,238.12. BACKGROUND: On March 3, 2008 the City Council adopted Resolution number 12438, and authorized the Director of Public Works to enter into an agreement with Kimley-Horn & Associates, Inc. to design the Northgate Gap Closure Bikeway Improvements. On February 17, 2009 the City Council adopted Resolution number 12658 approving the preferred design alternative and directing staff to proceed with preparation of the design plans and specifications. On September 25, 2009, Caltrans approved and issued the required documents allowing the City to proceed with bidding and construction of the project. On January 19, 2010 the City Council adopted the plans and specifications and authorizing the City Clerk to call for bids. The project was advertised in accordance with San Rafael's Municipal code and policies on January 22, 2010 and bids were publicly opened on February 22, 2010 at 2:30 PM and read aloud. The engineer's estimate was $255,731.00. The following eight bids were received: NAME OF BIDDER AMOUNT Ghilotti Construction Company $185,238.12 Michael Paul Company, Inc. $192,307.12 North Bay Construction $201,047.15 Argonaut Constructors $205,524.10 Maggiora & Ghilotti, Inc. $208,208.00 Team Ghilotti, Inc. $215,515.80 Ghilotti Bros., Inc. $227,045.90 W.K. McLellan Co. $232,140.30 FOR CITY CLERK ONLY File No.: x"'1-1 'bl � Council Meeting:: 311/1010 Disposition: P - V-r10w1 * 1192 3 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 On July 6"i, 2009, City Council adopted the 2009/2010 Capital Improvement Program allocating $362,000 for this project. ANALYSIS: The bid from Ghilotti Construction Company, Inc.. was $185,238.12 and falls within the allocated project budget. FISCAL IMPACT: The bid amount falls within the already approved project budget of $362,000. Project expenditures for design and construction are 100% reimbursable from the Non -Motorized Transportation Pilot Program grant. OPTIONS: The Council can choose not to award the contract and direct Staff to rebid the project. ACTION REQUIRED: Adopt Resolution awarding contract to Ghilotti Construction Company, Inc. in the amount of $185,238.12. Enclosures 1. Resolution 2. Agreement RESOLUTION NO. 12923 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AWARDING A CONTRACT FOR THE NTPP — NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS, PROJECT NO. 11117, TO GHILOTTI CONSTRUCTION COMPANY, INC., IN THE AMOUNT OF $185,238.12. WHEREAS, on the 22nd day of February, 2010, pursuant to due and legal notice published in the manner provided by law, inviting sealed bids or proposals for the work hereinafter mentioned, as more fully appears from the Affidavit of Publication thereof on file in the office of the City Clerk of the City of San Rafael, California, the City Clerk of said City did publicly open, examine, and declare all sealed bids or proposals for doing the following work in said City, to wit: "NTPP — Northgate Gap Closure Bikeway Improvements" Project No. 11117 In accordance with the plans and specifications therefore on file in the office of said City Clerk; and WIIEREAS, the work designed on the NTPP — Northgate Gap Closure Bikeway Improvements Project Contract Documents is eligible to be funded utilizing Non -Motorized Transportation Pilot Program (NTPP) funds; and WHEREAS, the bid of Ghilotti Construction Company, Inc., at the unit prices stated in its bid was and is the lowest and best bid for said work and said bidder is the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Rafael, that the bid of Ghilotti Construction Company, Inc. is hereby accepted at said unit prices and that the contract for said work and improvements is hereby awarded to Ghilotti Construction Company, Inc at the unit prices mentioned in said bid. IT IS FURTHER ORDERED AND RESOLVED that the City Manager and the City Clerk of said City be authorized and directed to execute a contract with Ghilotti Construction City of San Rafael • California Form of Contract Agreement for NTPP — Northgate Gap Closure Bikeway Improvements PROJECT NO. 11117 This Agreement is made and entered into this 151 day of March, 2010 by and between the City of San Rafael (hereinafter called City) and Ghilotti Construction Company, Inc. (hereinafter called Contractor). Witnesseth, that the City and the Contractor, for the considerations hereinafter named, agree as follows: I - Scope of the Work The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary, and to perform all of the work shown on the plans and described in the specifications for the project entitled: NTPP — Northgate Gap Closure Bikeway Improvements, Project No. 11117, all in accordance with the requirements and provisions of the Contract Documents as defined in the General Conditions which are hereby made a part of this Agreement. The liability insurance provided to City by Contractor under this contract shall be primary and excess of any other insurance available to the City. II - Time of Completion (a) The work to be performed under this Contract shall be commenced within FIVE (5) WORKING DAYS after the date of written notice by the City to the Contractor to proceed. (b) All work shall be completed within 40 WORKING DAYS and with such extensions of time as are provided for in the General Conditions. (d) This project is anticipated to commence on March 15, 2010, and the project completed by May 11, 2010. III - Liquidated Damages It is agreed that, if all the work required by the contract is not finished or completed within the number of working days as set forth in the contract, damage will be sustained by the City, and that it is and will be impracticable and extremely difficult to ascertain and determine the actual damage which the City will sustain in the event of and by reason of such delay; and it is therefore agreed that the Contractor will pay to the City, the sum of $1,000 for each and every working day's delay in finishing the work in excess of the number of working days prescribed above; and the Contractor agrees to pay said liquidated damages herein provided for, and further agrees that the City may deduct the amount thereof from any moneys due or that may become due the Contractor under the contract. IV - The Contract Sum The City shall pay to the Contractor for the performance of the Contract the amounts determined for the total number of each of the units of work in the following schedule completed at the unit price stated. The number of units contained in this schedule is approximate only, and the final payment shall be made Page 1 for the actual number of units that are incorporated in or made necessary by the work covered by the Contract. ITEM NO. ITEM QTY UNIT UNIT PRICE ITEM TOTAL 1 Mobilization (3% Max. of Total Bid) 1 LS $5,000.00 $5,000.00 2 Traffic Control System (5% Max. of Total Bid) 1 LS $6,000.00 $6,000.00 3 Construction Staking 1 LS $3,000.00 $3,000.00 4 Clearing and Grubbing 1 LS $3,000.00 $3,000.00 5 Excavation 394 CY $48.00 $18,912.00 6 Remove Concrete (Median Curb) 163 LF $10.00 $1,630.00 7 Asphalt Concrete (14" Full -Depth AC Section - 830 TON $86.00 $71380.00 3/4" Max. Aggregate) ' 8 Asphalt Concrete (14" Full -Depth AC Section - 100 TON $87.00 $8700.00 1/2" Max. Aggregate) ' 9 Minor Concrete (Modified Type E Median Curb) 88 LF $24.00 $2,112.00 10 Minor Concrete (Transition 6" Modified Type E 80 LF $25.00 $2,000.00 Median Curb to Flush Curb) 11 Minor Concrete (Flush Curb) 1848 LF $22.50 $41,580.00 12 Remove Traffic Stripes 1560 LF $2.45 $3,822.00 13 Remove Pavement Markings 82 SF $2.00 $164.00 14 Install Thermoplastic Pavement Markings 44 SF $10.00 $440.00 15 Install Paint Pavement Markings 392 SF $2.00 $784.00 16 Install Detail 22 Stripe (paint) 17 LF $1.47 $24.99 17 Install Detail 25 Stripe (paint) 1927 LF $0.27 $520.29 18 Install Detail 27B Stripe (paint) 1957 LF $0.24 $469.68 19 Install Detail 29 Stripe (paint) 376 LF $1.47 $552.72 20 Install Detail 39 Stripe (paint) 5836 LF $0.29 $1,692.44 21 Install Detail 39A Stripe (paint) 1500 LF $0.34 $510.00 22 Paint Median Curb Yellow 88 LF $2.00 $176.00 23 Install 4" Yellow Stripe (paint) 400 LF $0.47 $188.00 24 Remove and Salvage Existing Sign and Post 1 EA $75.00 $75.00 25 Remove and Salvage Existing Sign; Furnish and 3 EA $95.00 $285.00 Install New Sign on Existing Post 26 Relocate Existing Sign to New Post; Remove 12 EA $150.00 $1,800.00 Existing Post 27 Furnish and Install New Sign(s) on Existing Post 2 EA $95.00 $190.00 28 Furnish and Install New Sign(s) on New Post 36 EA $225.00 $8,100.00 Page 2 ITEM UNIT ITEM NO. ITEM QTY UNIT PRICE TOTAL 29 Furnish and Install 6' Metal Tree Stakes (Set of 2) 3 EA $75.00 $225.00 30 Furnish and Install Street Tree 3 EA $635.00 $1,905.00 Grand Total $185,238.12 V - Progress Payments (a) On not later than the 6th day of every month the Public Works Department shall prepare and submit an estimate covering the total quantities under each item of work that have been completed from the start of the job up to and including the 25th day of the preceding month, and the value of the work so completed determined in accordance with the schedule of unit prices for such items together with such supporting evidence as may be required by the City and/or Contractor . (b) On not later than the 15th day of the month, the City shall, after deducting previous payments made, pay to the Contractor 90% of the amount of the estimate as approved by the Public Works Department. (c) Final payment of all moneys due shall be made within 15 days after the expiration of 35 days following the filing of the notice of completion and acceptance of the work by the Public Works Department. (d) The Contractor may elect to receive 100% of payments due under the contract from time to time, without retention of any portion of the payment by the public agency, by depositing securities of equivalent value with the public agency in accordance with the provisions of Section 4590 of the Government Code. Such securities, if deposited by the Contracor, shall be valued by the City's Finance Director, whose decision on valuation of the securities shall be final. VI - Acceptance and Final Payment (a) Upon receipt of written notice that the work is ready for final inspection and acceptance, the Engineer shall within 5 days make such inspection, and when he finds the work acceptable under the Contract and the Contract fully performed, he will promptly issue a Notice of Completion, over his own signature, stating that the work required by this Contract has been completed and is accepted by him under the terms and conditions thereof, and the entire balance found to be due the Contractor, including the retained percentage, shall be paid to the Contractor by the City within 15 days after the expiration of 35 days following the date of recordation of said Notice of Completion. (b) Before final payment is due the Contractor shall submit evidence satisfactory to the Engineer that all payrolls, material bills, and other indebtedness connected with work have been paid, except that in case of disputed indebtedness or liens the Contractor may submit in lieu of evidence of payment a surety bond satisfactory to the City guaranteeing payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. (c) The Contractor shall provide a "Defective Material and Workmanship Bond" for 50% of the Contract Price, before the final payment will be made. (d) The making and acceptance of the final payment shall constitute a waiver of all claims by the City, Page 3 other than those arising from any of the following: (1) unsettled liens; (2) faulty work appearing within 12 months after final payment; (3) requirements of the specifications; or (4) manufacturers' guarantees. It shall also constitute a waiver of all claims by the Contractor, except those previously made and still unsettled. (e) If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor, and the Engineer so certifies, the City shall, upon certificate of the Engineer, and without terminating the Contract, make payment of the balance due for that portion of the work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. IN WITNESS WHEREOF, City and Contractor have caused their authorized representatives to execute this Agreement the day and year first written above. ATTEST: Esther C. Beirne City Clerk APPROVED AS TO FORM: Robert F. Epstein City Attorney CITY OF SAN RAFAEL: a Ke4A11' rdoff City heift§er w� ' CONTRACTOR: for Page 4 Premium is for Contrart- Term and is Subject to Adjustment Based c Final Contract Price LibertX Liberty Mutual Surety Alutual, 1001 4th Avenue, Suite 1700 Seattle, WA 98154 Executed in Triplicate PERFORMANCE BOND Premium $1,500.00 Bond #6674684 KNOW ALL BY THESE PRESENTS, That we, Ghilotti Construction Company, Inc. (hereinafter called the Principal), as Principal, and Safeco Insurance Company of America , a corporation duly organized under the laws of the State of Washington (hereinafter called the Surety), as Surety, are held and firmly bound unto - i y of San Rafael, 111 Morphew Street, San Rafael, CA 94915 , (hereinafter called the Obligee), in the sum of One Hundred Eighty-five Thousand Two Hundred Thirty-eight Dollars And Twelve Cents ($ 185,238.12 ) Dollars, for the payment of which sum well and truly to be made, we, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Signed and sealed this 8th day of March 2010 WHEREAS, said Principal has entered into a written Contract with said Obligee, dated March 1, 2010 for ect No. 11117 in accordance with the terms and conditions of said Contract, which is hereby referred to and made a part hereof as if fully set forth herein: NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the above bounden Principal shall well and truly keep, do and perform each and every, all and singular, the matters and things in said contract set forth and specified to be by said Principal kept, done and performed, at the times and in the manner in said contract specified, or shall pay over, make good and reimburse to the above named Obligee, all loss and damage which said Obligee may sustain by reason of failure or default on the part of said Principal so to do, then this obligation shall be null and void; otherwise shall remain in full force and effect. NO SUIT, ACTION OR PROCEEDING by the Obligee to recover on this bond shall be sustained unless the same be commenced within two (2) years following the date on which Principal ceased work on said Contract. S-0757/SA 10/99 Ghilotti ConWuctiqp Company, Inc. Principal By At Afff"LL (L L Safeco Insuran(Lpany_qf America By 4�L Ja6a B.,p4lgard, Attorney -in -Fact XDP ACKNOWLEDGMENT State of California County of Placer ) On March 8, 2010 before me, Kathy Rangel, Notary Public (insert name and title of the officer) personally appeared Jana B. Pilgard who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature k (Seal) 6N1PhY6M6°4d'17�P'niMJ'Idw,rlJ"�"�W'68M'NJ'SN'm°4"6+"�d'W'�P9AnAAY6^W'Gd'6�'�^MYL CY �� ^ °i�'�,r�:"� �aaomi.rin¢�zs¢aruv Ik:re�Neo'a°� vAstoiau ark 2"do 1PYil3 ','^ i °h"b"m�M1%d't"ti79"ti1 �d9�V°A"^Olid'L°1^Pb°W'"^hw^L^yP67'4""6WJ'6i"w"w'�^'J 0�Liberty mutuil PAYMENT :•h• Premium is for Contract Term and is Subject to Adjustment Based Final Contract Price Liberty Mutual Surety 1001 4th Avenue, Suite 1700 Seattle, WA 98154 Executed in Triplicate Premium Included KNOW ALL BY THESE PRESENTS, That we, Ghilotti Construction Company, Inc. and the Safeco Insurance Company of America , a corporation organized and existing under the laws of the State of Washington and authorized to transact surety business in the State of California, as Surety, are held and firmly bound unto City. of San Rafael, 111 Morphew Street San Rafael CA 94915 as Obligee, in the sum of One Hundred Eighty-five Thousand Two Hundred Thirty-eight Dollars And Twelve Cents Dollars ($ 185,238.12 ), for the payment whereof, well and truly to be made, said Principal and Surety bind themselves, their heirs, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH, That WHEREAS, the above -bounden Principal has entered into a contract, dated 1st day of March , 2010 , with the Obligee to do and perform the following work, to -wit: NTPP - Northgate Gap Closure Bikeway Improvements; Project No. 11117 NOW, THEREFORE, if the above -bounden Principal or his/her subcontractors fail to pay any of the persons named in Section 3181 of the Civil Code of the State of California, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or any amounts required to be deducted, withheld and paid over to the Franchise Tax Board from the wages of employees of the Principal or his/her subcontractors pursuant to Section 18806 of the Revenue and Taxation Code, with respect to such work and labor, Surety will pay for the same, in an amount not exceeding the amount specified in this bond, and also, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the court. This bond shall inure to the benefit of any and all persons, companies or corporations entitled to file claims under Section 3181 of the Civil Code of the State of California, so as to give a right of action to them or their assigns in any suit brought upon this bond.. Signed, sealed and dated this 8th day of March , 2010 No premium is charged for this bond. It is executed in connection with a bond for the performance of the contract. S-0816/SA 10/99 Ghilotti C,nstruction Company„ Inc, Principal Safeco Insurance Company off. merica ................................._................................................... ........... Bye. JanaI1:3 Pi gard, Attorney -in -Fact XDP ACKNOWLEDGMENT State of California County of Placer ) On March 8, 2010 before me, Kathy Rangel, Notary Public (insert name and title of the officer) personally appeared Jana B. Pilgard who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. KATHY RANGEL COMIIA ##1828903 aro s NOTARY REX, - CA U0O�#3NA> wISio� r RAC ;pw�a.�w�a^�.a�,�wg uw�»^�,�U^..:,pW,� .1V rv.^��dVwVUWW nature Seal Safeco Insurance Company of America General Insurance Company of America [.; XIII [' POWER 100141hAvenue OF ATTORNEY sous 1700 Seattle, WA 98154 KNOW ALL BY THESE PRESENTS: No. 13401 That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby appoint *�*««DONA LISA BUSCHMANN; J. BUSCHMANN; SUSAN FOURNIER; JANA B. PILGARD; KATHY RANGEL; ROBERT D. LAUX: Roseville, CA"««u«««««««r**«,«"*"«*««.**«.«...«++«+»+++«+r•..,�»«.■«+r«+F+,e.�„«.«***«« Its true and lawful attorney(s)-in-fact, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character Issued In the course of Its business, and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents this 21 st day of March 2009 Dexter R. Leaa. Secretary Timothy A. Mlkolatewski Vice President CERTIFICATE Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA: "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint Individuals as attomeys-in-fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character Issued by the company in the course of its business... On any Instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any Instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimle thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such Instrument or undertaking." Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28,1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, 4) The provisions of Article V, Section 13 of the By -Laws, and (li) A copy of the power-af-attomey appointment, executed pursuant thereto, and (Ili) Certifying that sold power-0f-attomey appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof." I, Dexter R. Legg Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney Issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are stili in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation this 8th SEAL COI��ATE l d SEAL 'OP grtsM�' 'idle erw,�>�6�d day of March . 2010 * R,kjfi Dexter R. Legg, Secretary S-09741DS 3109 WEB PDF ACORD r. CERTIFICATE OF LIABILITY INSURAN�.E TDATE/05/20 o' PRODUCER Woodruff -Sawyer & Co. 88 Rowland Way, Suite 180 Novato, CA 94945 (415) 878-2460 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED Ghilotti Construction Company, Inc. 246 Ghilotti Avenue Santa Rosa, CA 95407 INSURER A: Everest National Insurance Company 10120 INSURER B: Old Republic General Insurance Corporatio 1 24139 INSURER C: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR R DD' POLICY NUMBER POLICY EFFECTIVE DATE MM DD POLICY EXPIRATION D MM DD LIMITS B X GENERALLIABILITY A1CG37540905 03/31/2009 03/31/2010 EACH OCCURRENCE $ 2,000,000 DAMAGE T 100,000 X COMMERCIAL GENERAL LIABILITY PREM SESOE.EoccurDence $ MED EXP (Any one person) S 5,000 CLAIMS MADE a OCCUR PERSONAL & ADV INJURY $ 2,000,000 GENERALAGGREGATE S 4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG S 2,000,000 POLICY X PRO LOC B AUTOMOBILE LIABILITY AlCA37540905 03/31/2009 03/31/2010 COMBINED SINGLE LIMIT $ 1,000,000 X ANY AUTO (Ea accident) BODILY INJURY $ ALL OWNED AUTOS SCHEDULED AUTOS (Per person) BODILY INJURY $ HIRED AUTOS X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EAACC $ ANY AUTO AUTO ONLY: qGG S EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ 3,000,000 _x1 7 7102000283091 03/31/2009 03/31/2010 3,000,000 A OCCUR CLAIMS MADE AGGREGATE $ $ $ DEDUCTIBLE S RETENTION $ WORKERS COMPENSATION AND AICW94680906 04/02/2009 03/31/2010 WC STATU- OTH- E.L. EACH ACCIDENT S 1,000,000 B EMPLOYERS' LIABILITY ANY PRnPRIETOR/PARTNER/EXECLITIVE OFFICER/MEMBEREXCLUDED? E.L. DISEASE - EA EMPLOYEE $ 1,000,UUU If yes, describe under SPECIAL PROVISIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS GCC job #5324, City Project #1117, NTPP Northgate Gap Closure Bikeway Improvements. It is herby understood & agreed that the City of San Rafael & County of Marin, its officers, agents & employees are additional insured hereunder but only as respects liability arising out of the land &for property &/or work described in the Public works contract for the project entitles, NTPP-Northgate Gap Closure Bikeway Improvements, Project No. 11117 between the City of San Rafael and Ghilotti Construction Company, Inc for work & the improvements described therein. Additional insured form CG 20 10 07 04, CG 20 37 07 04 attached. Separation of the insured applies per form CG 00 01 12 04 attached. CERTIFICATE HOLDER City of San Rafael 111 Morphew Street San Rafael, CA 94915 10 Dav Notice for Non-Pavment of Premium SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL IXI�Xv76rX37b MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT 1MXNKIX)MY, NX16xMMxxo€XtxcxKAXNl)fHXxXxNXiNxaf kxW AUTHORIZED REPRESENTA ACORD 25 (2001108) ID #: Attn: Leslie Bloomquist © ACORD =PORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001/08) NAMED INSURED: Ghilotti Construction Company, Inc. POLICY NUMBER: AICG37540905 COMMERCIAL GENERAL LIABILITY CG 20 10 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organ izations : Locations Of Covered Operations City of San Rafael GCC job #5324, City Project #1117, NTPP Northgate Gap 1 I I Morphew Street Closure Bikeway Improvements. It is herby understood & San Rafael, CA 94915 agreed that the City of San Rafael & County of Marin, its officers, agents & employees are additional insured hereunder but only as respects liability arising out of the land &6or property &/or work described in the Public works contract for the project entitles, NTPP-Northgate Gap Closure Bikeway Improvements, Project No. 1 1117 between the City of San Rafael and Ghilotti Construction Company, Inc for work & the improvements described therein. Additional insured form CG 20 10 07 04, CG 10 37 07 04 attached, Senaration of the Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) desig- nated above. B. With respect to the insurance afforded to these additional insureds, the following additional exclu- sions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equip- ment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its in- tended use by any person or organization other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the same project. CG 20 10 07 04 © ISO Properties, Inc., 2004 Page 1 of 1 13 NAMED INSURED: Ghilotti ConstruL.,on Company, Inc. POLICY NUMBER: AICG37540905 COMMERCIAL GENERAL LIABILITY CG 20 37 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Or anization s : Location And Description Of Completed Operations City of San Rafael GCC job #5324, City Project #1117, NTPP Northgate Gap Closure 1 I 1 Morphew Street Bikeway Improvements. It is herby understood & agreed that the San Rafael, CA 94915 City of San Rafael & County of Marin, its officers, agents & employees are additional insured hereunder but only as respects liability arising out of the land Wor property Wor work described in the Public works contract for the project entitles, NTPP-Northgate Gap Closure Bikeway Improvements, Project No. 11117 between the City of San Rafael and Ghilotti Construction Company, Inc for work & the improvements described therein. Additional insured form CG 20 10 07 04, CG 20 37 07 04 attached. Separation of the insured applies per form CG 00 01 12 04 attached. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Section II — Who Is An Insured is amended to in- at the location designated and described in the clude as an additional insured the person(s) or or- schedule of this endorsement performed for that ad- ganization(s) shown in the Schedule, but only with ditional insured and included in the "products-com- respect to liability for "bodily injury" or "property pleted operations hazard". damage" caused, in whole or in part, by "your work" CG 20 37 07 04 Copyright, ISO Properties, Inc., 2004 Page 1 of 1 UNIFORM Named Insured: Ghilotti Construction Company, Inc Policy No: AICG37540905 (3) When this insurance is excess over other insurance, we will pay only our share of the amount of the loss, if any, that exceeds the sum of: (a) The total amount that all such other insurance would pay for the loss in the absence of this insurance; and (b) The total of all deductible and self- insured amounts under all that other in- surance. (4) We will share the remaining loss, if any, with any other insurance that is not de- scribed in this Excess Insurance provision and was not bought specifically to apply in excess of the Limits of Insurance shown in the Declarations of this Coverage Part. c. Method Of Sharing If all of the other insurance permits contribution by equal shares, we will follow this method also. Under this approach each insurer con- tributes equal amounts until it has paid its ap- plicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. 5. Premium Audit a. We will compute all premiums for this Cover- age Part in accordance with our rules and rates. b. Premium shown in this Coverage Part as ad- vance premium is a deposit premium only. At the close of each audit period we will compute the earned premium for that period and send notice to the first Named Insured. The due date for audit and retrospective premiums is the date shown as the due date on the bill. If the sum of the advance and audit premiums paid for the policy period is greater than the earned premium, we will return the excess to the first Named Insured. c. The first Named Insured must keep records of the information we need for premium computa- tion, and send us copies at such times as we may request. 6. Representations By accepting this policy, you agree: a. The statements in the Declarations are accu- rate and complete; b. Those statements are based upon representa- tions you made to us; and c. We have issued this policy in reliance upon your representations. 7. Separation Of Insureds Except with respect to the Limits of Insurance, and any rights or duties specifically assigned in this Coverage Part to the first Named Insured, this in- surance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each insured against whom claim is made or "suit" is brought. 8. Transfer Of Rights Of Recovery Against Others To Us If the insured has rights to recover all or part of any payment we have made under this Coverage Part, those rights are transferred to us. The in- sured must do nothing after loss to impair them. At our request, the insured will bring "suit" or transfer those rights to us and help us enforce them. 9. When We Do Not Renew If we decide not to renew this Coverage Part, we will mail or deliver to the first Named Insured shown in the Declarations written notice of the nonrenewal not less than 30 days before the expi- ration date. If notice is mailed, proof of mailing will be sufficient proof of notice. SECTION V — DEFINITIONS 1. "Advertisement' means a notice that is broadcast or published to the general public or specific mar- ket segments about your goods, products or ser- vices for the purpose of attracting customers or supporters. For the purposes of this definition: a. Notices that are published include material placed on the Internet or on similar electronic means of communication; and b. Regarding web -sites, only that part of a web- site that is about your goods, products or ser- vices for the purposes of attracting customers or supporters is considered an advertisement. 2. "Auto" means: a. A land motor vehicle, trailer or semitrailer de- signed for travel on public roads, including any attached machinery or equipment; or b. Any other land vehicle that is subject to a com- pulsory or financial responsibility law or other motor vehicle insurance law in the state where it is licensed or principally garaged. However, "auto" does not include "mobile equip- ment'. Page 12 of 16 © ISO Properties, Inc., 2006 CG 00 01 12 07 ❑ AGORUTM CERTIFICATL OF LIABILITY INSURANCE DATE (MM1DDfYYYY 03/05/20 0 ) PRODUCER Woodruff -Sawyer & Co. 88 Rowland Way, Suite 180 Novato, CA 94945 (415) 878-2460 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED Ghilotti Construction Company, Inc. 246 Ghilotti Avenue Santa Rosa, CA 95407 INSURER A: Everest National Insurance Company 10120 INSURER B: Old Republic General Insurance Corporatio 1 24139 INSURER C: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRADO'L TYPE OF INSURANCE POLICY NUMBER POLICY EFFECfMMIODTIVE POLICY EXPIRATIONNSR DATE IMMIDDMI LIMBS B X GENERAL LIABILITY A1CG37540905 03/31/2009 03/31/2010 EACH OCCURRENCE $ 2,000,000 DAMAGE To PREM SES EaEocccTuEDnce $ 100,000 IS X COMMERCIAL GENERAL LIABILITY CLAIMS MADE FKOCCUR MED EXP (Any one person $ 5,000 & ADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 POLICY 7X PRO LOC B AUTOMOBILE LIABILITY AICA37540905 03/31/2009 03/31/2010 COMBINED SINGLE LIMIT $ 1,000,000 X ANY AUTO (Ea accident) BODILY INJURY $ ALL OWNED AUTOS SCHEDULED AUTOS (Per person) BODILY INJURY $ HIRED AUTOS X NON -OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC $ ANY AUTO AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ 3,000,000 FI 71C2000283091 03/31/2009 03/31/2010 3,000,000 A X OCCUR CLAIMSMADE AGGREGATE $ $ DEDUCTIBLE $ RETENTION $ B WORKERSCOMPENSATION AND AICW94680906 04/02/2009 03/31/2010LIMITS WC STATU- OTH- E.L. EACH ACCIDENT $ 1,000,000 EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? E.L. DISEASE - EA EMPLOYE $ 1,000,000 If yes, describe under 1,000,000 SPECIAL PROVISIONS below E.L. DISEASE - POLICY LIMIT I $ OTHER $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS GCC job #5324, City Project #1117, NTPP Northgate Gap Closure Bikeway Improvements. It is herby understood & agreed that the City of San Rafael & County of Marin, its officers, agents & employees are additional insured hereunder but only as respects liability arising out of the land &/or property &/or work described in the Public works contract for the project entitles, NTPP-Northgate Gap Closure Bikeway Improvements, Project No. 11117 between the City of San Rafael and Ghilotti Construction Company, Inc for work & the improvements described therein. Additional insured form CG 20 10 07 04, CG 20 37 07 04 attached. Separation of the insured applies per form CG 00 01 12 04 attached. TE HOLDER City of San Rafael 111 Morphew Street San Rafael, CA 94915 I LOAN #: CANCELLATION 10 Day Notice for Non -Payment of Premium SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL Ia�EVUM MAIL 3 0 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT d��el�i�bk�}�XT7dpY.�{�o`�Xr�{c�c171r�u�c3�IJfI�XxXu��Xi#Xc3�a11���} AUTHORIZED ACORD 25 (2001/08) ID #: Attn: Leslie Bloomquist © ACORD�PORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001108) NAMED INSURED: Ghilotti Construction Company, Inc. POLICY NUMBER: AICG37540905 COMMERCIAL GENERAL LIABILITY CG 2010 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organ izati on (s): Locations Of Covered Operations City of San Rafael GCC job #5324, City Project #1117, NTPP Northgate Gap 111 Morphew Street Closure Bikeway Improvements. It is herby understood & San Rafael, CA 94915 agreed that the City of San Rafael & County of Marin, its officers, agents & employees are additional insured hereunder but only as respects liability arising out of the land Wor property Wor work described in the Public works contract for the project entitles, NTPP-Northgate Gap Closure Bikeway Improvements, Project No. 11117 between the City of San Rafael and Ghilotti Construction Company, Inc for work & the improvements described therein. Additional insured form CG 20 10 07 04, CG 20 37 07 04 attached. Separation of the Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) desig- nated above. B. With respect to the insurance afforded to these additional insureds, the following additional exclu- sions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equip- ment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its in- tended use by any person or organization other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the same project. CG 20 10 07 04 © ISO Properties, Inc., 2004 Page 1 of 1 13 NAMED INSURED: Ghilotti Construction Company, Inc. POLICY NUMBER: AICG37540905 COMMERCIAL GENERAL LIABILITY CG 20 37 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization (s): Location And Description Of Completed Operations City of San Rafael GCC job #5324, City Project #1117, NTPP Northgate Gap Closure 111 Morphew Street Bikeway Improvements. It is herby understood & agreed that the San Rafael, CA 94915 City of San Rafael & County of Marin, its officers, agents & employees are additional insured hereunder but only as respects liability arising out of the land Wor property Wor work described in the Public works contract for the project entitles, NTPP-Northgate Gap Closure Bikeway Improvements, Project No. 11117 between the City of San Rafael and Ghilotti Construction Company, Inc for work & the improvements described therein. Additional insured form CG 20 10 07 04, CG 20 37 07 04 attached. Separation of the insured applies per form CG 00 01 12 04 attached. Information required to complete this Schedule if not shown above will be shown in the Declarations. Section II — Who Is An Insured is amended to in- at the location designated and described in the clude as an additional insured the person(s) or or- schedule of this endorsement performed for that ad- ganization(s) shown in the Schedule, but only with ditional insured and included in the "products-com- respect to liability for "bodily injury" or "property pleted operations hazard". damage" caused, in whole or in part, by "your work" CG 20 37 07 04 Copyright, ISO Properties, Inc., 2004 Page 1 of 1 UNIFORM Named Insured: Ghilotti Construction Company, Inc Policy No: AlCG37540905 (3) When this insurance is excess over other insurance, we will pay only our share of the amount of the loss, if any, that exceeds the sum of: (a) The total amount that all such other insurance would pay for the loss in the absence of this insurance; and (b) The total of all deductible and self- insured amounts under all that other in- surance. (4) We will share the remaining loss, if any, with any other insurance that is not de- scribed in this Excess Insurance provision and was not bought specifically to apply in excess of the Limits of Insurance shown in the Declarations of this Coverage Part. c. Method Of Sharing If all of the other insurance permits contribution by equal shares, we will follow this method also. Under this approach each insurer con- tributes equal amounts until it has paid its ap- plicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. 5. Premium Audit a. We will compute all premiums for this Cover- age Part in accordance with our rules and rates. b. Premium shown in this Coverage Part as ad- vance premium is a deposit premium only. At the close of each audit period we will compute the earned premium for that period and send notice to the first Named Insured. The due date for audit and retrospective premiums is the date shown as the due date on the bill. If the sum of the advance and audit premiums paid for the policy period is greater than the earned premium, we will return the excess to the first Named Insured. c. The first Named Insured must keep records of the information we need for premium computa- tion, and send us copies at such times as we may request. 6. Representations By accepting this policy, you agree: a. The statements in the Declarations are accu- rate and complete; b. Those statements are based upon representa- tions you made to us; and c. We have issued this policy in reliance upon your representations. 7. Separation Of Insureds Except with respect to the Limits of Insurance, and any rights or duties specifically assigned in this Coverage Part to the first Named Insured, this in- surance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each insured againstwhom claim is made or "suit" is brought. 8. Transfer Of Rights Of Recovery Against Others To Us If the insured has rights to recover all or part of any payment we have made under this Coverage Part, those rights are transferred to us. The in- sured must do nothing after loss to impair them. At our request, the insured will bring "suit" or transfer those rights to us and help us enforce them. 9. When We Do Not Renew If we decide not to renew this Coverage Part, we will mail or deliver to the first Named Insured shown in the Declarations written notice of the nonrenewal not less than 30 days before the expi- ration date. If notice is mailed, proof of mailing will be sufficient proof of notice. SECTION V — DEFINITIONS 1. "Advertisement' means a notice that is broadcast or published to the general public or specific mar- ket segments about your goods, products or ser- vices for the purpose of attracting customers or supporters. For the purposes of this definition: a. Notices that are published include material placed on the Internet or on similar electronic means of communication; and b. Regarding web -sites, only that part of a web- site that is about your goods, products or ser- vices for the purposes of attracting customers or supporters is considered an advertisement. 2. "Auto" means: a. A land motor vehicle, trailer or semitrailer de- signed for travel on public roads, including any attached machinery or equipment; or b. Any other land vehicle that is subject to a com- pulsory or financial responsibility law or other motor vehicle insurance law in the state where it is licensed or principally garaged. However, "auto" does not include "mobile equip- ment". Page 12 of 16 © ISO Properties, Inc., 2006 CG 00 01 12 07 ❑ Uompany Profile Company Profile Company Search Company Search Results Company Information Old Company Names Agent for Service Reference Information NAIC Group List Lines of Business Financial Statements PDF's Annual Statements Quarterly Statements CA Supplements Company Complaint Company Performance & Comparison Data Company Enforcement Action Composite Complaints Studies Additional Info Find A Company Representative In Your Area View Financial Disclaimer Page 1 of 2 COMPANY PROFILE Company Information EVEREST NATIONAL INSURANCE COMPANY 477 MARTINSVILLE ROAD LIBERTY CORNER, NJ 07938-0830 800-438-4375 Old Company Names DRYDEN GUARANTY INSURANCE COMPANY PRUDENTIAL NATIONAL INSURANCE COMPANY back to top Agent For Service NANCY CARAVACA 1111 BROADWAY SUITE 2050 OAKLAND CA 94607 back to top Reference Information Effective Date 10/20/1993 06/17/1996 NAIC #: 10120 California Company ID #: 3138-5 Date Authorized in California: 03/02/1988 License Status: UNLIMITED -NORMAL Company Type: Property & Casualty State of Domicile: DELAWARE back to top NAIC Group List NAIC Group #: 1120 EVEREST REIN HOL INC back to top Lines Of Business The company is authorized to transact business within these lines of insurance. http ://interactive.web. insurance. ca. gov/companyprofile/companyprofile?event=companyPr... 3/15/2010 Company Profile For an explanation of any of these terms, please refer to the glossary. AIRCRAFT AUTOMOBILE BOILER AND MACHINERY BURGLARY COMMON CARRIER LIABILITY FIRE LIABILITY MARINE PLATE GLASS SPRINKLER SURETY TEAM AND VEHICLE WORKERS' COMPENSATION back to top © 2008 California Department of Insurance Page 2 of 2 http://interactive.web.insurance.ca. gov/companyprofile/companyprofile?event=companyPr... 3/15/2010 Company Profile Company Profile Company Search Company Search Results Company Information Old Company Names Agent for Service Reference Information NAIC Group List Lines of Business Financial Statements PDF's Annual Statements Quarterly Statements CA Supplements Company Complaint Company Performance & Comparison Data Company Enforcement Action Composite Complaints Studies Additional Info Find A Company Representative In Your Area View Financial Disclaimer Pagel of 2 COMPANY PROFILE Company Information OLD REPUBLIC GENERAL INSURANCE CORPORATION 307 N MICHIGAN AVE 17TH FL CHICAGO, IL 60601-5382 800-331-5554 Old Company Names INTERNATIONAL BUSINESS & MERCANTILE REASSURANCE COMPANY MOTORISTS BENEFICIAL INSURANCE COMPANY back to top Agent For Service KAREN HARRIS 2730 GATEWAY OAKS DRIVE SUITE 100 SACRAMENTO CA 95833 back to top Reference Information Effective Date 12/14/2006 04/21/1982 NAIC #: 124139 California Company ID #: 1800-2 Date Authorized in California: 06/30/1965 License Status: UNLIMITED -NORMAL Company Type: Property & Casualty State of Domicile: ILLINOIS back to top NAIC Group List NAIC Group #: back to top Lines Of Business 0150 OLD REPUBLIC GRP http://interactive.web. insurance. ca.gov/companyprofile/companyprofile?event=companyPr... 3/15/2010 Company Profile Page 2 of 2 The company is authorized to transact business within these lines of insurance. For an explanation of any of these terms, please refer to the glossary. AUTOMOBILE BOILER AND MACHINERY BURGLARY COMMON CARRIER LIABILITY DISABILITY FIRE LIABILITY MARINE MISCELLANEOUS PLATE GLASS SPRINKLER SURETY TEAM AND VEHICLE WORKERS' COMPENSATION back to top © 2008 California Department of Insurance http://interactive.web. insurance. ca. gov/companyprofile/companyprofile?event=companyPr... 3/15/2010 I ECL0TT1 ��Eln� uD i Since 1914 �VIA'wM .� 1 2010 G Qy f), ";N\" "NASI LETTER OF TRANSMITTAL TO: CITY OF SAN RAFAEL 111 MORPHEW STREET SAN RAFAEL, CA 94915 ATTN: LESLIE BLOMQUIST WE ARE SENDING YOU: 0 ENCLOSED THE FOLLOWING ITEMS: Q CONTRACTS ❑ SOILS REPORT ❑ COPY OF LETTER ❑ PLANS DATE: 3/9/10 JOB/PROJECT: #5324 — NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS; PROJECT NO. 11117 ❑ UNDER SEPARATE COVER VIA: . ,-,Fed Ex„ ❑ SPECIFICATIONS ❑ DBE SUBMITTALS ❑ SAMPLES ❑ THESE ARE TRANSMITTED as indicated below: REMARKS: ❑ For your approval 0 For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit for approval ❑ For review and comment ❑ For quotation ❑ For bids due ❑ For Your Signature Thank you, BY: Laura Hidalgo Contract Administra If enclosures are not as noted, kindly notify the above as soon as possible. — Engineering Contractor — 246 GHILOTTI AVENUE • SANTA ROSA, CA 95407.707-585-1221 • FAX: 707-585-0129 STATE CONTRACTORS LICENSE #644515 CONSTRUCTION •COMPANY• Corporate Resolution to Execute Contracts Resolved that this Corporation, Ghilotti Construction Company, hereby approves and appoints Richard W. Ghilotti, President of Ghilotti Construction Company, Brian Ongaro, Vice President of Ghilotti Construction Company, Ali Yazdi, VP, General Manager of Ghilotti Construction Company, and Stacy L. Magill, Secretary of Ghilotti Construction Company for the purpose of executing in the name of this corporation, all bid documents, contract documents and contract bonds. Resolved further, that any and all actions taken by Richard W. Ghilotti, Brian Ongaro, Ali Yazdi and Stacy L. Magill in executing said bid documents, contract documents, contract bonds and any other required documents be, and they hereby are, ratified and approved, and all such Contracts and bonds and documents are hereby adopted as binding obligations of this corporation. I, Stacy L. Magill, Secretary of Ghilotti Construction Company, a corporation incorporated under the laws of the State of California, do hereby certify that the foregoing is a full, true and correct copy of resolutions of the Board of Directors of the said corporation, duly and regularly passed and adopted at a special meeting of the Board of Directors of the said corporation which was duly and regularly called and held in all respects as required by law, and by the bylaws of the said corporation, at the office thereof on the 21St day of August, 2001, at which special meeting a majority of the board of Directors of the said corporations was present and voted in favor of said resolutions. IN WITNESS WHEREOF, I have hereto set my hand as such Secretary and affixed the corporate seal of the said corporation, this 29th day of July, 2009. ra Stacy L. M ill Secretary Engineering i . • STATE CONTRACTORS LICENSE #644515 PROFESSIONAL SERVICES AGREEMENT/CONTRACT COMPLETION CHECKLIST AND ROUTING SLIP Below is the process for getting your professional services agreements/contracts finalized and executed. Please attach this "Completion Checklist and Routing Slip" to the front of your contract as you circulate it for review and signatures. Please use this form for all professional services agreements/contracts (not just those requiring City Council approval). This process should occur in the order presented below. _ ................_ ......... _..... Step Responsible Department 1 City Attorney Description Review, revise, and comment on draft agreement. Completion Date 2 Contracting Department Forward final agreement to contractor for their signature. Obtain at least two signed originals from contractor. 3 Contracting Department Agendize contractor -signed agreement for Council approval, if Council approval necessary (as defined by City Attorney/City Ordinance*). .,,,,,,._,�.�,,,._���..,..._.._,..,.�_., �..,,n,._,.��� ,,,,......_ 4 City Attorney .... _ -- Review and approve form of agreement; j f ra e bonds, and insurance certificates and w� endorsements. ._......_. 5 City Manager / Mayor / or _ Agreement executed by Council authorized I� Head official. -Department 6 City Clerk ..... .. .. City Clerk attests signatures, retains original 7,p agreement and forwards copies to the �\ contracting department. To be completed by Contracting Department: Project Manager: �- �, Project Name: // Agendized for City Council Meeting o 'f necessary): If you have questions on this process, please contact the City Attorney's Office at 485-3080. * Council approval is required if contract is over $20,000 on a cumulative basis. PUBLIC WORKS - ADMIN/ENGINEERING: (415) 485-3355 FAX: (415) 485-3334 FAXED, E-MAILED AND MAILED January 20, 2010 P. O. No. 00449 File No: 16.01.241.03 Independent Journal P.O. Box 6150 Novato, CA 94949 FAX NO: 382-1535 Attn: Donna Lazarus Re: NOTICE INVITING SEALED PROPOSALS - NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS PROJECT NO: 11117 Enclosed is one copy of Notice Inviting Sealed Proposals for Public Works entitled: "NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS". Please publish the enclosed notice on Friday, January 22, 2010 and furnish us with Galley Proof and Proof of Publication in duplicate. Thank you for your cooperation in this matter. Sincerely yours, N&U mnra(l Leslie Blomquist Associate Civil Engineer LB:dw Enclosure (1) cc: Esther C. Beirne, City Clerk (2 copies-w/encls.) Project Engineer (w/encl.) Secretaries (2) (w/encl.) 111 Morphew Street, P. O. Box 151560, San Rafael, CA 94915-1560 CITY OF SAN RAFAEL - DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice is hereby given that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTIIGATE GAP CLOSURE BIKEWAY IMPROVEMENTS CITY PROJECT NO. 11117 FEDERAL AID PROJECT NO. NMTPL-5043(025) Each bid shall be in accordance with the plans and specifications adopted by the City of San Rafael City Council on January 19, 2010, and other contract documents, now on file with the City Clerk, City Hall, San Rafael, California; and may be examined and copies may be obtained at the Department of Public Works, 111 Morphew Street, P.O. Box 151560, San Rafael, CA 94901. Cost shall be One Hundred Dollars ($100.00) per set, non-refundable. Cost of mailing sets shall be an additional Ten Dollars ($10.00) per set. The UDBE Contract goal is 2.27% (percent). THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Office of the City Clerk located at City Hall, Room 209; 1400 Fifth Avenue, San Rafael, CA, and available from the California Department of Industrial Relations' Internet website at http://wwNv.dir.ca.gov/DLSR/PWD. The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the Special Provisions and in copies of the Special Provisions that may be examined at the offices described above where project plans, special provisions, and bid forms may be seen. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of the Special Provisions. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. Attention is directed to the Federal minimum wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal gage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. Each bid shall be made out on the form to be obtained at the Department of Public Works, 111 Morphew Street, San Rafael, California 94901 and shall be accompanied by cash, certified check or bidder's bond for ten percent (10%) of the amount of bid, made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City llall, Room 209, San Rafael, California 94901 on or before 2:30 PM, Monday, February 22, 2010. The City reserves the right to reject any or all bids or to waive any informality in a bid. ESTHER C. BEIRNE City Clerk Dated: January 22. 2010 CITY OF SAN RAFAEL OPENING OF SEALED BIDS RE: NTPP Northgate Gap Closure Bikeway Improvements PROJECT NO. 11117 Date of Bid Opening: Monday, February 22, 2010 @ 2:30 p.m. NAME OF BIDDER Argonaut Constructors A California Corporation P.O. Box 639 1236 Central Avenue Santa Rosa, CA 95402 Ghilotti Bros., Inc. 525 Jacoby Street San Rafael, CA 94901 Ghilotti Construction Company 246 Ghilotti Avenue Santa Rosa, CA 95407 Maggiora & Ghilotti, Inc. 555 DuBois Street San Rafael, CA 94901-3965 Michael Paul Company, Inc. 1200 Casa Grande Road Petaluma, CA 94954 North Bay Construction 431 Payran Street P.O. Box 6004 Petaluma, CA 94955-6004 Team Ghilotti, Inc. 2531 Petaluma Blvd. South Petaluma, CA 94952 W.K. McLellan Co. 254 Sears Point Road Petaluma, CA 94954 AMOUNT $205,524.10 $227,045.90 $185,238.12 ENGINEER'S ESTIMATE: $255,731.00 $208,208.00 $192,307.12 $201,047.15 $215,515.80 $232,140.30 PW NTPP Northgate Gap Closure Bikeway Improvements CITY OF SAN RAFAEL ROUTING SLIP / APPROVAL FORM INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT, ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL/ AGENCY. SRRA / SRCC AGENDA ITEM NO. FROM: PARVIZ MOKHTARI, P.E. DEPARTMENT: PUBLIC WORKS DATE: 02/24/2010 TITLE OF DOCUMENT: DATE OF MEETING: 03/01/2010 �Tm �q D I, u. "'J'' i- W, + 2010 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AWARDING A CONTRACT FOR THE NTPP — NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS, PROJECT NO. 11117, TO GHILOTTI CONSTRUCTION COMPANY, INC., IN THE AMOUNT OF $185,238.12. (BID OPENING HELD ON�NDAY, FEBRUARY 22, 2010) ignatu (LOWER HALF OF FORM FOR APPROVALS ONLY) APPROVED AS COUNCIL/ AGENCY AG ND ITEM: , City Mangier (signature) NOT APPROVED REMARKS: APPROVED AS TO FORM: Com--- ) . &- City Attorney (signature) Marin Independent Journal 150 Alameda del Prado PO Box 6150 Novato, California 94948.1535 (415) 382-7335 legals@marinij.com SAN RAFAEL,CITY OF PO BOX 151560/CITY CLERK, DEPT OF PUBLIC WORKS,1400 FIFTH AVE SAN RAFAEL CA 94915-1560 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Marin FILE NO. 00449/PROJ O. 11117-000337204 I am a citizen of the United States and a resident of the County aforesaid: I am over the age of eighteen years, and not a party to or interested in the above matter I am the principal clerk of the printer of the MARIN INDEPENDENT JOURNAL, a newspaper of general circulation, printed and published daily in the County of Marin, and which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Marin, State of California, under date of FEBRUARY 7, 1955, CASE NUMBER 25566; that the notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: 1/22/2010 I certify (or declare) under the penalty of perjury that the foregoing is true and correct. Dated this 22th day of January, 2010. Signature PROOF OF PUBLICATION Legal No. 0003372046 CITY OF SAN RAFAEL . DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice Is hereby liven that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS CiTY PROJECT NO.11117 FEDERAL AID PROJECT NO. NMTPL-5043(025) Each bid shall be in accordance with the plans and specifications adopted by the City of San Rafael City Council on January 19, 2010 and other con- tract documents now on file with the City Clerk, City Hall San Rafael, California and may be exam - Ined ana copies may be obtained at the Depart- ment of Public Works, 111 Morphew Street, P.O. Box 151560, San Rafael, CA 94901. Cost shall be One Hundred Dollars (5100.00) per set, non-refundable. Cost of mailing sets shall be an additional Ten Dol- lars ($10.00) per set. The UDBE Contract goal is 2,27% (percent). THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFI- CIENCY ACT OF 1991. to Section 1773 of the Labor Code, the revailing wage rates in the county, or In which the work is to be done have !rmined by the Director of the California nt of Industrial Relations. These wages rth in the General Prevailing Wage Rates iecl, available at the Office of the City ted at City Hall, Room 209; 1400 Fifth Ave- tafael, CA, and available from the Califor- Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the Special Provisions and in copies of the Special Provisions that may be exam- ined at the offices described above where project plans, special provisions and bid forms may be seen. Addenda to modlt the Federal minimum wage rates, if necessary, will be Issued to holders ofthe Special Provisions. Future effective general prevailing wage rates, which have been predeter- mined and are on file with the California Depart- ment of Industrial Relations are referenced but not printed in the general prevailing wage rates. Attention is directed to the Federal minimum wage rate requirements in the Special Provisions. If there is a difference between the minimum wane cany Incivaea In the teaeral minimum wage deter- minations. This Includes "helper" (or other classi- fications based on hours of experlence) or any other classification not appearing In the Federal wage determinations. Where Federal wage deter- minations do not contain the State wage rate de- termination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in ques- tion. Each bid shall be made out on the form to be ob- tained at the Department of Public Works, 111 Morphew Street, San Rafael, California 94901 and shall be accompanied by cash, certified check or bidder's bond for ten percent (10%) of the amount of bid made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City Hall, Room 209, San Rafael, California 94901 on or before 2.30 PM, Mon- day, February 22, 2010. The City reserves the right to reject any or all bids or to waive any informality in a bid. /s/ Esther C. Belme ESTHER C. BEIRNE City Clerk Dated: January 22, 2010 NO. 83 D N D CL o o. m X y N N t0 d V zN m r CL v n n O � O c I ICD 5 0 CL v a a o � co a 0 0 x 3 m H 1O 3 m N O a 0 a mw D CL m2 a 'No d o a . � . N � O 2 3 D x 2 2 3 0 V a c m m m a m n D m m Zr n m CL o y m m to m D n g m rI ii C to O Q n < u to O N 4 N N In O m to 3 D x 3 ^t 3 0 3 m m M T S m a m n D to ? n m CL o y m to m D n g Dy z o O a D m m 1 A a P K0 cn -u - 3' � m 'p C7 •D O O CL r In O �i 'O m 3 y m z m m 1 A a P K0 cn -u - N 'p C7 •D N m O D O z m d 0 A m °' ] ' m •O D 0 D N D Om n • o O D c n 0 tom w rcn A D z o 3 CY j tn n m > T m ` `V O D `" A fO 3 m r A A o C V z m CY0 C O � m m G M cn r - m z m 0 m K -V c c D 3 o a 0 3 3 z m m -M z c c O to 3 m U) d x O x m M V N O O sa w . SDN M :3 a�rariM_ n �gncog .1_ mgF�s� m3o��o 3 C£aCt,0 QU 0n,= ° Mq c 3?��Nv fo va.�„f M3 lO R M n rofoi 7Pi �•OR M X5fo �f1 c �vfo oto 10 4a> a N c _. Y ^ [ 1 h N�ma� „3,3 3 _j383 v» �cj Mro ..m 0'a 4, -0 A—mai m?=o3-9 o• 3^ D�Z06 m Pyatd c. g4., -,p t° i n Fo. QG ���tiN tN� t M DTmm O N5+ fu Ism N o ira=� abp '�ns�•`o'' _ b poor a° Mi ^g0bbfyyn c6�oo(7 10 Ptid��+rtt LMCC Z 'mg 3&• mZa mr,n �•('n0 `GOZ r7-?o�in +� �z ° °pian Z Mood ¢ �s N�Mrn c V< j5 C M � god j5 nn2� R Ery A D jAL 9 t N ^Mz IP in to oa Rpwt �a' F? fi M Moto 0 z AR plo0 ?5z0 00 1.51 Q. C CD N F) T N C 1 n U3 m Z m � D V 3 o C3 61 Er ,± a V 3 N ° O ti d 3 m 3 0 CL v{ < i 3 I m K Q 0 s0 rriri mF CL a c. n 'w ~ gag m F �o'g NN N -M N � ? nM. D n x.� w$ c �— Qm mx m � Mo ro3# c N pN �w r ;a CD m m � N C") r L en V d 3 G) z c m c m r m m a to m o m o 0 t � q CL m y M, Yel -u p m Cin m A O CITY OF SAN RAFAEL - DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice is hereby given that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS CITY PROJECT NO. 11117 FEDERAL AID PROJECT NO. NMTPL-5043(025) Each bid shall be in accordance with the plans and specifications adopted by the City of San Rafael City Council on January 19, 2010, and other contract documents, now on file with the City Clerk, City Hall, San Rafael, California; and may be examined and copies may be obtained at the Department of Public Works, 111 Morphew Street, P.O. Box 151560, San Rafael, CA 94901. Cost shall be One Hundred Dollars ($100.00) per set, non-refundable. Cost of mailing sets shall be an additional Ten Dollars ($10.00) per set. The UDBE Contract goal is 2.27% (percent). THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Office of the City Clerk located at City Hall, Room 209; 1400 Fifth Avenue, San Rafael, CA, and available from the California Department of Industrial Relations' Internet website at http://www.dir.ca.gov/DLSR/PWD. The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the Special Provisions and in copies of the Special Provisions that may be examined at the offices described above where project plans, special provisions, and bid forms may be seen. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of the Special Provisions. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. Attention is directed to the Federal minimum wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. Each bid shall be made out on the form to be obtained at the Department of Public Works, 111 Morphew Street, San Rafael, California 94901 and shall be accompanied by cash, certified check or bidder's bond for ten percent (10%) of the amount of bid, made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City Hall, Room 209, San Rafael, California 94901 on or before 2:30 PM, Monday, February 22, 2010. The City reserves the right to reject any or all bids or to waive any informality in a bid. ESTHER C. BEIRNE City Clerk Dated: January 22, 2010 CITY OF SAN RAFAEL - DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice is hereby given that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) TERRA LINDA— NORTH SAN RAFAEL IMPROVEMENTS CITY PROJECT NO. 11118 FEDERAL AID PROJECT NO. NMTPL-5043(026) Each bid shall be in accordance with the plans and specifications adopted by the City of San Rafael City Council on January 19, 2010, and other contract documents, now on file with the City Clerk, City Hall, San Rafael, California; and may be examined and copies may be obtained at the Department of Public Works, 111 Morphew Street, P.O. Box 151560, San Rafael, CA 94901. Cost shall be One Hundred Dollars ($100.00) per set, non-refundable. Cost of mailing sets shall be an additional Ten Dollars ($10.00) per set. The UDBE Contract goal is 2.27% (percent). THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Office of the City Clerk located at City Hall, Room 209; 1400 Fifth Avenue, San Rafael, CA, and available from the California Department of Industrial Relations' Internet website at http://www.dir.ca.gov/DLSR/PWD. The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the Special Provisions and in copies of the Special Provisions that may be examined at the offices described above where project plans, special provisions, and bid forms may be seen. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of the Special Provisions. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. Attention is directed to the Federal minimum wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. Each bid shall be made out on the form to be obtained at the Department of Public Works, 111 Morphew Street, San Rafael, California 94901 and shall be accompanied by cash, certified check or bidder's bond for ten percent (10%) of the amount of bid, made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City Mall, Room 209, San Rafael, California 94901 on or before 3:00 PM, Monday, February 22, 2010. The City reserves the right to reject any or all bids or to waive any informality in a bid. .*%& e . lea a.s ' ESTHER C. BEIRNE City Clerk Dated: January 22, 2010 PUBLIC WORKS - ADMIN/ENGINEERING: (415) 485-3355 FAX: (415) 485-3334 FAXED, E-MAILED AND MAILED January 20, 2010 P. O. No. 00449 File No: 16.01.241.03 Independent Journal P.O. Box 6150 Novato, CA 94949 FAX NO: 382-1535 Attn: Donna Lazarus Re: NOTICE INVITING SEALED PROPOSALS - NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BTREWAY IMPROVEMENTS PROJECT NO: 11117 Enclosed is one copy of Notice Inviting Sealed Proposals for Public Works entitled: "NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS". Please publish the enclosed notice on Friday, January 22, 2010 and furnish us with Galley Proof and Proof of Publication in duplicate. Thank you for your cooperation in this matter. Sincerely yours, . N,6 Leslie Blomquist Associate Civil Engineer LB:dw Enclosure (1) cc: Esther C. Benne, City Clerk (2 copies-w/encls.) Project Engineer (w/encl.) Secretaries (2) (w/enol.) 111 Morphew Street, P. O. Box 151560, San Rafael, CA 94915-1560 CITY OF SAN RAFAEL - DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice is hereby given that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for NON -MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP) NORTHGATE GAP CLOSURE BIKEWAY IMPROVEMENTS CITY PROJECT NO. 11117 FEDERAL AID PROJECT NO. NMTPL-5043(025) Each bid shall be in accordance with the plans and specifications adopted by the City of San Rafael City Council on January 19, 2010, and other contract documents, now on file with the City Clerk, City Hall, San Rafael, California; and may be examined and copies may be obtained at the Department of Public Works, 111 Morphew Street, P.O. Box 151560, San Rafael, CA 94901. Cost shall be One Hundred Dollars ($100.00) per set, non-refundable. Cost of mailing sets shall be an additional Ten Dollars ($10.00) per set. The UDBE Contract goal is 2.27% (percent). THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Office of the City Clerk located at City Hall, Room 209; 1400 Fifth Avenue, San Rafael, CA, and available from the California Department of Industrial Relations' Internet website at http://wwNv.dir.ca.gov/DLSR/PWD. The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the Special Provisions and in copies of the Special Provisions that may be examined at the offices described above where project plans, special provisions, and bid forms may be seen. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of the Special Provisions. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. Attention is directed to the Federal minimum wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. Each bid shall be made out on the form to be obtained at the Department of Public Works, 111 Morphew Street, San Rafael, California 94901 and shall be accompanied by cash, certified check or bidder's bond for ten percent (10%) of the amount of bid, made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City Hall, Room 209, San Rafael, California 94901 on or before 2:30 PM, Monday, February 22, 2010. The City reserves the right to reject any or all bids or to waive any informality in a bid. ESTHER C. BEIRNE City Clerk Dated: January 22, 2010