HomeMy WebLinkAboutPW Fair Dr. Retaining Wall; NOC RecordedAgenda Item No: 10 Meeting Date: December 20, 2010 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Public Works Prepared by: /!/` ity Manager Approval: J 5 Director of Public Works File No. 16.01.257 SUBJECT: ACCEPT COMPLETION OF THE 5 FAIR DRIVE RETAINING WALL REPLACEMENT PROJECT, PROJECT #11160, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION. RECOMMENDATION: Staff recommends that the City Council accept completion of the project and authorize the City Clerk to file the Notice of Completion. BACKGROUND: On July 19, 2010 the City Council adopted the project plans and specifications which were advertised in accordance with San Rafael's Municipal code and policies on January 22, 2010. Bids were opened on August 31, 2010 at 10:30 AM. The City Council adopted Resolution number 13050 authorizing the Public Works Director to enter into an agreement with Hillside Drilling, Inc. (the low bidder) to construct the project. PROJECT UPDATE: The project construction was fully completed (including all punch list items) on November 24, 2010 and the new facilities and improvements were opened to the public. The engineer recommends acceptance of the project and recordation of a Notice of Completion. PROJECT SUMMARY: The following summarizes the project costs: Category Amount Construction Contract Amount based on Estimated Quantities $79,369.00 Actual Contract Amount based on Measured Quantities* $79,369.00 FOR CITY CLERK ONLY File No.: 141t -& L/ Council Meeting: o-12d2D/t7 Disposition: [coDEIR( SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 Change Orders* (1,2,3) $5,709.19 Extra Work* $0.00 Total* $85,078.19 Design Related Costs $4,900.00 Advertisement Costs 1,196.22$ Total Construction Cost $91,174.41 * includes the 10% retention to be paid 35 days after Notice of Completion is filed. Change Orders 1, 2, 3: After the start of construction a total of three changes were necessary to complete the project. A concrete slab discovered under the surface was not shown on the plan. Exceptionally hard drilling was encountered for some piles which were harder than the material described on the original soils report for the project. In addition, the wall height was modified in some areas to account for minor fluctuations in the ground surface. These changes comprised a total of three change orders at a total additional cost to the contract of $5,709.19 The following summarizes the project milestones and working days: All work was completed within the amount of working days specified. ANALYSIS: Pursuant to Civil Code Section 3093 the City, owner of the improvements, is required to record a Notice of Completion upon acceptance of the improvements by the City. This acceptance initiates a time period during which project sub contractors may file Stop Notices seeking payment from the City out of the fiends owed to the Contractor for the project work. ACTION REQUIRED: Accept completion of the 5 Fair Drive Retaining Wall Replacement Project (Project #11160) and authorize the City Clerk to file a Notice of Completion. ' Sr_pw'<<projects',,StreetsyACTIVE PROJECTS\5 Fair Drive Retaining Wall',Council & Agreements\2010-12-20 Notice of Completion'�5 Fair Dr Accept Notice of Completion REPORT.doc When recorded mail to: City of Saul Rafael Esther C. Beirne, City Clerk 1400 Fifth Avenue P. O. Box 151560 San Rafael, CA 94915-1560 2►� 1 �-212►E.72G8 Recaru'ed Official Records Co my of Marin J ara C. iHAfER Assessor -Recorder 02:17PM 213 -Dec -2010 RFC FEE 0.00 2 Page 1 of 1 SPACE ABOVE THIS LINE FOR RECORDER'S USE CITY OF SAPS RAFAEL NOTICE OF COMPLETION OF IMPROVEMENT TO ALL PERSONS WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN for and on behalf of. the City of San Rafael, County of Marin, State of California, that there has been a cessation of labor upon the work or improvement and that said work or improvement was completed upon the 10th day of November, 2010 and accepted the 24th day of November 2010; that the name, address and nature of the title of the party giving this notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the boundaries of which said work or improvement was made upon land owned by said City and/or over which said City has an easement; that said work or improvement is described as follows: 5 FAIR DRIVE RETAINING WALL REPLACEMENT PROJECT NO: 11160 and reference is hereby made for a further description thereof to the plans and specifications approved for said work or improvements now on file in the office of the City Clerk of said City, and said plans and specifications are hereby incorporated herein by reference thereto; and that the name of the Contractor who contracted to perform said work and make such improvement is HILLSIDE DRILLING INC. I declare under penalty of perjury that the foregoing is true and correct. Executed at San Rafael, California, ot./�4g,,,� ?� 20 CITY OF SAN RAFAEL A Municipal Corporation By NADER MANSOURIAN Public Works Director STATE OF CALIFORNIA COUNTY OF MARIN On this X2 ma day of .bE44Ef'fBEr% . 20J before me, ESTHER C. BEIRNE, City Clerk of the City of San Rafael, County of Marin, State of California, residing therein, personally appeared NADER MANSOURIAN, (or proved to me on the basis of satisfactory evidence) to be the person (s) whose name (s),n/are subscribed to the within instrument and acknowledged to me thatZ /she/they executed the same iii /her/their authorized capacity (ies), and that bXp/her/their signature (s) on the instrument the person (s), or the entity upon behalf of which the person (s) acted, executed the instrument. WITNESS my hand and official seal. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Signature G - F ESTHER C. BEIRNE, City Clerk,%... •... File:16.01.257 C:\Documents and Settings\dianeal\ ei '..fop\Ilfotice,of.Con}pletion.doc CITY OF SAN RAFAEL ROUTING SLIP / APPROVAL FORM INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT, ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY. Ih SRRA / SRCC AGENDA ITEM NO. I U DATE OF MEETING: 12/20/10 FROM: Nader Mansourian DEPARTMENT: Public Works DATE: 12/14/10 TITLE OF DOCUMENT: ACCEPT COMPLETION OF THE 5 FAIR DRIVE RETAINING WALL REPLACEMENT PROJECT, PROJECT #11160, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION Department Head (signature) *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** (LOWER HALF OF FORM FOR APPROVALS ONLY) APPROVED AS COUNCIL / AGENCY AGEN AM: City anaµ er 'gna ure) NOT APPROVED REMARKS: APPROVED AS TO FORM: L 2 �6s City Attorney (signature) File No.: 16.01.257