HomeMy WebLinkAboutPW City Hall HVAC; NOC RecordedPoo
Agenda Item No: 3 j,
Meeting Date: August 5, 2013
'Til VAJ ll WIN 0 1 411WAX
,* a &_&Xfi"L "OQ
Department: Public Works
Prepared by: Director of Public Works (KM) City Manager Approval
SUBJECT: ACCEPT COMPLETION FOR THE CITY HALL HEATING, VENTILATION
AND AIR CONDITIONING SYSTEM UPGRADES, PROJECT NO. 11154, AND
AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION.
Staff recommends that the City Council accept completion of the project and authorize the City Clerk to
file the Notice of Completion.
On December 21, 2009 the City secured a federal grant for $575,400 from the Department of Energy
from its Energy Efficiency and Conservation Block Grant (EE&CBG) program. The amount of money
granted was based on the current population of the City and not the actual project improvements needed.
On March 15, 2010, the City Council approved a contract with Lefler Engineering to design the
replacement of the main heating and cooling system within City Hall and reconstruct the first floor duct
system. The actual Heating, Ventilation and Air Conditioning (HVAC) units were purchased previously
and stored in the Public Works Corporation Yard.
In May 2011 the project was bid. In July 2011 construction bids were received; however, due to
inadequate funding, the bids were rejected. On May 16, 2012 this project was rebid and on June 18, 2012
the City Council authorized the Public Works Director to award the construction contract to Trahan
Mechanical, Inc. and construction commenced on July 31, 2013.
Over the course of the construction a total of 14 change orders were issued for this project. Some related
to standard chamzes to the design to adapt the mechanical equipment previously purchased to match the
building for which they are to be installed. In addition, hazardous materials associated with the age of the
building was discovered, which required additional funding to mitigate the material. On February 4, 2013
the City Council approved an additional allocation of funding to support the construction modifications.
Construction was completed on May 17, 2013 within the authorized construction budget. The total project
i
cost including design, advertisement and construction is $1,427,026.90 as shown below.
File No.:
Council Meeting:
Disposition:
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
A total of $35,650.00 is being withheld from the contractor for liquidated damages ($18,200) and not re-
roofing a portion of the building ($17,450).
�►���Venses
Design and Consultation -01 --- $84,928.71 Design (Multiple Consultants)
Material $159,1793.38 i� Equ�pTent Purchase
M- I M M -M N W N LTA $49659.49 Reproduction of Plans and Specifications
Already Expenses Sub Total $249
Obligated,381.58
Construction ExPenses
Construction -02 $869,600.00 Actual contract Amount
$172,534.08
-$359650.00 Amount withheld for liquidated damages
I
and re-roofine
* Subtotal Construction --,--$1,006,484.08
Construction Inspection Services and
Miscellaneous Equipment
Construction Ex enses Subtotal i� $IJ771645.31
P
Total Project Cost
*Includes the 5% retention to be paid 35 days after Notice of Completion is filed.
Staff time associated with this project is not included in the summary above; however, the cost to
administer this construction project is estimated to be more than $70,000.
A"
Fil 0 Ell
Pursuant to Civil Code Section 3093 the City is required to record a Notice of Completion upon
acceptance of the improvements by the City. This acceptance initiates a time period during which project
subcontractors may file Stop Notices seeking payment from the City out of the funds owed to the
Contractor for the project work.
ACTION REQUIRED:
Accept completion of the City Hall Heating, Ventilation and Air Conditioning System, Project No.
11154, and authorize the City Clerk to file a Notice of Completion.
Enclosures: Notice of Completion
rECORDII,IG REQUESTED Ry
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
RECORD SAT 2380
UT
FEE PER G G.
2013-0054491
I IICC FEE
Offid Cc.rnnled flw:nrds I
launtr 0 1
Ilann I
RM1010 it 0EIK01 I
9csussur Pecm der I
rounti flua I
ie
01.52PI1 11 Oug 2013 I Page i of I
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
�3, 0r
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 17th day of May, 2013 and accepted the 5th day of August
2013; that the name, address and nature of the title of the party giving this notice is as follows: The
City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement; that said work or improvement is described as follows:
TIIE CITY HALL HEATING, VENTILATION AND AIR CONDITIONING SYSTEM UPGRADES,
PROJECT NO. 11154
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
TRAHAN MECHANICAL, INC.
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 20 L-3.
CITY OF SAN RAFAEL
A Municipal Corporation �
By
NADER MANSOURIAN
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this 14 r r day of A UG-& Si . 209 before me, ESTHER C. BEIRNE, City Clerk of the
City of San Rafael, County of Marin, State of California, residing therein, personally appeared NADER
MANSOURIAN, (or proved to me on the basis of satisfactory evidence) to be the person whose name
is subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Signature /�LS7=e C 'P. -W 'e``—
ESTHER C. BEIRNE, City Clerk
File: 06.01.191
A" �A
In ARM
ROUTING SLIP /APPROVAL FORM
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A 'CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL /AGENCY.
SRRA / SRCC AGENDA ITEM NO. 3 -AT -
FROM: NADER MANSOURIAN
711� fflim1w
ACCEPT COMPLETION FOR THE CITY HALL HEATING, VENTILATION AND AIR CONDITIONING
SYSTEM UPGRADES, PROJECT NO. 11154, AND AUTHORIZE THE CITY CLERK TO FILE THE
NOTICE OF COMPLETION.
Separtment Head (signature:
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL AGENCY
AGENDA ITEM:
also
APPROVED AS TO FORM:
jpF Er
City Attorney (signature)
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. 0. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California., that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 17th day of May, 2013 and accepted the 5th day of August
2013; that the name, address and nature of the title of the party giving this notice is as follows: The
City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement; that said work or improvement is described as follows:
THE CITY HALL HEATING, VENTILATION AND AIR CONDITIONING SYSTEM UPGRADES,
PROJECT NO. 11154
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and speccations are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
TRAHAN MECHANICAL , INC.
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 120
CITY OF SAN RAFAEL
A Municipal Corporation
By
11a'l
On this day of 20, before me, ESTER C. BEIRNE, City Clerk of the
City of San Rafael, County of Marin, State of California, residing therein, personally appeared NAILER
MANSOURIAN, or proved to me on the basis of satisfactory evidence) to be the person whose name
is subscribed to the within instrument and acknowledged to me that he executed the same in his
authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Signature
ETHER C. BEIRNE, City Clerk