HomeMy WebLinkAboutPW CIP FY2014-15Department: Public Works Prepared by: C *ty Manager Approv Director of Public Works File No.: 0 1. 15. SUBJECT: RESOLUTION APPROVING SAN RAFAEL'S 5 -YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2014/15 THROUGH 2018/19 TO BE INCORPORATED INTO NEXT YEAR'S BUDGET AND AUTHORIZING THE REPROGRAMMING OF 23 CAPITAL PROJECTS TO SUBSEQUENT YK4,RS, Staff recommends that the City Council adopt the resolution approving San Rafael's 5 -Year Capital Improvement Program {CIP) for Fiscal years 2014/15 through 2018/19 and authorize the reprogramming of 23 capital projects to subsequent years. I _11*10i x" ml `Il The Capital Improvement Program (CIP) is a planning document developed by the Department of Public Works to manage new construction, repairs, and improvements to the City's current infrastructure. The CIP is broken down into 4 categories.- • City Owned Properties (COP) • Drainage (D) Right of Way (R/W) Traffic (T) The City is responsible for 23 buildings, 12 pump stations, a 112 mile storm drain system pipes, 34 miles of ditches,, 175 miles of roads.,, 86 traffic signals, 25 parks/mini parks and play fields, and more than 4,400 street liorhts. All these facilities require constant maintenance. Some are more than 40 years old and are in need of significant improvements. The purpose of the CIP is to identify some of these deficiencies in order to allow policy makers an, opportunity to prioritize and allocate resources to keep current City programs functioning for the public. FOR CITY CLERK ONLY flcl, Fe No.: I Coundil Meefi*ng: �5i Z;_J 121 Dilsposiftiiow Liz— CIP MANAGEMENT The Capital Improvement Program is managed by the City's Department of Public Works. The Department has 45 fall time employees, 8 of whom are in the engineering division. That . division is responsible for the following 6 areas of service: CEP Provide design and construction services for the City's Capital Improvement Program, individual department project implementation,, state and federal grant management. Traffic Manage traffic operations and on -street parking. Manage 86 traffic signals, 4,400 street lights and the City's Traffic Coordination Committee which coordinates with Police,, Fire..) City Attorney's Office, Community Development and Parking Services to address public complaints relating to traffic issues. The division utilizes traffic models and technical expertise to manage traffic operations and perform development impact analyses. Land Development Provide subdivision, design review and building permit review services to identify infrastructure improvements for private development within the City. Coordinate with Planning and Building Division. Permits Provide design review, construction review and assistance to utilities, property owners and other entities performing work within the public right-of-way. Administer and inspect grading, in compliance with the planning process, dredging, tideland,, transportation,, license agreements and other permits. Manage mandated programs such the Marin County Stormwater Pollution Prevention Program (MCSTQPPP). Public Service Address public concerns,. provide over the counter services, property investigation, map assistance, FEMA maps, the City's Graphic Information System (GIS) and general public assistance. Administration Oversight of department goals and objectives. C1P projects are funded with local, federal and state resources and fees, many of which have specific compliance deadlines and requirements. For instance, federal and state grants for roadway resurfacing projects have strict engineering, environmental, construction management and related regulations guidelines. Certain funding sources impose strict project limitations. Traffic Mitigation Fees, for example, can only be used for projects identified in Exhibit 21 of Policy 6A of General Plan 2020. The Department of Public Works has matched each project with the appropriate funding source to maximize available resources. Table I details funding and estimated allocations for fiscal year 2014/15. These are also separated per each CIP category to show that funding is available for projects noted in the CIP. Funding in City Right of Way, Drainage, Traffic, and a portion of City Owned Property projects are generally supported by grants, Gas Tax, Traffic Mitigation Fees and the Storm Water Fund. A total of Z: $9.1 million is available from these funds. Combining this total with the allocation from the Building and Parking Services funds ($1.1 million) brings total funding to $10.2 million', as detailed in Table I and in Exhibit A. Federal and state grant opportunities have decreased over the past 5 years. Ironically, grant management requirements have increased significantly. This complexity equates to detailed documentation and 1;�'11]g AM required paperwork that is highly.staff intensive. In some cases, small grants available to local jurisdictions are so staff intensive that they are no longer cost effective. Nevertheless, the Department of Public Works continues to seek cost effective federal and state grants to support our infrastructure and to meet the City's goals and objectives. Over the last fiscal year Department of Public Works staff completed 19 CIP projects. While all these projects are important there are three projects of particular significance to the City. The 'Point San Pedro Median Improvement project This project consisted of installing irrigation systems and landscaping in the median of Point San Pedro Road from Biscayne to Union Street which is approximately 4.2 miles of roadway. The project included work within the County's jurisdiction and took more than a year to complete at a cost of over $1.7 million. This project is funded completely by an assessment district. 2013 City Hall Interior Improvements This project included improvements to the I't and 2 nd floors of the City Hall. The City Hall, built in the 1960's. had not seen significant improvements to the I A and 2 d floor since its construction. New carpeting, wall treatments, HVAC delivery system upgrades are just some of the improvements included with the project. The projects complexities increased significantly because a majority of the work needed to be performed during non-workim4 hours in order to minimally affect City services during the daytime. The work was completed at a cost of approximately $997,000. Funding for the project was developed by combining several projects together (Vt floor Interior Improvements $650,000, 2 d Floor HVAC Improvements $200.000.. Electrical Improvements to the 911 Call Center $35,000, City Building Lock System Upgrade $75.00) City-wide Street Resurfacing The City of San Rafael applied for and received a grant to resurface several main arterial streets within the City in 2013. Portions of 5t" Avenue, D Street, Mission Avenue, and Bellam Blvd. were resurfaced. Resurfacing of these main arterial roadways was difficult based on the amount of vehicle traffic that utilizes these roadways. Scheduling, detours and utility coordination in order resurface these roads are just some of the complexities that were needed to occur before the work could even commence. The project was supported by a federal grant which stipulated that the work could only occur on main arterial roadways and was completed at a total cost of $1.46 million. Other projects such as 3 rd and C**os Parking Lot Improvements, 12/13 Street Resurfacing, Canal Lifeline ii Project - Phase 2 which are also noteworthy projects were completed this year. A summary of these completed projects is provided in Table 2 and in Exhibit A A total of 6 the 19 projects completed were not listed in the previous year's CIP's but were unavoidable emergency projects. Their immediacy demonstrates the continued deterioration of our infrastructure. Lower priority repair/improvement needs evolved into high priority and often costly emergencies. Currently, staff is working on 57 capital projects with a wide range of complexity. They are prioritized by their safety concerns and grant deadlines. Table 3 lists active CIP projects. Other active and continuing programs such as Marin County Storm Water Pollution Prevention Program (MCSTOPPP) are shown as projects in Table 3. This mandatory program requires San Rafael to comply with state and federal regulations for minimizing waterway erosion and pollution. MCSTOPPP wi evolve,, and become more costly, in the next few years in order to comply with more complex and I restrictive conditions. The same engineering staff and funding sources are utilized to manage this 2 • IN&U-9mm I Fro - The ambitious number of capital projects will be managed by utilizing Engineering Division staff as well as leveraging consultant resources. Many projects cannot be completed within one year since they involve permitting and external agency involvement. Other smaller projects will be combined wherever possible for purposes of efficiency and to maximize construction funding. The Department of Public Works intends to complete the majority of currently active projects prior to initiating the new projects identified in this year's CIP. 1. The Council may accept the recommendation to initiate the projects listed within this document for Fiscal Year 2014/15 Capital Improvement Program 2. The Council may direct staff to reprogram the list based on different funding and the needs of the city. Accept the updated 5 -Year Capital Improvement Program and authorize the reprogramming of 23 projects as noted above. ily 1L M01M Enclosures: Table I — CIP — Funding Sources Table 2 — FY13/ 14 Completed Projects Table 3 — Active Projects Table 4 — New Projects Added to FY14/ 15 CIP Table 5 — FY14/15 CIP Projects/Descriptions Table 6 — FY14/ 15 Reprogrammed Projects Exhibit A - 5 -Year CIP Update Document SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 6 TABLE I (CIP - FUNDING SOURCES) City Owned Proj2ey ,Z COP ELoject FunEnS Available from Anticipated Previous Fiscal Allocation for FY Estimated Total Description Years ($) 2014/15($) Available ($) Building Fund (603) 255,199 750,000 1,005,199 Parking Services Fund (501) 30,000 807000 Other Funds (Parkland Dedications Funds, -Grants, etc.) 145,000 145,000 Total Available for City Owned Property (COP) = 1)2301199 rVainarirp- M) Prnip-r-f Fiindina fi Fundin of Way LRI .M� ELoject YLnq AvaiIIII� I �lable fUI ro���m AII " nticipated Previous Fiscal Allocation for FY Estimated Total Description Years 2014/15($) Available ($) Estimated Total Description Years ($) (D) Total Available for Drainage Projects ( -I" �''Maffm! fi Fundin of Way LRI .M� ELoject YLnq Available from Anticipated Previous Fiscal Allocation for FY Estimated Total Description Years ($) 2014/15($) Available ($) Gas Tax Fund (206) 4,315,722 2,500,000 61816,722 Parking Services Fund (501) 27,500 27,500 Other Funds (Parkland Dedications Funds, Grants, etc.) 581,500 551,500 Total Available for Right of Way (R/W) Projects = 7,405,722 Traffic Q ELoject Fundin Available from Anticipated Previous Fiscal Allocation for FY Estimated Total Description Years ($) 2014/15($) Available ($) Gas Tax Fund (206) 4507000 4507000 Traffic Mitigation Fund (246) 150,000 150,000 Other Funds (Parkland Dedications Funds, Grants, etc.) Total Available for Traffic (T) Projects = 600,000 9 Ana CIP Projects (Originally Listed in Previous Year's CIP's) Remove the e)dstin a ove ciround fuel tank at Station 53, and 55 # _Project Name Description Cost ($) 16 Eme Storm D air - Bellarn enc rain Re I e drain le on this Remove and replace the existing heating, ventilation and air ------ 1, City Hall WAC Project ------- I ----------- conditioning units on the 2nd and 3rd floors of the City Hall,— --- 11 -- ----------- ----------- 1,427,027 104,729 Reconstruct parking lot to improve traffic circulation, resurface 18 Combination Traffic Si nal Head Re lacements uniform sized. parking area, upgrade safety lighting, install electric vehicle 19 5th Avenue Drainage Improvements 2 3rd & Cijos Parking Lot Improvements charging station, landscaping, bicycle parking, and pay stations. 384,907 237,..924 Install improvements on the 1st and 2nd floor of the City Hall including new carpet, floors, remodel of the bathrooms and locker 3 2013 Ci Hall Interior Improvements 1-1 ------- ------------------- rooms, etc. 996,936 Provide additional electrical improvements to support the work by 4 -Electricallm rovements to 911 Call Center AT&T to im rove the 911 Call S stems. 18,353 Resurface D Street, 5th Avenue, Mission, Bellam, in compliance 5 Ci wide Street Resuqa �in with a Federal Grant related to Arterial Roads s..... 1,465,223 Annual resurfacing project for the City's most severely worn 6 Street Resurfacing 12/13 roadways._ 1,112,245 Construct new bus pullouts and curb ramps along Canal St and Lifeline Phase 2 - Canal and Kerner Pedestrian Kerner Blvd to incresae safety for pedestrians and upgrade 7 & Transit Im rovements access to transit. 831,995 Pt. San Pedro Median Assessment District Install landscaping and irrigation system in the Point San Pedro 8 Improvement Proiect Medians from Union to Bisca ne. 1,712,936 Replace high pressure sodium street lights with energy efficient 9 LED Street Li htin Li ht Emitting Diode fixtures. 308,346 10 1 Fair Drive Resurfacing Resurface of a portion of Fair Drive. 811715 Install five new curb ramps, three ramps at 1 st & B and two ramps at Tvvelveoak Hill and Cedar Hill. Install associated 11 _13 St. - 1st St Curb Ramps drainage improvements in preparation of resurfacing. 108 807 Install a new bicycle/pedestrian bridge across the canal next to Grand Avenue Pathway Connector Project the existing Grand Avenue bridge. Construction funds are not 12 (Design) ----------------- available at this time. 180,311 Design a retaining wall next to Brookdale Avenue which 13 Brookdale Retaining Wall (Design) experienced a slide several years aclo. 5,500 Subtotal Completed CIP Projects = 8,634,302 These project Project Name �v in nature and were not identified in previous years CIF's Description it Reolace the dilapidated e leck at 1313 5th Avenue. I 15 Station 5 Above Ground Fuel Tank Removal Remove the e)dstin a ove ciround fuel tank at Station 53, and 55 16,500 Replace a failed storm drain culvert and install a new manhole to 16 Eme Storm D air - Bellarn enc rain Re I e drain le on this 17,971 Install empty conduit on the east side of Lincoln Avenue for future 17 Lincoln Avenue Conduit Installation fiber installation 104,729 Replace all remaing combination sized traffic signal heads with 18 Combination Traffic Si nal Head Re lacements uniform sized. 25,595. 19 5th Avenue Drainage Improvements Install a drains e s stem near 2156 5th tc reroute ter, 68,629 Subtotal l�lon� CIP Projects 237,..924 Total Completed Projects F`13/14 8,872,225 I IN Estimated # Project Name Status Description Cost Replace small and obsolete existing dugout area 1 Bernard Hoffman Du out Improvements On Hold at Bernard Hoffman Park. (Limited Funding) 31) 0 Assist with the installation of Solar Facilities to Staff Time 2 U�ra�des Stud Desi n existin Ci buildin s. Assistance ­�g�iB�Lfilcrin�Sp�lar Resurface parking lot, upgrade to met current ADA requirements, improve traffic circulation, lighting, access, etc. (Development influenced by 3 5th St. & D St. Parking Lot Improvements On Hold Measure E) --------------- 400000 Resurface parking lot, upgrade to meet current 4 5th St. & Lootens Parking Lot Improvements Desi_qn ADA requirements. 1001000 Remove and replace the East side exterior siding 5 Fire Station Drill Tower Repair Desi n and repair of internal dDl rot. 40,000 Examines the City's parking structures and garages to determine if structural and/or seismic upgrades are required to comply with current 6Parkin Structure U radelRe lacement Stud Desi n state and federal requirements. 200,000 Replace the driveway apron in front of Station 1 7 Fire Station 1 Drivewa Aran Desi n with an ADA compliant sidewalk and apron. 00,000 Renovate and Expand the Terra Linda Pool House Mich currently is not sufficient for the 8 Terra Linda Recreation Center Pool House Ai _Pes n amount of use at this facili. 6871500 Replace the existing Emergency Speaker system within all the City's Fire Stations which are 9 Fire Station Speaker System Upgrade Design obsolete. 200,000 ....... Replace the existing worn out carpeting within the 10 Ci ly Libra [y Carpeting Replacement Construction downtown libra . 175,000 Replace the existing desks and work stations with ergonomic work stations and accessible 11 Ci tv Library Desks and Work Station Upgrades Desi n furniture. 90,000 Replace the original 1960's parquet flooring in 12 B St. Communi Center Fluorin Re lacement Construction the Auditorium. 100,000 Replace the existing shingle siding on the exterior 13 B St. Communi Center Sidin Re Iacement Desi n of the buildin ---200,000 Examine the existing lighting within the library and determine what modifications are necessary 14 Ci Libra Li titin Stud & Re Iacement Desi n to rovide ade uate and efficient li titin 35,000 Replace the existing carpeting within the main 15 Albert J. Boro Communi Center Hall Car et Construction05,000 Install a new basketball court on the east side of the Community Center. This project is partially Albert J. Boro Community Center Basketball funded by donations from the 16 Court On Hold commu it �.Fu�ndinShortfall100,000 Replace the bridge connecting Sea Way to 17 Sea Unfunded Administer the City's Storm Water Pollution Prevention Program and modify that program per Marin County Storm Water Pollution Prevention the new permit regulations required by the State Staff Time 18 Pro ram FY13/14 IMCSTOPPP) On Going_ of California Assistance Install structural improvements to prevent further 19 400 Canal Pum Station Gorstruction deteriorafion. 95,000 Structural repair of this older pump station which 20 Rossi Purn Station _Construction has deteriorated o r the ears. 970,000 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 9 Estimated # Project Name Status Description Cost Work with the Federal Emergency Management Agency to update the community regarding the new maps produced by FEMA in relation to the Bay Study. This project will involve community meetings and staff involvement in order to provide information to the community on the 21 FES U dates an Goin map and insurance chap es. ____6O,000 This collaborative project with the County of Marin will study the Las Gallinas Watershed to determine environmental, navigational and other 22 North San Rafael Watershed Study On Goin im rovements for this area. 50,000 Fill existing culvert with grout. Drainage water 23 Happy Lane Storm Drain Abandonment Not Yet Started has been re-routed. Low Priori - Staffing) 20,000 Assist with setting up Quiet Zones within the City regarding the new rail system scheduled to start 24 Quiet Zones Design o erati ons in 2016 O -SIVIART Work with SMART to develop and construct a 25 SMART Andersen Drive Design_ safe at rade crossin desi n. 0 Coordinate with SMART regarding construction of SMART station and grade crossing at Civic 26 SMART Civic Center Coordination Desi n Center Drive. 0 Coordinate with SMART regarding construction 27 SMART Downtown Coordination On Going of SMARTS qrade crossings in downtown. 0 NTPP Puerto Suello Path to Transit Connector Install a separated bike path from Mission to 4th 28 Project Desi n Street alonq Hetherton. 1,550,000 Install a compliant sidewalk along Lindaro to 29 Safe Routes to School - Davidson Desi n improve access to Davidson School. 565,000 Widening the e)asting sidewalk along East Francisco Blvd between Grand Ave and Vivian 30 NTPP-Francisco Blvd. East Sidewalk Widening Desi n St. Construction funds are not et available 2,000,000 Install an ADA compliant sidewalk to connect 201 D Street Driveway and Sidewalk existing sidewalks and crosswalks at D and 31 Improvements ---------------------.... Not Yet Started Antonette. D51 __40,000 2nd St & Lindaro St Bridge Deck Treatments Maintenance coating on two bridges identified by 2 (Methacrylate) Construction CalTrans. 35,000 Replace Southern Heights Bridge and perform 33 Cily Bridge Re lace nt Desi n maintenance repairs on various other bridges. Construct new ADA compliant curb ramps on the 4 Street Resurfacin Curb Ram s 2013114 Desi n roadways that are scheduled to be resurfaced. 3001000 Resurface a portion of the 175 miles of the City's 5 Street Resurface 2013114 Design roads stem 6001000 Construct ADA compliant curb ramps throughout the City in compliance with the Department of 6 ADA -DOJ Curb Ram s 2013114 Construction Justice settlement a ree nt. 135,000 Assist the County of Marin with resurfacing Point San Pedro Road from Union to the quarry entrance which crosses both County and City 37 Point San Pedro Road Resurfac� Construction `ursdcton. 625,000 Upgrade the traffic signal systems and Regional Transportation System Enhancement pedestrian facilities within the doxAntom area 38 Project Design near the new rail station and lire. 21400,000 Resurface Del Presidio, from Manual Freitas to Las Gallinas, and Point San Pedro Road from the quarry entrance to Biscayne. Includes the 30 Del Presidio Blvd - Pt San Pedro Resurface Desi n construction of 9 ADA corn Dant curb rare s. 504,000 Replacing a faded drainage system on H Street and thea resurface the roadway from Forbes to 40 H Street Road I 1,11 ro nts Desi n 4 Street. 200,000 # Project dame Status Description Estimated Cost projects are ernergency emergencyin nature and were identified in previous ear's CIP`s Study and design to install ramp metering Estimated systems on the on -ramps to highways that travel Project Dame Status Description Cost $ through the City. City of San Rafael ramps have 41 FY12113 Ramp Metering On Hold not been p2 limented et b CalTrans. 0 Desi nwater ---------- before crossing the roadwa . - 45,000 Replace obsolete traffic controllers and cabinets Install a new catch basins and manhole to with up-to-date equipment to better respond to Kerner & Bahia new Catch Basin Construction improve drainage on Bahia. 37,500 and control traffic throughout the City. Includes Review the traffic operations on Third Street installation of wireless communication equipment between Grand and Netherton. Implementation and upgrade to the existing traffic signal 42 Traffic Cabinet Controller Upgrades 2313114 Design monitoring software. 230,000 modifications for several months to report on ---------------- Replace obsolete traffic controllers and cabinets 3rd Street Traffic Study On Going mented changes. 0 with up-to-date equipment to better respond to Fairhills Drive Widenin Construction Minor roads widenin near Twin Oaks 75,000 and control traffic throughout the City. Includes Install video detection for bicycles at various installation of wireless communication equipment intersections city-wide. This is a county lead and upgrade to the existing traffic signal Bic cle Detection Camera Installation 43 Traffic Cabinet Controller Upgrades 2312113 Design monitoring software. 100,030 r Subtotal Estimated Active (CIP) Projects -) 14,052,500 j These projects are ernergency emergencyin nature and were identified in previous ear's CIP`s Estimated # Project Dame Status Description Cost $ Install a drainage system that intercepts storm 44 Jewell & Broadview Drainage Im rovements Desi nwater ---------- before crossing the roadwa . - 45,000 Install a new catch basins and manhole to 45 Kerner & Bahia new Catch Basin Construction improve drainage on Bahia. 37,500 Review the traffic operations on Third Street between Grand and Netherton. Implementation of recommendations. Study & observations modifications for several months to report on 40 3rd Street Traffic Study On Going mented changes. 0 47 Fairhills Drive Widenin Construction Minor roads widenin near Twin Oaks 75,000 Install video detection for bicycles at various intersections city-wide. This is a county lead 43 Bic cle Detection Camera Installation Desi n reject. 0 Improve existing ramp by replacing hand rails 49 4th and A Ramp Repair Not Yet Started and conforms. Staff availab 40,000 ------------ ----- Install bulb -outs, construct compliant sidewalk along Lovell to improve access to the back 50 Safe Routes to School - Davidson C cle 2 Not Yet Started entrance of Davidson School. Staff a ilabili TBD Visual pavement distress surveys and measurements out in the field. Develop rating PTAP (Paverrient Management Technical system of the condition of all 175 miles of public 1 Assistance Program) Design road —52,000 Construct ADA compliant curb ramps at 2 intersections on San Rafael Avenue and reconstruct a portion of the wall at Lodge. 52 San Rafael Avenue Curb Rams Desi n Construct associated drains e im ro nts. 250,000 Assist county/SMART with Design for Civic 53 Civic Center DrivejMpE2nts Desi n Center Drive. 0 Coordinate with the Baypoint HOA to replace the existing street lights with new street lights. 54 Ba Dint HOA Li htin Re lace nts Not Yet Started Develop MOU for maintenance. Staff availabili 0 Francisco Boulevard East and Lindaro Street Repair "bump" on Francisco Boulevard East and 55 Roadway Imprmements Desi n Lindaro Street. IT* A 6M Ion AN 53 111 1111 1 1� 1111� N These nroiects are enieroencv in nature and were identified in previous vear's CIP's # Project Name Status Description Estimated Cost Conduct a parking study of the existing and future (with SMARI) parking demands. Conduct a study of the existing yfinding signs and their effectiveness. Develop near-term and long-term Downtown Station Area Parking Utilization and recommendations. (Waiting for Grant 56 Wayfinding Study Not Yet Started Authorization) 340,000 Repair all safety issues along the sidewalk and 57 Park Sidewalk and Pathway Repair Construction pathways identified by Parks Division. 100,000 a a I 479 MA Q I' TA13 ' A• Table 4 PROJECTS ADDED BY DEPARTMENT DIRECTORS (CITY OWNED PROPERTIES) Proiects Added to the City Owned Pro erties Category Citv Hall Generator Ee_pl.qeTe CiN Hall Accessibilit _!mp �y Ci Hall Interior IT Relocation to the 3rd floor. 'C.i!y Hall 3rd Floor Hallvvay B2�_ �retipg. paratus Floor Heaters - 5 Fire Stations 1 Citv Plaza Benches Repl;�cernent BID Bike Par�le West End Tri e Ug Re t��qerneqt TLCC Roof p TLCC Hardscpp ai�� Albert Park Council Chambers Energy Efficient Lighting # Name of Project Scope of Work 1 This annual project addresses emergency repairs of existing City owned Properties which can include but is not limited to plumbing, roofing, and other Emergency Facilities Repair significant repairs. 2 This project includes the construction of the Terra Linda Pool house which currently is not sufficient for Terra Linda Recreation tenter Pool the amount of use at this facility. The design for this House project was initiated in FY 13/14. Five of the seven City Fire Stations utilize floor heaters in their apparatus Bays. This project includes Ap aratus Floor Heaters - 5 Fire Stations replacing these heaters which are currently failing. 4 This project involves space planning efforts to provide several work stations on the 3rd floor for IT IT Relocation to the 3rd floor staff. 5 This project relates to acquiring the property between Fire Station one and the 5th and D parking area, demolishing the existing structure and installing a parking area in preparation for civic building or Public Facility Parking Expansion asking facility. 6 This project includes replacing existing deteriorated City Plaza Bench benches in the courtyard at 4th and Court Streets. 7 This project includes the replacement of Heating, City Hall Interior Improvements (3rd ventilation and Air Conditioning mixing boxes on Floor) the third floor to provide better air circulation. 8 This project is composed of installing accessibility 5th St. & Lootens Parking Lot improvements, resurfacing, and making electrical Improvements (Construction) upgrades to the 5th and Lootens Parking Lot. # dame of Proect Scope of Work ' Miscellaneous Storm .Drain, Slide Repair This annual project addresses emergency repairs Projects related to drainage issues. 10 Provide staff time associated with compliance with the latest requirements from the State Regional Marin County Storm eater Pollution Water Quality Control Board and federal rules and Prevention Program (MCSTOPP regulations related to the Phase e it. i, I g 5[�11'11J�a Kn- 21 i L I I Otil solo ILdwil N1 1 Fri 9 Name of Proiect 13 Miscellaneous Right of Way Repair Projects 14 City Bridge Repair Program (Design and Construction) 15 H Street Roadway Improvements (Construction) 16 SMART Andersen Drive Crossing Improvement (Design) 17 Street Resurfacing 2014/15 (Design and Construction) 18 ADA -DOJ Curb Ramps 2014/15 (Design and Construction) 19 2nd and Grand Intersection Improvements (Design) 20 San Rafael Downtown Integrated Transit Center Study Scope of Work This annual project addresses emergency projects.in and above norinal maintenance of the City's streets. Street Bridge near Highway 101 and Southern Heights Bridge are in need of repair. Initial reviews of these bridges indicated that further studies are needed prior to implementing repairs or possibly replacements of these facilities. This project involves replacing a failed drainage system within H'Street and resurfacing the roadway from Forbes to 4th Street. Additional utility relocations may be necessary. This project involves making improvements to Andersen Drive at the new SMART rail crossing in order to have a crossing that is in compliance with the CPUC and Federal Rail Authority. This project involves resurfacing a portion of the 175 miles of the City's road system. This project involves installing updated curb ramps in compliance with the Department of Justice Settlement with the City of San Rafael. This project involves the installation of new signal pole at anus, cabinet controller and upgrades to curb ramps and realignment of an exit driveway from Montecito Shopping Center adjacent to Grand Avenue. This project includes a study related to relocating the Transit Center to make it safer and closer to SMART station without conflicting with other transit uses in the area. Name of Project Scope of Work 11 This project involves working with the Federal Emergency Management Agency to update the community regarding the new maps produced by FEMA in relation to the Bay Study. This project will involve community meetings and staff involvement in order to facilitate informing the community of the FEMA Updates (Public Assistance) map and insurance changes. 12 A portion of a City culvert at #7 Beachwood is deteriorating and needs replacement. This 7 Beachwood — Culvert Repair unanticipated project arose in 2014. The repair will (Construction) require work in the backyard of #7 Beachwood. 9 Name of Proiect 13 Miscellaneous Right of Way Repair Projects 14 City Bridge Repair Program (Design and Construction) 15 H Street Roadway Improvements (Construction) 16 SMART Andersen Drive Crossing Improvement (Design) 17 Street Resurfacing 2014/15 (Design and Construction) 18 ADA -DOJ Curb Ramps 2014/15 (Design and Construction) 19 2nd and Grand Intersection Improvements (Design) 20 San Rafael Downtown Integrated Transit Center Study Scope of Work This annual project addresses emergency projects.in and above norinal maintenance of the City's streets. Street Bridge near Highway 101 and Southern Heights Bridge are in need of repair. Initial reviews of these bridges indicated that further studies are needed prior to implementing repairs or possibly replacements of these facilities. This project involves replacing a failed drainage system within H'Street and resurfacing the roadway from Forbes to 4th Street. Additional utility relocations may be necessary. This project involves making improvements to Andersen Drive at the new SMART rail crossing in order to have a crossing that is in compliance with the CPUC and Federal Rail Authority. This project involves resurfacing a portion of the 175 miles of the City's road system. This project involves installing updated curb ramps in compliance with the Department of Justice Settlement with the City of San Rafael. This project involves the installation of new signal pole at anus, cabinet controller and upgrades to curb ramps and realignment of an exit driveway from Montecito Shopping Center adjacent to Grand Avenue. This project includes a study related to relocating the Transit Center to make it safer and closer to SMART station without conflicting with other transit uses in the area. # Name of Project Scope of Work 21 Traffic Cabinet Controller Upgrades This project consists of studying the existing signage 2014/15 (Design and Construction) and parking characteristics in downtown and resent 23 Downtown Parking and Wayfinding recommendations on improvements to be made to Study i� rove general circulation. Name ofP'ro'ect Scope of Work 22 Traffic Cabinet Controller Upgrades This project consists of upgrading older traffic 2014/15 (Design and Construction) controller equipment to meet current standards. 23 This project consists of widening the Intersection of Las Gallinas and Freitas Parkway. In particular the left turn pocket onto Las Gallinas from Freitas Parkway heading south should be expanded to Freitas/Las Gallinas Intersection accommodate the current traffic. This work also Improvements (Design) involves work over a creek. 4 Replace all existing Red, Yellow and Green traffic signal lights with new LED's and warrantee their Traffic Signal LED Group R.elamping & installation and upgrade the existing 3 5 0 non - Ped Dead Upgrades countdown pedestrian signal heads. VJA ,, � � , 1► 1 i # i 1 � ! �► � I Current roiYri Reprogrammed Prqject Name Schedule to Fire Station 2 ParkiA ILII 1 .qpace Consolidation for 519 storacie .......... �Cillk_ iloing ra es 'Exterior` i ..lower Parking i� ff Electrical !4pgradesthe i . ' ! ! r r i` i i • Electrical __ades in ! i s ReplacePublic 1!Enclose" i Book Area for i i i .i 11601Ap_��iqt Downtown Library Interior! 111 '.Landscapinq of Downtown i� ' • ! ----------- ,'Library RestroomAddition i i Book Shelvin cement ' i► i i .ii`.ii �� FYI 5/16 ''EncloseLibraryPatio ' FireStationAll stations' __. .. _ ... . . . . ----------------- ! ! ii P. i i i i r r ParksideInterior R` i lower parking lot. ' 1 ! ------------------ r r I i• Menzies . . . . . . . . . . ................ ' ............. i Storm System Replacement i r : r Drain. _ Sea Level i Study VIII I ' • I ! (Construction)�` ' INA! !Bungalow .. rReconstruction I� ■ ' FYI 5/1 ! 7 :i i r r ar at Galli a Intersection Freitas instruction ' ! RESOLUTION APPROVING SAN RAFAEL'S 5 -YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2014/15 THROUGH 2018/19 TO BE INCORPORATED INTO NEXT YEAR'S BUDGET AND AUTHORIZING THE REPROGRAMMING OF 23 CAPITAL PROJECTS TO SUBSEQUENT YEARS WHEREAS, the Public Works Director has submitted to the San Rafael City Council a document entitled "CITY OF SAN RAFAEL CAPITAL IMPROVEMENT PROGRAM (CIP) FISCAL YEAR 2014/15 TO 2018/19'.'. and WHEREAS, the document describes a wide range of capital projects, consistent with current Council priorities, required to maintain and/or upgrade the City's assets including but not limited to City Owned Property, City Right of Way, Drainage, Traffic which include, but are not limited to maintain roads, pedestrian and bicyclist facilities, traffic control networks, drainage systems, buildings, parks, and parking facilities; and WHEREAS, the document further describes project cost estimates that may be utilized for said projects, recognizing that such estimates are based on currently available information that is subject to change over the next five years; and WHEREAS, the Capital Improvement Program may be modified and amended by the Council as priorities and funding sources and amounts change over the five year life of the document; and WHEREAS it is the intention of this Council to adopt by this Resolution said "CITY OF SAN RAFAEL 5 -YEAR CAPITAL IMPROVEMENT PROJECT LIST" as submitted by the Public Works Director, with the exception of that item designated in the staff report for this meeting as "Active project #39 Del Presidio Blvd — Pt San Pedro Resurfacing." Council that the City Council approves the document entitled "CITY OF SAN RAFAEL CAPITAL IMPROVEMENT PROGRAM {CIP) FISCAL YEAR 2014/15 TO 2018AW" . which is on file with the City Clerk, with the exception of that item designated in the staff report for this meetinv, as "Active project #39 Del Presidio Blvd — Pt San Pedro Resurfacing." 1, ESTHER C, BEIRNE, Clerk of the City of San Rafael, hereby certif� that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on the 5th day of May, 2014, by the following vote, to wil AYES: COU NCI LM EMBERS: Bushey, Colin, Connolly, McCullough & Mayor Phillips NOES: COUNCIL MEMBER None File No.: 0 1. 15