Agenda Item No: 3.m
Meeting Date: July 7, 2014
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: City Manager Approval
iV
44
Director of Public Works
File No. 22.08.06
SUBJECT: ACCEPT COMPLETION OF THE PARK SIDEWALK AND PATHWAY
REPAIRS PROJECT, CITY PROJECT NO. 11242, AND AUTHORIZE THE
CITY CLERK TO FILE THE NOTICE OF COMPLETION
RECOMMENDATION:
Staff recommends that the City Council accept completion of the project and authorize the City Clerk to
file the Notice of Completion.
BACKGROUND:
Department of Public Works staff identified seven City owned and maintained parks in need of repairs to
address safety concerns. The concerns included both concrete sidewalks and asphalt concrete pathways
which had been uplifted or damaged by tree roots or were experiencing subgrade failures resulting in
uneven walking surfaces. The seven identified parks were Sun Valley, Hill View, Oleander, Munson,
Victor Jones, Peacock Gap, and Arbor. This project was not identified in the original Capital
Improvement Program. However, based on the conditions described above, immediate action was needed
to repair the pathways.
On May 5, 2014, the City Council adopted a resolution authorizing the Public Works Director to enter
into an agreement with the low bidder, Maggiora and Ghilotti Inc. Construction commenced on May 12,
2014.
Construction was completed on Jame 11, 2014 within the originally authorized construction budget. The
total project cost, including advertisement and construction, is $137,269.10, as shown below.
FUNDING SOURCES
*roleci;l ttritlin S+nu ce :;< ,
P A11acation Ari�crunt
Measure A (Park & Recreation Facilities Improvements)
Measure A (Park Maintenance Savings)
$11900.00
$19,000.00
Total Available
$138,000.00
FOR CITY CLERK ONLY
File No.: �,-4 .-- "
Council Meeting: I i
._i I, 4-
Disposition: c,,/Cd
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
EXPENSES
Document Reproduction (i.e., Advertisement) I $273.62
Design Total = 1 $273.62
Actual Construction Contract Amount Based on Measured Quantities* $123,262.00
Contract Change Orders* $1,147.00
Construction Inspection** $12,586.48
Construction Subtotal = $136,995.48
Total Project Expenses = $137,269.10
*Includes the 5% retention to be paid 35 days after Notice of Completion is filed.
**Includes hours to be paid for final project close-out documentation.
The project design was completed by Department of Public Works engineering staff at an approximate
cost of $7,000. Additional construction management by Public Works staff was required at an estimated
cost of $3,000. The total estimated staff cost of $10,000 is not shown in the tables above.
The following summarizes the project milestones and working days:
Item
Date
Workin
Days
Date of Contract
May 5, 2014
Date of Notice to Proceed
May 12, 2014
Construction Work Commencement
May 12, 2014
All Work Complete (Including Punch List Items)
June 11, 2014
22
Working Days Allowed by Contract
20
Working Days Allowed by Change Order / Extra Work
3
Non -Working Days Due to Weather
0
Non -Working Days Other Than Weather
0
Other Days Allowed
0
Actual Working Days Allowed
23
All work was completed within the number of actual working days allowed. Staff recommends
acceptance of the project and recordation of the Notice of Completion.
ANALYSIS:
Pursuant to Civil Code Section 3093, the City is required to record a Notice of Completion upon
acceptance of the improvements by the City. This acceptance initiates a time period during which project
subcontractors may file Stop Notices seeking payment from the City out of the funds owed to the
Contractor for the project work.
ACTION REQUIRED:
Accept completion of the Park Sidewalk and Pathway Repairs Project, City Project No. 11242, and
authorize the City Clerk to file a Notice of Completion.
Enclosures: Notice of Completion
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE. THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work
or improvement was completed upon the 11th day of June, 2014 and accepted the 7th day of July,
2014; that the name, address and nature of the title of the party giving this notice is as follows: The
City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement, that said work or improvement is described as follows:
PARK SIDEWALK AND PATHWAY REPAIR PROJECT
CITY PROJECT #11242
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
MAGGIORA AND GHILOTTI INC.
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 20_.
CITY OF SAN RAFAEL
A Municipal Corporation
By
NADER MANSOURIAN
Public Works Director
STATE OF CALIFORNIA
COUNTY OF MARIN
On this ______ ____ day of 20J before me, ESTHER C. BEIRNE, City Clerk of the
City of San Rafael, County of Marin, State of California, residing therein, personally appeared NADER
MANSOURIAN, (or proved to me on the basis of satisfactory evidence) to be the person (s) whose
name (s) is/are subscribed to the within instrument and acknowledged to me that he/she/they
executed the same in his/her/their authorized capacity (ies), and that by his/her/their signature (s) on
the instrument the person (s), or the entity upon behalf of which the person (s) acted, executed the.
instrument.
WI`T'NESS my hand and official seal,
CITY OF SAN RAFAEL
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT,
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRRA / SRCC AGENDA ITEM NO.
DATE OF MEETING: July 7, 2014
FROM: Nader Mansourian
DEPARTMENT: Public Works
DATE: June 23, 2014
TITLE OF DOCUMENT:
ACCEPT COMPLETION OF THE PARK SIDEWALK AND PATHWAY REPAIRS PROJECT, CITY
PROJECT NO. 11242, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF
COMPLETION
Department Head (signature) RVn
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL / AGENCY
AGENDA ITEM:
City Manage(signature)
NOT APPROVED
Fff NXIMEM
City Attorney (signature)
File No. 22.08.06