Loading...
HomeMy WebLinkAboutPW SRTS Davidson School; NOC RecordedCITY OF�� Agenda Item No: 3, f Meeting,Date: March 2, 2015 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Public Works Prepared by: �irY Manager Approval: Director of Public Works File No.: 18.10.19 SUBJECT: ACCEPT COMPLETION OF THE SAFE ROUTES TO SCHOOL (SRTS) AT JAMES B. DAVIDSON MIDDLE SCHOOL PROJECT, CITY PROJECT NO. 11211, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION. RECOMMENDATION: Staff recommends that the City Council accept completion of the project and authorize the City Clerk to file the Notice of Completion. BACKGROUND: Safe Routes to School (SRTS) is a federal funding program that is intended to improve conditions for children in kindergarten through eighth grade to safely walk and bicycle to school. In 2011, the Public Works Department applied for and received SRTS funding to construct the following improvements at James B. Davidson Middle School: ■ Installation of a 4 to 5 foot wide sidewalk on both sides of Lindaro Street between Woodland Avenue and Andersen Drive to remove gaps in the pedestrian network and reduce the impacts of wide industrial access driveways. ■ Widen the sidewalk on the south side of Lindaro Street to 8 feet between Jordan Street and Andersen Drive. ■ Install additional signing and striping. ■ Install a radar speed feedback sign on Lindaro Street. On December 17, 2012, the City Council adopted Resolution number 13475 authorizing the Director of Public Works to enter into an agreement with Coastland Engineering to design the project. The project was advertised in accordance with San Rafael's Municipal Code on August 15, 2014, and sealed bids were publicly opened and read aloud on September 9, 2014 at 10:00 AM. On September 15, 2014, the City Council adopted Resolution No. 13810 authorizing the Public Works Director to enter into an agreement with the low bidder, J.J.R. Construction, Inc., and construction commenced on October 3, 2014. Substantial completion of construction was achieved on November 7, 2014, at which time the City issued a temporary suspension of work until delivery of the overhead electrical equipment. After receiving the necessary electrical equipment all construction work was completed on February 5, 2015. FOR CITY CLERK ONLY File No.: 4 �/— Council Meeting: Disposition: SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 The following summarizes the project milestones and working days: Working Non -Working Item Date Days Days Date of Contract Se tember 15, 2014 - - Date of Notice to Proceed October 1, 2014 - - Construction Work Commencement October 3, 2014 - - All Work Com Tete (Including Punch List Items) February 5, 2015 - - Working Days Allowed by Contract 40 - Working Days Allowed by Change Order / Extra 0 - Work Non-Workin Da s Due to Weather - 1 Non-Workin Days Other Than Weather - 29 Actual Workin Da s Allowed 40 30 * 29 working days required for electrical equipment procurement and delivery. All work was completed in 26 working days, which is less than the number of working days allowed. Staff reconnnends acceptance of the project and recordation of the Notice of Completion. ANALYSIS: Pursuant to Civil Code Section 3093 the City is required to record a Notice of Completion upon acceptance of the improvements by the City. This acceptance initiates a time period during which project subcontractors may file Stop Notices seeking payment from the City out of the funds owed to the Contractor for the project work. FISCAL IMPACT: Construction was completed within the originally authorized construction budget. The total project cost including design, advertisement, construction, and materials testing is $395,756.53. No local match is required. The following tables summarize project revenue and expenses: FUNDING SOURCES Total Available Funds L $480,100.00 EXPENSES: Design Costs Amount Design, Environmental Clearance, Translation Services, $80,696.54 Document R�odue ction etc. ....._..._............. ....- _. Design Subtotal $80,696.54 Construction Costs Document ........ _...._......__ .__.. .. Construction Contract Amount Based on Measured $294,850.20 Quantities* Contract Change Orders* $12,425.,00 Extra Work*$2,000.00 Materials Sampling and Testing $4,199.30 Construction Inspection (Estimated) $30,000.00 Construction Subtotal $345,059.99 Total Project Cost $425,756.53 SAN RAFAEL CITY COUNCIL AGENDA REPORT / Pa2e: 3 *Includes the 5% retention to be paid 35 days after Notice of Completion is filed. The project design was completed by Coastland Engineering. City staff time totaling approximately $39,000 was required to provide design support, complete federally required documents for Caltrans review, and administer the consultant contract. This cost is not reimbursable through the Safe Routes to School grant. This amount is not shown in the table above. Construction inspection by Public Works staff was required to review and manage the construction work at an estimated cost of $30,000. City staff time for construction inspection is reimbursable through the Safe Routes to School grant. ACTION REQUIRED: Staff recommends that the City Council accept completion of the project and authorize the City Clerk to file the Notice of Completion. Enclosures: Notice of Completion Record Without Fee, Per GC 27383 and When recorded mail to: City of San Rafael Esther C. Beirne, City Clerk 1400 Fifth Avenue P. O. Box 151560 San Rafael, CA 94915-1560 II Illllllllllllillllllllllll Illiill�l I11 III 2015-0010955 Recorded I REC FEE 0.00 Official Records I County of I CONFORMED COPY 0.00 RICHARD It. BENSON I Assessor -Recorder I County Clerk I la 01:25P11 12 -Mar -2015 I Page 1 of 2 SPACE ABOVE THIS LINE FOR RECORDER'S USE CITY OF SAN RAFAEL NOTICE OF COMPLETION OF IMPROVEMENT TO ALL PERSONS WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of California, that there has been a cessation of labor upon the work or improvement and that said work or improvement was completed upon the 5th day of February, 2015 and accepted the 2nd day of March, 2015; that the name, address and nature of the title of the party giving this notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the boundaries of which said work or improvement was made upon land owned by said City and/or over which said City has an easement; that said work or improvement is described as follows: SAFE ROUTES TO SCHOOL AT JAMES B. DAVIDSON MIDDLE SCHOOL CITY PROJECT NO. 11211 and reference is hereby made for a further description thereof to the plans and specifications approved for said work or improvements now on file in the office of the City Clerk of said City, and said plans and specifications are hereby incorporated herein by reference thereto; and that the name of the Contractor who contracted to perform said work and make such improvement is J.J.R. CONSTRUCTION, INC. I declare under penalty of perjury that the foregoing is true and correct. Executed at San Rafael, California, on // , 24�s" CITY OF SAN RAFAEL A Municipal Corporation By NADER MANSOURIAN Public Works Director A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF MARIN Subscribed and sworn to (or affirmed) before me on this 0 !H day of HIA R :�' ff , 20P� , by IJAbek 11ca,usovl�iA�✓ , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. WITNESS my hand and official seal. Signature "t544cag -` F ESTHER C. BEIRNE San Rafael City Clerk File: 18.10.19 CITY OF SAN RAFAEL ROUTING SLIP / APPROVAL FORM INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT, ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY. SRRA / SRCC AGENDA ITEM NO. DATE OF MEETING: 3/2/15 FROM: Nader Mansourian DEPARTMENT: Public Works DATE: 2/9/15 TITLE OF DOCUMENT: ACCEPT COMPLETION OF THE SAFE ROUTES TO SCHOOL (SRTS) AT JAMES B. DAVIDSON MIDDLE SCHOOL PROJECT, CITY PROJECT NO. 11211, AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF COMPLETION. Department Head (signature) *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** (LOWER HALF OF FORM FOR APPROVALS ONLY) APPROVED AS COUNCIL / AGENCY A IT W. 77 C4 M ager sig ature) NOT APPROVED APPROVED AS TO FORM: City Attorney (signature) File No.: 18.10.19 When recorded mail to: City of San Rafael Esther C. Beirne, City Clerk 1400 Fifth Avenue P. O. Box 151560 San Rafael, CA 94915-1560 SPACE ABOVE THIS LINE FOR RECORDER'S USE CITY OF SAN RAFAEL NOTICE OF COMPLETION OF IMPROVEMENT TO ALL PERSONS WHOM IT MAY CONCERN: NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of California, that there has been a cessation of labor upon the work or improvement and that said work or improvement was completed upon the 5th day of February, 2015 and accepted the 2nd day of March, 2015; that the name, address and nature of the title of the party giving this notice is as follows: The City of San Rafael, a municipal corporation, in the County of Marin, State of California, within the boundaries of which said work or improvement was made upon land owned by said City and/or over which said City has an easement; that said work or improvement is described as follows: SAFE ROUTES TO SCHOOL AT JAMES B. DAVIDSON MIDDLE SCHOOL CITY PROJECT NO. 11211 and reference is hereby made for a further description thereof to the plans and specifications approved for said work or improvements now on file in the office of the City Clerk of said City, and said plans and specifications are hereby incorporated herein by reference thereto; and that the name of the Contractor who contracted to perform said work and make such improvement is J.J.R. CONSTRUCTION, INC. I declare under penalty of perjury that the foregoing is true and correct. Executed at San Rafael, California, on , 20 CITY OF SAN RAFAEL A Municipal Corporation By NADER MANSOURIAN Public Works Director A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF MARIN Subscribed and sworn to (or affirmed) before me on this day of , 20, by , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. WITNESS my hand and official seal. Signature ESTHER C. BEIRNE San Rafael City Clerk File: 18.10.19