Loading...
HomeMy WebLinkAboutCC Resolution 13801 (Purchase Durastar Truck)RESOLUTION NO. 13801 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO APPROVE THE PURCHASE OF AN INTERNATIONAL DURASTAR TRUCK VIA STATE OF CALIFORNIA CONTRACT AND TO WAIVE COMPETITIVE BIDDING TO PURCHASE AN ASPHALT HOT BOX FROM NIXON-EGLI EQUIPMENT CO., IN A COMBINED AMOUNT NOT TO EXCEED $200,662.73. WHEREAS, on March 4, 2013 the City Council approved Resolution number 13506, authorizing the Director of Public Works to purchase up to 40 replacement vehicles for various City departments; and WHEREAS, DPW's "patch truck", #95-00, used by Streets Division maintenance personnel for emergency and non -emergency roadway and sidewalk repairs, was among the vehicles scheduled for replacement; and WHEREAS, #95-00 is an International truck in continuous service since 2000, with a permanently mounted "hot box" the purpose of which is to maintain asphalt at a proper working temperature throughout the day; and WHEREAS, the truck (14 years old) and hot box (28 years old) have deteriorated significantly over time due to heavy usage and require frequent repairs; and WHEREAS, a 2015 International Durastar truck is available via State of California vehicle purchasing contract #1-14-23-20, a cooperative purchasing program in keeping with the guidelines described in chapter 2.55.260 of the San Rafael Municipal Code; and WHEREAS, a BC -4E hot box, manufactured by PB Loader, is compatible with the International Durastar truck and best meets our roadway and sidewalk repair needs; and WHEREAS, Nixon -Egli Equipment of Tracy is the sole dealer of PB Loader equipment in Northern California; and WHEREAS, Chapter 2.55.070 (D) of the San Rafael Municipal Code allows for the waiver of competitive bidding when "limitations on the source of supply" exist; and WHEREAS, there are sufficient funds in the Vehicle Replacement Fund for the transactions described above. NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of San Rafael does hereby authorize the Director of Public Works to purchase an International Durastar truck via State of California vehicle purchasing contract #1-14-23-20 and to purchase a PB Loader hot box from Nixon -Egli Equipment Co. via the waiver of competitive bidding allowed under Chapter 2.55.070{D} of the San Rafael Municipal Code, in a combined amount not to exceed $200,662.73. I, ESTHER C. BEIRNE, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on the 2nd day of September, 2014, by the following vote, to wit: AYES: COUNCILMEMBERS: Bushey, Colin, Connolly, McCullough & Mayor Phillips NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ESTHER C. BEIRNE, City Clerk File No.: 01.14.16 Address Gla SSe! TiH I 07/01/14 �Riverview International Trucks, LLC 2445 Evergreen Ave. euyrr Sales Tax West Sacramento City of San Rafael, Department of Public Works Legal Owner California 95691 Address 916-371-3110 111 Morphew St. Excise Tax Gy. $Lora 2p Cnwy Tex Rete ISbck Nunber urlaapa San Rafael, CA 94901 Marin 9.250° EXEMPT AM: lawarstJeenaekunber stale Richard Landis 4 $10.50 SNp To Adlnas Umme Plato N,aeba stkker-sol" Year Same Year Newlused Make Model Serial #/Description Axles Sales Price 2015 New INTL DuraStar Line 34 - State of CA vehicle contract 2 + $70,343.00 # 1-14-23-20F Inlcuded Options: $9,852.37 Down Payment Upgrade to crew cab, 2 bucket front seats, bench rear $0.00 seat, Goodyear tires, healed minors, upgrade to Cash Allison automatic transmission, fender mirror, Chassis# body builder interface for stophailltum lights, 6b $0.00 body builder in cab switches, PTO switch, air horn, Net allowance air dryer, vertical exhaust stack with curved tip, tilt/ Body Typ telescoping steering column, dual 12 volt recepticles in Total Down 7 dash Address I Sales Tax 2 $7,418.07 Legal Owner Excise Tax 3 $0.00 Address EXEMPT CA Tire Fee 4 $10.50 $1.751TIRE Make jSale Price 5 I $87,623.94 Inciudinq Taxes Yr./MdlI Down Payment 6a $0.00 Cash Chassis# Trade In 6b $0.00 Net allowance Body Typ Total Down 7 $0.00 Amounts Amounts i'ayment Allowance $0.00 $0.00 Forward Balance 8 $87,623,94 Amt.Owed I 50.00 I $0.00 Optional Service 9 $0.00 Contract Lein Hldr. License & Doc. 10 $0.00 Net Trade ..Ilowance I EXEMPT $0.00 $0.001 Unpaid Balance 11 $87,623.94 1 TOTAL I TRUCK $87,623.94 Source of Payment TBD - quote aniv Accepted By:(Management) I Purchaser: Order Taken By: Jason Farrell I Note: This order Is subject to the acceptance or he dealer m wnkh n Is aadremd, and Is subject to written acceptance by ds Sales Manager Purchasers deposit we be returned d not socepled If veldck(s) is used the vehidejs) Is sold'es W Wth no tvarranyevressed or implied If Vehicle(s) is used the vehicle(s) is sold "as W with no warranty, Purchaser acknovAedges receipt of exact copy of this order ,"I"-1261.1 '.'1"11"AI N, 1.410 www.nixon-egli.com 11;11 SO. CALIFORNIA: 2044 South Vineyard Avenue, Ontario, CA 91761 • (909) 930-1822 a FAX (909) 923-2356 [] NO. CALIFORNIA: 800 East Grant Line Road, Tracy, CA 95376 • (209) 830-8600 + FAX (209) 830-8884 City of San Rafael July 11, 2014 111 Morphew St. San Rafael, CA 94901 Attention: Richard Landis Subject: PB Patch Truck Dear Richard: We are pleased to provide you a budgetary quotation on a P -B Model BC -4E Patch Truck (4 cubic yard — approximate 8 -ton capacity) installed on a Customer supplied 2015' International, crew -cab conventional chassis and equipped with the following: • Electric Heat system in lieu of standard propane heater • Kevlar Chain Conveyor • Model CS -65 Emulsion spray system • Apron • Hand torch • Prime paint • LPG tank, 25 gal with brackets • Overnight heat emulsion tank —110 Volt • Cab controls • Tool box 36" • Tool basket • Thermometer 0-300 • Electric Overnight heat - 220 Volt — asphalt box • Compactor lift platform -hydraulic • Air Blow Gun x 25' Hose • Solvent Pump & wand • 15 Gallon solvent tank • Two each - Cone holder — Frame mount • Water Igloo (5 Gal.) with Bracket • LED Arrow Board with Controls and Bracket —10 light • Hose Reels 318" x 25' for Solvent/Air/Torch + Hose Reel'/:" x 25' for Emulsion • Dual asphalt lute bolder + Compactor lift platform -- hydraulic • 5 -Gallon Igloo cooler w/bracket • Hitch plate with 20 -ton pintle • ECCO Back-up camera system ,1,I"-1261.1 1M011111i1I1_N T 1_41. www.nixon-egii.com Included options and features — continued: • 8 each — Whelen LED 500 Flashers — 4 at corners facing side, 2 face rear, 2 in front grill • 1 each - Whelen LED Super 360 Strobe • Dual shovel holders • 12" Cross -Frame catwalk • 18" Underbody spoils bin • Lute dip tank • Installation and paint — Black Unit installed on Customer supplied new 2015' International Crew -Cab chassis. PB unit mounted on International Crew -Cab chassis $ 1.03,468.00 Sales Tax at 9.25% 9,570.79 Customer Price, FOB San Rafael, CA $ 1139038.79 Note: The above price includes applicable sales tax at 9.25%. This quote is valid for 60 days. Thank you for the opportunity to quote on your equipment needs. If you have any further questions, please feel free to contact me. Sincerely, NIXON-EGLI EQUIPMENT CO. Michael Knight Area Manager