HomeMy WebLinkAboutCC Resolution 12447 (Design Assistance; Kimley-Horn)RESOLUTION NO. 12447
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO AMEND AN
AGREEMENT WITH KIMLEY-HORN & ASSOCIATES, INC. TO DESIGN SIGNAL
IMPROVEMENTS FOR THE INTERSECTIONS OF FIFTH AVENUE AND LINCOLN
AVENUE, AND FIFTH AVENUE AND IRWIN STREET.
WHEREAS, the City Council adopted Resolution number 11850 on
November 7, 2005 authorizing the Director of Public Works to enter into a professional
services agreement with Kimley-Horn & Associates, Inc. to design signal improvements
for the intersections of Fifth Avenue and Lincoln Avenue and Fifth Avenue and Irwin
Street; and
WHEREAS, due to the complexity of the existing conditions of the
intersections, additional design work and construction support is necessary to avoid
construction delay and cost, and accordingly, the scope of services of the original
agreement must be expanded; and
WHEREAS, the additional cost of $9,600.00 for the additional design and
construction work will be allocated from the City's Miscellaneous Traffic Signal
Improvement funds; and
WHEREAS, staff received a proposal from Kimley-Horn & Associates,
Inc. for professional traffic and civil engineering services for the additional scope of work
(Exhibit "A" to the amendment); and
WHEREAS, staff has reviewed the proposal and has found it to be
complete and within industry standards.
/d Ci4 4
NOW, THEREFORE, BE IT RESOLVED that the Council does hereby
authorize the Public Works Director to amend an Agreement with Kimley-Horn &
Associates, Inc. for professional engineering services in a form approved by the City
Attorney for the amount of $9,600.00 as listed in Exhibit "A", and take necessary actions
to complete the projects.
I, ESTHER C. BEIRNE, Clerk of the City of San Rafael, hereby certify that the
foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the
Council of said City on the 17`h day of March 2008, by the following vote, to wit:
AYES: COUNCILMEMBERS: Brockbank, Connolly, Heller, Miller & Mayor Boro
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
ESTHER C. BEIRNE, City Clerk
File No.: 18.01.67
AMENDMENT TO AGREEMENT
FOR PROFESSIONAL SERVICES CONTRACT WITH KIA,ILEY-HORN
AND ASSOCIATES, INC. TO EXPAND THE SCOPE OF WORK FOR TRAFFIC SIGNAL
IMPROVEMENTS ON FIFTH AVENUE AND LINCOLN AVENUE AND FIFTH AVENUE AND
IRWIN STREET FOR THE AMOUNT OF $9,600.00.
WHEREAS, KIMLEY-HORN AND ASSOCIATES, INC. ("CONTRACTOR'), a Civil and Traffic Engineering
Consultant, entered into an Agreement (dated November 7, 2005) with the City of San Rafael ("CITY") for civil and traffic
engineering consulting services to design and prepare plans and specifications for Traffic Signal Improvements on Fifth
Avenue and Lincoln Avenue and Fifth Avenue and Irwin Street; and
WHEREAS, CITY has determined that the need exists to expand the scope of CONTRACTOR's work under the
original agreement, in order to provide more detailed design work and construction support; and
WHEREAS, CONTRACTOR is willing and able to perform the additional scope of work required by the CITY
at an additional cost; and
WHEREAS, CONTRACTOR and CITY are agreeable to a revision in the existing agreement to increase the
scope of work and perform additional duties; and
NOW THEREFORE, CONTRACTOR and CITY agree to amend their Agreement for Professional Services,
dated November 7, 2005, as follows:
Section 5 of the original agreement is amended to read as follows:
"5. COMPENSATION.
For the full performance of the services described herein by CONTRACTOR, CITY shall pay
CONTRACTOR on a time and materials basis for services rendered in accordance with the rates shown
on the current fee schedule as described in Exhibits "A" and "B" attached and incorporated herein. The
total payment made for any individual work task will not exceed the amounts shown on the Proposal
Budgets, set out in Exhibits "A" and `B"."
Section 3 of the original agreement is amended to add the following sentence to the end of the section:
"CONTRACTOR also agrees to perform the additional services specified in the letter dated February 26,
2008, Exhibit "B" attached hereto and incorporated herein."
All other terms and conditions of the original Agreement not otherwise modified by this Amendment
shall remain in full force and effect.
IN WITNESS WHEREOF, the parties have executed this Amendment to Agreement with Kimley-Horn as of
the 17`x' day of March, 2008.
CITY OF SAN RAFA
J
ANDREW PREST
PUBLIC WORKS IRECTOR
ATTEST:
Z
ESTHER C. BEIRNE, City Clerk
APPRQ, 'ED S TaFORM:
ROBERT.' OSTEIN, Cipy Attorney
CONTRACTOR _
1ffML9Y-HORN ASSOCIATES, INC
ANUSH NEJAD
Exhibit "A"
0
M �- MIA
(via email)
February 26, 2008
Mr. Nader Mansourian, P.E.
City Traffic Engineer
111 Morphew St.
San Rafael, CA 94915-1560
555 12th Street
Suite 1230
Oakland, CA 94607
(510) 625-0712
RE: Proposal for add-on services for Yh Streetl1hpin Street & 5* Street/Lincoln: Avenue
Signal Upgrades in San Rafael, CA
Dear Nader:
Thank you for meeting with me on February 8, 2008 to discuss the 5th Street/ Irwin Street & 5th
Street/ Lincoln Avenue Signal Upgrades Project. As requested, I've prepared the attached scope
of services, schedule, and fee proposal for the additional design and construction phase services
for this project.
If you have any questions, please do not hesitate to call me at 510-625-0712 (main) or at 510-
350-0215 (direct). I look forward to continuing to work with you, Leslie, and the City on this
project.
Very truly yours,
KINILEY-HORNAND ASSOCL4 TES, INC.
Elbert K.
Chang, POE.
RCE#61548
Attachments: Scope, Schedule, Professional Fee
T. WarkehnglProposalslSan Ralae/15th Avenue SignalslSan Rafael 5th Street Signal scope�_20080226.doc
EXHIBIT '13'
Kimley-Hom
and Associates, Inc. San Rafael 51h Street Signal Upgrades
Page 2
SCOPE OF SERVICES
Kimley-Horn and Associates, Inc. (KHA) will provide additional traffic engineering services for the
design of traffic signal upgrades at the following intersections in the City of San Rafael:
1. 5th Street/ Irwin Street
2. 5`h Street/ Lincoln Avenue
The additional traffic engineering services are for curb ramps design and safety lighting design that are
outside of the original scope of work. These additional services have also raised the overall
complexity of design for the project, requiring an additional submittal and City review, as well as
increased construction support.
Task 1 —REVISED FINAL DRAFT PS&E
This task consists of revising the Final PS&E documents for the 5th Street/ Irwin Street & 5`h Street/
Lincoln Avenue Signal Upgrades Project (July 2007) to include curb ramps and safety lighting as well
as updating the engineer's opinion of probable costs.
As discussed during our 2/8/08 meeting, it is our understanding that the existing safety lights on the
utility poles and their power will remain untouched by this project, and the City will arrange their
removal in a separate effort.
The revised FINAL DRAFT PS&E documents will be submitted to the City electronically. The City's
original redline plan mark-ups will be returned to facilitate City review. The design in the revised
FINAL DRAFT PS&E documents will be considered to be essentially complete, with only minor
editorial comments expected.
Deliverables:
■ Electronic submittal of project plans (AutoCAD 2007 format)
■ Electronic submittal of project special provisions (Word 2003 format)
■ Electronic submittal of engineer's opinion of probable costs (Excel 2003 format)
Task 2 —FINAL PS&E
Based on the City comments on the revised FINAL DRAFT PS&E, KHA will prepare the Final PS&E
documents. The final submittal will consist of the following:
■ Final Plans in 24"x36" Standard City of San Rafael format on bond. Plans will be signed and
sealed by a State of California, registered civil engineer. Plans will be provided to the City
electronically in AutoCAD format.
Kimley-Horn & Associates, Inc. February 26, 2008
SWA-(4: INr
i3q I IM
• Final Technical Specifications in electronic and hardcopy formats.
• Final Estimate of Probable Cost in hardcopy format and electronically.
Deliverable:
■ One (1) set of 100% PS&Eto the City
Task 3 —CONSTRUCTION PHASE SERVICES
San Rafael 5'h Street Signal Upgrades
Page 3
Under this task, KEA will provide additional construction phase services to the City for the 5th Street/
Irwin Street and 5th Street/ Lincoln Avenue Signal Upgrade project related to the increased
complexity of the project. These services will consist of the following:
• Answering City questions during the project advertising and bidding stage
■ Preparing up to one bid addenda
• Responding the Contractor Request -for -Information (RFIs)
■ Attendance at up to one construction field meeting
■ Preparing up to one contract change order (CCO)
KHA will perform these services only with the City's authorization. Utility coordination is assumed
to be performed by the City and is not included in this proposal.
SCHEDULE
KEA is prepared to begin work immediately upon receipt of the notice to proceed (NTP), and we will
endeavor to meet your scheduling needs. Highlights of a proposed schedule for the project are as
follows:
Deliverable
Submit revised FINAL DRAFT PS&E
documents
Submit FINAL PS&E
Construction Phase Services
Time
I week from NTP
1 week from receipt of City
comments on revised final draft.
As needed
Kimley-Horn & Associates, Inc. February 26, 2008
Fl" EM�I Kimley-Hom
T.. 3 and Associates, Inc. San Rafael 5'" Street Signal Upgrades
Page 4
PROFESSIONAL FEE
KHA will provide the services outlined in the above scope of services on a time -and -materials basis
with a contract ceiling of $9,600. This amount is distributed as follows among the following tasks:
Task Budget
Task 1 —REVISED FINAL DRAFT PS&E $5,860
Task 2 —FINAL PS&E
$1,240
Task 3 —CONSTRUCTION PHASE SERVICES 1 $2,500
TOTAL
$9,600
An estimate of hours and cost for each task is attached to this proposal. This fee includes labor cost,
direct expenses, indirect expenses and computer expenses incurred in performing these services. Direct
expenses for outside services (e.g., as -built scanning, full-size photocopying, overnight delivery) will be
billed at cost plus 15%.
Services other than those set forth in the Scope of Services shall constitute additional services.
Additional services, such as attendance at meetings other than those included in the Scope of Services,
shall be performed only with your authorization, and be billed on a time and materials basis as per the
attached rate schedule.
Kimley-Horn & Associates, Inc. February 26, 2008
KJnn|ey-Horn and Associates, Inc.
Schedule of Billing Rates (BOD)
(Effective January O1,2UO8)
Code
Classification
| 2008 Rates
Xb
Support Staff
$105.00
XG
Support Staff
| $115.00
X7
Support Staff
| $135.00
}<O
| Senior Support Staff
| $155.00
B1
Senior Support Staff
/ $100.00
B2
Senior support staff
| $110.00
B3
/ senior support staff
/ $120.00
B4
| Senior Support Staff
| $140.00
B5
| Senior Professional 1
| $160.00
BG
| Senior Professional 1
| $190.00
B7
| Senior Professional
| $220.00
B8
| Senior Professional
| $240.00
N1
Support Staff
| $85.00
N2
Support Staff
| $90.00
N3
| Support Staff
| $95.00
N4
| Senior Support Staff
| $100.00
N5
Senior Support Staff
{ $105.00
NG
Senior support staff
( $110.00
CO3
CAO[>Operator
{ $105.00
C04
CAO[)Operator
| $110.00
C[)5
| SeniorCAO[) Operator
/ $120.00
{}OG
| SeniorCAOD Operator
| $130.00
O7
| Designer
| $140.00
O8
Senior Designer
$150.00
E1 |
Principe/
$275.00
E2 |
Principal
| $275lX0
E3 |
Principal
/ $275.00
E4 |
Principal
} $275.00
P |
Professional
| $110.00
P1
Professional
| $120.00
P2 |
Professional
$140.00
P3 |
Professional
| $155.00
P4
Registered Professional
| $170.00
P5
Senior Professional 1
$185.00
PG |
Senior Professional 2
| $210.00
P7 |
Senior Professional 3
! $240.00
P8 |
Principal
/ $275.00
T1 |
Technician
/ $85.00
T2 |
Technician
/ $90.00
T3 |
Technician
/ $95.00
T4 |
Technician
| $10000
T5 |
Technician
$105.00
T@ |
Senior Technician
$11U.O0
T7
Senior Technician
$115.00
An allocation charge of 8.5% will be added to the labor fee shown above to cover routine expenses, such
aslocal mileage, copying,f8x.nnei[by|ephone,in'hOuSeb|uephnUng,angineehngsoftworecornpuUar
usage, etc. A15Y6administration fee will beadded for outside expenses, Overtime work ischarged at