Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
CED 620 Canal Street - Closing Binder
CM Marin Sanitary Service Bond
CM MSS Franchise Agreement Amendment 3
CM MSS Franchise Agreement Amendment 4
CM MSS Franchise Agreement Amendment 5
CS Alberts Tennis Court Resurfacing
FD Alexander Avenue Replanting Project
FD B Street Demonstration Garden
FD Black Canyon Broom Removal Project; Contract Change Order 1
FD Black Canyon Invasive Species Management Project
FD City Hall Zone Zero Landscape
FD Fire Adapted Garden Maintenance Project
FD Fire St. Apparatus Bay Heater Unit Upgrade Proj. 11254
FD Gerstle Park Fuels Reduction Project
FD Marin Operational Area 2013
FD Marin Operational Area 2015
FD Marin Operational Area 2024
FD Marin Operational Area MOU 2019
FD North Lucas Valley Defensible Space Fules Reduction
FD North Lucas Valley Defensible Space Fules Reduction; First Amendment
FD Open Space Herbicide Application Project
FD Service Level Agreement; Task Order No. F2 Trimming Historic Grazing Sites Project
FD South Pedro Fuels Reduction Project
HR Advanced Disability; Buffy Paxson
HR Advanced Disability; Elisha Adams
HR Advanced Disability; Eric Cogbill
HR Advanced Disability; James Bellamy
HR Advanced Disabiltiy; Kaitlin Maley
HR AFSCME - Local 1 MOU 2021-2024
HR AFSCME - Local 1 MOU 2024-2027
HR Bargaining Unit Side Letter Extending Current Agreement with SEIU Local 1021
HR Fire Chief Employment Agreement; Abraham Roman
HR Firefighters Association MOU 2018-2020
HR MOU Fire Chief Officers' Assoc 2016
HR MOU Firefighters Association 2016
HR MOU Police Mid-Management 2016
HR MOU Public Employees Union Local 1 2018
HR MOU PUE Local 1 Confidential
HR MOU San Rafael Firefighters Association
HR MOU San Rafael Firefighters Association 2018
HR MOU SEIU Childcare 2015-16
HR MOU SEIU Local 1021 2016
HR MOU Western Council of Engineers
HR PEU Local 1 MOU 2018-2020
HR San Rafael Fire Chief Officers' Association
HR San Rafael Fire Chief Officers' Association 2024-2027
HR San Rafael Fire Chief Officers' Association MOU
HR San Rafael Fire Chief Officers' Association MOU; Side Letter
HR San Rafael Firefighters Association MOU
HR San Rafael Firefighters' Association MOU
HR San Rafael Firefighters' Association MOU 2021-2024
HR San Rafael Firefighters' Association MOU 2024-2027
HR San Rafael Firefighters' Association MOU 2024-2027; Side Letter
HR San Rafael Firefighters' Association MOU; Side Letter
HR San Rafael Mid-Management Association MOU 2024-2027
HR San Rafael Police Association MOU
HR San Rafael Police Association MOU 2021-2024
HR San Rafael Police Association MOU 2024-2027
HR San Rafael Police Association MOU; Retirees Health Insurance
HR San Rafael Police Association MOU; Side Letter
HR San Rafael Police Mid-Management Association MOU
HR San Rafael Police Mid-Management Association MOU 2021-2024
HR San Rafael Police Mid-Management Association MOU 2024-2027
HR San Rafael Police Mid-Management Association MOU; Compaction
HR San Rafael Police Mid-Management Association MOU; Educational Incentive
HR San Rafael Police Mid-Management Association MOU; Side Letter
HR SEIU Child Care Unit MOU 2016-19
HR SEIU Child Care Unit MOU 2019-2021
HR SEIU Local 1021 - Child Care Unit MOU 2021-2024
HR SEIU Local 1021 MOU 2021-2024
HR SEIU Local 1021 MOU 2024-2027
HR Separation Agreement; Auger, Brian
HR Separation Agreement; Braa, Jannette
HR Separation Agreement; Bracken, Lynne
HR Separation Agreement; Coale. Christopher
HR Separation Agreement; Derrick, Anne
HR Separation Agreement; Dillon, Diane
HR Separation Agreement; Hendricks, Lori
HR Separation Agreement; Lee, Daniel
HR Separation Agreement; Lin, Suporn
HR Separation Agreement; Sahlemariam, Yihew
HR Separation Agreement; Salvisberg, Larry
HR Side Letter Agreement Public Employees Union Local 1 - Confidential Unit
HR Side Letter Agreement Western Council of Engineers
HR Western Council of Engineers 2018-2020
HR Western Council of Engineers MOU 2021-2024
HR Western Council of Engineers MOU 2024-2027
PW 1033 Annex Fire Spinkler; Essential Facilities
PW 1033 C Street Office Relocation
PW 20 Meyer Road Slide Repair
PW 2017 Storm Damage Repair - #21 San Pablo
PW 2017 Storm Damage Repair - #70 Irwin Street
PW 2017 Storm Damage Repair - #80 Upper Toyon
PW 2018 Pump Station Repair & Replacement
PW 2018-19 Restriping Project
PW 2021-22 Slurry Seal Project
PW 2022-23 Slurry Seal Project
PW 2023 Sidewalk Repair Program Shaving Project
PW 2024 Sidewalk Program List
PW 237 Upper Toyon Drive Emergency Slide Repair Project
PW 2nd & 3rd Street Operations with SMART Extension
PW 2nd & 3rd Street SMART-Related Signal Impr
PW 2nd & East New Solar Powered Rectangular Rapid Flashing Beacon System
PW 2nd and Irwin Tank Removal Support
PW 34 Graceland Drive Replacement Project
PW 3rd & Cijos Street Transit Center Improv
PW 520 Fairhills Storm Drain Improvements
PW 7 Beechwood Court Storm Drain Improvements
PW 87 Chula Vista Retaining wall Project
PW 87 Chula Vista Winterization
PW ABCC Roof Coating & Solar Stand-off Sealing
PW ADA DOJ Curb Ramps 2016-17
PW ADA/DOJ Curb Ramps 2015-16
PW Agreemen for Award of Emergency Contract/Emergency Response 2017
PW Al Boro Community Center Project
PW Albert J Boro Community Center Mural Plaster Demo and Installation
PW Albert J Boro Community Center Storefront Window Replacement Project
PW Albert J. Boro Center Backflow Prevention Installation
PW Albert Park Fence Replacement Project
PW Albert Park Restrooms & Wheelchair Lift
PW Alexander Ave & W Crescent Drive CMP Replacement
PW Andersen Dr. Rail Crossing
PW Andersen Dr. Rail Crossing Amendment
PW Annual Pump Station Maintenance FY 22-23
PW Annual Pump Station Maintenance FY 24-25
PW B St. Culvert Replacement
PW B Street Culvert Replacement 2024 Project
PW Battery Backup System Installation; 4th & Greenfield
PW Belvedere St -Louise St CMP Replacement services; A1
PW Bike Path Lighting Upgrades
PW Boyd House Carpentry; Essential Facilities
PW Boyd House Electrical Upgrade; Essential Facilities
PW Boyd House Final Clean; Essential Facilities
PW Boyd House Label Panels; Essential Facilities
PW Boyd House Sanitary Repairs
PW Boyd Park Interim Equipment Installation
PW Bret Ave. Drainage Improvements
PW Bret Harte Storm Drain Improvements
PW Brookdale Ave Retaining Wall Contract
PW Bryn Mawr Storm Drain Replacement
PW Bungalow and Woodland Resurfacing Project
PW Bungalow Avenue - Added Vehicular Concrete
PW Canal District Double Fiberized Resurfacing
PW Canal Neighborhood Pedestrian Improvements Project
PW Canal Parking Striping 2024
PW Canal Phase 2 Sidewalk Shaving Project
PW Canal Sidewalk Shaving 2022
PW Center Street Pedestrian Ramp Improvements
PW CIP Project Management Svcs 2017
PW City Council Chambers ADA Ramp Project
PW City Hall & TLCC Re-roof
PW City Hall Parking Lot HVAC Installation; Essential Facilities
PW City Hall Parking Lot Lighting Restoration
PW City Hall Parking Lot OH Doors
PW City Hall Parking Lot Power Poles
PW City Hall Parking Lot Tel-Data
PW City Hall Renovation Project
PW City Hall Server Room HVAC Replacement
PW City Hall Switchgear Replacement and PG&E Upgrades
PW City Hall Temporary Facilities Door Installation
PW City Hall Temporary Facilities FS 51; Essential Facilities
PW City Hall Temporary Facilities; Essential Facilities
PW City Manager's Small Office Buildout Project
PW City Property and Sidewalk Repair Program Sidewalk Shaving
PW City Property Sidewalk Shaving Project
PW CIty Restoration of The Puerto Suello Bike Path
PW Citywide Safety Electrical Services Project
PW Connect Electrical to City ATS System Project
PW Controller Cabinet and Video Detection Installations
PW Crosswalk Evaluation PSA
PW D St and Via Sessi Storm Drain Improvements
PW D Street & Frances CMP Replacement
PW David Ct. Storm Drain Improvements
PW Design of Changeable Message Signs and Protected Left Turn Phasing
PW Downtown Communication Project
PW Downtown Library HVAC Upgrades
PW Downtown Library Renovation Project
PW Downtown Library Roof Repair
PW Downtown Monthly Pressurewash-Disinfection
PW Downtown Sidewalk Offset Shaving 2024 Project
PW Downtown Sidewalk Shaving
PW DPW Methane Wiring
PW Du Bois CMP Replacement
PW Economic Development Moving Services; Essential Facilities
PW Emergency Repairs to Kerner and Peacock Gap Pump Stations
PW Esmeyer Storm Drains
PW Essential Facilities - Public Safety Center
PW Essential Facilities Construction Project; 52 & 57
PW Essential Facilities Demolition Escrow Agr
PW Essential Facilities Phase 1 Fire Stations 52 & 57
PW Evacuation Route Clearance
PW Fall 2023 CMP Replacement Project
PW Final Design of Grand Avenue Cycle Track Between 2nd and 4th Street
PW Final Design of Grand Avenue Cycle Track Between 2nd and 4th Street; First Amendment
PW Fire Station #57 - Concrete Polishing
PW Fire Station 51 - Miscellaneous Temp Facilities - Repairs
PW Fire Station 51 Annex Building Improvements
PW Fire Station 51 Split Electric
PW Fire Station 52 - Alerting System Wiring & Installation
PW Fire Station 52 & 57 Demolition
PW Fire Station 54 Perimeter Fencing
PW Fire Station 55 Concrete Walkway and Stairs Project
PW Fire Station 55 Plumbing
PW Fire Station 55 Project
PW Fire Station 55 Site Work
PW Fire Station 55-Point San Pedro Road Restriping
PW Fire Station 56 Reroofing Services; 2025.0031
PW Fire Station 57 - Alerting System Wiring & Installation
PW Fire Stations 54 & 55 Reconstruction
PW Forbes Ave Drainage Imrpovements Project
PW Forbes Avenue & H Street CMP Replacement
PW Fourth Street Sidewalk Shaving
PW Francisco Blvd Mid-Block Crossing Enhancement
PW Francisco Blvd West - Rice Drive to Second Street Project
PW Francisco Blvd West - Rice Drive to Second Street Project; Change Order
PW Francisco Blvd West MUP Lighting Project
PW Francisco Blvd. E. & Louise Street Drainage Adjustment
PW Francisco Blvd. Sidewalk Improvements Project
PW Freitas - Montecillo - Bamboo Intersection Improvements
PW Freitas and Las Gallinas Improvement Project (Ghilotti Amendment)
PW Freitas Las Gallinas Intersection Improvements
PW Freitas Parkway Sidewalk Replacement
PW Freitas Pkwy Drainage Channel Repairs
PW Fremont Rd and Marquard Ave Minor Concrete Repair
PW Fremont Road and Marquard Ave
PW FS#53 Overhead Door Motor
PW FY24-25 Sidewalk Repair Program Sidewalk Shaving
PW G Street Improvements - Phase II Project
PW G Street Improvements; Phase I
PW Ghilotti Construction Cermenho Court Resurfacing
PW Glenwood Pump Station Repair Project
PW Grand and Linden CMP Replacement Project
PW Grand Ave. Intersection Modification Project; Construction
PW Grand Avenue Cycle Track Project
PW Grand Avenue Pathway Connector Project Construction Contract
PW Grand Avenue Storm Drain Replacement Project
PW Heat Pump Replacement at Mary Silveira Children's Center
PW Hetherton Signal Modifications
PW Hetherton St. Curb Ramps; Ghilotti Construction
PW Hetherton Street Traffic Signal Modifications
PW Installation of LED Decorative String Lights on Streetlight Poles
PW Jacoby Street Grinding and Paving Project
PW Jacoby Street Pothole Repairs Project
PW Janitorial Services 2020
PW Jessup Street & East Street Storm Drain Improvements
PW Kerner Pump Station Pressure Chamber Cap
PW Lincoln Avenue Corridor Safety Improvements at Wilson Court and Brookdale Avenue Project
PW Lochinvar Road at Binnie Banks Way
PW Long Reach Excavator and Operator Services re Fire at 516 Canal Street
PW Los Gamos Drive Bike Lane Project
PW Los Gamos Drive Crosswalk Solar RRFB & Curb Ramps Installation
PW Los Ranchitos Park Restroom Sewer Repair
PW Martens Blvd & Ivy Lane CMP Replacement
PW McInnis Pkwy. & Civic Center Dr. Traffic Signal Cabinet Relocation
PW McNear Drive Digouts
PW MERA Tower Retrofit Project
PW Merrydale Vegetation Management Project
PW Methane Monitor Repair and Replacement
PW Misc Traffic Signal Improvements 2019
PW Mission Ave & Lincoln Ave CMP Replacement
PW Mission Avenue Sidewalk Project
PW Morphew Cabling Upgrade
PW Morphew Methane Monitor Repair & Replacement
PW Mountain View and Convent CMP Replacement
PW Multi-Use Pathway Repairs Project
PW MUP Phase 1 Concrete Slab Replacements
PW MUP Phase 1 Lighting Conduit Installation Project
PW N. San Pedro & Los Ranchitos Traffic Signal Cabinet Relocation
PW New Conduit and Fiber Optic Communication Project
PW New Conduit and Fiber Optic Communication Project; First Amendment
PW New Controller and Video Detection; Fourth and Ross Valley
PW North Francisco Stormwater Pump Sation Wet Well Cleanout
PW North San Rafael Pavement Maintenance
PW Open Space Fuel Reductions
PW Open Space Fuel Reductions Project
PW Parkette Maintenance Project
PW Parkette Routine Landscape Maintenance
PW Parking Services Alarm & Cameras
PW Parkside Childcare Interior Painting
PW Partition Wall Replacements; ABCC & TLCC
PW Pavement Maintenance FY 2024-25
PW Pavement Maintenance Program Additional Striping Modifications
PW Peacock Gap Median Improvement Project
PW Peacock Gap Park Playground Improvements 2024
PW Peacock Gap Playground Fencing
PW Peacock Gap Pump Station Repairs
PW Peacock Gap Spring Repair
PW Pedestrian Warning System
PW Phase 1 Safe Roads Striping Project
PW Pickleweed Childcare Sewer Line Installation
PW Pickleweed Library Renovation
PW Pickleweed Park BBQ Rehab Project
PW Pickleweed Park Enhancement Project
PW Pickleweed Park Playground Fencing Project
PW Pickleweed Park Playground Replacement
PW Pickleweed Playground ADA Ramp Reconstruction Project
PW Point San Pedro Asphalt Sidewalk
PW Property Exchange Agreement; SMART
PW PSC Evidence Locker Fencing
PW Public Library Collections Move and Storage Project
PW Public Safety Center Alten Construction
PW Public Safety Center Construction Bid Award
PW Public Safety Center Demolition
PW Public Safety Center Pixel Panels
PW Public Safety Center Resurfacing; Fifth and D Corner Reconstruction
PW Public Safety Center Street Resurfacing Project
PW Pump Replacement: Kerner #1
PW Pump Station Maintenance; Koeffler Electrical Mechanical
PW Pump Station Repair & Replacement 2019-20
PW Recreation and Childcare Janitorial Services
PW Relocate Hanging Fence FS 53; Essential Facilities
PW Removal of Underground Storage Tank
PW Replacement of 2 Cooling Compressors for HVAC at Public Safety Center
PW Robert Dollar Drive Barrier Gate
PW Roof Repair - 519 4th St.
PW Roof Skylight Repair at 519 4th St.
PW Rossi Pump Station Telemetry & Programming
PW Rotary Manor Culvert Replacement Project
PW San Quentin Pump Station Reconstruction Project; Thompson Builders
PW San Quentin Pump Station Reconstruction Project; Thompson Builders; First Amend
PW San Rafael Canal Dredging FY 2022-23 Project
PW SCADA Programming for San Quentin Pump Station
PW Second and Irwin Retaining Wall Project
PW Second Floor Return Fan VFD Replacement
PW Secondary Main Hot Water Pump Installation
PW Sewer Drainage Emergency Improvements
PW Shoreline Park Pathway Improvements Project
PW Sidewalk & ADA Ramp Repairs
PW Sidewalk Offset Cutting on City Properties Project
PW Sidewalk Repair Progam
PW Sidewalk Shaving Services FY2017-18
PW Sidewalk Shaving Services FY2017-18; First Amendment
PW Silveira Parkway Streetlight Poles Reinstallation
PW SMART Larkspur Extension Project
PW SMART Larkspur Extension Project Amendment 1
PW SMART Larkspur Extension Project Amendment 2
PW SMART Larkspur Extension Project Contingency Increase
PW SMART Ped X-ing
PW Smith Ranch Road and Lucas Valley Road Resurfacing Project
PW Solar RRFB System Installations for Crosswalk Safety Improvements
PW South Merrydale Road - Civic Center Drive Connector Pathway Project
PW Southern Heights Boulevard Bridge Replacement Project
PW Southern Heights Road Repair
PW Southern Heights, Courtright & Pearce Retaining Walls Project
PW Spinnaker Baypoint Parking Striping Project
PW Spinnaker Point Parking Modifications Project
PW Spinnaker Point Post Construction Project
PW Sprung Structure Installation; Essential Facilities
PW Stagecoach Road Defensible Space Fuel Reduction
PW Station 51 Demo Nederman Equipment; Essential Facilities
PW Storm Water Ditch Clamming 2017
PW Storm Water Pump Station Cellular Upgrade
PW Storm Water Pump Station Repair 2017
PW Street Resurfacing 2015-2016; Ghilotti Construction
PW Street Resurfacing 2016-2017 Contractor
PW Street Resurfacing 2018-2019 Project
PW Streetlight Audit & Design Project
PW Sun Valley Basketball Court Resurfacing
PW Sun Valley Park Playground Equipment
PW Sun Valley Park Playground Project
PW Supplemental Freeway Maintenance Agreement; First Amendment
PW Tamalpais Avenue Queue Cutter Improvement Project
PW Tamalpais Avenue Queue Cutter Improvements Project - Vehicle Loop Installation
PW Terra Linda Community Center Roof Walking Pad Installation
PW Terra Linda Ped Easement Walkway Repair
PW Third & Irwin Street Overlay
PW Third and Irwin Street Intersection Improvements Project
PW Third and Union Street Resurfacing
PW Third Street at Hetherton Street Improvements Project
PW Third Street CMP Manhole Replacement
PW Third Street Pedestrian Improvements Project
PW Third Street Rehabilitation Project - Contract Change Order No. 2
PW Third Street Safety Improvements Project; CC 02-07-22
PW Third Street Safety Improvements Project; CC 04-18-22
PW Third Street Sidewalk Grinding
PW Third Street Sidewalk Grinding; First Amendment
PW TL Community Center Auditorium Flooring Replacement
PW Traffic Detection System Installation
PW Traffic Management System Upgrades
PW Traffic Signal Mast Arm Pole (Northbound)
PW Traffic Signal Mast Arm Pole Replacement
PW Traffic Signal Modifications C and D Streets; Project No. 11378
PW Traffic Signal Poles Installation
PW Transportation Fund for Clean Air Funding Agreement
PW Tree Routine Services; Sidewalk Repair Program
PW Various Pump Station Maintenance; Pump Repair Services
PW Various Storm Drain Repairs
PW Vegetation Management; Roadside Clearance Phase 2
PW Victor Jones Park Improvements
PW Video Detection Cameras on Bellam Corridor
PW Village at Loch Lomond Marina Groundskeeping Services
PW West End Village Re-bid
PW West St Marquard Storm Drain Improvements
PW Windward Way Landfill Well Installations
PW Windward Way Security Cameras